Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost Data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Advanced Fuel Cycle Cost Basis Report: Module D1-4 and Module D1-5 Ceramic Pelletized Sodium-Cooled Fast Reactor (SFR) Fuel Fabrication Ceramic Vibrocompacted Fuel Fabrication

This is a cost module that is part of the Advanced Fuel Cycle -- Cost Basis Report. Module D1-4: Nature of this module update (Rev 1) from previous advanced fuel cycle cost basis reports (AFCCBRs): new life cycle cost data on U,Pu SFR mixed oxide (MOX) fuels is derived from the Nonproliferation Assessment Systems Analysis Program (NASAP) conducted in the late 1970s. Highassay low-enriched uranium (HALEU) ceramic fuel is also discussed in more detail compared to earlier AFC-CBRs, since some advanced SFR concepts currently under development will require this HALEU fuel type for startup. Module D1-5: Nature of this FY-21 module update from previous AFC-CBRs: this module includes a few new references and a somewhat expanded discussion of vibrocompaction fuel fabrication technology. The WIT values for VIPAC are pegged directly to those for conventional LWR and SFR pelletized U,Pu MOX (note that this module now includes VIPAC MOX fuel for LWRs in addition to SFRs). Based on information from Russia, where VIPAC has been studied extensively, the unit costs are expressed as a percentage of those in the new updated Module D1-2 (pelletized U,Pu MOX) and new updated Module D1-4 (pelletized U,Pu MOX) for large NOAK fabrication facilities of the same production capacity. Since both ceramic pelletized MOX Modules D1-2 and D1-4 benefitted from analysis of 1970s NASAP data, by extension this Module D1-5 also benefits.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A comprehensive cost model for NASA data archiving

A simple archive cost model has been developed to help predict NASA's archiving costs. The model covers data management activities from the beginning of the mission through launch, acquisition, and support of retrospective users by the long-term archive; it is capable of determining the life cycle costs for archived data depending on how the data need to be managed to meet user requirements. The model, which currently contains 48 equations with a menu-driven user interface, is available for use on an IBM PC or AT.

Green, J. L.↗

The JPL Cost Risk Analysis Approach that Incorporates Engineering Realism

This paper discusses the JPL Cost Engineering Group (CEG) cost risk analysis approach that accounts for all three types of cost risk. It will also describe the evaluation of historical cost data upon which this method is based. This investigation is essential in developing a method that is rooted in engineering realism and produces credible, dependable results to aid decision makers.

cost risk↗

Estimation of abatement potentials and costs of air pollution emissions in China

Understanding the air pollution emission abatement potential and associated control cost is a prerequisite to design cost ef?cient control policies. In this study, a linear programming algorithm model, International Control Cost Estimate Tool, was updated with cost data for applications of 56 types of end-of-pipe technologies and ?ve types of renewable energy in 10 major sectors namely power generation, industry combustion, cement pro-duction, iron and steel production, other industry processes, domestic combustion, transportation, solvent use, livestock rearing, and fertilizer use. The updated model was implemented to estimate the abatement potential and marginal cost of multiple pollutants in China. The total maximum abatement potentials of sulfur dioxide (SO2), nitrogen oxides (NOx), primary particulate matter (PM2.5), non-volatile organic compounds (NMVOCs), and ammonia (NH3) in China were estimated to be 19.2, 20.8, 9.1, 17.2 and 8.6 Mt, respectively, which accounted for 89.7%, 89.9%, 94.6%, 74.0%, and 80.2% of their total emissions in 2014, respectively. The associated control cost of such reductions was estimated as 92.5, 469.7, 75.7, 449.0, and 361.8 billion CNY in SO2, NOx, primary PM2.5, NMVOCs and NH3, respectively. Shandong, Jiangsu, Henan, Zhejiang, and Guangdong provinces exhibited large abatement potentials for all pollutants. Provincial disparity analysis shows that high GDP regions tend to have higher reduction potential and total abatement costs. End-of-pipe technologies tended be a cost-ef?cient way to control pollution in industries processes (i.e., cement plants, iron and steel plants, lime production, building ceramic production, glass and brick production), whereas such technologies were less cost- effective in fossil fuel-related sectors (i.e., power plants, industry combustion, domestic combustion, and transportation) compared with renewable energy. The abatement potentials and marginal abatement cost curves developed in this study can further be used as a crucial component in an integrated model to design optimized cost-ef?cient control policies.

