Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Satellite services system program plan

The purpose is to determine the potential for servicing from the Space Shuttle Orbiter and to assess NASA's role as the catalyst in bringing about routine on-orbit servicing. Specifically this study seeks to determine what requirements, in terms of both funds and time, are needed to make the Shuttle Orbiter not only a transporter of spacecraft but a servicing vehicle for those spacecraft as well. The scope of this effort is to focus on the near term development of a generic servicing capability. To make this capability truly generic and attractive requires that the customer's point of veiw be taken and transformed into a widely usable set of hardware. And to maintain a near term advent of this capability requires that a minimal reliance be made on advanced technology. With this background and scope, this study will proceed through three general phases to arrive at the desired program costs and schedule. The first step will be to determine the servicing requirements of the user community. This will provide the basis for the second phase which is to develop hardware concepts to meet these needs. Finally, a cost estimate will be made for each of the new hardware concepts and a phased hardware development plan will be established for the acquisition of these items based on the inputs obtained from the user community.

Hoffman, Stephen J.↗

Space station experiment definition: Long-term cryogenic fluid storage

The conceptual design of a space station Technology Development Mission (TDM) experiment to demonstrate and evaluate cryogenic fluid storage and transfer technologies is presented. The experiment will be deployed on the initial operational capability (IOC) space station for a four-year duration. It is modular in design, consisting of three phases to test the following technologies: passive thermal technologies (phase 1), fluid transfer (phase 2), and active refrigeration (phase 3). Use of existing hardware was a primary consideration throughout the design effort. A conceptual design of the experiment was completed, including configuration sketches, system schematics, equipment specifications, and space station resources and interface requirements. These requirements were entered into the NASA Space Station Mission Data Base. A program plan was developed defining a twelve-year development and flight plan. Program cost estimates are given.

Jetley, R. L.↗

Experiments of opportunity pay loads revisited

The design and operation of the Spartan program are discussed. The objective of the Spartan program is to utilize the Space Shuttle for conducting exoatmospheric science research. The Spartan 1 data storage and handling, attitude control, power, and thermal control systems and structure are described. The Spartan 1 was to study the structure of two prominent cosmic X-ray sources, the Perseus cluster of galaxies, and the center of the Milky Way. Spartan 1 was launched on June 17, 1985, deployed on June 20, and retrieved on June 22. The performance of the Spartan's system, and the collected data are analyzed; it was observed that the systems performed as planned. The methods used to minimize the Spartan program costs are considered.

Shrewsberry, D. J.↗

Application of boost guidance to NASA sounding rocket launch operations at the White Sands Missile Range

This paper addresses the unique problems associated with launching the Black Brant V, VIII, and IX sounding rocket vehicles at White Sands Missile Range (WSMR) and the significance of the introduction of the S19 to the NASA Goddard Space Flight Center Wallops Flight Facility sounding rocket program in terms of launch flexibility, improved impact dispersion, higher flight reliability, and reduced program costs. This paper also discusses salient flight results from NASA 36.011UL (the first S19 guided Black Brant launched at WSMR) and the NASA Comet Halley missions (36.010DL and 36.017DL).

Montag, W. H.↗

A Voyager-style tour of comets and asteroids 1994-2005

A low cost program that links a dual-comet flyby sample-return mission with a multicomet/asteroid tour is proposed. Two spacecraft are used to carry out this program: a three-axis stabilized Observer-class spacecraft and a smaller spin-stabilized sample-return probe. The Observer spacecraft uses earth-swingby and propulsive maneuvers to accomplish the small-body tour, which includes flybys of three comets (Tempel-1, Tempel-2, and Encke) and two asteroids (46-Hestia and 433-Eros) over a 12-year period. Two of these comets (Tempel-1 and Tempel-2) are also the shared targets, the Observer serves as a navigational aid for the probe, which scoops up dust particles as it flies through the cometary atmosphere. After collecting the cometary dust samples, the probe returns to a low earth orbit where it is recovered by the Space Shuttle.

Farquhar, Robert W.↗

Supercritical water oxidation - Concept analysis for evolutionary Space Station application

The ability of a supercritical water oxidation (SCWO) concept to reduce the number of processes needed in an evolutionary Space Station design's Environmental Control and Life Support System (ECLSS), while reducing resupply requirements and enhancing the integration of separate ECLSS functions into a single Supercritical Water Oxidation process, is evaluated. While not feasible for an initial operational capability Space Station, the SCWO's application to the evolutionary Space Station configuration would aid the integration of eight ECLSS functions into a single one, thereby significantly reducing program costs.

Hall, John B., Jr.↗

Space Station Freedom electrical power system hardware commonality with the United States Polar Platform

Information is presented on how the concept of commonality is being implemented with respect to electric power system hardware for the Space Station Freedom and the U.S. Polar Platform. Included is a historical account of the candidate common items which have the potential to serve the same power system functions on both Freedom and the Polar Platform. The Space Station program and objectives are described, focusing on the test and development responsibilities. The program definition and preliminary design phase and the design and development phase are discussed. The goal of this work is to reduce the program cost.

