Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “End Date”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

245 records · Page 14

Physics Division Strategic Plan Fiscal Years 2020-2024

The vision of the Physics Division (PHY) at Argonne National Laboratory is to continue enhancing its role as a world-leading institution in basic nuclear physics research and its applications. Key to this vision is for PHY to continue to safely and effectively operate and evolve the capabilities of the Argonne Tandem Linac Accelerator System (ATLAS) facility to best serve its users. ATLAS is the Department of Energy (DOE) accelerator facility for low-energy nuclear physics research. The research carried out by PHY covers many themes in contemporary science but can be distilled into five areas of focus. These themes are interconnected, with continuously evolving synergies between the various groups and facilities in PHY and the broader Laboratory. This five-year strategic plan serves to illustrate our current capabilities and new directions related to these five areas of focus (ATLAS also develops an independent strategic plan): Accelerator research and design. The goal of this theme is to design, fabricate, test, and implement novel accelerator systems, with a focus on high-intensity ion and electron systems. These R&D activities have led to enhancements in the ATLAS accelerator system. Among others, the division’s accelerator systems are in use or planned for use at Fermilab, the Advanced Photon Source, and in a broad variety of applications at the Facility for Rare Isotope Beams (FRIB). Atom trapping and fundamental symmetries. The goal of this theme is to explore and exploit the uses of advanced laser cooling and trapping techniques to manipulate atoms. There are three main areas of focus. First is in the application of the atom trap trace analysis (ATTA) technique for age determination of groundwater and ice by using radio-krypton dating. The next two trapping-based programs involve tests of fundamental symmetries in nature: the cooling and trapping of radium-225 with the aim of determining limits on an observation of its electric dipole moment and precision measurements of the beta decay properties of helium-6 to set limits on the tensor coupling constant. This is complemented by measurements of similar properties in lithium-8 and boron-8. Nuclear astrophysics. The goal of this theme is to enhance our understanding of how elements are created in the universe via explosive nucleosynthesis and how stars evolve. To meet the challenges of this theme, many of the capabilities of ATLAS are being enhanced, including the development of new beams through a new in-flight separator (RAISOR) and the anticipated neutron-generator upgrade of the Californium Rare Isotope Breeder Upgrade facility (nuCARIBU). These are coupled to state-of-the-art instruments such as the Canadian Penning Trap, Helical Orbit Spectrometer, Gammasphere, GRETINA, Multi-Sampling Ionization Chamber, the Fragment Mass Analyzer, and Argonne Gas-filled Fragment Analyzer, and a new low-background experimental area for decay studies. Nuclear structure. The goal of this theme is to understand the structure of nuclei, both stable and radioactive, in terms of single-particle properties, their shapes, and the dynamics governing reactions between them. These include questions such as what are the limits of nuclear stability and what are the properties of super heavy nuclei. As with the nuclear astrophysics theme, the capabilities of ATLAS, guided by the ATLAS user community, are continuously being enhanced to this end. The Division has strategic initiatives to play a leading role in the development of instrumentation and research programs at the FRIB. Quantum chromodynamics (QCD) and hadron physics. The goal of this theme is to lead major research programs focused on revealing the quark and gluon structure of protons, neutrons, nuclei, and short-lived mesons and baryons. These involve major programs at Jefferson Lab, Fermilab, and smaller facilities. They are complemented by theoretical endeavors centered on the question of how hadrons and their properties emerge from QCD. Out of these activities arise strategic initiatives to play a major role in the forthcoming Electron-Ion Collider (EIC).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

BWR Spent Nuclear Fuel Acquisition and Testing to Support DOE-NE High Burnup Spent Fuel Data Project

