Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Improving Multi-Model Trajectory Simulation Estimators using Model Selection and Tuning

Multi-model Monte Carlo methods have been demonstrated to be an efficient and accurate alternative to standard Monte Carlo (MC) in the model-based propagation of uncertainty in entry, descent, and landing (EDL) applications. These multi-model MC methods fuse predictions from low-fidelity models with the high-fidelity EDL model of interest to produce unbiased statistics with a fraction of the computational cost. The accuracy and efficiency of the multi-model MC methods are dependent upon the magnitude of correlations of the low-fidelity models with the high-fidelity model, but also upon the correlation among the low-fidelity models, and their relative computational cost. Because of this layer of complexity, the question of how to optimally select the set of low-fidelity models has remained open. In this work, methods for optimal model construction and tuning are investigated as a means to increase the speed and precision of trajectory simulation for EDL. Specifically, the focus is on the inclusion of low-fidelity model tuning within the sample allocation optimization that accompanies multi-model MC methods. Preliminary results indicate that low-fidelity model tuning can significantly improve efficiency and precision of trajectory simulations and provide an increased edge to multi-model MC methods when compared to standard MC. The challenges and potential benefits to exploring a fully iterative and comprehensive optimization strategy in future work are highlighted.

uncertainty quantification↗

Smart Sensor Demonstration Payload

Sensors are a critical element to any monitoring, control, and evaluation processes such as those needed to support ground based testing for rocket engine test. Sensor applications involve tens to thousands of sensors; their reliable performance is critical to achieving overall system goals. Many figures of merit are used to describe and evaluate sensor characteristics; for example, sensitivity and linearity. In addition, sensor selection must satisfy many trade-offs among system engineering (SE) requirements to best integrate sensors into complex systems [1]. These SE trades include the familiar constraints of power, signal conditioning, cabling, reliability, and mass, and now include considerations such as spectrum allocation and interference for wireless sensors. Our group at NASA s John C. Stennis Space Center (SSC) works in the broad area of integrated systems health management (ISHM). Core ISHM technologies include smart and intelligent sensors, anomaly detection, root cause analysis, prognosis, and interfaces to operators and other system elements [2]. Sensor technologies are the base fabric that feed data and health information to higher layers. Cost-effective operation of the complement of test stands benefits from technologies and methodologies that contribute to reductions in labor costs, improvements in efficiency, reductions in turn-around times, improved reliability, and other measures. ISHM is an active area of development at SSC because it offers the potential to achieve many of those operational goals [3-5].

Schmalzel, John↗

A Global Land Cover Training Dataset From 1984 to 2020

State-of-the-art cloud computing platforms such as Google Earth Engine (GEE) enable regional-to-global land cover and land cover change mapping with machine learning algorithms. However, collection of high-quality training data, which is necessary for accurate land cover mapping, remains costly and labor-intensive. To address this need, we created a global database of nearly 2 million training units spanning the period from 1984 to 2020 for seven primary and nine secondary land cover classes. Our training data collection approach leveraged GEE and machine learning algorithms to ensure data quality and biogeographic representation. We sampled the spectral-temporal feature space from Landsat imagery to efficiently allocate training data across global ecoregions and incorporated publicly available and collaborator-provided datasets to our database. To reflect the underlying regional class distribution and post-disturbance landscapes, we strategically augmented the database. We used a machine learning-based cross-validation procedure to remove potentially mis-labeled training units. Our training database is relevant for a wide array of studies such as land cover change, agriculture, forestry, hydrology, urban development, among many others.

Radost Stanimirova↗

Ultra-Wideband Phased Array for Millimeter-Wave 5G and ISM

Growing mobile data consumption has prompted the exploration of the millimeter-wave spectrum for large bandwidth, high speed communications. However, the allocated bands are spread across a wide swath of spectrum: fifth generation mobile architecture (5G): 28, 38, 39, 64-71 GHz, as well as Industrial, Scientific, and Medical bands (ISM): 24 and 60 GHz. Moreover, high gain phased arrays are required to overcome the significant path loss associated with these frequencies. Further, it is necessary to incorporate several of these applications in a single, small size and low cost platform. To this end, we have developed a scanning, Ultra-Wideband (UWB) array which covers all 5G, ISM, and other mm-W bands from 24-72 GHz. Critically, this is accomplished using mass-production Printed Circuit Board (PCB) fabrication.