Zhang, Fenfen↗

Preliminary design study of a baseline MIUS

Results of a conceptual design study to establish a baseline design for a modular integrated utility system (MIUS) are presented. The system concept developed a basis for evaluating possible projects to demonstrate an MIUS. For the baseline study, climate conditions for the Washington, D.C., area were used. The baseline design is for a high density apartment complex of 496 dwelling units with a planned full occupancy of approximately 1200 residents. Environmental considerations and regulations for the MIUS installation are discussed. Detailed cost data for the baseline MIUS are given together with those for design and operating variations under climate conditions typified by Las Vegas, Nevada, Houston, Texas, and Minneapolis, Minnesota. In addition, results of an investigation of size variation effects, for 300 and 1000 unit apartment complexes, are presented. Only conceptual aspects of the design are discussed. Results regarding energy savings and costs are intended only as trend information and for use in relative comparisons. Alternate heating, ventilation, and air conditioning concepts are considered in the appendix.

Wolfer, B. M.↗

Technoeconomic Opportunity Analysis for Local Power Generation in Falls City, Nebraska

Falls City is a small community in Nebraska interested in understanding how energy from local energy systems could support the community's economic development planning. To address the current community needs and address the future energy demand technical assistance conducted through the Communities Local Energy Action Program (Communities LEAP) assessed the technical and economic opportunities of adding energy technologies to Falls City's municipally owned and operated electric utility system. The modeling performed considered the technical and economic feasibility of technologies using the System Advisor Model (SAM). The modeling explored three technology configurations using multiple years of historical weather and wholesale cost data (2015-2022 & a typical meteorological year), and two different wholesale escalation rates (0.3% and 2.5%). Wholesale energy prices were based on the Southwest Power Pool's (SPP) real-time energy market and the annual escalation rates of these rates based on historical SPP wholesale and national retail electricity price trends. Results from the modeling showed that at current CAPEX costs and SPP wholesale electricity costs no technology combination averaged across the scenarios run provide a positive net present value (NPV). External financial support, changes in market conditions, and additional revenue streams would help create more economically favorable projects. As conditions change re-evaluation may be necessary.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operation of the Computer Software Management and Information Center (COSMIC)

The major operational areas of the COSMIC center are described. Quantitative data on the software submittals, program verification, and evaluation are presented. The dissemination activities are summarized. Customer services and marketing activities of the center for the calendar year are described. Those activities devoted to the maintenance and support of selected programs are described. A Customer Information system, the COSMIC Abstract Recording System Project, and the COSMIC Microfiche Project are summarized. Operational cost data are summarized.