The Office of Spent Fuel and Waste Disposition (SFWD) within the US Department of Energy (DOE) Office of Nuclear Energy (NE) established the Spent Fuel and Waste Science and Technology (SFWST) campaign to conduct research and development (R&D) activities related to the storage, transportation, and disposal of spent nuclear fuel (SNF) and high-level radioactive waste. The SFWST program was created within SFWD to address issues of extended or long-term SNF storage and transportation. Some near-term objectives of SFWST are to use a science-based, engineering-driven approach to: Support the enhancement of the technical bases to support the continued safe and secure dry storage of SNF for extended periods; Support the enhancement of the technical bases for retrieving SNF after extended dry storage; Support the enhancement of the technical bases for transporting high burnup (HBU) fuel and transporting low burnup fuel and HBU fuel after dry storage DOE-NE, in partnership with the Electric Power Research Institute, developed the High Burnup Spent Fuel Data Project to perform a large-scale demonstration and laboratory-scale testing of HBU pressurized water reactor (PWR) fuels (exceeding 45 gigawatt-days per metric ton of uranium [GWd/MTU]). Under this project, 25 sister rods—which are rods that have the same design, power histories, and other characteristics—were removed from assemblies at the North Anna Nuclear Power Station and sent to Oak Ridge National Laboratory (ORNL) in January 2016. ORNL performed detailed nondestructive examination (NDE) on all 25 rods. The NDE consisted of visual examinations, gamma and neutron scanning, profilometry and rod length measurements, and eddy current examinations. After completing the NDE, 10 of the sister rods were delivered to Pacific Northwest National Laboratory (PNNL) in a NAC International, Inc. legal-weight truck cask in September 2018 for destructive examination (DE). To date, SFWD work has focused on the PWR fuel that is part of the Sister Rod Test program. No boiling water reactor (BWR) fuel has been tested in the program, and the data needs that were identified for the PWR fuel have not been collected for BWR fuel. The goal to obtain six to nine BWR rods and test them at ORNL will support closing this important data gap. BWR fuel comprises approximately 56% of the total fuel assemblies currently in storage at nuclear power plants in the United States. BWR nuclear fuel and cladding designs and manufacturing are significantly different from PWRs. Differences include the following: BWR fuel pellets are larger than PWR pellets; Variations of Zircaloy-2 (including liners) are used instead of the Zircaloy-4 cladding materials used in PWRs; Clad manufacturing and stress-relief processes are different between PWRs and BWRs; The fuel rod dimensions are different because larger rod diameters and thicker cladding are used in BWRs; BWR fuel typically has lower internal rod pressures and sees vastly different operating conditions than PWR fuel (i.e., two-phase flow); BWR assemblies are “canned,” meaning each assembly is surrounded by a metal fuel channel; BWR cladding is often composed of an inner pure Zr liner that has widely different mechanical properties than the Zircaloy-2 alloy and exhibits a stronger affinity for hydrogen; The BWR SNF generally has more total hydrogen in the cladding/liner than typical PWR fuel; The construction of the PWR and BWR assemblies is vastly different; BWR rods are solidly attached to the assembly nozzles and experience a much different vibration and shock load than PWR rods, which are “floating” within a grid system attached to guide tubes, and the rods sit loosely on the bottom end plates. These numerous differences will affect the way the BWR SNF responds under dry storage preparation processes (e.g., vacuum drying) and during transportation. The results collected in the PWR experimental program must be compared with a subset of similar data collected on BWR SNF to establish a technical basis for whether the larger PWR database is sufficient to bound the BWR SNF end-of-life conditions as is currently assumed for several fuel/clad properties. Changes that occur in both fuel types at HBU could exacerbate any mechanical property differences. As the fuel burnup increases, several changes occur that might affect the performance of the fuel, cladding, and assembly hardware in storage and transportation. These changes include increased cladding corrosion layer thickness, increased cladding hydrogen content, increased cladding creep strains, increased fission gas release, and the formation of the HBU structure at the surface of the fuel pellets. The Nuclear Regulatory Commission (NRC) limits the current maximum rod-averaged burnup to 62 GWd/MTU due to these changes and the lack of data at higher burnups.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

QUBO formulations for training machine learning models

Abstract Training machine learning models on classical computers is usually a time and compute intensive process. With Moore’s law nearing its inevitable end and an ever-increasing demand for large-scale data analysis using machine learning, we must leverage non-conventional computing paradigms like quantum computing to train machine learning models efficiently. Adiabatic quantum computers can approximately solve NP-hard problems, such as the quadratic unconstrained binary optimization (QUBO), faster than classical computers. Since many machine learning problems are also NP-hard, we believe adiabatic quantum computers might be instrumental in training machine learning models efficiently in the post Moore’s law era. In order to solve problems on adiabatic quantum computers, they must be formulated as QUBO problems, which is very challenging. In this paper, we formulate the training problems of three machine learning models—linear regression, support vector machine (SVM) and balanced k-means clustering—as QUBO problems, making them conducive to be trained on adiabatic quantum computers. We also analyze the computational complexities of our formulations and compare them to corresponding state-of-the-art classical approaches. We show that the time and space complexities of our formulations are better (in case of SVM and balanced k-means clustering) or equivalent (in case of linear regression) to their classical counterparts.

97 MATHEMATICS AND COMPUTING↗

Demonstration of μCHP in Light Commercial Hot Water Applications

Internal combustion engine driven combined heat and power (CHP) systems produce power while the waste heat is recovered and used for another purpose. For µCHP systems (less than 50kWe output) overall efficiencies can reach over 90% for products currently on the market throughout the world. On a fuel basis this offers an advantage over using grid-based power and another fuel for heat. Additionally, the cost of natural gas on an energy unit basis is significantly less expensive than electric power. This difference can lead to substantial savings for the end user of a CHP system. In some parts of the world, particularly Germany and Japan, µCHP has become a common part of the heat and distributed generation equipment mix. Market analysis conducted in 2012 showed that in North America there is potential of a 5,300 units per year market for µCHP, resulting in an annual energy savings of approximately 13.5 TBtu and more than $84 million in annual customer savings. However, µCHP still has not seen much market penetration in North America. This study helps to identify some of the reasons why, address roadblocks that still need to be overcome and provide experience to established best practices. Nine commercial sites were initially identified (fitness club, surgical center, senior community, resort and spa, commercial laundry, two multi-family housing, restaurant and manufacturing facility). Systems from two different manufacturers were installed at five sites total, but due to unforeseen circumstances, only three of those sites were finally commissioned: test data were collected by Oak Ridge National Laboratory. While not all systems were installed as intended, the project resulted in the following key findings: Micro combined heat and power is an unfamiliar technology for building owners and plumbing and electrical contractors that serve the buildings most suited for µCHP. Manufacturers will need to be aggressive in providing training and providing broad support to successfully bring the technology to market.; The proper integration of µCHP into other building systems is the most critical part of a successful installation. Manufacturers will need to be able to provide the expertise to train, advise and support the mechanical contractors during the design and installation of the heat integration system.; Regulations governing µCHP varies across the country. There are a few UL standards (UL 2200 and UL 1741) that apply nationally. Emissions are governed by EPA except in California where the California Air Resources Board (CARB) has established their own standard. Requirements that dictate installation and interconnection are dependent on local building codes and local utility processes and requirements. Some out of date building codes do not offer clear guidance for these requirements, leading to confusion. This makes developing training and determining broadly applicable best practices difficult.; Installation costs of µCHP are a key factor in making an installation successful. It is critical that these costs and all national, state and local regulations be understood and accounted for by all parties involved in the installation before a project is undertaken.; A robust customer service organization is important to meet the needs of the customers. These systems require annual maintenance and service and local capability is needed to keep costs inline.

