Commercial Orbital Transportation Services (COTS) Demonstrations

U.S. space policy directs pursuit of commercial opportunities for providing transportation and other services low Earth orbit and beyond. COTS Project established to implement policy. COTS strategy: Phase 1) Assist industry with system development/demonstrations (COTS Demos); Phase 2) Procure commercial services for ISS logistics support. COTS Demonstrations competition completed in 10 months. Two industry partners selected for funded Space Act Agreements: 1) SpaceX & Rocketplane-Kistler; and 2) Unfunded Space Act Agreements in work with other competitors. COTS budget of $500 M thru 2010, with pay for performance milestone approach. Cargo flight demonstrations planned for 2008 and 2009: Crew flight demonstration options for 2011-2012. Commercial cargo transportation services potentially available as early as 2009-2010. Successful COTS partners may open new space markets and provide reliable, cost effective cargo and crew transportation services, a new era for commercial space.

Lindenmoyer, Allan↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

Critical Infrastructure for Ocean Research and Societal Needs in 2030

The United States has jurisdiction over 3.4 million square miles of ocean expanse greater than the land area of all fifty states combined. This vast marine area offers researchers opportunities to investigate the ocean's role in an integrated Earth system, but also presents challenges to society, including damaging tsunamis and hurricanes, industrial accidents, and outbreaks of waterborne diseases. The 2010 Gulf of Mexico Deepwater Horizon oil spill and 2011 Japanese earthquake and tsunami are vivid reminders that a broad range of infrastructure is needed to advance our still-incomplete understanding of the ocean. The National Research Council (NRC)'s Ocean Studies Board was asked by the National Science and Technology Council's Subcommittee on Ocean Science and Technology, comprised of 25 U.S. government agencies, to examine infrastructure needs for ocean research in the year 2030. This request reflects concern, among a myriad of marine issues, over the present state of aging and obsolete infrastructure, insufficient capacity, growing technological gaps, and declining national leadership in marine technological development; issues brought to the nation's attention in 2004 by the U.S. Commission on Ocean Policy. A 15-member committee of experts identified four themes that encompass 32 future ocean research questions enabling stewardship of the environment, protecting life and property, promoting economic vitality, and increasing fundamental scientific understanding. Many of the questions in the report (e.g., sea level rise, sustainable fisheries, the global water cycle) reflect challenging, multidisciplinary science questions that are clearly relevant today, and are likely to take decades of effort to solve. As such, U.S. ocean research will require a growing suite of ocean infrastructure for a range of activities, such as high quality, sustained time series observations or autonomous monitoring at a broad range of spatial and temporal scales. Consequently, a coordinated national plan for making future strategic investments becomes an imperative to address societal needs. Such a plan should be based upon known priorities and should be reviewed every 5-10 years to optimize the federal investment. The committee examined the past 20 years of technological advances and ocean infrastructure investments (such as the rise in use of self-propelled, uncrewed, underwater autonomous vehicles), assessed infrastructure that would be required to address future ocean research questions, and characterized ocean infrastructure trends for 2030. One conclusion was that ships will continue to be essential, especially because they provide a platform for enabling other infrastructure autonomous and remotely operated vehicles; samplers and sensors; moorings and cabled systems; and perhaps most importantly, the human assets of scientists, technical staff, and students. A comprehensive, long-term research fleet plan should be implemented in order to retain access to the sea. The current report also calls for continuing U.S. capability to access fully and partially ice-covered seas; supporting innovation, particularly the development of biogeochemical sensors; enhancing computing and modeling capacity and capability; establishing broadly accessible data management facilities; and increasing interdisciplinary education and promoting a technically-skilled workforce. The committee also provided a framework for prioritizing future investment in ocean infrastructure. They recommend that development, maintenance, or replacement of ocean research infrastructure assets should be prioritized in terms of societal benefit, with particular consideration given to usefulness for addressing important science questions; affordability, efficiency, and longevity; and ability to contribute to other missions or applications. These criteria are the foundation for prioritizing ocean research infrastructure investments by estimating the economic costs and benefits of each potential infrastructure investment, and funding those investments that collectively produce the largest expected net benefit over time. While this type of process is clearly subject to budget constraints, it could quantify the often informal evaluation of linkages between infrastructure, ocean research, the value of information produced, societal objectives, and economic benefits. Addressing the numerous complex science questions facing the entire ocean research enterprise in 2030 from government to academia, industry to nonprofits, local to global scale represents a major challenge, requiring collaboration across the breadth of the ocean sciences community and nearly seamless coordination between ocean-related federal agencies.

