Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMPANIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Technologist in Residence for Advanced Manufacturing and Materials in Unconventional Oil and Gas Equipment and Infrastructure

The DOE Technologist in Residence (TIR) program pairs a senior technical staff member from a National Laboratory (Lab Technologist), and a senior technical staff member(s) from a clean energy manufacturing company or consortium of companies (Industry Technologist). Each technologist may represent single or multiple national laboratories, or single or multiple companies. These pairs of Lab and industry technologists work together for a period of 18 to 24 months to accomplish several goals: 1) Identify the participating company’s (or companies’) technical priorities and challenges, and the resources and capabilities in DOE’s National Laboratories that may be highly suitable to address them; 2) Propose collaborative R&D efforts to develop science-based solutions to the company’s (or companies’) most strategic scientific, technological, and business issues; and 3) Develop a general framework agreement and begin developing specific scopes of work for the proposed collaborative R&D efforts. The proposed R&D will then take place outside of the program and will not use TIR program funds. Oak Ridge National Laboratory (ORNL) and Pioneer Natural Resources were awarded a TIR project by DOE in late 2016 and the CRADA component of the project was initiated in 2017. This report describes work performed under the CRADA agreement between 2017 and 2020.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Commercial Space Research: Entering a New Stage

The Space Act which established NASA included direction that NASA is to foster to the maximum extent possible the commercial use of space. In order to achieve this, NASA began establishing in 1985, Commercial Space Centers (CSCs). These centers are a consortium of industry, academia, and government. Primarily university based, the CSCs are chartered to partner with industry to help companies learn how using space can improve their bottom line. Responsibility for the Commercial Space Centers rests with the Space Product Development Office at Marshall Space Flight Center. Since the program was established in 1985, SPD has sponsored nearly 180 commercial microgravity research payloads on 30 Shuttle missions. The vast majority of these missions were on the order of 6 days. Most companies have only had on average three flight opportunities to advance their product development efforts. From the product development standpoint of an individual company only three weeks of microgravity time have been obtained to date. Of key importance to a company is the fact that this time has not been continuous. Anywhere from one to three years elapses between flights. Despite these flight constraints, the companies in the SPD program have made considerable progress. For example, over the course of the program through 1999, industry has invested over half a billion dollars in cash and in-kind. Over a dozen new product lines are in development by the industrial partners of the Commercial Space Centers. Now the companies partnered with the SPD program have a new opportunity in the International Space Station. The long duration capability provided by the Station will provide double the amount of per company average microgravity time in just the first increment. Current planning through planning increment 5 shows that commercial investment in space research should now be positioned for greater returns.

Nall, Mark E.↗

NASA’s Initial and Sustained Artemis Human Landing Systems

On March 26, 2019, in keeping with President Trump’s Space Policy Directive-1, Vice President Pence charged NASA with landing the first woman and the next man on the South Pole of the Moon by 2024, followed by a sustained presence on and around the Moon by 2028. NASA’s Human Landing System (HLS) Program is responsible for the final mode of transportation in deep space that will carry humans to and from the surface of the Moon, to be designed and developed by American companies for NASA’s Artemis lunar exploration program. This paper examines the approach for Artemis human landing systems for both the initial missions and future sustained missions. While achieving the 2024 goal requires a focus on speed and the use of mature technologies, planning toward sustained operations to and from the lunar surface requires a focus on reliability and reusability. The two approaches, however, are not mutually exclusive, as demonstrated by the HLS prime contractors’ integrated lander system proposals. On April 30, 2020, NASA announced that Blue Origin of Kent, Washington, Dynetics (a Leidos company) of Huntsville, Alabama, and SpaceX of Hawthorne, California, were the awardees for NASA’s Human Landing System contracts under Appendix H of the NextSTEP-2 Broad Agency Announcement. The companies began work in a 10-month base period during which NASA teams worked with the companies to streamline the review of required products and to share the agency’s expertise in human spaceflight systems development. Following the base period, NASA will determine which company or companies will develop the human landers for the initial missions, including the 2024 landing, and which companies will develop landers for future sustained missions toward the end of the decade.