Ultra-wide band phased array↗

NASA Tech Briefs, December 2003

Topics covered include: Organic/Inorganic Hybrid Polymer/Clay Nanocomposites; Less-Toxic Coatings for Inhibiting Corrosion of Aluminum; Liquid Coatings for Reducing Corrosion of Steel in Concrete; Processable Polyimides Containing APB and Reactive End Caps; Rod/Coil Block Copolyimides for Ion-Conducting Membranes; Techniques for Characterizing Microwave Printed Antennas; Cylindrical Antenna With Partly Adaptive Phased-Array Feed; Command Interface ASIC - Analog Interface ASIC Chip Set; Predicting Accumulations of Ice on Aerodynamic Surfaces; Analyzing Aeroelasticity in Turbomachines; Software for Allocating Resources in the Deep Space Network; Expert Seeker; High-Speed Recording of Test Data on Hard Disks; Functionally Graded Nanophase Beryllium/Carbon Composites; Thin Thermal-Insulation Blankets for Very High Temperatures; Aerostructures Test Wing; Flight-Test Evaluation of Flutter-Prediction Methods; Piezoelectrically Actuated Microvalve for Liquid Effluents; Larger-Stroke Piezoelectrically Actuated Microvalve; Innovative, High-Pressure, Cryogenic Control Valve: Short Face-to-Face, Reduced Cost; Safer Roadside Crash Walls Would Limit Deceleration; Improved Interactive Medical-Imaging System; Scanning Microscopes Using X Rays and Microchannels; Slotting Fins of Heat Exchangers to Provide Thermal Breaks; Methane Clathrate Hydrate Prospecting; Automated Monitoring with a BSP Fault-Detection Test; Automated Monitoring with a BCP Fault-Decision Test; Vector-Ordering Filter Procedure for Data Reduction; Remote Sensing and Information Technology for Large Farms; Developments at the Advanced Design Technologies Testbed; Spore-Forming Bacteria that Resist Sterilization; and Acoustical Applications of the HHT Method.

Source record↗

LANDSAT D: X-band analysis study

The effects of the use of an X-band carrier frequency on the transmission link margins and on the affected ground station equipment are investigated. The specific effects of the X-band carrier frequency allocation on the link margin are detailed. This includes an examination of a Local User Terminal's (LUT) coverage circle radius requirements, detailed elements of the link calculation, and specific spacecraft and ground configurations that would satisfy the link requirements. The requirements that spacecraft signal acquisition and tracking place on the front-end of the ground station equipment are also examined. The availability of the required ground station equipment and representative costs for these items are included. The costs considered shall be both for procurement of a new ground station (front-end only) and for modification of an existing S-band station to X-band.

Alexander, L.↗

The human role in space: Technology, economics and optimization

Man-machine interactions in space are explored in detail. The role and the degree of direct involvement of humans that will be required in future space missions are investigated. An attempt is made to establish valid criteria for allocating functional activities between humans and machines and to provide insight into the technological requirements, economics, and benefits of the human presence in space. Six basic categories of man-machine interactions are considered: manual, supported, augmented, teleoperated, supervised, and independent. Appendices are included which provide human capability data, project analyses, activity timeline profiles and data sheets for 37 generic activities, support equipment and human capabilities required in these activities, and cumulative costs as a function of activity for seven man-machine modes.

Hall, S. B.↗

Computer architecture for efficient algorithmic executions in real-time systems: New technology for avionics systems and advanced space vehicles

Improvements and advances in the development of computer architecture now provide innovative technology for the recasting of traditional sequential solutions into high-performance, low-cost, parallel system to increase system performance. Research conducted in development of specialized computer architecture for the algorithmic execution of an avionics system, guidance and control problem in real time is described. A comprehensive treatment of both the hardware and software structures of a customized computer which performs real-time computation of guidance commands with updated estimates of target motion and time-to-go is presented. An optimal, real-time allocation algorithm was developed which maps the algorithmic tasks onto the processing elements. This allocation is based on the critical path analysis. The final stage is the design and development of the hardware structures suitable for the efficient execution of the allocated task graph. The processing element is designed for rapid execution of the allocated tasks. Fault tolerance is a key feature of the overall architecture. Parallel numerical integration techniques, tasks definitions, and allocation algorithms are discussed. The parallel implementation is analytically verified and the experimental results are presented. The design of the data-driven computer architecture, customized for the execution of the particular algorithm, is discussed.