47 OTHER INSTRUMENTATION↗

Wind Supply Chain Security: Hardware Enumeration and Analysis

This project, undertaken by Idaho National Laboratory (INL) for the Department of Energy (DOE) Wind Energy Technologies Office (WETO), focused on the enumeration and analysis of six key devices important to wind technologies. The devices analyzed included Beckhoff Bus Terminal Controllers (BK1120 and BC9000), a Beckhoff Economy Built-in Panel PC (CP6231), an N-Tron Managed Industrial Ethernet Switch (711FX3), a Bachmann M1 Gateway, and a Bachmann Smart Power Plant Controller. Device selection was driven by availability and budget constraints, with several components sourced from existing wind farms and others procured through a co-agreement with another WETO-funded project. The project's primary objective was to create a hardware bill of materials (HBOM) for each device, identifying and documenting all components to assess potential security and supply chain risks. A detailed analysis revealed over 750 unique components across the six devices, with 80% successfully identified and accompanied by datasheets. Notably, Texas Instruments emerged as the leading supplier, providing over 16% of the components, followed by ON Semiconductor at 11.3%, Analog Devices at 5.3%, and Renesas Electronics Corp at 4.1%. Other notable vendors included Toshiba Corporation, iC-Haus Corporation, Atmel, Vishay, and STMicroelectronics. The enumeration process involved thorough documentation of each component, including its designation, quantity, identifiers, pin package, description, vendor, model, and country of origin. This process provided valuable insights into the complexity and diversity of the electronic systems within these wind devices. It also highlighted the distinct separation of components between vendors, suggesting a trend of vendor-specific component usage. Key findings from the project emphasized the importance of broadening the scope of vendor analysis in future research to gain a comprehensive understanding of component distribution and commonality. The identification of vendor-specific component usage patterns offers new avenues for research and underscores the significance of continued investigation in this field. Overall, this project provides critical insights into the component composition of wind devices, aiding in the development of improved supply chain management and component sourcing strategies. The results contribute valuable knowledge to the wind technology sector, laying the groundwork for enhanced security and resilience in wind energy systems.

17 - WIND ENERGY↗

Leveraging the Educational Outreach Efforts of Low-Cost Missions

A small portion of the budget for every NASA mission must be devoted to education and public outreach. The question is, how can projects best leverage these funds to create a high-quality message and get it disseminated to the largest and most appropriate audience? This paper describes the approach taken by a small educational outreach team for NASA's New Millennium Program (NMP). The team's approach has been twofold: develop a highly desirable suite of products designed to appeal to, as well as enlighten, the target audience; then negotiate relationships with existing, often under-utilized channels for dissemination of these products. Starting with NMP missions as the base of support for these efforts, the team has invited participation by other missions. This approach has resulted in a richer and broader message, and has allowed the continuing development of the audience base.