Source record↗

DOE Deep Energy Retrofit Cost Survey

A survey was conducted by the Lawrence Berkeley National Laboratory on deep energy retrofit (DER) market drivers, opportunities, and challenges. The survey was part a research study sponsored by the U.S. Department of Energy to gather information on the costs of DER from home performance contractors and stakeholders. Cost data was gathered from DER projects that use a comprehensive, whole-home approach to drastically reduce energy use and improve performance. DER projects often aim at reducing energy use by 50% or more. In addition, these projects can improve home comfort and potentially benefiting occupant health. Yet, market adoption of DER has been limited. Major limiting factors include complex projects, high costs, perceived risks, extensive disruption, and unfamiliar work scopes to some contractors. In order to better understand what motivates and deters DER projects in today’s market, a survey was conducted to gather this information, and to learn about promising approaches and technologies from the industry perspective. Past surveys on homeowners and home energy performance professionals have studied the motivations and barriers of energy efficiency retrofits. Two surveys of home energy performance professionals were conducted in recent years. The Resources for the Future (RFF) Home Energy Audit and Retrofit Survey was conducted in 2011 by recruiting energy auditors and retrofit installers through members of Efficiency First and Building Performance Institute (BPI) accredited contractors. The survey asked about the business and services that respondents provide, how often homeowners follow their recommendations to retrofit their homes, and the respondents’ opinion on barriers faced by the industry. The survey found that not enough homeowners know about energy audits, but more importantly, it is the high cost of retrofits compared to low energy prices that is responsible for few energy audits and retrofits being completed. The RESNET Deep Retrofit Industry Stakeholder Survey was conducted shortly after launching of the EnergySmart Home Performance Team program. The EnergySmart Team program involves a formal agreement among allied contractors who are engaged in high performance retrofits. Using this allied team approach, teams can pool their expertise and provide each other with customer referrals. The survey asked EnergySmart Team members and outside stakeholders on questions about market and technical barriers in performing home energy retrofits. Survey respondents identified lack of consumer awareness and lack of affordable financing for consumers as the leading market barriers to home energy retrofits. In their written comments, many survey respondents also echoed that the high costs of retrofit compared to low energy prices is a market barrier. Respondents found “certain housing characteristics that prevent effective retrofit” and “energy analysis software inaccuracy or limitations” are the two leading technical barriers. Their choices for technical barriers were reflective of the energy rater/auditor role played by the majority (78%) of the survey respondents. In comparison to past surveys, this work aimed to gather inputs from a broader segment of the home performance industry to identify the opportunities and barriers faced by DERs from all perspectives. The survey asks for project costs to help breakdown the high costs of DERs. This survey is also motivated by a need to better understand the role of DERs in reducing energy use by the residential sectors and meeting climate goals. The survey is designed towards obtaining more substantive inputs from survey respondents by encouraging written comments, rather than setting the goal to reach a large number of respondents. We took this approach because DER is currently still a niche market, so it is more valuable to gather in-depth inputs from individuals who are performing this work rather than getting to the masses.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Tug fleet and ground operations schedules and controls. Volume 3: Program cost estimates

Cost data for the tug DDT&E and operations phases are presented. Option 6 is the recommended option selected from seven options considered and was used as the basis for ground processing estimates. Option 6 provides for processing the tug in a factory clean environment in the low bay area of VAB with subsequent cleaning to visibly clean. The basis and results of the trade study to select Option 6 processing plan is included. Cost estimating methodology, a work breakdown structure, and a dictionary of WBS definitions is also provided.

Source record↗

Marine Energy Environmental Permitting and Compliance Costs

Costs to permit Marine Energy projects are poorly understood. In this paper we examine environmental compliance and permitting costs for 19 projects in the U.S., covering the last 2 decades. Guided discussions were conducted with developers over a 3-year period to obtain historical and ongoing project cost data relative to environmental studies (e.g., baseline or pre-project site characterization as well as post-installation effects monitoring), stakeholder outreach, and mitigation, as well as qualitative experience of the permitting process. Data are organized in categories of technology type, permitted capacity, pre- and post-installation, geographic location, and funding types. We also compare our findings with earlier logic models created for the Department of Energy (i.e., Reference Models). Environmental studies most commonly performed were for Fish and Fisheries, Noise, Marine Habitat/Benthic Studies and Marine Mammals. Studies for tidal projects were more expensive than those performed for wave projects and the range of reported project costs tended to be wider than ranges predicted by logic models. For eight projects reporting full project costs, from project start to FERC or USACE permit, the average amount for environmental permitting compliance was 14.6%.

