Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

International Commission on Radiological Protection Committee 1: Current Status and Future Directions

The International Commission on Radiological Protection (ICRP), Committee 1 (C1) considers the risk of induction of cancer and heritable disease (stochastic effects) together with the underlying mechanisms of radiation action. C1 also considers the risks, severity, and mechanisms of induction of tissue/organ damage and developmental defects (deterministic effects). The committee was significantly revamped in 2013 and last met in Abu Dhabi in October of 2013. C1 evaluated progress on two ongoing Task Groups (TG’s); TG 64 “Cancer Risk from Alpha Emitters” and TG 75 “Stem Cell Radiobiology”. Following approval from the Main Commission (MC), C1 established two new TG’s; TG 91 “Radiation Risk Inference at Low Dose and Low Dose Rate Exposure for Radiological Protection Purposes”, and TG 92 “Terminology and Definitions”. Here I will present a synopsis of the current status of C1 and outline the tasks C1 may undertake in the future.

Morgan, William F.↗

Coupled Thermal-Hydraulic and Fuel Performance Simulations of the TWIST LOCA Commissioning Test Series in TREAT

As the nuclear industry is looking to increase light water reactor (LWR) burnup limits, Idaho National Laboratory has developed an experiment vehicle for the Transient Reactor Test Facility (TREAT) to support high burnup fuel safety testing. One of the main purposes of this vehicle, known as the Transient Water Irradiation System for TREAT (TWIST), is to perform in-pile loss-of-coolant accident (LOCA) experiments on high burnup LWR fuel to investigate phenomena termed fuel fragmentation, relocation, and dispersal (FFRD). Prior to performing experiments on high burnup fuel specimens, a commissioning test series will be performed. The main purpose of the Loss-of-Coolant-Commissioning (LOC-C) test series is to qualify the TWIST device and validate the power coupling between TREAT and the TWIST fuel rod as well as validation of the thermal-hydraulic and fuel performance simulation predictions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Commissioning of the prototype C75 cavities in a CEBAF cryomodule

Prototype cavities have been built at Jefferson Lab to increase the energy of future refurbished CEBAF cryomodules to 75 MeV in the most cost efficient way. Three such cavities, named "C75", have been built from ingot Nb material of different purity and have been processed and tested. The two better performing cavities have been assembled into a "cavity pair" and installed in the latest refurbished original CEBAF cryomodule. The cryomodule was installed and commissioned in CEBAF. The results from the commissioning of the C75 cavities, compared with the original CEBAF cavities, are presented in this article. The vertical test performance of the C75 cavities was preserved in the cryomodule with one of the cavities achieving the performance specification of an accelerating gradient of 19 MV/m with a quality factor of ~8×109 at 2.07 K. The performance in terms of microphonics and tuner operation was similar to that of original CEBAF cavities, as expected, and the high-order modes are properly damped. The quality factor of the two C75 cavities was the highest achieved in a CEBAF cryomodule, possibly due to the better magnetic flux expulsion of ingot Nb than standard fine-grain Nb.

Drury, Michael A.↗

Synchrotron Radiation Beam Diagnostics at IOTA - Commissioning Performance and Upgrade Efforts

The Integrable Optics Test Accelerator is a research electron and proton storage ring recently commissioned at the Fermilab Accelerator Science and Technology facility. A key part of its beam diagnostics suite are synchrotron radiation monitors, used for measuring transverse beam profile, position, and intensity. In this paper, we report on the performance and uses of this system during the year 1 run. We demonstrate sub-100nm statistical beam position uncertainty and high dynamic range from 10⁹ electrons down to a single electron. Commissioning challenges and operational issues are discussed. We conclude by outlining current upgrade efforts, including improved modularity, small emittance measurements, and a multi-anode photomultiplier system for turn-by-turn acquisition.

43 PARTICLE ACCELERATORS↗

Slow Extraction Beam Commissioning for the Mu2e Experiment at Fermilab

Following the successful completion of the Muon g-2 experiment run at Fermilab, the Muon Campus facility has been reconfigured from delivering 3 GeV muon beams to the g-2 storage ring to providing slow-extracted 8 GeV proton beam spills for the Mu2e experiment. The first full-scale commissioning run with slow extraction was conducted during the 2025 run, followed by the second run in early 2026. We present the results and current status of this commissioning campaign.

Nagaslaev, V. [Fermilab]↗

Commissioning And First Results From The Fermilab Cryomodule Test Stand

A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.