Fisher, Diane K.↗

Physics in NASA Exploration

The primary focus of the workshop was NASA's new concentration on sending crewed missions to the Moon by 2020, and then on to Mars and beyond. Several speakers, including JPL s Fred O Callaghan and NASA's Mark Lee, broached the problem that there is now a serious reduction of capability to perform experiments in the ISS, or to fly significant mass in microgravity by other means. By 2010, the shuttle fleet will be discontinued and Russian craft will provide the only access to the ISS. O Callaghan stated that the Fundamental Physics budget is being reduced by 70%. LTMPF and LCAP are slated for termination. However, ground-based experiments are continuing to be funded at present, and it will be possible to compete for $80-90 million in new money from the Human Research Initiative (HRI). The new program thrust is for exploration, not fundamental physics. Fundamental, we were told by Lee, does not ring well in Washington these days. Investigators were advised to consider how their work can benefit missions to the Moon and Mars. Work such as that regarding atomic clocks is looked upon with favor, for example, because it is considered important to navigation and planetary GPS. Mark Lee stressed that physicists must convey to NASA senior management that they are able and willing to contribute to the new exploration research programs. The new mentality must be we deliver products, not do research. This program needs to be able to say that it is doing at least 50% exploration-related research. JPL s Ulf Israelsson discussed the implications to OBPR, which will deliver methods and technology to assure human health and performance in extraterrestrial settings. The enterprise will provide advanced life-support systems and technology that are reliable, capable, simpler, less massive, smaller, and energy-efficient, and it may offer other necessary expertise in areas such as low-gravity behavior. Like Dr. Lee, he stated that the focus must be on products, not research. While there is not yet a formal direction, he said, LTMPF and PARCS ISS flight projects are slated to terminate in October 2004. All flight investigations are being returned to ground programs and phased out by the end of FY07. Physics ground programs are intact for now, but to survive we must shift about 50% of research to supporting exploration. Basic research programs in other disciplines are being cancelled. Product lines will support human health, safety and life-support, including countermeasures against radiation and other hazards, as well as advances in time-keeping, navigation and communications technologies. Israelsson said that the new Fundamental Physics for Exploration Roadmap points to how fundamental physics research can and does support exploration. JPL will use the roadmap to argue for support for fundamental physics research under several codes. Nicholas Bigelow of the University of Rochester encouraged attendees not to become discouraged, but rather to embrace the opportunities presented by NASA's new direction.

O'Callaghan, Fred↗

Summary of experimental discussion session at ILWOG42

During the ILWOG-42 held at LANL in May of 2010, a set of discussions between scientists from AWE, LANL, and LLNL was held to develop collaborative experiments that would improve radiochemical diagnostic evaluations. DOE headquarters has asked that a 5-year roadmap be developed to resolve outstanding issues. The goal of this discussion was to explore common areas of interest where collaborative experiments could be undertaken to resolve identified problems and to gain support across the weapons program and DOE for this work. Collaboration was encouraged not only between these laboratories, but with University collaborators who are funded through the NNSA Stewardship Science Academic Alliance. In the development of experiments there were some criteria that were established. The uncertainty budgets will need to be assessed for proposed experiments so that potential gains to the programs can be determined. Measurements using different methods should be encouraged to provide greater confidence (and hopefully improved accuracy) in the result. Six distinct subjects were discussed: (1) Experiments at critical assemblies/14-MeV neutron (D+T) facilities; (2) Fission-chain-yield (FCY) energy dependence; (3) Absolute FCY measurements; (4) Measurements of {sup 147}Nd 531-keV absolute gamma-ray intensity; (5) Atom scale cross calibrations; and (6) Other experimental issues. A short summary of the discussions is given.