HLS↗

NREL Quickens its Tech Transfer Efforts

Innovations and 'aha' movements in renewable energy and energy efficiency, while exciting in the lab, only truly live up to their promise once they find a place in homes or business. Late last year President Obama issued a directive to all federal agencies to increase their efforts to transfer technologies to the private sector in order to achieve greater societal and economic impacts of federal research investments. The president's call to action includes efforts to establish technology transfer goals and to measure progress, to engage in efforts to increase the speed of technology transfer and to enhance local and regional innovation partnerships. But, even before the White House began its initiative to restructure the commercialization process, the National Renewable Energy Laboratory had a major effort underway designed to increase the speed and impact of technology transfer activities and had already made sure its innovations had a streamlined path to the private sector. For the last three years, NREL has been actively setting commercialization goals and tracking progress against those goals. For example, NREL sought to triple the number of innovations over a five-year period that began in 2009. Through best practices associated with inventor engagement, education and collaboration, NREL quadrupled the number of innovations in just three years. Similar progress has been made in patenting, licensing transactions, income generation and rewards to inventors. 'NREL is known nationally for our cutting-edge research and companies know to call us when they are ready to collaborate,' William Farris, vice president for commercialization and technology transfer, said. 'Once a team is ready to dive in, they don't want be mired in paperwork. We've worked to make our process for licensing NREL technology faster; it now takes less than 60 days for us to come to an agreement and start work with a company interested in our research.' While NREL maintains a robust patent portfolio, often companies are looking to do more than just license a technology. These relationships are invaluable in successfully moving technologies from NREL to the marketplace. 'We may generate new and potentially valuable innovations, but our commercialization partners do the heavy work of building a successful business around our technology,' Farris said. Tools such as CRADAs (Cooperative Research and Development Agreements) allow NREL to continue working with companies to refine and develop technologies. And, working with businesses is an area where NREL excels. NREL is responsible for one quarter of the CRADAs in the DOE system. 'When you look at the results of our CRADA program, you can demonstrate that we are actively engaged with companies in collaborating on research and moving technologies to market,' Farris said. NREL is first among DOE labs with 186 active CRADAs. And last year, NREL also was first with the number of new CRADAs signed. 'Part of the success in our working with industry goes back to NREL's mission to grow and support new industries,' Farris added. 'NREL has basic research capabilities, but we are never going to be the ultimate producer of a commercial product. That is the role of the private sector.' Farris also credits the advocacy and support that the Office of Energy Efficiency and Renewable Energy at DOE provides for these technology transfer activities. 'EERE's support is critical to our success,' Farris said. To assist the private sector in moving a technology from the lab to the manufacturing line, NREL has a number of programs in place to give that first, or even final, nudge toward commercialization. For instance, the Commercialization Assistance Program helps startups overcome technical barriers by granting free access to 40 hours of work at the lab. Through the Innovation and Entrepreneurship Center, NREL also helps clean energy businesses develop strong links with the financial community, as well as other key stakeholders in the commercialization process. In March, NREL formally opened the Colorado Center for Renewable Energy and Economic Development a cooperative program with the state of Colorado designed to bring together stakeholders and service providers that support the growth of cleantech companies. CREED currently is working with more than 25 stakeholders - governmental partners, universities, industry associations, venture capital organizations and small businesses - to improve the access these groups have to technologies developed at NREL and to provide services such as classes and workshops for entrepreneurs. When it comes to bringing together cleantech stakeholders, NREL's Industry Growth Forum is the marquee event. At the forum, clean energy entrepreneurs have the opportunity to present their business cases to an expert panel of investors and energy executives. Companies that have presented have raised $3.4 billion in funding to date.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Materials for Advanced Ultra-Supercritical (AUSC) Steam Turbines – AUSC Component Demonstration