03 NATURAL GAS↗

Laser Confocal Microscopy Uncertainty Quantification Study

At Los Alamos National Laboratory (LANL), the Storage Safety and Engineering (SSE) team completes annual surveillance on a subset of in-use interim nuclear material storage containers in fulfilment of requirements outlined in DOE Manual M 441.1-1. The containers are selected through several methods, such as subject matter expert judgement, random selection, and trending items. Following these selections, the SSE team has the capacity to complete surveillance on 15-20 containers each fiscal year, composed of a combination of SAVY-4000 and Hagan storage containers. Through previous work, the stainless-steel components of the containers have been identified as life limiting components, with an emphasis on the thin-walled bodies. The team is focused on understanding the extent of general and pitting corrosion, due to observations of extensive corrosion from stored contents and bag-out-bag degradation. Quantifying corrosion effects on the thin-walled stainless steel container bodies, and understanding potential impacts to the respective design release rates and design qualification release rates is paramount to the team. To date, destructive examination (DE) has proven to be the most insightful method for developing an understanding on the extent of corrosion on used containers. To standardize this process, the SSE team developed a destructive examination guide for analyzing stainless steel components of the containers. Corroded containers of interest are identified during surveillance activities and set aside for sectioning and characterization. Following sectioning, a major step in the DE workflow is the utilization of laser confocal microscopy for scanning corroded samples of interest and extracting data on pits, such as count, depth, and equivalent diameter. Adhering to the techniques outlined in the DE guide, analysis has been completed on two Hagans and one SAVY-4000 container, with the maximum pit depth recorded as 139.1 ± 22.82 μm on a 17.5 year old Hagan. The findings from the completed destructive examinations will be utilized to support lifetime extension efforts of the SAVY-4000 as the team can better estimate corrosion rates and effects over time based on stored contents and age. Due to the implications of observing extreme pit depths that approach the nominal container body thickness of .0299 inches (0.759 mm) or minimum container thickness of 0.236” (0.6 mm), high confidence in the LCM measurements is desired. Through testing outlined in, it was concluded that the total error ascribed to the 20x objective when conducting large image mapping on the Keyence VK-X3050 laser confocal microscope (LCM) relative to a 50x objective (reference) is 16.4% (± 8.73%). For shallow features on the order of pristine SAVY surface defects (i.e. 5 μm), this uncertainty is appropriate. However, this conservative estimate of total error poses a fundamental concern for pit depths that approach the thickness of the measured samples. That is, with the measurement uncertainty currently employed on all measurements, the LCM would be unable to resolve if a pit with a depth of 515 μm is through wall. Standard step height samples were procured and used in the present study to assess the resolution and repeatability of height measurements. Understanding the resolution and repeatability of height measurements was the first focus of the team as it relates directly to pit depth, which is of primary concern. Calibration gratings were procured to evaluate the resolution and repeatability of measurements in the X and Y axes of the LCM stage. The results of the depth uncertainty study were conducted first and presented in the subsequent sections. The planar uncertainty study is appended to the depth study with conclusions from both summarized at the end of the report.

36 MATERIALS SCIENCE↗

Characterization of Orography-Influenced Riming and Secondary Ice Production and Their Effects on Precipitation Rates Using Radar Polarimetry and Doppler Spectra (CORSIPP-SAIL)

The Characterization of Orography-Influenced Riming and Secondary Ice Production and Their Effects on Precipitation Rates Using Radar Polarimetry and Doppler Spectra (CORSIPP) project was conducted to help improve the understanding of precipitation formation in orographically influenced terrain. Special focus is put on the two processes of riming and secondary ice production and their external drivers. Two instruments, a polarimetric W-band simultaneous transmission simultaneous reception (STSR) Doppler cloud radar manufactured by Radiometer Physics GmbH (RPG, instrument type RPG-FMCW-94-DP), from now on named LIMRAD94, and the video in situ snowfall sensor (VISSS), were deployed at the U. S. Department of Energy Atmospheric Radiation Measurement (ARM) user facility’s Surface Atmosphere Integrated Field Laboratory (SAIL) site in Gothic, Colorado between November 2022 and June 2023 during the second SAIL winter. Note that the exact dates of data availability differ between the instruments. Both instruments arrived at Gothic on November 2, 2022, 09:20 local time. VISSS, described by Maahn et al., is equipped with two camera systems with telecentric lenses. The two cameras are at a 90° angle to each other. This configuration allows for size-independent measurements by capturing images of hydrometeors from two sides at a high frame rate of 250 Hz. With a minimum detection size of 200 μm, VISSS provides valuable insights into particle size, number, shape, complexity, and fall velocity. The VISSS was deployed on the grassland next to the ARM facility with the amazing help of the ARM employees on site. The setup started on November 2, 2022, and was finished on November 5, 2022, without major problems. VISSS measurements were started on November 6, 2022. LIMRAD94 was installed on a scaffolding platform near Orehouse (Gothic) on November 9, 2022, with the great help of RMBL staff. LIMRAD94 was mounted on a cold temperature scanner prototype. After a short test of the setup on November 9, 2022, the digital control of the scanner elevation stopped working for (at that time) unknown reasons. All attempts to resolve the problem failed. This malfunction made it impossible to operate LIMRAD94 in scanning mode. The scanner was then manually moved to zenith pointing mode and between November 10 and November 15, 2022, vertical observations for polarimetric calibration were performed. On November 15, 2022, after the polarimetric calibration was applied, the scanner was manually moved to 40° elevation with azimuthal view towards the Ka-band ARM Zenith Radar (KAZR) and measurements were continued at constant elevation. Investigation of the scanner malfunction on February 6, 2023, by Benn Schmatz revealed a disengagement between the cogwheel of the elevation motor and the cogwheel moving the scanner in elevation. This mechanical issue was temporarily solved by re-engaging the cogwheels. This made the scanner operational again for about four weeks, until mechanical force disengaged the cogwheels again on March 15, 2023. This repeated scanner failure remained undetected for about three weeks until April 8, 2023; during this time the scanner was stuck at 72° elevation. However, the radar software continued to produce data files falsely indicating that the scanner was still operational. After the scanner failure was noticed, scanning was stopped again, and we returned to constant elevation measurements. On May 15, 2023, the cogwheels of the elevation motor were secured with additional screws sent by the manufacturer. At some point in May, the cogwheels of the azimuth motor were also disengaged by mechanical force, which still allowed for range height indicator (RHI) but no plan position indicator (PPI) scans in the last weeks of the campaign. The azimuth motor was repaired in Germany after the end of the campaign. Throughout the campaign, RMBL and ARM staff kept the radar and the VISSS free of snow.