36 MATERIALS SCIENCE↗

National Plan for the Disposal of Existing and Future TRU Wastes - 18616

Now that the Waste Isolation Pilot Plant (WIPP) has re-opened, after being down for three years due to an accident the DOE National TRU Program has re-developed a plan for the disposal of existing and future TRU wastes. The National TRU Waste Management Plan (NTWMP) is an integrated plan to address the needs of DOE sites across the DOE Weapons Complex that create and store TRU waste, and is centered on the capability of WIPP to receive and dispose of TRU waste. The WIPP capability is planned as a weekly shipping rate and is defined by emplacement and receipt rate capabilities since WIPP is not permitted for long-term storage. And, shipping rates may be constrained by new WIPP Waste Acceptance Criteria (WAC) and future plans for repository configurations and disposal package capabilities over the next 30 years. Since WIPP is the only disposal system available to the DOE for TRU waste disposal, DOE has a newly projected life-cycle need for WIPP to remain open and available up to 2050. It is projected that the need for WIPP will continue up to the year 2050 for the disposition of the remaining legacy TRU inventories and for the disposal of TRU waste continuing to be generated at DOE's National Laboratories. In addition, there are several other potential new waste streams in which WIPP is being considered an alternative solution for their disposition. The NTWMP has been updated to reflect the short-term and long-term plans for TRU waste disposal at WIPP. The short-term plan is used by DOE for budget projection and integration purposes to facilitate and inform budget planning, both in DOE's Environmental Management (EM) and National Nuclear Security Administration (NNSA) organizations. Most legacy TRU waste (generated in the past and stored at DOE sites today) is owned and managed by EM. And, EM submits integrated budget requests for DOE sites, including the integration of resources for TRU waste management. NNSA and DOE's Office of Science (OS) funds TRU waste management as part of their mission funding and NNSA should eventually be the primary user of the WIPP resources as EM's legacy TRU waste is cleaned-up. Prior to the unexpected shutdown of WIPP in 2014, there was a small back-log of waste certified for WIPP disposal and shipments of TRU waste to WIPP were 'just-in-time' as waste was certified. After three years of WIPP being down, DOE sites have built significant back-logs of TRU waste to be certified for WIPP. That back-log built up to over 25,000 containers of TRU waste during that three-year period (Table 1). The backlog included both Contact-Handled (CH) TRU waste and Remote-Handled (RH) TRU waste, and even though WIPP re-opened in April of 2017, it is only open for TRU waste containers that can be stacked on disposal room floors. Plans for changing RH waste disposal packages and methods are in-the-works, but are not yet mature enough for significant planning. In addition, the WIPP underground facilities are now partially contaminated with radioactive particulate, which significantly reduces the WIPP operational efficiencies as compared to 2014. With a large back-log of waste ready for WIPP disposal and limited throughput for WIPP disposal rates, the focus of the NTWMP is to prioritize the selection of TRU wastes from the various sites based on WIPP waste emplacement rates and shipping rates to WIPP. Some TRU waste sites have a significant need to be top priority for shipments to WIPP, and that must be balanced with the need for all TRU waste sites to have some shipments to deplete their back-log of TRU wastes. Storage and management of TRU waste is very costly for DOE and many of those resources could be used to optimize the overall disposition of TRU waste and save DOE significant funding. In addition, the plan will show the possible transition of TRU Waste Management from primarily being an EM function to being an NNSA function in the coming years. As legacy TRU waste inventories are removed, and as NNSA mission-related TRU waste inventories are produced, DOE will be faced with deciding where the primary responsibility for TRU waste management should reside. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rising CO2 and Long-term Carbon Storage in Terrestrial Ecosystems: An Empirical Carbon Budget Validation (Final Report)

The primary goal of this report is to report the results of Grant DE-FG02-97ER62458, which began in 1997 as Grant DOE-98-59-MP-4 funded through the TECO program. However, this project has a longer history because DOE also funded this study from its inception in 1985 through 1997. The original grant was focused on plant responses to elevated CO2 in an intact ecosystem, while the latter grant was focused on belowground responses. Here we summarize the major findings across the 25 years this study has operated, and note that the experiment will continue to run through 2020 with NSF support. The major conclusions of the study to date are: (1 Elevated CO2 stimulated plant productivity in the C3 plant community by ~30% during the 25 year study. The magnitude of the increase in productivity varied interannually and was sometime absent altogether. There is some evidence of down-regulation at the ecosystem level across the 25 year record that may be due to interactions with other factors such as sea-level rise or long-term changes in N supply; (2) Elevated CO2 stimulated C4 productivity by <10%, perhaps due to more efficient water use, but C3 plants at elevated CO2 did not displace C4 plants as predicted; (3) Increased primary production caused a general stimulation of microbial processes, but there were both increases and decreases in activity depending on the specific organisms considered. An increase in methanogenesis and methane emissions implies elevated CO2 may amplify radiative forcing in the case of wetland ecosystems; (4) Elevated CO2 stimulated soil carbon sequestration in the form of an increase in elevation. The increase in elevation is 50-100% of the increase in net ecosystem production caused by elevated CO2 (still under analysis). The increase in soil elevation suggests the elevated CO2 may have a positive outcome for the ability of coastal wetlands to persist despite accelerated sea level rise; (5) Crossing elevated CO2 with elevated N causes the elevated CO2 effect to diminish, with consequences for change in soil elevation.

