NASA-STD-6030 and NASA-STD-6033 Compliance Matrix Forms
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Abstract not provided.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Abstract not provided.
When photovoltaic modules are installed on rooftops the temperature is dependent on both the geographic location and the mounting configuration. If the mounting structure does not provide sufficient air flow in a hot environment, the 98th percential temperature will exceed 70 degrees C which according to IEC TS 63126 requires higher levels of thermal stability testing. However, a simple there is not a clear way to determe which temperature level is needed for a particular location and system design. In this work we identify a relationship between the gap between the rooftop and a module and propose methods to describe minimum gaps for a given location. Because system designs vary in more ways than just the gap, we show how to determine an effective gap which can be simply applied to generic calculations. Lastly, we show measurements and calculations from several systems to demonstrate how this method could work.
Explore the source record for details and available documents.
This presentation is part of a session providing an overview of the multifamily weatherization process from programmatic, technical, grantee, and Subgrantee perspectives and feature a panel discussion exploring the day-to-day activities of a multifamily program and how they differ from single-family weatherization projects.
Explore the source record for details and available documents.
The research project is undertaken to better understand the changing relationship between the two basic methods of building energy code compliance – prescriptive and performance – and how those methods relate to each other with respect to advancements in building energy computer simulation standards and capabilities. The International Energy Efficiency Code (IECC) is a model code adopted by many jurisdictions across the United States. Historically, the prescriptive compliance methodology has been preferred in most jurisdictions. The prescriptive methodology requires meeting or exceeding specific efficiency minimums for each envelope component. This tends to be a simple method to teach and verify. A more involved prescriptive alternative called the Total UA alternative is sometimes used. This method requires some multiplication, summing, and comparison to compute, so it is done with a fairly simple computer program. However, advances in computer and building energy simulation technology have resulted in increased use of more detailed performance compliance methods. The performance compliance method establishes the annual energy cost threshold via hourly simulation models. The compliance threshold is determined with a comparison building model simulation with geometry similar to the proposed home and with energy feature parameters and efficiencies as specified in the IECC. This project examines relationships between the two methods of building energy code compliance, including: • Overall annual energy use based on utility bill analysis by compliance method • Code official work processes with respect to compliance methods • Gaps and issues associated with building code compliance methods • Simulated energy use difference between compliance methods • Code compliance cost as a function of compliance method • Code compliance labeling effectiveness for high performance residences • Getting to net zero energy use and net zero greenhouse gas emissions through high performance code alternatives • Electronic code permitting and compliance alternatives
5/22/2019 National Aeronautics and Space Administration 1 Airspace Technology Demonstration 2 (ATD-2) Analysis of APREQ Flights at CLT May 22, 2019 5/22/2019 Objective 2 Quantify impact of IADS Phase 1 & 2 capabilities on APREQ flights at CLT with respect to: • Compliance to the Controlled Take Off Time (CTOT) • Benefits for APREQ flights that use IDAC to renegotiate for an earlier CTOT • Benefits of pre-scheduling APREQ flights using the Earliest Off Block Time (EOBT) • Relationship between EOBT compliance and rescheduling CTOT 5/22/2019 CLT APREQ Daily Compliance(Compliance Improvement Since ATD-2 Start) 3 Steady increase of APREQ compliance over the life of the project. Reduced variation in compliance leading to improved predictability. In addition to overall improved compliance into TBM systems, the predictability is increasing 5/22/2019 APREQ Compliance 10K Rolling Window 4 The most substantial APREQ compliance improvements started with Phase 2 capability (AEFS integration, ZTL IDAC, pre-scheduling and scheduler updates). 