16 TIDAL AND WAVE POWER↗

NASA Software Engineering Benchmarking Study

To identify best practices for the improvement of software engineering on projects, NASA's Offices of Chief Engineer (OCE) and Safety and Mission Assurance (OSMA) formed a team led by Heather Rarick and Sally Godfrey to conduct this benchmarking study. The primary goals of the study are to identify best practices that: Improve the management and technical development of software intensive systems; Have a track record of successful deployment by aerospace industries, universities [including research and development (R&D) laboratories], and defense services, as well as NASA's own component Centers; and Identify candidate solutions for NASA's software issues. Beginning in the late fall of 2010, focus topics were chosen and interview questions were developed, based on the NASA top software challenges. Between February 2011 and November 2011, the Benchmark Team interviewed a total of 18 organizations, consisting of five NASA Centers, five industry organizations, four defense services organizations, and four university or university R and D laboratory organizations. A software assurance representative also participated in each of the interviews to focus on assurance and software safety best practices. Interviewees provided a wealth of information on each topic area that included: software policy, software acquisition, software assurance, testing, training, maintaining rigor in small projects, metrics, and use of the Capability Maturity Model Integration (CMMI) framework, as well as a number of special topics that came up in the discussions. NASA's software engineering practices compared favorably with the external organizations in most benchmark areas, but in every topic, there were ways in which NASA could improve its practices. Compared to defense services organizations and some of the industry organizations, one of NASA's notable weaknesses involved communication with contractors regarding its policies and requirements for acquired software. One of NASA's strengths was its software assurance practices, which seemed to rate well in comparison to the other organizational groups and also seemed to include a larger scope of activities. An unexpected benefit of the software benchmarking study was the identification of many opportunities for collaboration in areas including metrics, training, sharing of CMMI experiences and resources such as instructors and CMMI Lead Appraisers, and even sharing of assets such as documented processes. A further unexpected benefit of the study was the feedback on NASA practices that was received from some of the organizations interviewed. From that feedback, other potential areas where NASA could improve were highlighted, such as accuracy of software cost estimation and budgetary practices. The detailed report contains discussion of the practices noted in each of the topic areas, as well as a summary of observations and recommendations from each of the topic areas. The resulting 24 recommendations from the topic areas were then consolidated to eliminate duplication and culled into a set of 14 suggested actionable recommendations. This final set of actionable recommendations, listed below, are items that can be implemented to improve NASA's software engineering practices and to help address many of the items that were listed in the NASA top software engineering issues. 1. Develop and implement standard contract language for software procurements. 2. Advance accurate and trusted software cost estimates for both procured and in-house software and improve the capture of actual cost data to facilitate further improvements. 3. Establish a consistent set of objectives and expectations, specifically types of metrics at the Agency level, so key trends and models can be identified and used to continuously improve software processes and each software development effort. 4. Maintain the CMMI Maturity Level requirement for critical NASA projects and use CMMI to measure organizations developing software for NASA. 5.onsolidate, collect and, if needed, develop common processes principles and other assets across the Agency in order to provide more consistency in software development and acquisition practices and to reduce the overall cost of maintaining or increasing current NASA CMMI maturity levels. 6. Provide additional support for small projects that includes: (a) guidance for appropriate tailoring of requirements for small projects, (b) availability of suitable tools, including support tool set-up and training, and (c) training for small project personnel, assurance personnel and technical authorities on the acceptable options for tailoring requirements and performing assurance on small projects. 7. Develop software training classes for the more experienced software engineers using on-line training, videos, or small separate modules of training that can be accommodated as needed throughout a project. 8. Create guidelines to structure non-classroom training opportunities such as mentoring, peer reviews, lessons learned sessions, and on-the-job training. 9. Develop a set of predictive software defect data and a process for assessing software testing metric data against it. 10. Assess Agency-wide licenses for commonly used software tools. 11. Fill the knowledge gap in common software engineering practices for new hires and co-ops.12. Work through the Science, Technology, Engineering and Mathematics (STEM) program with universities in strengthening education in the use of common software engineering practices and standards. 13. Follow up this benchmark study with a deeper look into what both internal and external organizations perceive as the scope of software assurance, the value they expect to obtain from it, and the shortcomings they experience in the current practice. 14. Continue interactions with external software engineering environment through collaborations, knowledge sharing, and benchmarking.

