Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DAMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Three Dimensional Analysis of the Final Design of Pier Extensions and West Guide Wall to Mitigate Local Scour Risk at the BNSF Railroad Bridge Downstream of the Prado Dam Supplemental Report

This report is a supplement to a previous report [ref] covering optimization of wedge shaped pier extensions to streamline large bluff body piers as a local scour countermeasure for the Burlington Northern and Santa Fe (BNSF) Railroad Bridge over the Santa Ana River downstream of Prado Dam in Riverside County, CA. The optimized design was tested in a 1/30 scale physical model at U.S. Army Engineer Research and Development Center (ERDC) in Vicksburg, MS, and the optimized design was used as the base for the construction design. Constructability issues having to do with both materials and site conditions including access underneath the BNSF bridge yielded a construction design that required making the pier extensions wider and either moving the western curve of the west guide wall upstream or changing its geometry.

13 HYDRO ENERGY↗

Financial Analysis of Experimental Releases Conducted at Glen Canyon Dam during Water Year 2015

This report examines the financial implications of experimental flows conducted at the Glen Canyon Dam (GCD) in water year (WY) 2015. It is the seventh report in a series examining the financial implications of experimental flows conducted since the Record of Decision (ROD) was adopted in February 1997 (Reclamation 1996). A report released in January 2011 examined WYs 1997 to 2005 (Veselka et al. 2011); a report released in August 2011 examined WYs 2006 to 2010 (Poch et al. 2011); a report released June 2012 examined WY 2011 (Poch et al. 2012); a report released April 2013 examined WY 2012 (Poch et al. 2013); a report released June 2014 examined WY 2013 (Graziano et al. 2014); and a report released September 2015 examined WY 2014 (Graziano et al. 2015). An experimental release may have either a positive or negative impact on the financial value of energy production. Only one experimental release was conducted at GCD in WY 2015; specifically, a high flow experimental (HFE) release conducted in November 2014. For this experimental release, financial costs of approximately $2.1 million were incurred because the HFE required sustained water releases that exceeded the powerplant’s maximum flow rate. In addition, during the month of the experiment, operators were not allowed to shape GCD power production to either follow firm power customer loads or to respond to market prices. This study identifies the main factors that contribute to HFE costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate financial impacts by simulating the GCD operations under two scenarios: (1) a baseline scenario that mimics both HFE operations during the experiment and during the rest of the year when it complies with the 1996 ROD operating criteria, and (2) a “without experiments” scenario that is identical to the baseline except it assumes that the HFE did not occur. The Generation and Transmission Maximization (GTMax) model was the main simulation tool used to simulate the dispatch of hydropower plants at GCD and other plants that comprise the Salt Lake City Area Integrated Projects (SLCA/IP). The research team used extensive data sets and historical information on SLCA/IP powerplant characteristics, hydrologic conditions, and Western Area Power Administration’s (WAPA’s) power purchase prices in the modeling process. In addition to estimating the financial impact of the HFE, the team used the GTMax model to gain insights into the interplay among ROD operating criteria, exceptions that were made to criteria to accommodate the experimental releases, and WAPA operating practices.

54 ENVIRONMENTAL SCIENCES↗

Financial Analysis of Experimental Releases Conducted at Glen Canyon Dam during Water Year 2017