The work by the United States Department of Energy (U.S. DOE)/Ohio Coal Development Office (OCDO) Advanced Ultra-Supercritical (AUSC) Steam Boiler and Turbine Materials Consortia from 2001 through September 2015 was primarily focused on lab scale and pilot scale materials testing. The field testing included air-cooled probes and steam-cooled “loops” that were installed into existing utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion due to the constituents in the coal ash. Successful research and development resulted in identification of metallic alloy materials and fabrication processes suited for power generation applications with metal temperatures up to approximately 1472°F (800°C). These materials or alloys have shown, in extensive laboratory tests and shop fabrication studies, to have excellent applicability for high-efficiency low CO2 transformational power generation technologies. However, as valuable as these material field tests have been for obtaining information, their scale is significantly below that required to minimize the risk associated with a power company building a multi-billion-dollar AUSC power plant. To decrease the identified risk barriers to full-scale implementation of these advanced materials, the U.S. DOE/OCDO AUSC Steam Boiler and Turbine Materials Consortia identified the key areas of the technology that need to be tested at a larger scale. Based upon the recommendations and outcome of a Consortia-sponsored workshop with the U.S.’s leading utilities, a Component Test (ComTest) Program for AUSC was proposed. The AUSC ComTest program would define materials performance requirements, plan for overall advanced system integration, design critical component tests, fabricate components for testing from advanced materials, and carry out the tests. A Pre-FEED evaluation of the test facility including the evaluation of three potential sites has been completed and previously reported. This report describes the Front-End Engineering Design (FEED), Detailed Engineering and the Environmental Assessment of the ComTest project. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as INCONEL 740H or HAYNES 282 alloys. Pathways to supply these components for ComTest have been identified as well as any further development that would be required. Every project of this nature has challenges and this project was no exception. The greatest challenge has been the project cost. Largely due to the infrastructure and balance of plant equipment upgrades required for Youngstown Thermal, the estimated project cost for the “base case” project was greater than originally budgeted. The project team spent a significant amount of time exploring opportunities for reducing the project cost. These options included: • Youngstown Thermal was exploring building a Combined Heat and Power (CHP) unit at their facility. The Youngstown Thermal staff, supported by Thermal Engineering Group, worked with the project team to determine whether it was economically desirable to supply ComTest with steam and other utilities, which would be supplied by the CHP project. • The project team also evaluated opportunities to optimize the project scope to reduce cost, such as reducing project scope by eliminating the Superheater Outlet Header test. • Southern Company had offered two sites as possible host locations for ComTest. Both sites had infrastructure in place such as steam from an existing unit, natural gas, cooling water and ample electrical power that would be required to be added at the Youngstown Thermal site. Utilizing this existing infrastructure could reduce the project cost. An additional project challenge was the departure of Babcock and Wilcox from the project in September 2016. This project setback was overcome by GE Power’s willingness to assume the design of the ComTest superheater. Since the project could not proceed without the superheater, this was a very positive project development. The merger of the GE Power and Alstom Power steam turbine divisions created synergies leading to the conclusion that instead of building a small-scale turbine, a more practical and useful endeavor would be to validate the manufacturing technology and supplier readiness for fabricating and machining full scale steam turbine components. Consequently, in March 2017, GE Power decided that a steam turbine test would not be necessary as part of the ComTest demonstration. Removing the operational testing of the steam turbine from ComTest further reduced the total project cost. Additionally, there was an opportunity to move ComTest from Youngstown Thermal to one of the Southern Company sites and operate ComTest at supercritical steam conditions and test the steam turbine main stop/control valve at a temperature and pressure that would be representative of the conditions of a high pressure steam turbine inlet valve. The steam could also possibly be returned to the host boiler so there would be no economic penalty of using this steam for ComTest. Relocating the project could further reduce the project cost due to the infrastructure already in place, including high pressure natural gas and cooling water, and the potential for heat integration, allowing a reduction of operating costs. Due to these potential cost reductions, it was decided to move the project away from Youngstown Thermal in March 2017. As integrating ComTest at the Southern Company site was explored, an issue was raised regarding the integration of the ComTest cycle with the plant steam cycle. Steam would be supplied to ComTest at nominally ~3865 psia and 775°F. The steam would be heated with natural gas to 1400°F for the valve test and then cooled to 1000°F so that the steam would be returned to the host boiler at the same conditions as their high pressure steam turbine inlet. However, there were concerns raised that the addition of the energy (natural gas) to the steam could trigger a New Source Review on the unit. Southern Company did not want ComTest to cause this review, so condensing all of the steam exiting ComTest and returning it to the host steam cycle as condensate was explored to insure there would be no implication that ComTest was adding energy to the host plant’s steam cycle. Ultimately, Southern Company decided that they wanted to “decouple” ComTest from the operating unit, making ComTest self-supporting, similar to the Youngstown Thermal “base case.” Without the steam turbine, the project team reached a consensus that operating the ComTest Superheater and steam turbine valves at the typical pressure of a package boiler (~1000 psig) would not generate enough useful technical information to justify the cost of the test. Therefore, it was decided in the December 2017 project quarterly meeting to cancel the operational phase of ComTest. Throughout the engineering phase of ComTest, manufacturing and supply chain challenges were identified. When GE Power recommended dropping the steam turbine test from ComTest, they identified many important manufacturing issues that should be evaluated and demonstrated. Other challenges had been raised by the GE Power group designing the superheater as well as those engineering components such as pressure relief and steam turbine bypass valves. In the December 2017 meeting, the project team decided that it was more beneficial to the AUSC technology to pursue these manufacturing and supply chain issues as Phase 2 of the ComTest project. This report is organized in the following manner: • Section 2 discusses the ComTest project background and organization. • Section 3 discussed project management. • Section 4 discusses the design of the ComTest AUSC components – the Superheater, steam turbine and Superheater Outlet Header. • Section 5 discusses the implementation of ComTest at Youngstown Thermal and the Southern Company site. • Section 6 discusses the development of the AUSC Supply Chain • Section 7 discusses the recommended plan for Phase 2 of ComTest