Rarick, Heather L.↗

Data storage, image tube type

Method and apparatus for the storage of digital or analog electrical signals are provided by a memory storage system employing a conventional vidicon tube. At the beginning of an operating cycle, the vidicon is conditioned to accept electrical data input by exposing its photosensitive target to a short, high intensity light flash. A first electron beam scan of the photosensitive surface then sets up a charge pattern on the photosensitive target. A second electron beam scan of the photosensitive surface by an unmodulated electron beam then develops an output signal across an output resistor by using capacitive currents. The conditioning and scanning steps are operated repetitively at high speed using conventional television camera scan, sync, and power supply circuitry to provide a low cost data storage system.

Lipoma, P. C.↗

Study of the cost/benefit tradeoffs for reducing the energy consumption of the commercial air transportation system

Practical means were assessed for achieving reduced fuel consumption in commercial air transportation. Five areas were investigated: current aircraft types, revised operational procedures, modifications to current aircraft, derivatives of current aircraft and new near-term fuel conservative aircraft. As part of a multiparticipant coordinated effort, detailed performance and operating cost data in each of these areas were supplied to the contractor responsible for the overall analysis of the cost/benefit tradeoffs for reducing the energy consumption of the domestic commercial air transportation system. A follow-on study was performed to assess the potential of an advanced turboprop transport aircraft concept. To provide a valid basis for comparison, an equivalent turbofan transport aircraft concept incorporating equal technology levels was also derived. The aircraft as compared on the basis of weight, size, fuel utilization, operational characteristics and costs.

Hopkins, J. P.↗

2025 Geothermal Drilling Cost Curves Update: Preprint

Drilling activities account for 30% to 57% of the cost to develop and install a geothermal plant. Therefore, an accurate representation of the cost to drill a well is paramount in techno-economic analysis to determine the feasibility of a geothermal power project. In 2022, the National Renewable Energy Laboratory (NREL) endeavored to revise the U.S. Department of Energy (DOE) GeoVision baseline drilling cost curves due to extensive improvement in drilling rates at the Utah Frontier Observatory Research in Geothermal Energy (FORGE) demonstration site. That effort did not culminate in the recommendation of new curves because the actual project costs did not match the reported performance improvements and were at or above the GeoVision baseline. The need for another iteration of this analysis has arisen from industry record drilling performance reported by recent commercial field-scale and demonstration projects, including Fervo Energy’s Cape Station, the Utah FORGE 16B(78)-32 demonstration and the Geysers Power Company’s GDC-36 demonstration. Therefore, in this work, we have estimated the resulting industry average rate of penetration (ROP) and bit life and applied these parameters as inputs to the Well Cost Simplified model used in the GeoVision analysis. The resulting revised cost curves show a significant decline from the GeoVision baseline. For vertical wells, the magnitude of cost decline ranges between 12% and 24% while for deviated wells, cost reductions between 18% and 26% are estimated. The revised cost curves are in good agreement with actual cost data and therefore, quantify the economic impact of the utilization of (and advances in) polycrystalline diamond compact (PDC) bit technology and the application of physics-based methodologies that optimize mechanical specific energy.

15 GEOTHERMAL ENERGY↗

Aerodynamic Properties Analysis of Rapid Prototyped Models Versus Conventional Machined Models

Initial studies of the aerodynamic characteristics of proposed launch vehicles can be made more accurately if lower cost, high fidelity aerodynamic models are available for wind tunnel testing early in the design phase. This paper discusses the results of a study undertaken at NASA's Marshall Space Flight Center to determine if four rapid prototyping methods using a variety of materials are suitable for the design and manufacturing of high speed wind tunnel models in direct testing applications. It also gives an analysis of whether these materials and processes are of sufficient strength and fidelity to withstand the testing environment. In addition to test data, costs and turn-around times for the various models are given. Based on the results of this study, it can be concluded that rapid prototyping models show promise in limited direct application for preliminary aerodynamic development studies at subsonic, transonic, and supersonic speeds.