Carroll, Chester C.↗

Geostationary platform systems concepts definition study. Volume 2: Technical, book 1

The initial selection and definition of operational geostationary platform concepts is discussed. Candidate geostationary platform missions and payloads were identified from COMSAT, Aerospace, and NASA studies. These missions and payloads were cataloged; classified with to communications, military, or scientific uses; screened for application and compatibility with geostationary platforms; and analyzed to identify platform requirements. Two platform locations were then selected (Western Hemisphere - 110 deg W, and Atlantic - 15 deg W), and payloads allocated based on nominal and high traffic models. Trade studies were performed leading to recommendation of selected concepts. Of 30 Orbit Transfer Vehicle (0TV) configuration and operating mode options identified, 18 viable candidates compatible with the operational geostationary platform missions were selected for analysis. Each was considered using four platform operational modes - 8 or 16 year life, and serviced or nonserviced, providing a total of 72 OTV/platform-mode options. For final trade study concept selection, a cost program was developed considering payload and platform costs and weight; transportation unit and total costs for the shuttle and OTV; and operational costs such as assembly or construction time, mating time, and loiter time. Servicing costs were added for final analysis and recommended selection.

Source record↗

Pre-Mission Input Requirements to Enable Successful Sample Collection by a Remote Field/EVA Team