01 COAL, LIGNITE, AND PEAT↗

"Dedicated To The Continued Education, Training and Demonstration of PEM Fuel Cell Powered Lift Trucks In Real-World Applications."

The project objective was to further assist in the commercialization of fuel cell and H2 technology by building further upon the successful fuel cell lift truck deployments that were executed by LiftOne in 2007, with longer deployments of this technology in real-world applications. We involved facilities management, operators, maintenance personnel, safety groups, and Authorities Having Jurisdiction. LiftOne strived to educate a broad group from many areas of industry and the community as to the benefits of this technology. Included were First Responders from the local areas. We conducted month long deployments with end-users to validate the value proposition and the market requirements for fuel cell powered lift trucks. Management, lift truck operators, Authorities Having Jurisdiction and the general public experienced 'hands on' fuel cell experience in the material handling applications. We partnered with Hydrogenics in the execution of the deployment segment of the program. Air Products supplied the compressed H2 gas and the mobile fueler. Data from the Fuel Cell Power Packs and the mobile fueler was sent to the DOE and NREL as required. Also, LiftOne conducted the H2 Education Seminars on a rotating basis at their locations for lift trucks users and for other selected segments of the community over the project's 36 month duration. Executive Summary The technology employed during the deployments program was not new, as the equipment had been used in several previous demos and early adoptions within the material handling industry. This was the case with the new HyPx Series PEM - Fuel Cell Power Packs used, which had been demo'd before during the 2007 Greater Columbia Fuel Cell Challenge. The Air Products HF-150 Fueler was used outdoors during the deployments and had similarly been used for many previous demo programs. The methods used centered on providing this technology as the power for electric sit-down lift trucks at high profile companies operating large fleets. As a long-standing lift truck dealership, LiftOne was able to introduce the fuel cells to such companies in the demanding applications. Accomplishments vs Objectives: We were successful in respect to the stated objectives. The Education Segment's H2 Education Sessions were able to introduce fuel cell technology to many companies and reached the intended broad audience. Also, demos of the lift truck at the sessions as well as the conferences; expos and area events provided great additional exposure. The Deployments were successful in allowing the 6 participating companies to test the 2 fuel cell powered lift trucks in their demanding applications. One of the 6 sites (BMW) eventually adopted over 80 fuel cells from Plug Power. LiftOne was one of the 3 fuel cell demonstrators at BMW for this trial and played a major role in helping to prove the viability and efficiency of this alternative form of energy for BMW. The other 5 companies that participated in the project's deployments were encouraged by the trials and while not converting over to fuel cell power at this time, expressed the desire to revisit acquisition scenarios in the near future as the cost of fuel cells and infrastructure continue to improve. The Education sessions began in March of 2009 at the 7 LiftOne Branches and continued throughout the duration of the project. Attendees came from a large base of lift truck users in North Carolina, South Carolina and Virginia. The sessions were free and invitations were sent out to potential users and companies with intrigue. In addition to the Education content at the sessions (which was offered in a 'H2 101' format), LiftOne was able to demonstrate a working fuel cell powered lift truck, which proved to be a big draw with the 'hands on' experience. LiftOne also demo'd the fuel cell lift trucks at many conferences, expos, professional association meetings, trade shows and 'Green' events in major cities region including Charlotte, Greenville, and Columbia. Such events allowed for H2 Education Material to be presented, and recruit attendees for future sessions. The Deployments began in May '09 and continued through August'10. While the overall results were good, there were some technical problems with the fuel cells at times during the trials. These items are detailed in the attachment provided with this submission. There were never any safety issues during the trials as design features and diagnostic capabilities allowed for quick analysis and field repairs. There were no products developed during this award, as we demo'd existing products. During the project, Tom Dever was able to speak at several panel type discussions and presentations at the NHA/ Fuel Cell & H2 Energy Annual Conference, as well as at the Promat Show in Chicago. Expertise and deployment/ education experiences were imparted during these events. The presentations are included as attachments.