Springer, A.↗

Potential Alternatives Report for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes

Identifying and selecting alternative materials and technologies that have the potential to reduce the identified HazMats and hazardous air pollutants (HAPs), while incorporating sound corrosion prevention and control technologies, is a complicated task due to the fast pace at which new technologies emerge and rules change. The alternatives are identified through literature searches, electronic database and Internet searches, surveys, and/or personal and professional contacts. Available test data was then compiled on the proposed alternatives to determine if the materials meet the test objectives or if further)laboratory or field-testing will be required. After reviewing technical information documented in the PAR, government representatives, technical representatives from the affected facilities, and other stakeholders involved in the process will select the list of viable alternative coatings for consideration and testing under the project's Joint Test Protocol entitled Joint Test Protocol for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes and Field Test Plan entitled Field Evaluations Test Plan for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes, both prepared by ITB. Test results will be reported in a Joint Test Report upon completion oftesting. The selection rationale and conclusions are documented in this PAR. A cost benefit analysis will be prepared to quantify the estimated capital and process costs of coating alternatives and cost savings relative to the current coating processes, however, some initial cost data has been included in this PAR. For this coatings project, isocyanates, as found in aliphatic isocyanate polyurethanes, were identified as the target HazMat to be eliminated. Table 1-1 lists the target HazMats, the related process and application, current specifications, and affected programs.

Lewis, pattie↗

Re-engineering the mission life cycle with ABC and IDEF

The theory behind re-engineering a business process is to remove the non-value added activities thereby lowering the process cost. In order to achieve this, one must be able to identify where the non-value added elements are located which is not a trivial task. This is because the non-value added elements are often hidden in the form of overhead and/or pooled resources. In order to be able to isolate these non-value added processes from among the other processes, one must first decompose the overall top level process into lower layers of sub-processes. In addition, costing data must be assigned to each sub-process along with the value the sub-process adds towards the final product. IDEF0 is a Federal Information Processing Standard (FIPS) process-modeling tool that allows for this functional decomposition through structured analysis. In addition, it illustrates the relationship of the process and the value added to the product or service. The value added portion is further defined in IDEF1X which is an entity relationship diagramming tool. The entity relationship model is the blueprint of the product as it moves along the 'assembly line' and therefore relates all of the parts to each other and the final product. It also relates the parts to the tools that produce the product and all of the paper work that is used in their acquisition. The use of IDEF therefore facilitates the use of Activity Based Costing (ABC). ABC is an essential method in a high variety, product-customizing environment, to facilitate rapid response to externally caused change. This paper describes the work being done in the Mission Operations Division to re-engineer the development and operation life cycle of Mission Operations Centers using these tools.

Mandl, Daniel↗

The development of a Sustained High Power Density (SHPD) facility

A Sustained High Power Density (SHPD) facility is being planned within the U.S. as a non DT device which can be a bridge to a Compact Fusion Pilot Plant (CFPP) DT operated facility with the future capacity to produce a levelised cost of electricity at a rate competitive with current power generating systems. To accomplish this a review of ITER cost data and recent next step physics/engineering studies that promoted technology development, physics enhancements and innovated configuration improvements that increase operating availability have been injected into a proposed PPPL SHPD design. Much of the physics and engineering design basis for this effort centers on a series of ST studies carried out in recent years attempting to maximize the low aspect ratio (AR) ST performance within realistic engineering constraints of this compact fusion device. One issue found in the low AR design is the lack of volt-seconds generated by a small central solenoid that resides in the available space left after sizing the TF structure to support the high current density/HTS TF coil. Although not required in a larger pilot plant device, a solenoid wrapped around the plasma side of the SC TF coil was considered for the small low aspect ratio SHPD device. Adding a solenoid to the plasma side of the TF imposes a major change to the device configuration – a change which has been found to have cost and assembly issues when compared with an OH solenoid located at the machine center. Finally, the inclusion of a liquid metal first wall divertor system, the integration of local pairs of outboard DCLL blanket segments and a summary of physics performance conditions will be presented.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