54 ENVIRONMENTAL SCIENCES↗

Gasification of Coal and Biomass: The Route to Net-Negative-Carbon Power and Hydrogen

One promising process that is a candidate for meeting the goals of the US Department of Energy’s 21st Century Power Plant initiative is to gasify a mixture of coal and biomass to yield a syngas, which can have CO2 removed and then be used to produce hydrogen as well as an off-gas that can be used to flexibly produce power. This concept would overall be carbon net-negative and readily meet the 21st Century Power Plant initiative targets of smaller scale MW generation, high ramp rates and turndown, feedstock flexibility, and high efficiency—at a reasonable cost. Moreover, adding the large-scale production of “ultra-green” hydrogen yields a system tailored for the coming hydrogen economy, providing long-term energy storage and an attractive co-product for sale. The objective of the work being led by the Electric Power Research Institute, Inc. (EPRI), with support by Bechtel Corporation (Bechtel), Gas Technology Institute (GTI), Hamilton Mauer International, Inc. (HMI), Nebraska Public Power District (NPPD), NexantECA, Inc. (Nexant), and Wärtsilä, is to perform a front-end design and engineering (FEED) study on an oxygen-blown gasification system coupled with water-gas shift, pre-combustion CO2 capture, and pressure-swing adsorption working off a coal/biomass mix to yield high-purity hydrogen and a fuel off-gas that can generate power. Several designs are being considered that will be capable of producing 50 MW net from a flexible generator, over 8500 kg/hr of hydrogen, and net-negative CO2 emissions, at an efficiency of 50% net HHV. The plant would be hosted at an NPPD site, where opportunities for enhanced oil recovery and sequestration have been investigated and the need for low-carbon power and hydrogen is imminent. The principal biomass to be used is corn stover—prevalent in Nebraska where the plant will be located—mixed with Powder River Basin (PRB) coal, necessitating a gasifier that can use this feedstock and be flexible to allow other types. Waste plastics will also be reviewed for use. Two oxygen-blown gasifiers have been identified as candidates that have done testing with biomass including corn stover: the GTI gasifier—a high-pressure, fluidized-bed type—and HMI’s, a lower pressure moving-bed type. Both have relative advantages that were investigated in the Phase I design study, with a resultant down select of one system for which the FEED will be performed in Phase II. The technical tasks for the project are: • Design Development: Completion of design activities necessary to provide inputs for the FEED study. Multiple design cases will be assessed with the selection of the optimal one for the FEED. • Investment Case Preparation: Development of the draft investment case for the proposed process with business cases performed for the proposed host site and two other locations. • Host Site Selection: Evaluation of the two potential host sites within NPPD’s portfolio to select the preferred candidate based on technical, economic, and environmental considerations. • Environmental Information Volume (EIV) Development: Completion of the EIV for the host site. • FEED Study: Completion of a FEED study based on the design selected in Phase I. A Greenhouse Gas Life Cycle Analysis will also be performed for the process. • Update Investment Case: Finalization of the investment case based on findings from the FEED. The advantages of the proposed project are significant. Having an engaged U.S. power utility willing to provide a host site that will produce energy from coal plus a deep and experienced team is critical; the process meets all the goals of DOE’s 21st Century Power Plant initiative at an estimated total plant cost of ~$880M and a production cost of hydrogen of ~$2/kg-H2 while producing net-negative carbon power. If developed, this process has real commercial potential in the United States—supported by EPRI’s initial review of the considerable interest from selected U.S. utilities—and elsewhere around the globe. The process has fewer environmental hurdles compared to other concepts, lowering regulatory and protest risks—providing a pathway to preserving the viability of a critical indigenous energy source by transforming its use to match a changing world. This presentation outlines the motivation for the effort, summarizes project plans, work completed to date, results of the Phase I effort and, and detailed work scope for the remainder of the project in the Phase II FEED effort.