08 HYDROGEN↗

Synchrophasor Visual Integration and Event Evaluation for Utilities (SynchroVIEEU) with High Penetration of Renewables

The Hawaiian Electric Companies (Companies), operating independent grid systems on the islands of Oahu, Hawaii, Maui, Molokai and Lanai, have been contending with some of the highest levels of renewable generation from both utility-scale and distributed generation resources. Renewable penetration levels exceeding 50% of generation are some of the highest in the nation and are changing the system characteristics and requiring operational changes to grid management. The Companies have aggressively leveraged federal, multi-state and industry grant funding to demonstrate new technologies for monitoring, visualization, forecasting and analysis to inform transformation needs and to improve operational awareness, especially at the distribution level. As part of the American Recovery and Reinvestment Act (ARRA) supported efforts to facilitate integration of renewables, synchrophasor devices were deployed on the islands of Hawaii and Maui in 2010. The devices have potential to provide Hawaii Electric Light Company (HELCO) on Hawaii Island and Maui Electric Company (MECO) with additional information to support post-event analysis and to help quantify observed area-wide changes in voltage and frequency on the systems. Consistent with the U.S. Department of Energy’s (DOE) Office of Electricity Delivery and Energy Reliability (OE) FOA objectives, the goal of this project was to accelerate the integration of synchrophasor information into production grade data visualization and analysis platforms/models to inform timely, efficient and reliable operations of a modern grid in light of high penetrations of renewable resources. The project comprised a two-year development effort to investigate the integration and visualization of synchrophasor field data into production-ready transmission and distribution proactive modeling efforts and a common data analysis platform application currently being used by the Companies. Conceptually, the project was about getting the right data to the right people at the right time in an easily accessible and timely environment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Initiation of Experimental Campaign to Address Knowledge Gaps Related to Simultaneous Thermal and Gamma Radiation Aging of Crosslinked Polyethylene and Ethylene-Propylene Rubber Cable Insulation

Key cable knowledge gaps identified in the Expanded Materials Degradation Assessment (EMDA) volume on Aging of Cables and Cable Systems (Volume 5) specifically relate to the combined effects of thermal and gamma irradiation stresses on cable insulation materials. These include dose rate effects (DRE), inverse temperature effects (ITE), and synergistic effects (S/E). Extent of radiation-induced polymer degradation is proportional to absorbed dose, but DRE describe the phenomenon in which degree of damage is based not only on total dose, but also on the dose rate experienced during dose accumulation. This can be particularly complicated in the presence of thermal stress as a material spends more time at elevated temperature to receive the same total dose at a lower dose rate. Rates of cable polymer degradation generally increases with temperature, but ITE describes the situation in which polymer material damage under irradiation is greater at lower temperatures than at higher temperatures. Finally, S/E describe the concept that the mechanism of polymer material degradation when exposed to thermal aging and radiation aging in succession may be different than when exposed to thermal and radiation aging concurrently. The experimental campaign at the Pacific Northwest National Laboratory (PNNL) described in this report seeks to address these knowledge gaps through investigation of the degradation of relevant cable insulation materials at select conditions using controlled temperatures, dose rates and total doses. Insulation materials considered were chosen to represent those most commonly found in U.S. nuclear power plants in terms of manufacturers and polymer systems. They include products from manufactures including The Rockbestos Company; The Okonite Company; Boston Insulated Wire & Cable Company; Kerite Company; Anaconda Company; Brand Rex, Inc.; and Samuel Moore Company. The products include the most ubiquitous cross-linked polyethylene (XLPE) and ethylene-propylene rubber (EPR) classes of insulation polymer. Circulating air ovens with remote temperature sensing and control are positioned within the gamma irradiation beam to enable controlled temperatures during radiation exposure. Dose rates are controlled through repeatable positioning of specimens at determined distances from the Cobalt-60 gamma source. Total absorbed doses for comparing temperature and dose rate effects are controlled by removing samples from exposure at pre-determined time points. The effects of gamma beam geometry, source decay and attenuation due to samples, ovens and racks are determined and controlled for using local point dosimetry. The temperature, dose and dose rates selected for the experimental campaign described in this report were determined following input from a range of stakeholders and intended to balance the constraints of the experimental capabilities, available material, project timeline and project funding with the value of the effort in narrowing EMDA-identified knowledge gaps. Results from this campaign are anticipated to reduce uncertainty in the understanding of cable material degradation behavior in nuclear power plant environments and thereby support cable aging management in long term operation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Draft Electric Rule 21 Test Protocols for Advanced Inverter Functions