5/22/2019 IADS Phase 1 & 2 Benefit Mechanisms 5 1. Collaborative surface metering •Reduced engine run time •Reduced fuel consumption and emissions 2. Overhead stream operational integration a.Scheduling controlled flights at the gate •Reduced engine run time •Reduced fuel consumption and emissions b.APREQ renegotiating for an earlier slot •Reduced total delay •Passenger value of time and crew costs •Reduced engine run time •Reduced fuel consumption and emissions Benefits (1) and (2a) achieved through tactical gate holds Benefit (2b) achieved through APREQ renegotiation process described below Step 1: APREQ flight has a release time but is capable of taking off earlier Step 2: FAA TMC uses the IDAC green space / red space to identify and request an earlierslot in the overhead stream Step 3: Aircraft receives earlierrelease time and the difference between the release times is the reduction in delay 5/22/2019 Benefits for APREQ flights using IDAC to renegotiate for earlierCTOT 6 LBS Fuel 270.7 hours of delay saved by electronically renegotiating a better overhead stream time for 2,071 flights. • The benefits described here are associated with better use of existing capacity in the overhead stream, and technology to reduce surface delay. •These benefits are in addition to (distinct from) surface metering savings. 5/22/2019 APREQ Delay For Pre-Scheduled Flights into KATL Have Been Reduced and are More Predictable For the Last Five Months 7 Substantial Improvements in predictability of delay for the last 5 months 5/22/2019 EOBT Compliance / CTOT Reschedulefor Pre-Scheduled Flights into KATL 8 5/22/2019 Wrap-up 9 • Compliance to the CTOT has improved throughout the lifecycle of ATD-2 with biggest improvements following the introduction of Phase 2 capabilities • Rescheduling APREQ flights using IDAC has reduced 270.7 hours of delay at CLT • Predictability of local surface delay for APREQ flights is substantially improved via pre-scheduling with the IADS system • Pre-scheduled flights that reschedule for later times tend to call ready later with respect to EOBT
Historically, Savannah River Nuclear Solutions LLC (SRNS) tracked environmental regulatory commitments and the requirements from hundreds of permits at the Savannah River Site (SRS) using several separate methods, making integrated compliance assurance cumbersome and labor-intensive. When SRNS experienced an increase in environmental issues in 2017, SRNS management and U.S. Department of Energy - Savannah River (DOE-SR) management decided a single, proactive approach was needed to capture environmental permit information (including regulations, Consent Orders, DOE Orders, and any other state or federally issued statement of requirements), track the tasks necessary to ensure compliance with these requirements, and thereby mitigate the risk of noncompliance. SRNS developed a list of mandatory objectives that the tool must meet to function as a Comprehensive Environmental Permits Linking Tool (CEPLT). A key requirement was the ability to map Site permits to their governed locations and display the associated requirements at the compliance point (e.g., outfall, stack, waste unit, etc.). Several options included modifying existing onsite resources, building a custom onsite solution, purchasing an off-the-shelf solution, and contracting an offsite developer to build a custom solution. SRNS concluded an off-the-shelf solution with configuration and customization options would provide the flexibility to fit the unique needs of Savannah River Site (SRS) while taking advantage of industry-tested software and providing a reduced deployment timeline. SRNS chose Gensuite{sup R} a, a cloud-based solution that offers numerous a la carte applications in the environmental, health, and safety arenas, as the best candidate. SRNS selected three (3) integrated applications (Compliance Calendar, Permit Manager, and Mapper) to function as the CEPLT. The Compliance Calendar module allows for creation and tracking of regulatory commitment tasks assigned to responsible environmental professionals. Permit Manager organizes permits and other requirement documents, linking the commitments in each to Compliance Calendar tasks and/or implementing procedures. Mapper provides GIS capability for mapping the data from the other two modules to their physical onsite locations. The CEPLT was configured to allow for other SRS Site Tenants to eventually utilize the applications. Additionally, DOE-SR uses the CEPLT to provide an overview of contractor environmental compliance activities and to organize DOE-specific documents and tasks. The CEPLT fulfilled the requirement of meeting current compliance needs as well as providing the ability to grow as new organizations are incorporated and functionality is expanded. SRNS now uses the CEPLT to more effectively manage permit requirements, improve knowledge transfer, and increase the Site's overall protection of the environment, the Site worker, and the public. Possible future uses of the system include integration of mobile applications for timely communication of potential non-compliant conditions and DOE complex-wide deployment allowing for enhanced DOE site and Head Quarters oversight. Implementation of CEPLT will result in cost savings, both in terms of dollars and man-hours. (authors)