Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Asset Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Blockchain cybersecurity audit platform

A cybersecurity distributed ledger is provided herein for managing, tracking, auditing, and securing assets in a power infrastructure. The cybersecurity distributed ledger may include a blockchain, and may combine with smart contract or smart negotiation technology, such as in a permissioned proof of authority blockchain. The cybersecurity distributed ledger may manage the complete life cycle of a grid asset, from asset requirement and specification, through production, testing, deployment, maintenance, and retirement. The cybersecurity distributed ledger may create an immutable record of the grid asset, which may be audited for regulatory compliance or build or development compliance. Further, the cybersecurity distributed ledger may store unique identifying information for a grid asset, which may be used to detect a security breach or other tampering with a grid asset. The cybersecurity distributed ledger may also track control or ownership of the grid asset, as well as changes or updates to the grid asset.

Mylrea, Michael E.↗

Human-Autonomy Teaming Research in Support of m:N Operations

Since 2019, the NASA and industry partners have been involved in research focused on a novel paradigm for operations of remotely piloted aircraft. This paradigm involves multiple people sharing a fleet of multiple vehicles between them. Referred to as m:N (pronounced “em-to-en”), this configuration describes a ratio where m is the number of operators and N is the number of vehicles. Through force and asset multiplication, the m:N concept seeks to enable a scalable and resilient operation of remotely crewed vehicles. The primary means of obtaining such a robust operation is through allowing a flexible crew of variable size to dynamically attend to the needs of assets in while performing real-time operator workload management. It is in that sense that assets are shared between operators: as needed (such as in events of elevated workload) an operator in an m:N context can “handoff” the responsibility for some amount of assets, nh < N, to be absorbed by the m – 1 crew members on staff. At some time later, these nh assets could be returned to their original owner or they may be further distributed to other crew if called for by the mission. During this panel, I will elaborate on the research activity undertaken by the Human-Autonomy Teaming (HAT) Laboratory at NASA Ames Research Center over the previous three years. The studies conducted by the HAT Lab range from interviews with subject matter experts, a cognitive walkthrough, a task analysis, and two simulation experiments to-date. During experimentation, pilots made use of an advanced Ground Control Station developed by the HAT Lab and industry partners to simulate m:N operations in two large, metropolitan areas of Southern California: Los Angeles and San Diego. Further experimentation planned over the next few years. Results from our research to-date indicates that pilots of a moderately sized fleet of about a dozen remotely crewed aircraft adequately maintained safety performance and situation awareness of their aircraft, even when presented with unexpected situations of heightened workload.

multi-vehicle control↗

MaROS: Information Management Service

This software is provided by the Mars Relay Operations Service (MaROS) task to a variety of Mars projects for the purpose of coordinating communications sessions between landed spacecraft assets and orbiting spacecraft assets at Mars. The Information Management Service centralizes a set of functions previously distributed across multiple spacecraft operations teams, and as such, greatly improves visibility into the end-to-end strategic coordination process. Most of the process revolves around the scheduling of communications sessions between the spacecraft during periods of time when a landed asset on Mars is geometrically visible by an orbiting spacecraft. These relay sessions are used to transfer data both to and from the landed asset via the orbiting asset on behalf of Earth-based spacecraft operators. This software component is an application process running as a Java virtual machine. The component provides all service interfaces via a Representational State Transfer (REST) protocol over https to external clients. There are two general interaction modes with the service: upload and download of data. For data upload, the service must execute logic specific to the upload data type and trigger any applicable calculations including pass delivery latencies and overflight conflicts. For data download, the software must retrieve and correlate requested information and deliver to the requesting client. The provision of this service enables several key advancements over legacy processes and systems. For one, this service represents the first time that end-to-end relay information is correlated into a single shared repository. The software also provides the first multimission latency calculator; previous latency calculations had been performed on a mission-by-mission basis.