This report examines the financial implications of the high-flow experiment (HFE) conducted at Glen Canyon Dam (GCD) during water year (WY) 2017. It is the eighth in a series of reports examining the financial implications of experimental flows conducted since the 1996 Record of Decision (ROD) was adopted in February 1997 (Reclamation 1996). The 1996 ROD implemented the Modified Low Fluctuating Flow (MLFF) regime. This is the first report since the 2016 ROD was adopted in January 2017 (Reclamation 2016). The 2016 ROD implemented the Long-Term Experimental and Management Plan (LTEMP) regime for monthly water releases, daily and hourly operating criteria, and experimental releases. A report released in January 2011 examined WYs 1997 to 2005 (Veselka et al. 2011); a report released in August 2011 examined WYs 2006 to 2010 (Poch et al. 2011); a report released in June 2012 examined WY 2011 (Poch et al. 2012); a report released in April 2013 examined WY 2012 (Poch et al. 2013); a report released in June 2014 examined WY 2013 (Graziano et al. 2014); a report released in September 2015 examined WY 2014 (Graziano et al. 2015); and a report released in November 2016 examined WY 2015 (Graziano et al. 2016). An experimental release may have either a positive or a negative impact on the financial value of energy production. Only one experimental release was conducted at GCD in WY 2017, specifically, a HFE release in November 2016. For this experimental release, financial costs of approximately $1.15 million were incurred because the HFE required sustained water releases exceeding the power plant’s maximum flow rate. In addition, during the month of the experiment, operators were not allowed to shape GCD power production, neither to follow firm electric service (FES) customer day-ahead energy deliveries nor to respond to market prices. This study identifies the main factors contributing to HFE costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate financial impacts by simulating GCD operations under two scenarios: (1) a Baseline scenario that mimics HFE operations both during the experiment and during the rest of the year when it complies with the 1996 daily/hourly operating criteria and the 2016 ROD monthly water release mandates, and (2) a counterfactual Without Experiments scenario identical to the Baseline scenario except it assumes that the HFE did not occur. The Generation and Transmission Maximization Superlite (GTMax SL) model was the main simulation tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. GCD is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). In the modeling process the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and Western Area Power Administration’s (WAPA’s) power purchase and sale prices. In addition to estimating the financial impact of the HFE, the team used the GTMax SL model to gain insights into the interplay among ROD operating criteria, exceptions made to criteria to accommodate the experimental releases, and WAPA operating practices.

13 HYDRO ENERGY↗

Financial Analysis of the 2018 Glen Canyon Dam Bug Flow Experiment

This report examines the financial implications of the macroinvertebrate production flows (MPF) experiment conducted at the Glen Canyon Dam (GCD) from May 1, through August 31, 2018. It is the first report examining the financial implications of a MPF experiment since the 2016 Record of Decision (ROD) was adopted in December 2016 (Reclamation 2016). The 2016 ROD implemented the Long-Term Experimental and Management Plan (LTEMP) regime. Experimental releases may have either a positive or a negative impact on the financial value of energy production. For these experimental releases, financial costs of approximately $165,000 were incurred because this experiment maintained flat releases on the weekends and holidays. This study identifies the main factors that contribute to MPF costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate financial impacts by simulating GCD operations under two scenarios: (1) a Baseline scenario that mimics MPF operations during the period of the experiment when it complies with the 2016 ROD operating criteria, and (2) a counterfactual Without Experiments scenario that is identical to the baseline except it assumes that the MPF experiment did not occur. The Generation and Transmission Maximization Superlite (GTMax SL) model was the main simulation tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. GCD is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and Western Area Power Administration’s (WAPA’s) power sale prices in the modeling process. In addition to estimating the financial impact of MPFs, the team used the GTMax SL model to gain insights into the interplay among ROD operating criteria, exceptions made to criteria to accommodate the experimental releases, and WAPA operating practices.

13 HYDRO ENERGY↗

Nadir Pressure Exposure Estimates for the Existing Turbines at McNary Dam

This report documents a numerical modeling study conducted to assess the pressure environment and relative biological performance of the existing turbine runner design at the U.S. Army Corps of Engineers (USACE) McNary Dam to establish a baseline for comparison to planned replacement runner designs. Computational fluid dynamics (CFD) models of the turbine unit constructed for this study were analyzed using a streamtrace-based technique called the Biological Performance Assessment (BioPA), which was developed at the Pacific Northwest National Laboratory (PNNL).