This paper is intended to evaluate the sample collection process with respect to sample characterization and decision making. In some cases, it may be sufficient to know whether a given outcrop or hand sample is the same as or different from previous sampling localities or samples. In other cases, it may be important to have more in-depth characterization of the sample, such as basic composition, mineralogy, and petrology, in order to effectively identify the best sample. Contextual field observations, in situ/handheld analysis, and backroom evaluation may all play a role in understanding field lithologies and their importance for return. For example, whether a rock is a breccia or a clast-laden impact melt may be difficult based on a single sample, but becomes clear as exploration of a field site puts it into context. The FINESSE (Field Investigations to Enable Solar System Science and Exploration) team is a new activity focused on a science and exploration field based research program aimed at generating strategic knowledge in preparation for the human and robotic exploration of the Moon, near-Earth asteroids (NEAs) and Phobos and Deimos. We used the FINESSE field excursion to the West Clearwater Lake Impact structure (WCIS) as an opportunity to test factors related to sampling decisions. In contract to other technology-driven NASA analog studies, The FINESSE WCIS activity is science-focused, and moreover, is sampling-focused, with the explicit intent to return the best samples for geochronology studies in the laboratory. This specific objective effectively reduces the number of variables in the goals of the field test and enables a more controlled investigation of the role of the crewmember in selecting samples. We formulated one hypothesis to test: that providing details regarding the analytical fate of the samples (e.g. geochronology, XRF/XRD, etc.) to the crew prior to their traverse will result in samples that are more likely to meet specific analytical objectives than samples collected in the absence of this premission information. We conducted three tests of this hypothesis. Our investigation was designed to document processes, tools and procedures for crew sampling of planetary targets. This is not meant to be a blind, controlled test of crew efficacy, but rather an effort to recognize the relevant variables that enter into sampling protocol and to develop recommendations for crew and backroom training in future endeavors. Methods: One of the primary FINESSE field deployment objectives was to collect impact melt rocks and impact melt-bearing breccias from a number of locations around the WCIS structure to enable high precision geochronology of the crater to be performed [1]. We conducted three tests at WCIS after two full days of team participation in field site activities, including using remote sensing data and geologic maps, hiking overland to become familiar with the terrain, and examining previously-collected samples from other islands. In addition, the team members shared their projects and techniques with the entire team. We chose our "crew members" as volunteers from the team, all of whom had had moderate training in geologic fieldwork and became familiar with the general field setting. The first two tests were short, focused tests of our hypothesis. Test A was to obtain hydrothermal vugs; Test B was to obtain impact melt and intrusive rock as well as the contact between the two to check for contact metamorphism and age differences. In both cases, the test director had prior knowledge of the site geology and had developed a study-specific objective for sampling prior to deployment. Prior to the field deployment, the crewmember was briefed on the sampling objective and the laboratory techniques that would be used on the samples. At the field sites (Fig. 2), the crewmember was given 30 minutes to survey a small section of outcrop (10-15 m) and acquire a suite of three samples. The crewmember talked through his process and the test director kept track of the timeline in verbal cues to the crewmember. At the conclusion, the team member conducting the scientific study appraised the samples and train of thought. Test C was a 90-minute EVA simulation using two crewmembers working out of line-of-sight in communication with a science backroom. The science objectives were determined by the science backroom team in advance using a Gigapan image of the outcrop (Fig. 1). The science team formulated hypotheses for the outcrop units and created sampling objectives for impact-melt lithologies; the science team turned these into a science plan, which they communicated to the crew in camp prior to crew deployment. As part of the science plan, the science team also discussed their sample needs in depth with the crewmembers, including laboratory methods, objectives, and samples sizes needed. During the deployment, the two crewmembers relayed real-time information to the science backroom by radio with no time delay. Both the crew and science team re-evaluated their hypotheses and science plans in real-time. Discussion: Upon evaluation, we found that the focused tests (Tests A and B) were successful in meeting their scientific objectives. The crewmember used their knowledge of how the samples were to be used in further study (technique, sample size, and scientific need) to focus on the sampling task. The crewmember was comfortable spending minimal time describing and mapping the outcrop. The crewmember used all available time to get a good sample. The larger test was unsuccessful in meeting the sampling objectives. When the crewmembers began describing the lithologies, it was quickly apparent that the lithologies were not as the backroom expected and had communicated to the crew. When the outcrop wasn't as expected, the crew members instinctively switched to field characterization mode, taking significant time to characterize and map the outcrop. One crew member admitted that he "kind of lost track" of the sampling strategy as he focused on the basic outcrop characterization. This is the logical first step in a field geology campaign, that a significant amount of time must be spent by the crew and backroom to understand the outcrop and its significance. Basic field characterization of an outcrop is a focused activity that takes significant time and training [2, 3]. Sampling of representational lithologies can be added to this activity for little cost [4]. However, we have shown that identification of unusual or specific samples for laboratory study also takes significant time and knowledge. We suggest that sampling of this type be considered a separate activity from field characterization, and that crewmembers be trained in sampling needs for different kinds of studies (representative lithologies vs. specialized samples) to acquire a mindset for sampling similar to field mapping. Sampling activities should be given a significant amount of specifically allocated time in scheduling EVA activities; and in the better case, that sampling be done as a second activity to a previously studied outcrop where both crew and backroom are comfortable with its context and characteristics. Our hypothesis posited that crewmember knowledge of how the samples would be used upon return would aid them in choosing relevant samples. Our testing bore this hypothesis out to some extent. We therefore recommend that crewmember training should include exposure to the laboratory techniques and analyses that will be used on the samples to foster this knowledge. There is also the potential for increasing crewmember contextual knowledge real-time in the field through the introduction of in situ geochemical technologies such as field portable XRF. The presence of field portable geochemical technology could enable the astronauts to interrogate the samples for K abundance real-time, ensuring they could collect valuable and dateable samples [5]. Though simulations such as these can teach us a fair bit about decision making processes and timeline building, one EVA participant noted that when he wasn't collecting "real" samples, he wasn't at his best. This effect suggests that higher-fidelity studies involving truly remote participants conducting actual scientific studies merit further attention to capture lessons for application to future crew situations.

sample collection↗

Human factors dimensions in the evolution of increasingly automated control rooms for near-earth satellites

The NASA-Goddard Space Flight Center is responsible for the control and ground support for all of NASA's unmanned near-earth satellites. Traditionally, each satellite had its own dedicated mission operations room. In the mid-seventies, an integration of some of these dedicated facilities was begun with the primary objective to reduce costs. In this connection, the Multi-Satellite Operations Control Center (MSOCC) was designed. MSOCC represents currently a labor intensive operation. Recently, Goddard has become increasingly aware of human factors and human-machine interface issues. A summary is provided of some of the attempts to apply human factors considerations in the design of command and control environments. Current and future activities with respect to human factors and systems design are discussed, giving attention to the allocation of tasks between human and computer, and the interface for the human-computer dialogue.