Rieker, Lorra L.↗

Liquid Rocket Booster (LRB) for the Space Transportation System (STS) systems study. Volume 2: Addendum 1

The potential of a common Liquid Rocket Booster (LRB) design was evaluated for use with both the Space Transportation System (STS) and the Advanced Launch System (ALS). A goal is to have a common Liquid Oxygen/Liquid Hydrogen (LO2/LH2) engine developed for both the ALS booster and the core stage. The LO2/LH2 option for the STS was evaluated to identify potential LRB program cost reductions. The objective was to identify the structural impacts to the external tank (ET), and to determine if any significant ET re-development costs are required as a result of the larger LO2/LH2 LRB. The potential ET impacts evaluated are presented.

Source record↗

The potential for crustal resources on Mars

Martian resources pose not only an interesting scientific challenge but also have immense astronautical significance because of their ability to enhance mission efficiency, lower launch and program costs, and stimulate the development of large Mars surface facilities. Although much terrestrial mineralization is associated with plate tectonics and Mars apparently possesses a thick, stationary lithosphere, the presence of crustal swells, rifting, volcanism, and abundant volatiles indicates that a number of sedimentary, hydrothermal, dry-magma mineral concentration processes may have operated on Mars. For example, in Colorado Plateau-style (roll-front) deposits, uranium precipitation is localized by redox variations in groundwater. Also, evaporites (either in salt pans or even interstitially in pore spaces) might concentrate Cl, Li, and K. Many Martian impact craters have been modified by volcanism and probably have been affected by rising magma bodies interacting with ground ice or water. Such conditions might produce hydrothermal circulations and element concentrations. If the high sulfur content found by the Viking landers typifies Martian abundances, sulfide ore bodies may have been formed locally. Mineral-rich Africa seems to share many volcanic and tectonic characteristics with portions of Mars and may suggest Mars' potential mineral wealth. For example, the rifts of Valles Marineris are similar to the rifts in east Africa, and may both result from a large mantle plume rising from the interior and disrupting the surface. The gigantic Bushveld complex of South Africa, an ancient layered igneous intrusion that contains ores of chromium and Pt-group metals, illustrates the sort of dry-magma processes that also could have formed local element concentrations on Mars, especially early in the planet's history when heat flow was higher.

Cordell, Bruce M.↗

Low Pressure Nuclear Thermal Rocket (LPNTR) concept

A background and a description of the low pressure nuclear thermal system are presented. Performance, mission analysis, development, critical issues, and some conclusions are discussed. The following subject areas are covered: LPNTR's inherent advantages in critical NTR requirement; reactor trade studies; reference LPNTR; internal configuration and flow of preliminary LPNTR; particle bed fuel assembly; preliminary LPNTR neutronic study results; multiple LPNTR engine concept; tank and engine configuration for mission analysis; LPNTR reliability potential; LPNTR development program; and LPNTR program costs.

Ramsthaler, J. H.↗

Advanced solid rocket motor project status

The objectives of the project are the following: (1) to improve system safety and reliability; (2) to improve Space Shuttle Payload performance - 12,000 lb; (3) to optimize program cost; and (4) to promote a competitive solid rocket motor industry. The topics are presented in viewgraph form and include the Advanced Solid Rocket Motor (ASRM) project team, ASRM design, design schedules, and technical issues.

Coates, Keith↗

Evolutionary lunar transportation family

The development of an evolutionary lunar transportation family (LTF) that can accommodate evolving human exploration goals is discussed. An evolutionary system is aimed at minimizing program costs while preserving programmatic versatility. Technical requirements that affect the design strategy for LTF include aerobraking technology and packaging constraints; mixed, unsymmetrical payload manifests; crew and payload exchange operations; crew and cargo off-loading on the lunar surface; and cryogenic lunar transfer and storage. It is concluded that the LTF is capable of meeting exploration goals, which include the provision for a significant early manned lunar surface science and exploration capability, the avoidance or reduction of some major operational and infrastructure requirements, and the incorporation of common vehicle designs and existing/near-term technology.

Capps, Stephen↗

Lunar campsite concept: Space transfer concepts and analysis for exploration missions