Disclaimer: The following document includes draft certification protocols and should not be viewed as a consensus-based performance standard. Distributed energy resources (DERs), such as photovoltaic (PV) systems, when deployed in a large scale, are capable of significantly influencing the operation of bulk and local power systems. Looking to the future, European and American stakeholders are working on standards to make it possible to manage the potentially complex interactions between DER and the power system. One of the jurisdictions considering modifications to the DER interconnection requirements is California. To determine what changes could improve electric grid reliability and allow greater penetrations of renewable energy, the California Public Utilities Commission (CPUC) and the California Energy Commission (CEC), in conjunction with consultant Frances Cleveland, convened the Smart Inverter Working Group (SIWG) in January 2013. The SIWG--composed of state agencies, utility engineers, national laboratories, manufacturers, trade associations, and advocacy groups--provided the CPUC a set of recommendations in early 2014 1 . The recommendations included specific advanced DER functions and interoperability requirements, along with a proposed timeline, for California to add new capabilities to grid-interconnected DER. On August 18, 2014 the three California Investor-Owned Utilities (IOUs)--Pacific Gas and Electric Company (PG&E), Southern California Edison Company (SCE) and San Diego Gas & Electric Company (SDG&E)--drafted a Advice Letter filing to the CPUC setting forth revisions to Electric Tariff Rule 21 to conform to the seven recommendations made by the Working Group 2 . After a comment period, the CPUC issued an update to the IOU recommendations 3 . At the time of this publication, there was no final legal ruling on the CPUC Rulemaking (R.) 11-09-011 ("Order Instituting Rulemaking on the Commission's Own Motion to improve distribution level interconnection rules and regulations for certain classes of electric generators and electric storage resources"). In the U.S., Nationally Recognized Test Laboratories (NRTLs) independently verify products to safety and functional standards. PV inverters are certified to Underwriters Laboratories (UL) Standard 1741 4 . However, new advanced inverter functions described in the SIWG and IOU proposals are not included in this standard, so there is a critical need to develop test protocols for these functions in preparation of a positive ruling by the CPUC. Through a California Solar Initiative Grant, Sandia National Laboratories (Sandia or SNL), Underwriters Laboratories (UL), Electric Power Research Institute, Inc. (EPRI), Xanthus Consulting, SunSpec Alliance, Loggerware, and utility and PV inverter manufacturers have collaborated to draft this certification protocol for the Rule 21 SIWG Phase 1 advanced inverter functions. This report also includes test procedures for Phase 2 and Phase 3 functions that will be demonstrated later in the CSI4 project. This collaborative effort was performed in close junction with the UL 1741 Standards Technical Panel (STP) working group. This document represents a snapshot of the draft testing protocols at the time of publication and not a consensus certification protocol for advanced inverters. 1 California Public Utilities Commission, "Recommendations for Updating the Technical Requirements for Inverters in Distributed Energy Resources, Smart Inverter Working Group Recommendations," Filed 7 Feb 2014. 2 J.J. Newlander, R.G. Litteneker, S.W. Walter, M. Dwyer, Joint motion of Pacific Gas and Electric Company (U 39 E), Southern California Edison Company (U 338 E) and San Diego Gas & Electric Company (U 902 E) regarding implementation of smart inverter functionalities, Rulemaking 11-09-011 Advice Letter, 18 July, 2014. 3 J.T. Sullivan, CPUC Rulemaking 11-09-011 Agenda ID #13460, 13 Nov, 2014. 4 Underwriters Laboratories Std. 1741 Ed. 2, "Inverters, Converters, Controllers and Interconnection System Equipment for use with Distributed Energy Resources," 2010.

42 ENGINEERING↗

Restoring Homes After Wildfires, Interviews with Practitioners about Common Cleanup Approaches and Knowledge Gaps

This document summarizes the key themes from our interviews with 10 remediation companies regarding common approaches used to remove odor and contaminants from homes impacted by fire and smoke damage Remediation companies are in agreement that thorough cleaning is the first step. Cleaning and removing contaminants from homes impacted by wildfires may be sufficient to eliminate smoke odor, which is the most important step when it comes to reducing exposure to any residues that may pose health risks to residents. Remediation companies differ in their approaches to addressing odors, such as using ozone generators, hydroxyl generators, chlorine dioxide treatment, thermal fogging and applying sealants. Their opinions of what works and why differs. There is little consensus on efficacy, safety, or application protocols. For example, some view ozone very favorably, while others would prefer using other methods. The influence of insurance companies in their coverage for some methods but not others also impact the decision about the approaches used. Remediation companies differ in their view on laboratory testing for contaminants, which may be partly influenced by insurance companies as well.