Allard, Daniel A.↗

Applying the Transactive Systems Business Value Model to IRP

As part of the Transactive Systems Program at Pacific Northwest National Laboratory, a value modeling system was developed to support the evaluation of transactive systems. The technique is general enough to be applied outside transactive systems and to demonstrate this capability, a project was undertaken to use this value modeling technique as a means for modeling the valuation process undertaken by vertically integrated utilities when undergoing integrated resource planning (IRP). IRP is the process by which vertically integrated utilities (those that both serve customers directly as well as manage and run generation assets to do so) regularly go through to demonstrate to their regulators that they have a plan to meet the expected future load of their customers in a least cost and compliant manner. Traditionally this has been primarily an issue of how many and of which types of power plants to build but increasingly has included alternative measures such as demand response programs. Increasingly, environmental regulations play a significant role in both determine what types of power plants can be built under current regulations as well as what retrofits or upgrades need to be made to existing plants to allow them to continue to operate. Two use-case diagrams were constructed, one showing the showing the process by which IRP is carried out and another showing how a vertically integrated utility procures the resources it requires to meet load now and in the future. These diagrams help clarify the difference and provide a high-level outline of the two processes. A class diagram was constructed to clearly define the types of actors that would be considered in this model and the relationships between them. This diagram tacitly indicates which types of actors are and are not included in the model which provides significant guidance in defining the scope of the model. The relationship between the classes/actors provides further indication of what areas of the model have higher levels of detail and by implication bear more significance in modeling the system. Using the classes/actors defined in the class diagram, a business value diagram was constructed that defines the key value streams exchanged between the actors. This diagram provides a clear expression of the business case of the vertically integrated utility and who its counterparties are during the process of meeting load. These value streams have not only to do with meeting the load but doing so in a manner that meets environmental regulations. Increasingly, IRPs have three key metrics to evaluate a given plant to meet load: net present value of revenue required, emissions, and renewable energy credits. From this business value diagram, more detailed activity diagrams were formed that focus on a few of the key value stream exchanges, showing the process by which each party accrues value. These diagrams provide insight into the timing and sequence of the interactions in a way that the business value diagrams did not. The transactive value model was found to be highly compatible with IRP and provided a clear, simple model of the analysis done during IRP and key metrics driving IRP decisions. In particular it highlighted a few key items that may or may not have been as clear prior to the development of the model. Specifically, the role of the environmental regulations has become increasingly important and two of the three key metrics by which IRPs are typically evaluated are environmentally focused. Additionally, though generally not acknowledged, the role of the investor was included in this model as they are an essential source of capital in building new power plants and cannot be ignored when defining the business case of the vertically integrated utility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Utility Distribution Costs: Scoping Study on Trends, Drivers, and Possible Response Strategies [Slides]

This scoping study synthesizes information that will help stakeholders understand the scope, scale, and drivers of recent increases in investor-owned utility (IOU) expenditures on local distribution power grids, while providing regulators and other decision-makers with potential strategies to keep electricity bills down. The study includes five distinct components. Drawing first on data from FERC Form 1, it summarizes key trends in past and recent IOU distribution costs. Next, through a review of a sample of distribution-system plans, it characterizes material drivers of planned distribution expenditures. Ultimately, regulators must approve cost recovery for IOU expenditures, including those for the distribution system. The study therefore also: examines trends in utility requests and regulatory approvals related to changes in retail rates and return on equity; identifies areas where utility shareholder and customer incentives may be misaligned; and develops a menu of options that state regulators might consider to optimize distribution system expenditures. Some of the key findings include: - IOU distribution spending at a national level has grown by 6%/yr since 2014 in real dollar terms, 4x faster than in the prior 20 years and consisting mostly of capital (not operating) expenditure. - On a per-kWh basis, increases in IOU distribution costs since 2014 represent over 30% of the overall national-average increase in retail electricity rates. - Regional spending growth has ranged from 2-8%/yr, with larger estimated rate impacts in CAISO, then NYISO & ISO-NE, and then the Southeast, MISO & PJM (see figure). - Some utilities are planning for significantly increased distribution system spending. Planned spending on managing the existing system (asset replacement, safety & reliability, and resilience are all important drivers) exceeds that for capacity expansion. - IOU rate increase requests ($18 billion in 2025) and public utility commission (PUC) approval levels (average of 64% of requested amounts from 2021-2025) have recently hit multi-decadal highs. - PUCs in New England and the Southeast have recently approved a greater fraction of rate requests (>75%, on average) than in ther regions, while PUCs in California and the Southeast have generally authorized higher equity returns than in other regions. - Regulators have many tools to tackle potential misalignments between utility and customer interests and, more specifically, to optimize and reduce distribution costs. Shorter-term options include those related to return on equity, capital structure, depreciation, trackers, construction work in progress, and securitization. Longer-term options include performance-based regulation and a wide variety of planning-related requirements. All options embed important tradeoffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Satellite Servicer System flight demonstration program