43 PARTICLE ACCELERATORS↗

Lessons from commissioning and operations of the ICARUS cryogenic system at Fermilab

Results and lessons from three years of commissioning and operations of the cryogenic and purificationsystems of the ICARUS neutrino detector installed at the Fermilab are described. The detector uses liquid argon stored in two separate containers of about 275 m 3 each. The liquid argon must be kept in very stable thermal conditions, and the contamination of electronegative impurities must be consistently kept at small fractions of parts per billion. Since its fill in early 2020, the detector has been commissioned and then operated in neutrino beams at Fermilab for the search of sterile neutrinos and measurements of neutrino-argon cross sections. The results of operating the cryogenic and purification systems and lessons learned, including challenges in reaching the design electron lifetime in argon bath, operating and servicing liquid nitrogen and argon circulation pumps, argon condensers and purifiers, are described. Plans for future operations and list of recommendations are presented.

43 PARTICLE ACCELERATORS↗

Training and Certification Program for Certified Energy Auditors (CEA) and Certified Building Commissioning Professionals (CBCP)

The Association of Energy Engineers (AEE) has offered energy efficiency training and certification programs for over 30 years. During that time AEE has certified more than 22,000 professionals. All of our certification programs are the result of extensive industry research and program development and oversight by certification boards. For this project award, AEE proposed to work with the Department of Energy to utilize and extend existing industry recognized Certified Energy Auditor (CEA) and Certified Building Commissioning Professional (CBCP) programs under this Training Program Development Announcement. These expanded training programs will have significant impact in training professionals for building commissioning and energy auditing to achieve the goal of bringing existing buildings up to their optimal energy performance potential and ensuring that new buildings maintain their expected optimal level of performance. The goals and objectives of the training development project were achieved with the development of new training programs that are now being offered as self-sustaining commercial training and certification programs. These new programs are training and certifying professionals who are accomplishing the goal of increasing building energy performance in both existing and new buildings.

Kent, Bill↗

Safe operating conditions for NSLS-II Storage Ring Frontends commissioning

The NSLS-II Storage Ring Frontends are designed to safely accept the synchrotron radiation fan produced by respective insertion device when the electron beam orbit through the ID is locked inside the predefined Active Interlock Envelope. The Active Interlock is getting enabled at a particular beam current known as AI safe current limit. Below such current the beam orbit can be anywhere within the limits of the SR beam acceptance. During the FE commissioning the beam orbit is getting intentionally disturbed in the particular ID. In this paper we explore safe operating conditions for the Frontends commissioning.

43 PARTICLE ACCELERATORS↗

Commissioning and Operation of the FNAL Front end Injection Line and Ion Sources.

This thesis documents the efforts made in commissioning and operating the RFQ Injection Line (RIL) as a replacement for the Cockcroft Walton front end. The Low Energy Beam Transport (LEBT) was assembled and tested with multiwire position and emittance monitor measurements. The Radio Frequency Quadrupole (RFQ) commissioning was completed with the same measurements as well as output beam energy measurements that showed it initially accelerated beam only to 700 keV, which was 50 keV lower than the design energy. Working with the manufacturer solutions were found and instituted to continue testing. The Medium Energy Beam Transport (MEBT) was then connected as the RIL was installed as the new front end of Linac. Testing gave way to operation when the new front end was used as the source of all High Energy Physics (HEP) beam for Fermi National Accelerator Laboratory (FNAL). The magnetron ion source that provides the H- beam for the front end required several changes and eventual upgrades to operate well; such as new source operating points for vacuum pressure and cesium admixture, and new materials for critical source components. Further research was conducted on the cathode geometry and nitrogen doping of the hydrogen gas as well as using solid state switches for the extractor system high voltage.

43 PARTICLE ACCELERATORS↗

Commissioning and Decommissioning of Rosebud Coal Mine

Calculates fuel consumption and resulting emissions to commission and decommission a surface mine for Rosebud subbituminous coal in Montana. Decommissioning values represented as a percentage of the commissioning values. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=DA7918B2-214E-4263-9B7A-8545C5501F74

01 COAL, LIGNITE, AND PEAT↗

Beam Commissioning Results from the CBETA Fractional Arc Test (CBETA Note 030)

This work describes first commissioning results from the Cornell Brookhaven ERL Test Accelerator fractional arc test. These include the recommissioning of the Cornell photoinjector, the first full energy operation of the main linac with beam, as well as commissioning of the lowest energy matching beamline (splitter) and a partial section of the Fixed Field Alternating gradient (FFA) return loop featuring first production Halbach style permanent magnets. Achieving these tasks required characterization of the injection beam, calibration and phasing of the main linac cavities, demonstration of the required 36 MeV energy gain, and measurement of the splitter line horizontal dispersion and R 56 at the nominal 42 MeV. In addition, a procedure for determining the BPM offsets, as well as the tune per cell in the FFA section via scanning the linac energy and inducing betatron oscillations around the periodic orbit in the fractional arc was developed and tested. A detailed comparison of these measurements to simulation is discussed.