Mitchell, C. M.↗

A Large-Grain Mapping Approach for Multiprocessor Systems Through Data Flow Model Ph.D. Thesis

A large-grain level mapping method is presented of numerical oriented applications onto multiprocessor systems. The method is based on the large-grain data flow representation of the input application and it assumes a general interconnection topology of the multiprocessor system. The large-grain data flow model was used because such representation best exhibits inherited parallelism in many important applications, e.g., CFD models based on partial differential equations can be presented in large-grain data flow format, very effectively. A generalized interconnection topology of the multiprocessor architecture is considered, including such architectural issues as interprocessor communication cost, with the aim to identify the 'best matching' between the application and the multiprocessor structure. The objective is to minimize the total execution time of the input algorithm running on the target system. The mapping strategy consists of the following: (1) large-grain data flow graph generation from the input application using compilation techniques; (2) data flow graph partitioning into basic computation blocks; and (3) physical mapping onto the target multiprocessor using a priority allocation scheme for the computation blocks.

Kim, Hwa-Soo↗

Model for Simulating a Spiral Software-Development Process

A discrete-event simulation model, and a computer program that implements the model, have been developed as means of analyzing a spiral software-development process. This model can be tailored to specific development environments for use by software project managers in making quantitative cases for deciding among different software-development processes, courses of action, and cost estimates. A spiral process can be contrasted with a waterfall process, which is a traditional process that consists of a sequence of activities that include analysis of requirements, design, coding, testing, and support. A spiral process is an iterative process that can be regarded as a repeating modified waterfall process. Each iteration includes assessment of risk, analysis of requirements, design, coding, testing, delivery, and evaluation. A key difference between a spiral and a waterfall process is that a spiral process can accommodate changes in requirements at each iteration, whereas in a waterfall process, requirements are considered to be fixed from the beginning and, therefore, a waterfall process is not flexible enough for some projects, especially those in which requirements are not known at the beginning or may change during development. For a given project, a spiral process may cost more and take more time than does a waterfall process, but may better satisfy a customer's expectations and needs. Models for simulating various waterfall processes have been developed previously, but until now, there have been no models for simulating spiral processes. The present spiral-process-simulating model and the software that implements it were developed by extending a discrete-event simulation process model of the IEEE 12207 Software Development Process, which was built using commercially available software known as the Process Analysis Tradeoff Tool (PATT). Typical inputs to PATT models include industry-average values of product size (expressed as number of lines of code), productivity (number of lines of code per hour), and number of defects per source line of code. The user provides the number of resources, the overall percent of effort that should be allocated to each process step, and the number of desired staff members for each step. The output of PATT includes the size of the product, a measure of effort, a measure of rework effort, the duration of the entire process, and the numbers of injected, detected, and corrected defects as well as a number of other interesting features. In the development of the present model, steps were added to the IEEE 12207 waterfall process, and this model and its implementing software were made to run repeatedly through the sequence of steps, each repetition representing an iteration in a spiral process. Because the IEEE 12207 model is founded on a waterfall paradigm, it enables direct comparison of spiral and waterfall processes. The model can be used throughout a software-development project to analyze the project as more information becomes available. For instance, data from early iterations can be used as inputs to the model, and the model can be used to estimate the time and cost of carrying the project to completion.

Mizell, Carolyn↗

The Lightweight Integrated Solar Array and anTenna (LISA-T) Big Power for Small Spacecraft

