Co-Designing to Create Sustainable Software: How to leverage a user-centered process to co-design sustainable software with users and stakeholders.
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Explore the source record for details and available documents.
A fusion engineering demonstration facility would be the first step in the commercial fusion plant developmental pathway that aims to be an engineering demonstration of tritium self-sufficiency. One of the primary requirements for tritium self-sufficiency, as well as to ensure low plant tritium release to the external environment, is to minimize the tritium loss through the internal components, which requires accurate predictions of the tritium behavior for a wide range of materials and system conditions. This grant addressed the lack of a comprehensive model which accounts for particular conditions, such as the significance of temperature fields and neutronics information, and the systematic uncertainty quantification of associated material properties that impact tritium generation, utilization, and loss mechanisms in the blanket.
A fusion engineering demonstration facility would be the first step in the commercial fusion plant developmental pathway that aims to be an engineering demonstration of tritium self- sufficiency. One of the primary requirements for tritium self-sufficiency, as well as to ensure low plant tritium release to the external environment, is to minimize the tritium loss through the internal components, which requires accurate predictions of the tritium behavior for a wide range of materials and system conditions. This grant addressed the lack of a comprehensive model which accounts for particular conditions, such as the significance of temperature fields and neutronics information, and the systematic uncertainty quantification of associated material properties that impact tritium generation, utilization, and loss mechanisms in the blanket.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
This paper considers a leader-following consensus in the presence of unknown but bounded cyber-attacks. Specifically, we consider the following cyber-attack scenarios: (i) an attacker aims to destabilize the consensus dynamics by injecting exogenous signals to both the actuators of the followers and/or the communication network, (ii) an eavesdropper adversary aims to obtain information on the physical state of the agents. To this end, a novel resilient leader-following consensus algorithm based on a competitive interaction method is proposed. In addition, it is demonstrated that by appropriately choosing the information exchanged between the agents, the proposed control framework also enables the cooperative system to either distributively identify the compromised communication links in real-time or to protect the privacy of the physical state of the agents from the eavesdropper. Here, a numerical example is provided to illustrate the proposed resilient control algorithms.
Explore the source record for details and available documents.
Herein this paper describes a system-level view of a fully automated transit system comprising a fleet of automated vehicles (AVs) in driverless operation, each with an SAE level 4 Automated Driving System, along with its related safety infrastructure and other system equipment. This AV system-level control is compared to the automatic train control system used in automated guideway transit technology, particularly that of communications-based train control (CBTC). Drawing from the safety principles, analysis methods, and risk assessments of CBTC systems, comparable functional subsystem definitions are proposed for AV fleets in driverless operation. With the prospect of multiple AV fleets operating within a single automated mobility district, the criticality of protecting roadway junctions requires an approach like that of automated fixed-guideway transit systems, in which a guideway switch zone "interlocking" at each junction location deconflicts railway traffic, affirming safe passage. The analogous AV protection safety subsystem is defined as fail-safe equipment that monitors roadway intersections and junctions, communicates traffic signal status, perceives and communicates alerts and signals to AV connected vehicles concerning potential unsafe conditions, and performs related primary safety functions. Conclusions are drawn that the AV protection roadway intersection functions must be performed by local roadside equipment dedicated to protecting each roadway intersection and junction. Further, it is concluded that the communications technology connecting the infrastructure with the vehicle to perform this vital, fail-safe protection should meet specific functional and performance criteria.
This paper surveys the existing landscape of standards relevant to heliostats, identifies their gaps, and proposes a path forward to a comprehensive set of heliostat guidelines, technical specifications, and standards under the framework of International Electrotechnical Commission (IEC) TC 117. Gaps in existing guidelines and standards are surveyed using a three-tiered taxonomy: component-level, heliostat-level, and field-level. At each level, the gap analysis is followed by a proposal for a coordinated path forward on the development of standards. At the component level, advances in the understanding of wind loading should inform a technical specification for drives and structures. Reflectors require consolidation of measurement guidelines into existing standards documents. Communications & controls require technical standards to inform their selection and secure implementation. At the heliostat level, IEC 62817 (solar trackers) adequately characterizes drive systems, structures, and electronics, but requires adaptation to heliostats' use patterns, operating modes, and expected life cycles. IEC 62817 does not address heliostat beam quality and pointing accuracy, but the process for determining both is elaborated in the SolarPACES Guideline for Heliostat Performance Testing. This SolarPACES document requires two main modifications: adaptation to IEC language and inclusion of testing after heliostats which have undergone accelerated weathering and mechanical cycling (to understand performance degradation). At the field level, IEC 62862-4-2 addresses the function and control of heliostat fields but does not cover the statistically rigorous testing of heliostat groups, or field performance factors like security and soiling. The addition of documents under IEC-62862-4 is proposed to address this gap.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Explore the source record for details and available documents.
Horizontal Compact High Temperature Gas Reactor (HC-HTGR) is being designed by a multi-disciplinary team of nuclear, mechanical, and structural engineers under the support of a DOE-NE Advanced Reactor Demonstration Program’s Advanced Reactor Concepts-20 (ARC-20) award. The objective of this ARC-20 project is to deliver a conceptual design for the proposed HC-HTGR in 3 years and support its commercialization as a safe, low-cost HTGR. Argonne National Laboratory (Argonne) is responsible for the design and analysis of the reactor cavity cooling system (RCCS) as a safety system for passive decay heat removal of the reactor concept. This report documents the design study to derive a conceptual design study of the RCCS for the HC-HTGR. It includes the identification of the functions and requirements of the HC-HTGR RCCS, design analyses including high-level design consideration and the calculations for optimizing design space of the system with supporting component-level analysis to inform the material selection and performance of the water panel, the description of the conceptual design of the HC-HTGR RCCS derived based on the analyses results, and performance evaluation of the conceptual RCCS for the HC-HTGR. A detailed concept of the RCCS has been identified and high-level system requirements has been developed for the HC-HTGR. Design space focusing on the natural circulation loop portion of the RCCS has been investigated to optimize the system performance. The initial baseline dimensions were firstly derived based on the scoping calculations. A component level design analysis was conducted for the water panel to inform the material selection and to assess its conduction performance. A preliminary system-level performance analysis was performed for the 1/8th of the compartment of the initial baseline design of the RCCS using RELAP5-3D. To improve the system thermal performance, the RCCS design has been updated by exploring various design options by design parametric analyses. Based on the results, the conceptual design of the RCCS for the HC-HTGR has been derived, which satisfies the target performance of ~1 MWt at the elevated vessel wall temperature conditions. Transient simulations were conducted for the conceptual RCCS design for the HC-HTGR under various operation modes and heat load conditions using RELAP5-3D. The system dynamics in different operating states was investigated and the system performance under transients of interest was evaluated. The results demonstrated the overall system feasibility that the RCCS design maintains structures temperatures lower than maximum allowable temperature with sufficient system inventory without any active heat removal in the design process with certain transients addressed. The HC-HTGR RCCS will have additional design updates of subsystems or optimization of the system components during the preliminary and final design phases. Since the entire plant has not been integrated yet, this delivered conceptual design is subject to changes for integration, that require additional conceptual design activities and Quality and Assurance implementation (Q&A). The performance assessment of the RCCS for the HC-HTGR will be then revisited and optimized to finalize the system design, and the RCCS integrated primary system analysis will be utilized to simulate selective accident scenarios of interest where efforts are currently undergoing in the project.