43 PARTICLE ACCELERATORS↗

Radiabeam Industrial Accelerator Commissioning

Radiabeam is building an industrial accelerator funded by the Defense Nuclear Detection Office in the Department of Homeland Security. The accelerator is designed as a radiation source for systems intended to find Special Nuclear Materials or contraband in cargo containers. Fermilab staff will travel to Radiabeam to help in commissioning of the accelerator. This work would primarily be focused on optimization of beam dynamics. In doing this, Fermilab would gain valuable general information about industrial linac operation and commissioning. Fermilab will also gain specific information about this new accelerator in support of a planned larger collaboration with Radiabeam.

43 PARTICLE ACCELERATORS↗

Oak Ridge National Laboratory Technical Input for the Nuclear Regulatory Commission Review of the 2017 Edition of ASME Section III, Division 5, ‘High Temperature Reactors’

To assist the Nuclear Regulatory Commission in its decision making on endorsement of the American Society for Mechanical Engineers Boiler and Pressure Vessel Code Section III, Division 5 (2017 Edition) for development of advanced non-light water reactors, the following Division 5 portions were reviewed: Article HBB-2000 Material; Article HCB-2000 Material; Article HGB-2000 Material; Mandatory Appendix HBB-I-14 Tables and Figures; and, Nonmandatory Appendix HBB-U Guidelines for Restricted Material Specifications to Improve Performance in Certain Service Applications. In addition to the 2017 Edition, the same parts of the 2019 Edition have also been reviewed as indicated in various sections of the report. This review was conducted by a collaboration of national laboratory and private sector participants with significant industrial experience, including some heavy lifting and deep diving from Clarus Consulting, LLC., all intended to achieve an objective, independent, and practical perspective. The report provides recommendations, descriptions of the evaluation methods, and the source references for the data used. To build confidence required for endorsement of the Code, this review was conducted as a verification and validation of the above Code contents. The objective of verification is to ensure that the Code is free of error – direct or implied; contains the information needed for its use, including proper coverage of the Code-specified materials for the intended application, and completeness and adequacy of references to other portions of the Code. The objective of validation is to authenticate that the Code tabulations and graphs represent design inputs consistent with what are determined using rules and methods specified by the Code. The authentication process used data that were assembled and/or generated independent of Code development, while the methods of analysis followed Code-specified methods where appropriate. The designated portions for this review cover the five alloys codified for high temperature reactor applications in Division 5, i.e. 316 SS, 304 SS, 800H, 2¼Cr-1Mo, and 9Cr-1Mo-V, regarding their general requirements, permitted specifications and design stress intensity values for pressure-retaining applications, deterioration in service, fatigue acceptance test, permissible weld materials, tensile and yield strength, expected minimum stress-to-rupture values (including for Alloy 718), weld stress rupture factors, permissible materials for bolting use, and restricted specifications in certain service applications. Additionally, stress intensity values for bolting materials including 316 SS, 304 SS and alloy 718 were reviewed. Analysis and discussion are also provided on contents outside of these designated Code portions where it was deemed relevant and necessary to develop a technically sound understanding of issues relating to the designated portions. Due to unavailability of sufficient test data on welds during the review period, the weld stress rupture factors in Tables HBB-I-10.14A to E, which cover a total of ten tables for the five alloys welded with twenty-eight different weld metals (some with similar properties), have been deferred to a future review effort. The review identified mainly two types of issues. The first type includes instances where the Code is found factually incomplete or incorrect, such as obsolete materials specifications listings, missing tabulation of stresses for bolting. Changes to the Code are recommended in these cases. The second type of issue includes instances where the Code tabulations and graphs are found to be less conservative than the review analysis results. In these cases, recommendations are made for further review and consideration where the difference in conservatism exceeds 10%, which is our threshold for questioning technical adequacy, meriting a risk assessment by the Nuclear Regulatory Commission and/or reactor designers. It is noted that this effort has been executed using all available data and established methods of analysis, including methods and criteria specified and used by the Code. As such, the findings that are presented in quantitative detail, in a format for convenient comparison with the Code, and with identification of where further review is recommended, should provide a sound technical basis for decisions about quantifying the implications of the reduced design margins and technical adequacy/inadequacy to form a basis for conditioning specific Code tabulation values on endorsement. Recommendations for specific changes to the Code, however, entail design conservatism considerations beyond the scope of this review effort, and are not made in this report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Veterans Commissioning Training Program for Commercial Healthcare Facilities [Final Report]