The lunar Campsite concept responds to a perceived need to identify early manned science and exploration missions that require minimal initial funding. The Campsite concept defers the build-up of many infrastructure components without escalating total program costs. The lunar Campsite has been sized nominally for four crew for 42 days (1 lunar night and 2 lunar days), but can be modified to span two lunar nights up to 60 days. Total mission fulfillment requires five Earth-to-LEO launches, four (100 mt class launch vehicle) for the two vehicle assemblies and one (PLS or NSTS) for the crew. The lunar Campsite mission mode is tandem direct using a booster stage and a lander stage. The booster is separated from the lander after the TLI burn and is expended into the Earth's atmosphere. In the Campsite mode, the lander lands on the surface not to be returned. In the crew delivery mode, the lander is guided to a precision landing about 500 m from the Campsite, and with enough propellant to return the crew to Earth. The Campsite consists of a habitat and airlock, body mounted radiators with a surface shield, sun tracking solar arrays, and an Earth-tracking high-gain antenna. The CV is very similar to the campsite delivery vehicle. The CV does not, however, have radiators or solar arrays. The vehicle stacks are essentially common in that they utilize the same structure system and engines, the same propellant tanks, the same 'cut-out' in which the CRV and payloads are incorporated, and the same RCS locations. The booster and lander stage propellant tank propellant capacities are identical and have margins which would allow additional fueling for propulsive capture of the boost stage into Earth orbit. This contractual study was performed to identify Campsite and vehicle interfaces and vehicle requirements, and to surface issues related to the integration of the Campsite and LTV's.

Source record↗

Computation of the Fluid and Optical Fields About the Stratospheric Observatory for Infrared Astronomy (SOFIA) and the Coupling of Fluids, Dynamics, and Control Laws on Parallel Computers

The June 1992 to May 1993 grant NCC-2-677 provided for the continued demonstration of Computational Fluid Dynamics (CFD) as applied to the Stratospheric Observatory for Infrared Astronomy (SOFIA). While earlier grant years allowed validation of CFD through comparison against experiments, this year a new design proposal was evaluated. The new configuration would place the cavity aft of the wing, as opposed to the earlier baseline which was located immediately aft of the cockpit. This aft cavity placement allows for simplified structural and aircraft modification requirements, thus lowering the program cost of this national astronomy resource. Three appendices concerning this subject are presented.

Atwood, Christopher A.↗

The changing nature of spacecraft operations: From the Vikings of the 1970's to the great observatories of the 1990's and beyond

Four trends in spacecraft flight operations are discussed which will reduce overall program costs. These trends are the use of high-speed, highly reliable data communications systems for distributing operations functions to more convenient and cost-effective sites; the improved capability for remote operation of sensors; a continued rapid increase in memory and processing speed of flight qualified computer chips; and increasingly capable ground-based hardware and software systems, notably those augmented by artificial intelligence functions. Changes reflected by these trends are reviewed starting from the NASA Viking missions of the early 70s, when mission control was conducted at one location using expensive and cumbersome mainframe computers and communications equipment. In the 1980s, powerful desktop computers and modems enabled the Magellan project team to operate the spacecraft remotely. In the 1990s, the Hubble Space Telescope project uses multiple color screens and automated sequencing software on small computers. Given a projection of current capabilities, future control centers will be even more cost-effective.

Ledbetter, Kenneth W.↗

Alpha LAMP Integration Facility

This paper describes the activity recently completed to meet the simulated space environment requirements for the ground-based testing of an integrated Space Based Laser (SBL) system experiment. The need to maintain optical alignment in the challenging dynamic environment of the pressure recovery system required to simulate space dominated the design requirements. A robust system design was established which minimized the total program costs, most notably by reducing the cost of integrating the components of the experiment. The components of the experiment are integrated on an optical bench in a clean area adjacent to the vacuum chamber and moved on air bearings into the chamber for testing.

Oshiro, Richard↗

EDOS operations concept and development approach

The Earth Observing System (EOS) Data and Operations System (EDOS) is being developed by the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) for the capture, level zero processing, distribution, and backup archiving of high speed telemetry data received from EOS spacecraft. All data received will conform to the Consultative Committee for Space Data Standards (CCSDS) recommendations. The major EDOS goals are to: (1) minimize EOS program costs to implement and operate EDOS; (2) respond effectively to EOS growth requirements; and (3) maintain compatibility with existing and enhanced versions of NASA institutional systems required to support EOS spacecraft. In order to meet these goals, the following objectives have been defined for EDOS: (1) standardize EDOS interfaces to maximize utility for future requirements; (2) emphasize life-cycle cost (LCC) considerations (rather than procurement costs) in making design decisions and meeting reliability, maintainability, availability (RMA) and upgradability requirements; (3) implement data-driven operations to the maximum extent possible to minimize staffing requirements and to maximize system responsiveness; (4) provide a system capable of simultaneously supporting multiple spacecraft, each in different phases of their life-cycles; (5) provide for technology insertion features to accommodate growth and future LCC reductions during the operations phase; and (6) provide a system that is sufficiently robust to accommodate incremental performance upgrades while supporting operations. Operations concept working group meetings were facilitated to help develop the EDOS operations concept. This provided a cohesive concept that met with approval of responsible personnel from the start. This approach not only speeded up the development process by reducing review cycles, it also provided a medium for generating good ideas that were immediately molded into feasible concepts. The operations concept was then used as a basis for the EDOS specification. When it was felt that concept elements did not support detailed requirements, the facilitator process was used to resolve discrepancies or to add new concept elements to support the specification. This method provided an ongoing revisal of the operations concept and prevented large revisions at the end of the requirement analysis phase of system development.

Knoble, G.↗