NASA is developing a space power system using lightweight, flexible photovoltaic devices originally developed for use here on Earth to provide low cost power for spacecraft. The Lightweight Integrated Solar Array and anTenna (LISA-T) is a launch stowed, orbit deployed array on which thin-film photovoltaic and antenna elements are embedded. The LISA-T system is deployable, building upon NASA's expertise in developing thin-film deployable solar sails such the one being developed for the Near Earth Asteroid Scout project which will fly in 2018. One of the biggest challenges for the NEA Scout, and most other spacecraft, is power. There simply isn't enough of it available, thus limiting the range of operation of the spacecraft from the Sun (due to the small surface area available for using solar cells), the range of operation from the Earth (low available power with inherently small antenna sizes tightly constrain the bandwidth for communication), and the science (you can only power so many instruments with limited power). The LISA-T has the potential to mitigate each of these limitations, especially for small spacecraft. Inherently, small satellites are limited in surface area, volume, and mass allocation; driving competition between their need for power and robust communications with the requirements of the science or engineering payload they are developed to fly. LISA-T is addressing this issue, deploying large-area arrays from a reduced volume and mass envelope - greatly enhancing power generation and communications capabilities of small spacecraft and CubeSats. The problem is that these CubeSats can usually only generate between 7W and 50W of power. The power that can be generated by the LISA-T ranges from tens of watts to several hundred watts, at a much higher mass and stowage efficiency. A matrix of options are in development, including planar (pointed) and omnidirectional (non-pointed) arrays. The former is seeking the highest performance possible while the latter is seeking GN&C simplicity. Options for leveraging both high performance, 'typical cost' triple junction thin-film solar cells as well as moderate performance, low cost cells are being developed. Alongside, UHF (ultrahigh frequency), S-band, and X-band antennas are being integrated into the array to move their space claim away from the spacecraft and open the door for more capable multi-element antenna designs such as those needed for spherical coverage and electronically steered phase arrays.

Space Exploration↗

Technology requirements for post-1985 communications satellites

The technical and functional requirements for commercial communication satellites are discussed. The need for providing quality service at an acceptable cost is emphasized. Specialized services are postulated in a needs model which forecasts future demands. This needs model is based upon 322 separately identified needs for long distance communication. It is shown that the 1985 demand for satellite communication service for a domestic region such as the United States, and surrounding sea and air lanes, may require on the order of 100,000 MHz of bandwith. This level of demand can be met by means of the presently allocated bandwidths and developing some key technologies. Suggested improvements include: (1) improving antennas so that high speed switching will be possible; (2) development of solid state transponders for 12 GHz and possibly higher frequencies; (3) development of switched or steered beam antennas with 10 db or higher gain for aircraft; and (4) continued development of improved video channel compression techniques and hardware.

Burtt, J. E.↗

Future satellite systems - Market demand assessment

During 1979-80, a market study was performed regarding the future total demand for communications services, and satellite transmission service at the 4/6 GHz, 12/14 GHz, and 20/30 GHz frequencies. Included in the study were a variety of communications traffic characteristics as well as projections of the cost of C and Ku band satellite systems through the year 2000. In connection with the considered study, a total of 15 major study tasks and subtasks were undertaken and were all interrelated in various ways. The telecommunications service forecasts were concerned with a total of 21 data services, 5 voice services, and 5 video services. The traffic volumes within the U.S. for the three basic services were projected for three time periods. It is found that the fixed frequency allocation for domestic satellites combined with potential interference from adjacent satellites means a near term lack of orbital positions above the U.S.

Reiner, P. S.↗

Aerospace Safety Advisory Panel

An assessment of NASA's safety performance for 1983 affirms that NASA Headquarters and Center management teams continue to hold the safety of manned flight to be their prime concern, and that essential effort and resources are allocated for maintaining safety in all of the development and operational programs. Those conclusions most worthy of NASA management concentration are given along with recommendations for action concerning; product quality and utility; space shuttle main engine; landing gear; logistics and management; orbiter structural loads, landing speed, and pitch control; the shuttle processing contractor; and the safety of flight operations. It appears that much needs to be done before the Space Transportation System can achieve the reliability necessary for safe, high rate, low cost operations.

Source record↗

Heritage and Advanced Technology Systems Engineering Lessons Learned from NASA Space Missions

Use of heritage and new technology is necessary/enabling to implementing small, low cost missions, yet overruns decrease the ability to sustain future mission flight rates The majority of the cost growth drivers seen in the D&NF study were embedded early during formulation phase and later realized during the development and I&T phases Cost drivers can be avoided or significantly decreased by project management and SE emphasis on early identification of risks and realistic analyses SE processes that emphasize an assessment of technology within the mission system to identify technical issues in the design or operational use of the technology. Realistic assessment of new and heritage spacecraft technology assumptions , identification of risks and mitigation strategies. Realistic estimates of effort required to inherit existing or qualify new technology, identification of risks to estimates and develop mitigation strategies. Allocation of project reserves for risk-based mitigation strategies of each individual area of heritage or new technology. Careful tailoring of inheritance processes to ensure due diligence.

Barley, Bryan↗