The major hardware elements, demonstration objectives, and technical approaches, as well as existing and developing technologies for applicability to the Satellite Servicer System (SSSFD) program are presented. In a project to develop the capability of servicing satellites in remote locations, NASA and SDI have planned a series of flights to demonstrate autonomous rendezvous and docking, supervised autonomous fluid transfer, and supervised autonomous orbital replacement unit exchange. Program objectives, design reference mission, and flight demonstrations are described. The expanded capability demonstrated by the SSSFD program will provide alternatives to excessive dependence on ground operations personnel and training, increase the reach into unique space environments, and decrease the costs of managing and operating space assets.

Moore, James S.↗

Signal to Noise Studies on Thermographic Data with Fabricated Defects for Defense Structures

There is a growing international interest in thermal inspection systems for asset life assessment and management of defense platforms. The efficacy of flash thermography is generally enhanced by applying image processing algorithms to the observations of raw temperature. Improving the defect signal to noise ratio (SNR) is of primary interest to reduce false calls and allow for easier interpretation of a thermal inspection image. Several factors affecting defect SNR were studied such as data compression and reconstruction using principal component analysis and time window processing.

Zalameda, Joseph N.↗

Life Sciences Data Archive (LSDA) in the Post-Shuttle Era

Now, more than ever before, NASA is realizing the value and importance of their intellectual assets. Principles of knowledge management, the systematic use and reuse of information/experience/expertise to achieve a specific goal, are being applied throughout the agency. LSDA is also applying these solutions, which rely on a combination of content and collaboration technologies, to enable research teams to create, capture, share, and harness knowledge to do the things they do well, even better. In the early days of spaceflight, space life sciences data were been collected and stored in numerous databases, formats, media-types and geographical locations. These data were largely unknown/unavailable to the research community. The Biomedical Informatics and Health Care Systems Branch of the Space Life Sciences Directorate at JSC and the Data Archive Project at ARC, with funding from the Human Research Program through the Exploration Medical Capability Element, are fulfilling these requirements through the systematic population of the Life Sciences Data Archive. This project constitutes a formal system for the acquisition, archival and distribution of data for HRP-related experiments and investigations. The general goal of the archive is to acquire, preserve, and distribute these data and be responsive to inquiries from the science communities.

Fitts, Mary A.↗

Ensuring US National Aeronautics Test Capabilities

U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD). However, changes in the Aerospace landscape, primarily the decrease in demand for testing over the last 20 years required an overarching strategy for management of these national assets. Therefore, NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD. Test facility utilization is a critical factor for ATP because it relies on user occupancy fees to recover a substantial part of the operations costs for its facilities. Decreasing utilization is an indicator of excess capacity and in some cases low-risk redundancy (i.e., several facilities with basically the same capability and overall low utilization). However, low utilization does not necessarily translate to lack of strategic importance. Some facilities with relatively low utilization are nonetheless vitally important because of the unique nature of the capability and the foreseeable aeronautics testing needs. Unfortunately, since its inception, the customer base for ATP has continued to shrink. Utilization of ATP wind tunnels has declined by more than 50% from the FY 2006 levels. This significant decrease in customer usage is attributable to several factors, including the overall decline in new programs and projects in the aerospace sector; the impact of computational fluid dynamics (CFD) on the design, development, and research process; and the reductions in wind tunnel testing requirements within the largest consumer of ATP wind tunnel test time, the Aeronautics Research Mission Directorate (ARMD). Retirement of the Space Shuttle Program and recent perturbations of NASA's Constellation Program will exacerbate this downward trend. Therefore it is crucial that ATP periodically revisit and determine which of its test capabilities are strategically important, which qualify as low-risk redundancies that could be put in an inactive status or closed, and address the challenges associated with both sustainment and improvements to the test capabilities that must remain active. This presentation will provide an overview of the ATP vision, mission, and goals as well as the challenges and opportunities the program is facing both today and in the future. We will discuss the strategy ATP is taking over the next five years to address the National aeronautics test capability challenges and what the program will do to capitalize on its opportunities to ensure a ready, robust and relevant portfolio of National aeronautics test capabilities.