54 ENVIRONMENTAL SCIENCES↗

Cryogenic Carbon Capture Development Final/Technical Report

This project extends and leverages the work completed under funding from ARPA-E and other sources by exploring aspects of the Cryogenic Carbon Capture™ (CCC) process and issues discovered during those projects, but that were not within the scope or budget of previous projects or that became apparent during field tests. Our successful completion of the tasks outlined in this project has increased the reliability, efficiency, and scalability of the CCC process and we are better prepared for pilot-scale testing. The first phase of this project improved key areas of the process through iterative design and experiment, culminating with recommendations for improvements to the existing skid-scale system developed under non-federal funding. The second phase of this project implemented the improved unit operations into the Cryogenic Carbon Capture External Cooling Loop (CCC ECL™) skid and field tests the improved system at a coal-fired power plant.

20 FOSSIL-FUELED POWER PLANTS↗

Excursions in technology policy

This technical report presents a summary of three distinct projects: (1) Measuring economic benefits; (2) Evaluating the SBIR program; and (3) A model for evaluating changes in support for science and technology. the first project deals with the Technology Applications Group (TAG) at NASA Langley Research Center. The mission of TAG is to assist firms interested in commercializing technologies. TAG is a relatively new group as is the emphasis on technology commercialization for NASA. One problem faced by TAG and similar groups at other centers is measuring their effectiveness. The first project this summer, a paper entitled, 'Measuring the Economic Benefits of Technology Transfer from a National Laboratory: A Primer,' focused on this measurement problem. We found that the existing studies of the impact of technology transfer on the economy were conceptually flawed. The 'primer' outlines the appropriate theoretical framework for measuring the economic benefits of technology transfer. The second project discusses, one of the programs of TAG, the Small Business Innovation Research (SBIR) program. This program has led to over 400 contracts with Small Business since its inception in 1985. The program has never been evaluated. Crucial questions such as those about the extent of commercial successes from the contracts need to be answered. This summer we designed and implemented a performance evaluation survey instrument. The analysis of the data will take place in the fall. The discussion of the third project focuses on a model for evaluating changes in support for science and technology. At present several powerful forces are combining to change the environment for science and technology policy. The end of the cold war eliminated the rationale for federal support for many projects. The new- found Congressional conviction to balance the budget without tax increases combined with demographic changes which automatically increase spending for some politically popular programs will make it difficult to find funding for science and technology. Also, the two political parties have very different conceptions of the appropriate future for research and development spending. All these changes create the potential for serious, perhaps unintended, consequences for the economic future of the country. In a paper entitled, 'A Conceptual Framework for Evaluating the Impact of Changes in Federal Support for Science and Technology,' we introduce a model to evaluate the effects of changes in federal spending for science and technology. This paper both provides a way of organizing informed discussions and points out important research topics for science and technology policy.