42 ENGINEERING↗

Behavior, Distribution, and Passage Metrics of Juvenile Chinook Salmon Above and Below Lookout Point Dam, Fall 2016 and Spring 2017 (Final Report)

This report presents the results of a fish behavior, distribution, and passage study conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers Portland District (USACE) at Lookout Point Dam (or Lookout) during the fall of 2016 (October–December) and spring of 2017 (March–June). The goal of this study was to provide biologists, engineers, resource managers, and regional decision-makers with information about the behavior, distribution, and passage of juvenile Chinook salmon (Oncorhynchus tshawytscha) through the reservoir and tailwaters of Lookout. The results of this study are intended to inform decision-making about long-term structural and operational measures to help rebuild populations of Upper Willamette River spring Chinook salmon listed as threatened under the Endangered Species Act.

59 BASIC BIOLOGICAL SCIENCES↗

Financial Analysis of the High Flow Experiment conducted at the Glen Canyon Dam during Water Year 2023

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specified criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report examines the financial implications of the high flow experiment (HFE) conducted at GCD during the spring of Water Year (WY) 2023 as required by the LTEMP HFE Protocol. This report is part of a series of reports that describe the financial costs of LTEMP experimental releases since the 2016 ROD was adopted in January 2017. Previous reports analyzed the impact of several past HFEs and Bug Flow Experiments. This report focuses on the HFE conducted in April 2023. For this experimental release, financial costs of approximately $1.33 million were incurred because the HFE required sustained water releases exceeding the power plant’s maximum turbine flow rate. In addition, during the experiment, operators were not allowed to shape GCD power production, either to follow Firm Electric Service (FES) customer day-ahead energy deliveries or to respond to market prices. This study identifies the main factors contributing to the HFE costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate Western Area Power Administration (WAPA) financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the operations that actually occurred and (2) a “Without Experiment” case that simulates operations under the assumption that the HFE did not occur. The “With Experiment” case mimics operations during the HFE and the entire month the HFE occurred. It complies with LTEMP hourly and daily operating criteria. The “Without Experiment” case assumes that the HFE did not occur. The monthly water release volume is assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices. In addition to estimating the financial impact of the HFE, the team used the CRiSPPy model to gain insights into the interplay among ROD operating criteria, exceptions made to criteria to accommodate the HFE, and WAPA operating practices.

13 HYDRO ENERGY↗

Bonneville Dam Powerhouse 2 Gatewell Improvement Post Construction Evaluation (Final Report)

Modifications to vertical barrier screens (VBS) and the addition of concrete corbels to improve passage conditions for juvenile salmonids in the gatewells of Bonneville Dam’s second powerhouse (B2) were completed prior to the 2024 passage season. To evaluate the effectiveness of those modifications, PNNL carried out a post construction evaluation to contrast fish condition and mortality between two turbine unit operational ranges within the peak efficiency range. A block-treatment study design was implemented in 2024 to contrast descaling and mortality of juvenile salmonids sampled in the juvenile fish facility following exposure to turbine operations (middle versus upper 1% peak efficiency range) during spring and summer passage periods. In spring, 1.96% of juvenile salmonids sampled during mid-1% operations were descaled and 0.46% were mortalities. Of those sampled during upper 1% unit operations in spring, 2.90% were descaled and 0.95% were mortalities. Although these differences appeared to be meaningful, substantial exceedances of the upper 1% limit occurred during two treatment blocks of the spring study period. Fish collected during the upper 1% treatment of these two blocks experienced substantially higher rates of descaling and mortality compared to those collected during mid-1% treatments. Censoring these two upper 1% samples from the spring study period resulted in upper 1% descaling and mortality rates that were statistically similar to those from the mid-1% treatment. During the summer study period, 0.99% of juveniles sampled during mid-1% operations were descaled and 0.33% suffered mortality; these rates were significantly lower than the descaling (2.80%) and mortality (1.73%) rates observed during upper 1% treatments. Comparing the results from the 2024 study to those from the historical (2008–2013) baseline of unmodified units revealed that the descaling and mortality rates observed during upper 1% operations in spring 2024 were near the upper end of the historic range observed for mid-1% operations. Spring 2024 upper 1% descaling and mortality rates were below, or well below the median of historical mid and upper 1% (combined) rates, which suggests that the modifications have had a positive effect. Summer 2024 upper 1% descaling and mortality rates were at or above the top of the range of historical mid 1% and above or well above the median of historical mid and upper 1% (combined) rates. It is important to keep in mind that 2024 is a single year when considering these comparisons. Additional study could help confirm these results or seek a level of operation that achieves the desired outcomes for fish.