This project was designed to develop a building energy training curriculum, with hopes for creating immediate, long-term job opportunities for returning Iraq and Afghanistan veterans as energy commissioning agents within both public and private sectors. As part of this proposed effort, an online version of the curricula were developed in part using a modified version of the Association of Energy Engineers (AEE) Certified Building Commissioning Professional program. Case studies utilizing building information modeling (BIM) data from actual retrocommissioning projects and 3D gaming platform were developed as part of the curriculum. In addition to using materials from existing literature, the PIs also conducted scientific-based research on energy retrofitting related to building envelopes using numerical simulation approach. And the research findings and recommendation were incorporated in the developed curriculum. Currently, there are a lack of scientific-based guidance on envelope retrofitting practice. Many retrofitting practices were based on experiences, and are limited by the lack of scientific evidence. Existing retrofitting training material have limitations due to this missing piece. We have succeeded in producing some scientific evidence to guide and provide solutions to some building envelope design and retrofitting. The results from some of our research using computational fluid dynamics have demonstrated the feasibility of using our recommended solutions. Research results and findings were disseminated to the research and industry communities through conference papers (Appendix B) and presentations (Appendix C), and some results and findings were incorporated into the developed training curriculum (Appendix A).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Monte Carlo Simulations in Support of NorthStar Irradiation Facility Commissioning Procedure

NorthStar Medical Radioisotopes LLC is constructing an irradiation facility at which electron accelerators will induce photo-transmutation (i.e., neutron knockout) of molybdenum-100 (Mo-100) to produce medically useful Mo-99. The facility will house two high-intensity electron RhodotronTM accelerators developed by IBA Industrial. The nominal power of each Rhodotron is 125kW at 40 MeV beam energy. The production target is made of metallic molybdenum enriched with Mo-100 isotope. It will be irradiated by electron beams and will itself play a role in electron conversion to intense X-rays. A full description of the NorthStar target as well as the concept of radiation shielding of the facility can be found in our previous report. The NorthStar irradiation facility is under commissioning now. The goal of the present work is to support the commissioning process by: (1) Studying residual radiation and activation to minimize personnel exposure and inform radiation waste management; (2) Using computational fluid dynamics (CFD) of the irradiated target to ensure the facility design is safe and reliable; and (3) Helping to determine radiation protection requirements during operation. Monte Carlo simulations are used for the analyses. Most of the results are presented as 3D arrays representing spatial distribution of values across simulated geometries: radiation energy depositions, ambient doses, residual isotopes accumulated, and residual doses.

07 ISOTOPE AND RADIATION SOURCES↗

Energy Storage Seminar for Western State Regulatory Commission Staff (Report on Proceedings)

On November 6, 2017, the U.S. Department of Energy (DoE) sponsored an Energy Storage Seminar for Western State Regulatory Commission Staff in Salt Lake City. The summit took place at the offices of the Western Electric Coordination Council, with training provided by staff from DoE, Pacific Northwest National Laboratory (PNNL), and Sandia National Laboratories (SNL). Staff from regulatory commissions in 10 western states attended. The seminar was designed with three key purposes in mind: to facilitate a discussion among regulatory staff about the challenges they face in current regulatory proceedings involving energy storage, to provide training to establish a baseline understanding of current energy storage technology and economics, and to solicit feedback from program participants about how future DoE-funded research and training on the topic of energy storage can be designed to meet state needs. Feedback suggests that future seminars and Energy Storage Program research should be focused on developing and sharing practical information about the impacts of energy storage on regulatory processes, that networking activities are highly valued by regulatory staff, and that program stakeholders want to be engaged in planning future events and research efforts.

25 ENERGY STORAGE↗

J. Robert Oppenheimer: The Atomic Energy Commission and His Security Clearance, Selected Documents

On April 14, 1954, Laboratory employees were formally notified by a “Special Bulletin to All Employees” (Appendix A) that the Atomic Energy Commission had convened a Personnel Security Board, at the request of J. Robert Oppenheimer, to investigate “substantial derogatory information” about their former director. Long on procedural detail and short on specifics, the Bulletin served primarily as an announcement that “A board was accordingly established for the purpose of hearing the case and advising the Commission as to whether or not suspension of clearance of Dr. Oppenheimer should be made permanent.”

99 GENERAL AND MISCELLANEOUS↗