Archibald, Robert B.↗

Prioritization of Stockpile Maintenance with Layered Pareto Fronts

Difficult choices are required for a decision-making process where resources and budgets are increasingly constrained. This study demonstrates a structured decision-making approach using layered Pareto fronts to identify priorities about how to allocate funds between munitions stockpiles based on their estimated reliability, the urgency of needing available units, and the consequences if adequate numbers of units are not available. This case study, while specific to the characteristics of a group of munitions stockpiles, illustrates the general process of structured decision-making based on first identifying appropriate metrics that summarize the important dimensions of the decision, and then objectively eliminating non-contenders from further consideration. Finally, the final subjective stage incorporates user priorities to select the four stockpiles to receive additional maintenance and surveillance funds based on understanding the trade-offs and robustness to various user priorities.

42 ENGINEERING↗

System Effectiveness

An effective risk assessment system is needed to address the threat posed by an active or passive insider who, acting alone or in collusion, could attempt diversion or theft of nuclear material. It is critical that a nuclear facility conduct a thorough self-assessment of the material protection, control, and accountability (MPC&A) system to evaluate system effectiveness. Self-assessment involves vulnerability analysis and performance testing of the MPC&A system. The process should lead to confirmation that mitigating features of the system effectively minimize the threat, or it could lead to the conclusion that system improvements or upgrades are necessary to achieve acceptable protection against the threat. Analysis of the MPC&A system is necessary to understand the limits and vulnerabilities of the system to internal threats. Self-assessment helps the facility be prepared to respond to internal threats and reduce the risk of theft or diversion of nuclear material. MSET is a self-assessment or inspection tool utilizing probabilistic risk assessment (PRA) methodology to calculate the system effectiveness of a nuclear facility's MPC&A system. MSET analyzes the effectiveness of an MPC&A system based on defined performance metrics for MPC&A functions based on U.S. and international best practices and regulations. A facility's MC&A system can be evaluated at a point in time and reevaluated after upgrades are implemented or after other system changes occur. The total system or specific subareas within the system can be evaluated. Areas of potential performance improvement or system upgrade can be assessed to determine where the most beneficial and cost-effective improvements should be made. Analyses of risk importance factors show that sustainability is essential for optimal performance. The analyses reveal where performance degradation has the greatest detrimental impact on total system risk and where performance improvements have the greatest reduction in system risk. The risk importance factors show the amount of risk reduction achievable with potential upgrades and the amount of risk reduction actually achieved after upgrades are completed. Applying the risk assessment tool gives support to budget prioritization by showing where budget support levels must be sustained for MC&A functions most important to risk. Results of the risk assessment are also useful in supporting funding justifications for system improvements that significantly reduce system risk.

99 GENERAL AND MISCELLANEOUS↗

Summary

An effective risk assessment system is needed to address the threat posed by an active or passive insider who, acting alone or in collusion, could attempt diversion or theft of nuclear material. The material control and accountability (MC&A) system effectiveness tool (MSET) is a self-assessment or inspection tool utilizing probabilistic risk assessment (PRA) methodology to calculate the system effectiveness of a nuclear facility's material protection, control, and accountability (MPC&A) system. The MSET process is divided into four distinct and separate parts: (1) Completion of the questionnaire that assembles information about the operations of every aspect of the MPC&A system; (2) Conversion of questionnaire data into numeric values associated with risk; (3) Analysis of the numeric data utilizing the MPC&A fault tree and the SAPHIRE computer software; and (4) Self-assessment using the MSET reports to perform the effectiveness evaluation of the facility's MPC&A system. The process should lead to confirmation that mitigating features of the system effectively minimize the threat, or it could lead to the conclusion that system improvements or upgrades are necessary to achieve acceptable protection against the threat. If the need for system improvements or upgrades is indicated when the system is analyzed, MSET provides the capability to evaluate potential or actual system improvements or upgrades. A facility's MC&A system can be evaluated at a point in time. The system can be reevaluated after upgrades are implemented or after other system changes occur. The total system or specific subareas within the system can be evaluated. Areas of potential system improvement can be assessed to determine where the most beneficial and cost-effective improvements should be made. Analyses of risk importance factors show that sustainability is essential for optimal performance and reveals where performance degradation has the greatest impact on total system risk. The risk importance factors show the amount of risk reduction achievable with potential upgrades and the amount of risk reduction achieved after upgrades are completed. Applying the risk assessment tool gives support to budget prioritization by showing where budget support levels must be sustained for MC&A functions most important to risk. Results of the risk assessment are also useful in supporting funding justifications for system improvements that significantly reduce system risk. The functional model, the system risk assessment tool, and the facility evaluation questionnaire are valuable educational tools for MPC&A personnel. These educational tools provide a framework for ongoing dialogue between organizations regarding the design, development, implementation, operation, assessment, and sustainability of MPC&A systems. An organization considering the use of MSET as an analytical tool for evaluating the effectiveness of its MPC&A system will benefit from conducting a complete MSET exercise at an existing nuclear facility.