01 COAL, LIGNITE, AND PEAT↗

Gasification of Coal and Biomass: The Route to Net-Negative-Carbon Power and Hydrogen

One promising process that is a candidate for meeting the goals of the US Department of Energy’s 21st Century Power Plant initiative is to gasify a mixture of coal and biomass to yield a syngas, which can have CO2 removed and then be used to produce hydrogen as well as an off-gas that can be used to flexibly produce power. This concept would overall be carbon net-negative and readily meet the 21st Century Power Plant initiative targets of smaller scale MW generation, high ramp rates and turndown, feedstock flexibility, and high efficiency—at a reasonable cost. Moreover, adding the large-scale production of “ultra-green” hydrogen yields a system tailored for the coming hydrogen economy, providing long-term energy storage and an attractive co-product for sale. The objective of the work being led by the Electric Power Research Institute, Inc. (EPRI), with support by Bechtel Corporation (Bechtel), Gas Technology Institute (GTI), Hamilton Mauer International, Inc. (HMI), Nebraska Public Power District (NPPD), NexantECA, Inc. (Nexant), and Wärtsilä, is to perform a front-end design and engineering (FEED) study on an oxygen-blown gasification system coupled with water-gas shift, pre-combustion CO2 capture, and pressure-swing adsorption working off a coal/biomass mix to yield high-purity hydrogen and a fuel off-gas that can generate power. Several designs are being considered that will be capable of producing 50 MW net from a flexible generator, over 8500 kg/hr of hydrogen, and net-negative CO2 emissions, at an efficiency of 50% net HHV. The plant would be hosted at an NPPD site, where opportunities for enhanced oil recovery and sequestration have been investigated and the need for low-carbon power and hydrogen is imminent. The principal biomass to be used is corn stover—prevalent in Nebraska where the plant will be located—mixed with Powder River Basin (PRB) coal, necessitating a gasifier that can use this feedstock and be flexible to allow other types. Waste plastics will also be reviewed for use. Two oxygen-blown gasifiers have been identified as candidates that have done testing with biomass including corn stover: the GTI gasifier—a high-pressure, fluidized-bed type—and HMI’s, a lower pressure moving-bed type. Both have relative advantages that are being investigated in the Phase I design study, with a resultant down select of one system for which the FEED will be performed in Phase II. The technical tasks for the proposed project are: • Design Development: Completion of design activities necessary to provide inputs for the FEED study. Multiple design cases will be assessed with the selection of the optimal one for the FEED. • Investment Case Preparation: Development of the draft investment case for the proposed process with business cases performed for the proposed host site and two other locations. • Host Site Selection: Evaluation of the two potential host sites within NPPD’s portfolio to select the preferred candidate based on technical, economic, and environmental considerations. • Environmental Information Volume (EIV) Development: Completion of the EIV for the host site. • FEED Study: Completion of a FEED study based on the design selected in Phase I. A Greenhouse Gas Life Cycle Analysis will also be performed for the process. • Update Investment Case: Finalization of the investment case based on findings from the FEED. The advantages of the proposed project are significant. Having an engaged U.S. power utility willing to provide a host site that will produce energy from coal plus a deep and experienced team is critical; the process meets all the goals of DOE’s 21st Century Power Plant initiative at an estimated total plant cost of ~$880M and a production cost of hydrogen of ~$2/kg-H2 while producing net-negative carbon power. If developed, this process has real commercial potential in the United States—supported by EPRI’s initial review of the considerable interest from selected U.S. utilities—and elsewhere around the globe. The process has fewer environmental hurdles compared to other concepts, lowering regulatory and protest risks—providing a pathway to preserving the viability of a critical indigenous energy source by transforming its use to match a changing world. This presentation will outline the motivation for the effort, summarize project plans, work completed to date, results of the Design Development task, and detailed work scope for the remainder of the project.

01 COAL, LIGNITE, AND PEAT↗

AGR 5/6/7 Data Qualification Report for ATR Cycles 162B through 168A

This report provides the qualification status of experimental data for the Advanced Gas Reactor (AGR) 5/6/7 fuel irradiation. AGR-5/6/7 was conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) in support of development and qualification of tri-structural isotropic (TRISO) low-enriched fuel for use in high temperature gas-cooled reactors. The objectives of the AGR-5/6/7 experiments are to: (i) irradiate reference-design fuel particles to support fuel qualification, (ii) establish operating margins for the fuel beyond normal operating conditions, and (iii) provide irradiated-fuel performance data and irradiated-fuel samples for post-irradiation examination (PIE) and safety testing. The test train contains five separate capsules that were independently controlled and monitored. Each capsule contains multiple 12.51-mm-long compacts filled with low enriched uranium carbide/oxide (UCO) TRISO fuel particles. The primary objective of the AGR-5/6 test (Capsules 1, 2, 4, and 5) is to verify successful performance of the reference-design fuel under normal operating conditions. The AGR-7 test (Capsule 3) was designed to explore fuel performance at higher temperatures to demonstrate the capability of the fuel to withstand conditions beyond normal operating conditions in support of plant design and licensing. AGR 5/6/7 will also provide irradiated-fuel performance data on fission-gas release from failed particles during irradiation. The AGR-5/6/7 capsules were irradiated in the ATR northeast flux trap location. The experiment began on February 16, 2018 and ended on July 22, 2020, spanning nine ATR cycles over two and a half years. Thus, the AGR-5/6/7 fuel compacts were irradiated for a total of 360.9 effective full power days. The AGR 5/6/7 experiment was able to remain in the reactor core during all three Powered Axial Locator Mechanism (PALM) cycles (163A, 165A, and 167A) without overheating its fuel compacts. This report includes irradiation monitoring data from nine ATR Cycles: 162B, 163A, 164A, 164B, 165A, 166A, 166B, 167A, and 168A, as stored in the Nuclear Data Management and Analysis System (NDMAS). During irradiation, data records consisted of instantaneous measurements recorded every minute and provided by text files automatically every 2 hours. The AGR 5/6/7 data streams addressed in this report include thermocouple (TC) temperatures, sweep gas data (flow rates [capsule inlet, outlet, and downstream at detector], pressure, and moisture content), and Fission Product Monitoring System (FPMS) data (release rates and release to birth rate ratios [R/Bs]) for each of the five capsules. A total of 94,989,908 TC temperature and sweep gas data records were received and processed by NDMAS for AGR 5/6/7 irradiation. Of these records, 41,593,387 (or 43.7% of the total) met data collection and accuracy requirements and are labeled as Qualified. A total of 57,746,693 TC temperature readings were captured from 54 installed TCs. Among them, 10,034,676 TC temperature records (only 17.4%) were Qualified and 47,701,371 TC temperatures (or 82.6%) are Failed due to 48 TC failures (63.5%) and due to missing values (19.1%). To assess performance of the operational TCs, analysis of daily correlations between TCs found no evidence of virtual junction failure for any TCs. Analyses on control charts of TC temperature differences revealed trending in TC readings for TC2, 4, 5, and 13 in Capsule 3, but there is no conclusive indication of TC drift failure that caused those trends. Therefore, TC control charts are not used to disqualify TC data, but only for users’ consideration. For sweep gas flow rates, a total of 31,519,747 gas flow records (84.4%) are Qualified for use for AGR-5/6/7 experiment; 5,723,468 gas flow records (15.4%) are Failed due mostly to missing values; and 74,641 high sweep gas flow rates (0.2 %) are Trend. A large number of Failed missing TC temperature and gas flow values were caused by an error in the data output script that outputted a ‘NULL’ value when values were unchanged. This problem was fixed during the outage of Cycle 166B, which led to a substantially decreased number of missing values during the last three cycles. Nonetheless, a large amount of non-missing data remained because of the high data acquisition frequency (1-minute) and still provided sufficient data to effectively monitor the experiment as designed. For FPMS data, NDMAS received and processed fission product release and R/B data for nine ATR cycles, when ATR core reached full power during AGR 5/6/7 irradiation. These data consist of 110,388 release rate records and 110,388 R/B records for the twelve radionuclides (Kr 85m, Kr 87, Kr 88, Kr 89, Kr 90, Xe 131m, Xe 133, Xe 135, Xe 135m, Xe 137, Xe 138, and Xe 139) for each of the five capsules. Equivalent numbers of uncertainty records associated the release rates and R/B values were provided. To date, qualification status of the FPMS data stored in the NDMAS dat