13 HYDRO ENERGY↗

Evaluation of Howard A. Hanson Dam Juvenile Fish Passage and Survival Study: Downstream Passage and Survival (Acoustic Telemetry) (Task Final Report)

The Downstream Passage and Survival (Acoustic Telemetry) task was one of several tasks for the Evaluation of Howard A. Hanson Dam (HAHD) Juvenile Fish Passage and Survival study. For this task, a juvenile fish passage and survival study was conducted at HAHD from March 10, 2024 through June 27, 2024 for arrays in the HAHD Reservoir and Green River, and through July 9, 2024 for the arrays in the Duwamish River. Fish releases occurred over four times from March through May. Active tag (acoustic telemetry) technology was used to provide biological baseline information for the passage and survival of juvenile Puget Sound (PS) Chinook salmon (Oncorhynchus tshawytscha). Results will be used by biologists, engineers, resource managers, and regional decision-makers to inform the engineering design of the new fish passage facility (FPF) at HAHD. However, hatchery sub-yearling PS Chinook salmon of the appropriate size for tag implantation during the study period (> 95 mm in fork length, Geist et al. 2018) were unavailable. Therefore, yearling Coho salmon (O. kisutch) were used as a surrogate species for this acoustic telemetry study.

13 HYDRO ENERGY↗

Financial Analysis of the Smallmouth Bass Flows implemented at the Glen Canyon Dam during 2025

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specifies criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases.

Ploussard, Quentin [Argonne National Laboratory (A↗

Operation of the Lower Granite Dam Adult Trap, 2008.

During 2008 we operated the adult salmonid trap at Lower Granite Dam from 7 March through 25 November, except during a short summer period when water temperatures were too high to safely handle fish. We collected and handled a total of 20,463 steelhead Oncorhynchus mykiss and radio-tagged 34 of the hatchery steelhead. We took scale samples from 3,724 spring/summer Chinook salmon O. tshawytscha for age and genetic analysis. We collected and handled a total of 8,254 fall Chinook salmon. Of those fish, 2,520 adults and 942 jacks were transported to Lyons Ferry Hatchery on the Snake River in Washington. In addition, 961 adults and 107 jacks were transported to the Nez Perce Tribal Hatchery on the Clearwater River in Idaho. The remaining 3,724 fall Chinook salmon were passed upstream. Scales samples were taken from 780 fall Chinook salmon tagged with passive integrated transponder (PIT) tags and collected by the sort-by-code system.

13 HYDRO ENERGY↗

Stocking of Offsite Waters for Hungry Horse Dam Mitigation Creston National Fish Hatchery, FY 2006 Annual Report.