99 GENERAL AND MISCELLANEOUS↗

System-Cost-Optimized Smart EVSE for Residential Application: Final Technical Report including Manufacturing Plan

In the 2nd quarter of 2012, a program was formally initiated at Delta Products to develop smart-grid-enabled Electric Vehicle Supply Equipment (EVSE) product for residential use. The project was funded in part by the U.S. Department of Energy (DOE), under award DE-OE0000590. Delta products was the prime contractor to DOE during the three year duration of the project. In addition to Delta Products, several additional supplier-partners were engaged in this research and development (R&D) program, including Detroit Edison DTE, Mercedes Benz Research and Development North America, and kVA. This report summarizes the program and describes the key research outcomes of the program. A technical history of the project activities is provided, which describes the key steps taken in the research and the findings made at successive stages in the multi-stage work. The evolution of an EVSE prototype system is described in detail, culminating in prototypes shipped to Department of Energy Laboratories for final qualification. After the program history is reviewed, the key attributes of the resulting EVSE are described in terms of functionality, performance, and cost. The results clearly demonstrate the ability of this EVSE to meet or exceed DOE's targets for this program, including: construction of a working product-intent prototype of a smart-grid-enabled EVSE, with suitable connectivity to grid management and home-energy management systems, revenue-grade metering, and related technical functions; and cost reduction of 50% or more compared to typical market priced EVSEs at the time of DOE's funding opportunity announcement (FOA), which was released in mid 2011. In addition to meeting all the program goals, the program was completed within the original budget and timeline established at the time of the award. The summary program budget and timeline, comparing plan versus actual values, is provided for reference, along with several supporting explanatory notes. Technical information relating to the product design and test results are contained in the appendices to this report.

33 ADVANCED PROPULSION SYSTEMS↗

A preliminary study of the Soviet civil space program. Volume 1: Organization and Operations

The organization, planning, and personnel is focused of Soviet space, advantage is taken of glasnost and improved foreign relations to explore a hitherto obscure subject. The way in which the civil space program obtains approval and funding is altered. Missions must be approved before the Supreme Soviet, and public opinion is beginning to play a greater role in the legislature's budget decision. The Soviet civil space program remains a collection of disparate elements, not unified by any national, centralized space agency. An attempt was made to catalog and delineate the relationships between the components proves helpful. There is little or no coordination of independent associations' efforts, and the planning process relied on previously to set priorities and allocate resources appears to be currently inoperative or in a state of flux. The civil space program is moving in new directions: toward budget tautness, more international interactions, an emphasis on civilian over military applications, commercialization, and fiscal accountability. This study is a snapshot of a dynamic subject, but hopefully on which has highlighted the critical elements to track.

Newton, Elizabeth K.↗

Report of the Cost Assessment and Validation Task Force on the International Space Station

The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort. The Program size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap. A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule. The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program. The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required. Completion of ISS assembly is likely to be delayed from one to three years beyond December 2003.

Source record↗

Cost Assessment and Validation Task Force on the International Space Station

The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort; The Program, size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap; A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule; The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program; The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program, growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required; and Completion of ISS assembly is likely to be delayed from, one to three years beyond December 2003.

Source record↗