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Combined Mesonet and Tracker

Title: Combined Mesonet and Trackers (UNL Mobile Mesonets) Authors University of Nebraska PI: Adam Houston, UNL Professor (ahouston2@unl.edu) Mailing Address: 126 Bessey Hall P.O. Box 880340 Lincoln, NE 68588-0340 CoMeT Overview The University of Nebraska-Lincoln operates three Combined Mesonet and Tracker (CoMeTs). CoMeTs are Ford Explorers (model years 2015, 2017, and 2019) with forward-mounted suites of meteorological sensors and dual moonroofs, combining the capability of a mobile mesonet to collect near-surface observations with the capability of an unmanned aircraft systems (UAS) tracker vehicle, which enables an observer in the second row of seats to see the aircraft and maintain compliance with Federal Aviation Administration policies on UAS operation. The CoMeTs collect observations of slow temperature and humidity at ~2 m above ground level (AGL) using a Vaisala HMP155A, fast temperature at ~2 m AGL using a Campbell Scientific 109SS-L thermistor, pressure at ~2.5 m AGL using a Vaisala PTB210, wind speed and direction at ~3.25 m AGL using an R.M. Young 05103 propeller anemometer, and vehicle heading using a KVH Industries C-100 fluxgate compass (Barbieri et al. 2019). The HMP155A and 109SS-L thermistor are shielded and aspirated within a U-tube (Waugh and Frederickson 2010; Houston et al. 2016). This list of sensors is also included in the CoMeT data file metadata. Manufacturer specifications for these instruments are given in Table 1 of Hanft and Houston (2018). The reported measured quantities are summarized below.CoMeT-3 was funded through an equipment allocation included in the NSF TORUS award (AGS-1824649). Instrument Description The specific sensors included on each CoMeT are summarized in the table at the end of this section. In general each CoMeT collects observations of slow temperature and humidity at ~2 m above ground level (AGL) using a Vaisala HMP155, fast temperature at ~2 m AGL using a Campbell Scientific 109SS-L thermistor, pressure at ~2.5 m AGL using a Vaisala PTB210 barometer with a Gill pressure port, wind speed and direction at ~3.25 m AGL using an R.M. Young 05103 propeller anemometer, position using a Garmin 19x HVS receiver, and vehicle heading using a KVH Industries C-100 fluxgate compass. The HMP155 and 109SS are shielded and aspirated within a U-tube (Waugh and Frederickson 2010; Houston et al. 2016). Fast temperature and corrected RH measurements (using sensors housed within the U-tube) have a time constant of 10-12 s based on data collected across a temperature and RH shock during the CLOUD-MAP 2017 calibration/validation tests on June 26, 2017. Vehicle speed was < 10 kts for this test. CoMeT-1 CoMeT-2 CoMeT-3 Slow Temperature Slow RH Vaisala HMP155A-L20-PT Part #: 22280-7 Vaisala HMP155E Part #: E1AA11A0B1A1A0A Vaisala HMP155E Part #: E1AA11A0B1A1A0A Fast temperature Campbell Scientific 109SS-L20-PT Part #: 21448-3 Campbell Scientific 109SS-L12-PW Part #: 21448-109 Campbell Scientific 109SS-L12-PW Part #: 21448-150 Pressure Vaisala PTB-210 Part #: A1A1B Gill Pressure Port Part #: 61002 Vaisala PTB-210 Part #: A1A1B Gill Pressure Port Part #: 61002 Vaisala PTB-210 Part #: A1A1B Gill Pressure Port Part #: 61002 Wind RM Young 05103-L20-PT Part #: 18435-310 RM Young 05103-L20-PW Part #: 18435-244 RM Young 05103-L20-PW Part #: 18435-244 GPS Garmin GPS 19x HVS (NMEA 0183) Part #: 010-01010-00 Garmin GPS 19x HVS (NMEA 0183) Part #: 010-01010-00 Garmin GPS 19x HVS (NMEA 0183) Part #: 010-01010-00 Compass KVH C-100 Part #: 01-0177-15 KVH C-100 Part #: 01-0177-15 KVH C-100 Part #: 01-0177-15 Logger Campbell Scientific CR6-NA-XT-SW Part #: 28385-9 Campbell Scientific CR6-WIFI-XT-SW Part #: 28385-6 Campbell Scientific CR6-WIFI-XT-SW Part #: 28385-6 Data Collection and Real-Time Processing The reported measured quantities are summarized in the table below. Quantity Units Source Epoch time Seconds GPS Latitude and longitude Degrees GPS Altitude m GPS Pressure hPa PTB210 Temperature (fast) deg C 109SS-L Temperature (slow) deg C HMP155 RH (slow) % HMP155 Vehicle speed m/s GPS Vehicle heading deg C-100 and GPS In addition to the measured variables, several derived variables are calculated. Corrected/fast relative humidity (%) Relative humidity is adjusted to the fast temperature following Richardson et al. (1998) and Houston et al. (2016). Water vapor mixing ratio (g/kg) Dew point temperature (&deg;C) Potential temperature (Kelvin) Virtual potential temperature (Kelvin) Equivalent potential temperature (Kelvin) Regular intercomparisons between all three CoMeTs were performed during TORUS 2019. Comparisons were also conducted between CoMeT-1 and CoMeT-2 during LAPSE-RATE (2018) on 14 July. In these intercomparisons, the vehicles were parked adjacent to each other aligned perpendicular to (and facing into) the wind. To minimize engine heating effects, intercomparisons were only conducted when the wind speed was >10 kts. Data Format Original data files for each deployment are saved as text files and then converted to NetCDF. NetCDF versions have units that are CF compliant and may not match the original units in the txt files. The naming convention for the NetCDF files is as follows: UNL.CoMeT3.