Marshall, Timothy J.↗

The System Modeling and Analysis of Resiliency in STEReO (SMARt-STEReO)

NASA's Scalable Traffic Management for Emergency Response Operations (STEReO) project aims to leverage Unmanned Aerial Systems (UAS) and UAS Traffic Management (UTM) to improve asset coordination and overall emergency response. One application of STEReO is wildfire response, which is the focus of this research. In order to implement the operations described in the STEReO project, these additions must have tangible benefits and proven safety. To this end, the System Modeling and Analysis of Resiliency in STEReO (SMARt-STEReO) project constructs a simulation model, developed through the Python modeling and resiliency analysis package fmdtools. The model describes wildfire response operations, including current operational concepts and emerging concepts utilizing UAS as described in STEReO. While previous simulation models focus primarily on fire propagation with some models including emergency response intervention, SMART-STEReO evaluates the system performance and resilience benefits gained by the addition of UAS and UTM. Due to the novelty and complexity of the model, initial model verification and validation efforts are conducted and a detailed description of the model is provided. Preliminary results from experimental analysis on the SMARt-STEReO model indicate that when compared to current operations, the addition of UAS in wildfire operations results in improved response efforts, in terms of fewer acres burned, as well as improved system resilience in response to a given fault.

Sequoia Andrade↗

An Open Source Extensible Smart Energy Framework

Aggregated distributed energy resources are the subject of much interest in the energy industry and are expected to play an important role in meeting our future energy needs by changing how we use, distribute and generate electricity. This energy future includes an increased amount of energy from renewable resources, load management techniques to improve resiliency and reliability, and distributed energy storage and generation capabilities that can be managed to meet the needs of the grid as well as individual customers. These energy assets are commonly referred to as Distributed Energy Resources (DER). DERs rely on a means to communicate information between an energy provider and multitudes of devices. Today DER control systems are typically vendor-specific, using custom hardware and software solutions. As a result, customers are locked into communication transport protocols, applications, tools, and data formats. Today’s systems are often difficult to extend to meet new application requirements, resulting in stranded assets when business requirements or energy management models evolve. By partnering with industry advisors and researchers, an implementation DER research platform was developed called the Smart Energy Framework (SEF). The hypothesis of this research was that an open source Internet of Things (IoT) framework could play a role in creating a commodity-based eco-system for DER assets that would reduce costs and provide interoperable products. SEF is based on the AllJoynTM IoT open source framework. The demonstration system incorporated DER assets, specifically batteries and smart water heaters. To verify the behavior of the distributed system, models of water heaters and batteries were also developed. An IoT interface for communicating between the assets and a control server was defined. This interface supports a series of “events” and telemetry reporting, similar to those defined by current smart grid communication standards. The results of this effort demonstrated the feasibility and application potential of using IoT frameworks for the creation of commodity-based DER systems. All of the identified commodity-based system requirements were met by the AllJoyn framework. By having commodity solutions, small vendors can enter the market and the cost of implementation for all parties is reduced. Utilities and aggregators can choose from multiple interoperable products reducing the risk of stranded assets. Based on this research it is recommended that interfaces based on existing smart grid communication protocol standards be created for these emerging IoT frameworks. These interfaces should be standardized as part of the IoT framework allowing for interoperability testing and certification. Similarly, IoT frameworks are introducing application level security. This type of security is needed for protecting application and platforms and will be important moving forward. Recommendations are that along with DER-based data model interfaces, platform and application security requirements also be prescribed when IoT devices support DER applications.