A total of 350,000, M012 strain, westslope cutthroat trout (WCT) eggs were received from Montana Fish Wildlife & Parks (MFWP), Washoe Park State Fish Hatchery in June of 2005 to accomplish this fishery management objective. These eggs were incubated, hatched and reared entirely inside the hatchery nursery building using a protected well water supply. Fish grew according to schedule and survival was excellent. The hatchery achieved a 0.78 feed fed to pounds gained conversion ratio for this group of WCT. Not all of the progenies from this fish lot were used for Hungry Horse Dam Fishery Mitigation Implementation. Some were used for other regional fishery management projects. Westslope cutthroat trout were reared using approved fish culture techniques as recommended in the USFWS Fish Hatchery Management Handbook and also utilizing a regimen adapted for hatchery specific site conditions. The fish health for these WCT was very good. Survival from first feeding fry stage to stocking was 79%. The hatchery had an annual fish health inspection performed by the USFWS Bozeman Fish Health Center in mid March of 2006. This inspection found all fish lots at Creston to be disease free. The Montana State Fish Health Board has placed the hatchery under a limited quarantine since May of 2005 due to an epizootic of Furunculosis. This classification has allowed the Creston NFH to stock disease free fish in locations approved by regional fish managers. The hatchery has been working with the State Fish Pathologist to remove the limited quarantine classification from the facility. Although fish health for all station fish lots remains disease free, MFWP has asserted it will not remove the limited quarantine until the new influent water treatment system, including the ultraviolet disinfection unit, is running full time, year round. The USFWS is working to secure the additional funding necessary to operate the treatment building year round. Distribution of the WCT took place from March through June. The stocking locations on the Flathead Reservation and State managed waters were identified by Confederated Salish and Kootenai Tribe (CSKT) and MFWP fishery biologists. Post release survival and angler success is monitored routinely by CSKT and MFWP fishery technicians. Stocking numbers and locations vary annually based on the results of biological monitoring, creel evaluations and adaptive management decisions. A total of 99,126 WCT were stocked during nine distribution trips in management approved waters (see Table 1). The average size of WCT at stocking was 3.91-inches. A total of 101,600, Arlee strain, rainbow trout (RBT) eggs were received from the Ennis National Fish Hatchery, Ennis, Montana, in December of 2005 and 35,000 Kamloops strain eggs were received from Murray Springs SFH, Eureka, Montana, in March of 2006 to accomplish this fishery management objective. The RBT were reared using approved fish culture techniques as recommended in the USFWS Fish Hatchery Management Handbook. There was no fish health related problems associated with this lot of fish. Survival from swim up fry stage to stocking was 93% for the Arlee's and 79% for the Kamloops. The hatchery achieved a 0.68 feed fed to pounds gained conversion ratio for the Arlee and 0.97 for the Kamloops RBT. The excellent feed conversion ratio can be attributed to refined feeding techniques and the use of an extruded high performance fry feed made with premium fish meal and marine fish oil. The Arlee strain of rainbow trout is requested for this fishery mitigation objective because the chosen stocking locations are terminal basin reservoirs or lakes, habitat conditions prevent natural spawning runs and returns to the creel are more favorable then for native westslope cutthroat trout. MFWP also requested a fall plant of Kamloops strain RBT and they will be evaluated for performance and future fall stockings in Echo Lake. Post release survival and angler success is monitored routinely by the Confederated Salish and Kootenai Tribe (CSKT) and Montana Fish Wildlife & Parks (MFWP) fishery technicians. Stocking numbers and locations vary annually based on the results of biological monitoring, creel evaluations and habitat conditions. The RBT were stocked in six distribution trips from June through September. The number of fish stocked and the receiving waters are identified below (see Table 2).

13 HYDRO ENERGY↗

Little Goose Dam Full Flow PIT-Tag Detection System Project Summary.

In 2006, the design phase of this project was kicked off and was for the most part modeled after the Full Flow PIT installation installed at Lower Monumental Dam during winter and spring of 2006 and 2007. As the Goose Full Flow design progressed and the project started to move towards construction, issues within contracting occurred and the project was put on delay for 1 year. Starting in mid December of 2008, Harcon Inc. was awarded the contract and construction of the new Goose Full Flow PIT-tag detection system began. The purpose of this document is to summarize the installation of the Little Goose Full Flow project from start to finish and to highlight the notable successes and challenges that the installation presented along with the final results and current status.

13 HYDRO ENERGY↗

Calculating arch dams

Approximation methods used in design of thin walled shells for hydroelectric power plant arch dams

POWER PLANT↗