99 GENERAL AND MISCELLANEOUS↗

Feasibility Analysis of Taxi Fleet Electrification Using 4.9 Million Miles of Real-World Driving Data: Preprint

Ride hailing activity is rapidly increasing, largely due to the growth of transportation network companies such as Uber and Lyft. However, traditional taxi companies continue to represent an important mobility option for travelers. Columbus Yellow Cab, a taxi company in Columbus, Ohio, offers traditional line-of-sight hailing as well as digital hailing through a mobile app. Data from Columbus Yellow Cab was provided to the National Renewable Energy Laboratory to analyze the potential for taxi electrification. Columbus Yellow Cab data contained information describing both global positioning system trajectories and taxi meter information. The data spanned a period of 13 months, containing approximately 70 million global system positioning system points, 840 thousand trips, and 170 unique vehicles. A variety of scenarios were evaluated using Columbus Yellow Cab data and the Electric Vehicle Infrastructure Projection Tool (EVI-Pro) to understand challenges and opportunities associated with operating an electrified taxi fleet. Two main factors-access to home charging and vehicle specifications-are shown to be major variables affecting successful electric fleet operation. The analysis indicates that 95.7% of taxi travel days can be successfully completed by a 250-mile-range electric vehicle assuming access to overnight and public charging infrastructure. However, when no overnight access is available to fleet vehicles, only 39.9% of taxi travel days are possible with 250-mile range electric vehicles. An additional scenario, reducing the vehicle range from 250 miles to 100 miles (while controlling for infrastructure access and permitting overnight charging) resulted in only 34.4% of taxi travel days being completed.

33 ADVANCED PROPULSION SYSTEMS↗

Operating The Central Process Systems At Glenn Research Center

As a research facility, the Glenn Research Center (GRC) trusts and expects all the systems, controlling their facilities to run properly and efficiently in order for their research and operations to occur proficiently and on time. While there are many systems necessary for the operations at GRC, one of those most vital systems is the Central Process Systems (CPS). The CPS controls operations used by GRC's wind tunnels, propulsion systems lab, engine components research lab, and compressor, turbine and combustor test cells. Used widely throughout the lab, it operates equipment such as exhausters, chillers, cooling towers, compressors, dehydrators, and other such equipment. Through parameters such as pressure, temperature, speed, flow, etc., it performs its primary operations on the major systems of Electrical Dispatch (ED), Central Air Dispatch (CAD), Central Air Equipment Building (CAEB), and Engine Research Building (ERB). In order for the CPS to continue its operations at Glenn, a new contract must be awarded. Consequently, one of my primary responsibilities was assisting the Source Evaluation Board (SEB) with the process of awarding the recertification contract of the CPS. The job of the SEB was to evaluate the proposals of the contract bidders and then to present their findings to the Source Selecting Official (SSO). Before the evaluations began, the Center Director established the level of the competition. For this contract, the competition was limited to those companies classified as a small, disadvantaged business. After an industry briefing that explained to qualified companies the CPS and type of work required, each of the interested companies then submitted proposals addressing three components: Mission Suitability, Cost, and Past Performance. These proposals were based off the Statement of Work (SOW) written by the SEB. After companies submitted their proposals, the SEB reviewed all three components and then presented their results to the SSO. While the SEB does not select the company receiving the contract, they can make recommendations based on their findings to the SSO, who actually awards the contract. The SEB began work for this contract in July 2003 by writing the SOW and the selection will tentatively occur July 30, 2004. Contract awarding will take place Aug. 15. Following the awarding, the winning company has a 30-day Phase-in Period beginning Sept. 1,2004 and full performance will begin October 1.