{deployment date YYYYMMDD}.{start time of observation collection in UTC HHMM}.L2.{post-processing codes}.cdf example: UNL.CoMeT3.20190627.1931.L2.g1.f1.cdf Post-processing codes are included to track modifications to the raw data. These codes are closely connected to error flags associated with each record. Each letter corresponds to a particular instrument: g: GPS p: Barometer tf: Fast temperature ts: Slow temperature rh: Relative humidity f: Compass w: Wind monitor a: All instruments Each number corresponds to a particular post-processing action described more below. Measured and derived variables are included in the following table. Variable Heading Standard Name Units time Time seconds since 00:00:00, 01-01-1970 Alt Altitude meters lat Latitude degrees north lon Longitude degrees east fast_temp Air Temperature kelvin slow_temp Air Temperature kelvin pressure Air Pressure pascals logger_RH Relative Humidity percent calc_corr_RH Relative Humidity percent wind_speed Wind Speed meters per second wind_dir Wind From Direction degrees vehicle_dir Vehicle Direction degrees dewpoint Dew Point Temperature kelvin mixing_ratio Humidity Mixing Ratio g/g theta Air Potential Temperature kelvin theta_v Virtual Potential Temperature kelvin theta_e Equivalent Potential Temperature Kelvin error_flag The error_flag variable is a string that matches the post-processing codes listed above. All instruments will have an associated code, but will have a &ldquo;0&rdquo; if the datum is unchanged from the initial processed value. Error Codes The following table summarizes the error codes for data collected before 2020: Error Code Relevant CoMeT Description g1 1,2,3 Exact correction. GPS position and time reprocessed from raw data g2 1 As far as we can tell this is an exact correction to an error in the GPS time. During the correct time periods the time suddenly went backwards ~250s and stayed at this offset for 750s when it corrected itself. The offset was applied to the &ldquo;time warp&rdquo; period. p1 2 Approximate correction. Hole in the pressure tube connecting the pressure port to the barometer. Resulted in erroneously low air pressure measurements when the vehicle was in motion. Derived variables recalculated (dew point temperature [e depends on qv and p], water vapor mixing ratio, potential temperature, virtual potential temperature, equivalent potential temperature) a1 3 Exact correction. Missing data reprocessed from raw data a2 1 Bug fix to bias correction for ts1, ts2, and rh1: water vapor mixing ratio was off by a factor of 10 and virtual potential temperature was wrong because of this. f1 3 No correction, missing data. Fluxgate compass inoperable. Wind speed and direction calculated using GPS-derived vehicle heading instead. rh1 1 Approximate correction. Constant bias of +1.7% removed from relative humidity. Derived variables recalculated (corrected/fast relative humidity, dew point temperature, water vapor mixing ratio, virtual potential temperature, equivalent potential temperature) ts1 1 Approximate correction. Constant bias of +0.6 K removed from slow temperature. Derived variables recalculated (corrected/fast relative humidity, dew point temperature, water vapor mixing ratio, virtual potential temperature, equivalent potential temperature) ts2 1 Approximate correction. Constant bias of +1.0 K removed. Derived variables recalculated (corrected/fast relative humidity, dew point temperature, water vapor mixing ratio, virtual potential temperature, equivalent potential temperature) References Bolton, D., 1980: The Computation of Equivalent Potential Temperature. Mon. Wea. Rev., 108, 1046&ndash;1053, https://doi.org/10.1175/1520-0493(1980)108<1046:TCOEPT>2.0.CO;2. Hanft, W., and A. L. Houston, 2018: An Observational and Modeling Study of Mesoscale Air Masses with High Theta-E. Mon. Wea. Rev., 146, 2503&ndash;2524, https://doi.org/10.1175/MWR-D-17-0389.1.Wexler Houston, A. L., R. J. Laurence III, T. W. Nichols, S. Waugh, B. Argrow, and C. L. Ziegler, 2016: Intercomparison of unmanned aircraft-borne and mobile mesonet atmospheric sensors. Journal of Atmospheric and Oceanic Technology. 33, 1569-1582, doi: 10.1175/JTECH-D-15-0178.1. Lowe, P. R., 1977: An Approximating Polynomial for the Computation of Saturation Vapor Pressure. J. Applied Meteorology, 16, 100&ndash;103. Richardson, S. J., S. E. Frederickson, F. V. Brock, and J. A. Brotzge, 1998: Combination temperature and relative humidity probes: Avoiding large air temperature errors and associated relative humidity errors. Preprints, 10th Symp. On Meteorological Observations and Instrumentation, Phoenix, AZ, Amer. Meteor. Soc., 278&ndash;283. Waugh, S., and S. E. Frederickson, 2010: An improved aspirated temperature system for mobile meteorological observations, especially in severe weather. 25th Conf. on Severe Local Storms, Denver, CO, Amer. Meteor. Soc., P5.2. [Available online at https://ams.confex.com/ams/25SLS/techprogram/paper_176205.htm.]