25 ENERGY STORAGE↗

'Strategy is a commodity, implementation is an art' - 2 years of implementation of the UK national LLW strategy

The Low Level Waste Repository (LLWR) is the primary facility for disposal of Low Level Waste (LLW) in the United Kingdom (UK), serving the UK nuclear industry and a diverse range of other sectors. Management of LLW in the UK historically was dominated by disposal to the LLWR. The value of the LLWR as a national asset was recognised by the 2007 UK Governmental Policy on management of solid LLW. At this time, analysis of the projected future demand for disposal at LLWR against facility capacity was undertaken identifying a credible risk that the capacity of LLWR would be insufficient to meet future demand if existing waste management practices were perpetuated. To mitigate this risk a National Strategy for the management of LLW in the UK was developed by the Nuclear Decommissioning Authority (NDA), partnered with LLW Repository Ltd. (the organisation established in 2008 to manage the LLWR on behalf of NDA). This strategy was published in 2010 and identified three mechanisms for protection of the capacity of LLWR - application of the Waste Hierarchy by waste producers; optimised use of existing assets for LLW management; and opening of new waste treatment and disposal routes to enable diversion of waste away from the LLWR. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A 20 Year Lifecycle Study for Launch Facilities at the Kennedy Space Center

The lifecycle cost analysis was based on corrosion costs for the Kennedy Space Center's Launch Complexes and Mobile Launch Platforms. The first step in the study involved identifying the relevant assets that would be included. Secondly, the identification and collection of the corrosion control cost data for the selected assets was completed. Corrosion control costs were separated into four categories. The sources of cost included the NASA labor for civil servant personnel directly involved in overseeing and managing corrosion control of the assets, United Space Alliance (USA) contractual requirements for performing planned corrosion control tasks, USA performance of unplanned corrosion control tasks, and Testing and Development. Corrosion control operations performed under USA contractual requirements were the most significant contributors to the total cost of corrosion. The operations include the inspection of the pad, routine maintenance of the pad, medium and large scale blasting and repainting activities, and the repair and replacement of structural metal elements. Cost data was collected from the years between 2001 and 2007. These costs were then extrapolated to future years to calculate the 20 year lifecycle costs.

Kolody, Mark R.↗

Disaster risk management in prospect mining area Blitar district, East Java, using microtremor analysis and ANP (analytical network processing) approach

Indonesia has a wealth of natural assets is so large to be managed and utilized, either from its own local government and local communities, especially in the mining sector. However, mining activities can change the state of the surface layer of the earth that have a high impact disaster risk. This could threaten the safety and disrupt human life, environmental damage, loss of property, and the psychological impact, sulking to the rule of law no 24 of 2007. That's why we strive to manage and minimize the risk of mine disasters in the region, how to use the method of calculation of Amplification Factor (AF) from the analysis based microtremor sulking Kanai and Nakamura, and decision systems were tested by analysis of ANP. Based on the amplification factor and Analytical Network Processing (ANP) obtained, some points showed instability in the surface layer of a mining area include the site of the TP-7, TP-8, TP-9, TP-10, (Birowo2). If in terms of structure, location indicated unstable due to have a sloping surface layer, resulting in the occurrence of landslides and earthquake risk is high. In the meantime, other areas of the mine site can be said to be a stable area.

54 ENVIRONMENTAL SCIENCES↗

Earth Independent Medical Operations (EIMO) Datascope: Challenges and Potential Solutions