Weiler, Carly P.↗

NASA's Initial and Sustained Artemis Human Landing Systems

On March 26, 2019, in keeping with President Trump’s Space Policy Directive-1, Vice President Pence charged NASA with landing the first woman and the next man on the South Pole of the Moon by 2024, followed by a sustained presence on and around the Moon by2028. NASA’s Human Landing System (HLS) Program is responsible for the final mode of transportation in deep space that will carry humans to and from the surface of the Moon, to be designed and developed by American companies for NASA’s Artemis lunar exploration program. This paper examines the approach for Artemis human landing systems for both the initial missions and future sustained missions. While achieving the 2024 goal requires a focus on speed and the use of mature technologies, planning toward sustained operations to and from the lunar surface requires a focus on reliability and reusability. The two approaches, however, are not mutually exclusive, as demonstrated by the HLS prime contractors’ integrated lander system proposals. On April 30, 2020, NASA announced that Blue Origin of Kent, Washington, Dynetics (a Leidos company) of Huntsville, Alabama, and SpaceX of Hawthorne, California, were the awardees for NASA’s Human Landing System contracts under Appendix H of the NextSTEP-2 Broad Agency Announcement. The companies began work in a 10-month base period during which NASA teams worked with the companies to streamline the review of required products and to share the agency’s expertise in human spaceflight systems development. Following the base period, NASA will determine which companies will develop the human landers for the initial missions, including the 2024 landing, and which companies will develop landers for future sustained missions toward the end of the decade.

Lisa Watson-Morgan↗

NASA’s Artemis Human Landing Systems: Enabling Lunar Exploration

On March 26, 2019, in keeping with Space Policy Directive-1, NASA was charged with landing the first woman and the next man on the South Pole of the Moon by 2024, followed by a sustained presence on and around the Moon by 2028. NASA’s Human Landing System (HLS) Program is responsible for the transportation in deep space to carry humans to and from the surface of the Moon, to be designed and developed by American companies for NASA’s Artemis lunar exploration program. On April 30, 2020, NASA announced the awardees for NASA’s Human Landing System contracts under Appendix H of the NextSTEP-2 Broad Agency Announcement: A Blue Origin-led team including Lockheed Martin, Northrup Grumman, and Draper; Dynetics (a Leidos company); and SpaceX. The companies began work in a multi-month base period during which NASA teams will work with the companies to streamline requirements, to establish standards and methods, to review required products and to share the NASA’s expertise in human spaceflight systems development. Following the base period, which ends in the spring of 2021, NASA will determine which company or companies will develop Artemis human landing systems for the initial demonstration missions, including the goal of landing on the Moon in 2024.This paper examines how the Human Landing System program is at the center of NASA’s Artemis lunar exploration program, designed to yield groundbreaking science, develop and utilize lunar surface resources and leverage the Moon as a proving ground for future Mars missions. While achieving the 2024 goal requires a focus on speed and the use of mature technologies, planning toward sustained operations to and from the lunar surface requires a focus on reliability and reusability.

Lisa Watson-Morgan↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 19217

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 20073

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental issues elimination through circular economy

Environmental efforts of European Union are currently going towards circular economy. Tools like Extended Producer Responsibility and Eco-design were established. The circular economy deals with resources availability issue on one hand and waste management on the other hand. There are few pioneering companies all over the world with some kind of circular economy practice. Generally the concept is not very wide-spread. The paper aims to evaluate possibility of transition towards circular economy in Slovak industrial companies. They need to have an active approach to material treatment of their products after usage stage. Innovation is another important pre-condition for the transition. Main problem of current cradle to grave system is landfilling of valuable materials after one cycle of usage. Their potential value for next manufacturing cycles is lost. Companies may do not see connection between waste management and material resource prices and volatility of supplies. Municipalities are responsible for municipal waste collection and treatment in Slovakia. The circular economy operates by cradle to cradle principle. Company manages material flow until the material comes back to the beginning of manufacturing process by itself or by another partners. Stable material supplies with quite low costs are provided this way. It is necessary to deal with environmental problems in phase of product design. Questionnaire survey results show on one hand low involvement of industrial companies in waste management area, however on the other hand they are open to environmental innovations in future.

54 ENVIRONMENTAL SCIENCES↗

Joint Real-Time Energy and Demand-Response Management using a Hybrid Coalitional-Noncooperative Game

In order to model the interactions among utility companies, building demands and renewable energy generators (REGs), a hybrid coalitional-noncooperative game framework has been proposed. We formulate a dynamic non-cooperative game to study the energy dispatch within multiple utility companies, while we take a coalitional perspective on REGs and buildings demands through a hedonic coalition formation game approach. In this case, building demands request different power supply from REGs, then the building demands can be organized into an ultimate coalition structure through a distributed hedonic shift algorithm. At the same time, utility companies can also obtain a stable power generation profile. In addition, the interactive progress among the utility companies and building demands which cannot be supplied by REGs is implemented by distributed game theoretic algorithms. Numerical results illustrate that the proposed hybrid coalitional-noncooperative game scheme reduces the cost of both building demands and utility companies compared with the initial scene.

24 POWER TRANSMISSION AND DISTRIBUTION↗