54 ENVIRONMENTAL SCIENCES↗

The Beam Dump eXperiment

Hadronic matter makes about 14% of the known universe. The remaining 86% is Dark Matter (DM). Since it does not interact with the ordinary matter via electromagnetic force, DM is not visible and, to date, it escaped detection. The search for Dark Matter (DM) is one of the hottest topic in modern physics. Despite the increasing number of astrophysical and cosmological observations proving the existence, so far no particle physics experiment has detected DM yet. Up to now, most of the experimental efforts have been focused on the so called WIMP (Weakly Interacting Massive Particle) paradigm, which predicts heavy DM (10 GeV-10 TeV mass range) interacting with Standard Model (SM) particles via the weak force mediators (W or Z bosons). More recently, due to the lack of clear evidence of WIMPs, other models of DM gained the interest of the physics community. These models consider Light DM particles (LDM), in MeV-GeV mass range. Among LDM theories, the Dark Photon theory predicts the existence of a Dark Sector interacting with SM particles via a new massive vector boson (Dark Photon, Heavy Photon or A0), mediator of a new force. This scenario, despite being theoretically well motivated, is remarkably experimentally unexplored. The Beam Dump eXperiment (BDX), is an approved experiment at Jefferson Lab (JLab), aiming to discover the DM predicted witihn the Dark Photon theory. The experiment uses the CEBAF (Continuous Electron Beam Accelerator Facility) 11 GeV electron beam, impinging on the JLab Hall-A beam-dump, to produce a beam of DM particles, detected by a ~ 1 m3 detector made of thallium doped cesium iodide (CsI(Tl)) crystals located ~ 20 m downstream. In order to achieve excellent background rejection, the experimental setup includes active vetos and passive shielding surrounding CsI(Tl) crystals. Given the weakness of the DM-SM interaction, the scattering of a DM particle in the BDX detector is a rare event. Therefore, the characterization of the expected background is a critical aspect of the experiment. Both cosmogenic and penetrating SM particles produced by the beam interaction in the dump contribute to the background of the experiment. While the cosmogenic contribution can be measured during the experiment when the beam is off, beam-related background can only be estimated via Monte Carlo (MC) simulations. Therefore, a careful assessment of possible systematics introduced by the MC is needed. The beam-correlated background characterization was made by measuring the muon flux produced by the interaction of the CEBAF beam with Hall-A dump in a dedicated experimental campaign in spring 2018 [1]. The comparison to the ?ux predicted by MC allowed us to validate the BDX simulation framework. The reach of BDX, i.e. the region that the experiment can probe in the LDM theory parameter space, depends critically on the background rejection capability and signal detection effciency. For this reason, the detector setup was fine-tuned through a dedicated study. The response to LDM and background events was evaluated for different setups and selection cuts. As a result of this procedure, the configuration resulting in the best sensitivity was selected [2]. The reach calculation was performed taking into account the different LDM production mechanisms, including the contribution of secondary particles produced in the beam-dump. In particular, the effect of the secondary positrons annihilation was found to be extremely significant. In the majority of the sensitivity studies, this contribution is neglected, but recent results [3] [4] demonstrated that this process significantly enhances the sensitivity of lepton beam-dump experiments. Currently, the BDX collaboration is focused on the deployment and operation of a small detector, called BDX-MINI, built to perform a preliminary physics measurement searching for LDM at JLab. This test will pave the way to the realization of the full BDX experiment. The measurement is currently ongoing but results are expected by the end of this year. During my PhD I was involved in all aspects of the BDX experiment: design, simulation, prototyping and data analysis. The main results of my work are reported in this thesis. This manuscript is organized as follows: the first Chapter provides an introduction to the theory of LDM, with particular attention to the Dark Photon paradigm; the second Chapter illustrates the BDX experimental setup, the LDM production and detection mechanisms and the expected backgrounds; Chapter 3 and 4 describe, respectively, the BDX-HODO measurement, with a detailed description of the simulations, and the BDX experimental setup and analysis cuts optimization. Chapter 5 reports about BDXMINI detector characterization, calibration and sensitivity estimate. Finally, Chapter 6 describes in detail the calculation of the secondary positron annihilation contribution to the sensitivity of BDX and other electron-beam thick-target experiment.

Marsicano, Luca↗