Data flows and storage/retrieval capacity are severely constrained during missions in space and challenges will become even greater during exploration class missions. There is a need for an artificial intelligence (AI)-based clinical decision support system (CDSS) to monitor and analyze data to provide real-time consultative support for crew medical officer (CMO) decision-making. EIMO is defined as the gradual transition of medical care and decision making from terrestrial to space-based assets, enabling support of astronaut health and performance and reducing overall mission risk. While a hallmark of this paradigm shift from low-earth orbit is that on-board care will increasingly become the responsibility of the astronauts for primary management and decision making, terrestrial assets will continue to be paramount in pre-mission screening and planning, as well as prevention, health maintenance and long-term care contingencies. New capabilities and systems that enable progressively more robust and resilient systems and crews will be necessary to reduce risk and increase probability of deep space exploration mission success. An aspiration for EIMO is to develop AI-enhanced solutions for analysis of crew health & performance data and to facilitate clinical decision support for autonomous medical operations. A “system of systems” approach is envisioned whereby EIMO will deploy AI-supported natural language processing and machine learning (ML) techniques to utilize embedded reference databases and real-time data streams [input vectors] from multiple data sources. Constituent input vectors may include environmental controls, countermeasures data, behavioral data, physiologic wearables, point-of-care laboratory tests, personalized medical records, inventory trade space risk assessments, COTS medical databases, and ground support inputs. An ideal AI capability would possess trained fusion algorithms to cross reference input vectors with medical ‘knowledge’ [cultivated database] to stratify relevant data streams for predictive and actionable capabilities. In addition, EIMO will feature mobility, in that it can be accessed and can push/pull data within and between multiple vehicles/habitats. Large amounts and variable sources of data can be leveraged to diagnose, inform treatment strategies, and potentially predict medical events and performance decrements. Inclusion of advanced training tools using extended reality will enable increasingly autonomous medical care to aid a CMO when ground support is unavailable or time-delayed beyond required action window, e.g., emergent medical situations. EIMO CDSS would require very large datasets to train pre-flight and significant amounts of data are needed to support ML via in-flight CDSS operations. An additional challenge will be to find sufficient data to train a model relevant to astronaut demographics. The rapid, accelerating evolution of this field creates a propitious solution space to leverage multi-modal AI through public-private partnership(s). The status of multi-modal AI systems today would preclude their use for long duration missions as they remain unreliable and are subject to “digital hallucinations” and other errors that could pose operational risk. A federated labs structure is being considered to test and optimize data flow from the multiple input vectors leading to field testing in suitable ground/flight analogs. Critical to the success of an EIMO CDSS will be integration and interoperability and success will be defined by a system that can serve as an in-flight medical consult for the CMO providing critical support during medical contingencies. Benefits to terrestrial medicine may be significant as an outflow of the EIMO medical system, particularly for remote areas and communities lacking significant infrastructure, personnel and resources.

J Lemery↗

Earth Independent Medical Operations (EIMO) Datascope: Challenges and Potential Solutions

Data flows and storage/retrieval capacity are severely constrained during missions in space and challenges will become even greater during exploration class missions. There is a need for an artificial intelligence (AI)-based clinical decision support system (CDSS) to monitor and analyze data to provide real-time consultative support for crew medical officer (CMO) decision-making. EIMO is defined as the gradual transition of medical care and decision making from terrestrial to space-based assets, enabling support of astronaut health and performance and reducing overall mission risk. While a hallmark of this paradigm shift from low-earth orbit is that on-board care will increasingly become the responsibility of the astronauts for primary management and decision making, terrestrial assets will continue to be paramount in pre-mission screening and planning, as well as prevention, health maintenance and long-term care contingencies. New capabilities and systems that enable progressively more robust and resilient systems and crews will be necessary to reduce risk and increase probability of deep space exploration mission success. An aspiration for EIMO is to develop AI-enhanced solutions for analysis of crew health & performance data and to facilitate clinical decision support for autonomous medical operations. A “system of systems” approach is envisioned whereby EIMO will deploy AI-supported natural language processing and machine learning (ML) techniques to utilize embedded reference databases and real-time data streams [input vectors] from multiple data sources. Constituent input vectors may include environmental controls, countermeasures data, behavioral data, physiologic wearables, point-of-care laboratory tests, personalized medical records, inventory trade space risk assessments, COTS medical databases, and ground support inputs. An ideal AI capability would possess trained fusion algorithms to cross reference input vectors with medical ‘knowledge’ [cultivated database] to stratify relevant data streams for predictive and actionable capabilities. In addition, EIMO will feature mobility, in that it can be accessed and can push/pull data within and between multiple vehicles/habitats. Large amounts and variable sources of data can be leveraged to diagnose, inform treatment strategies, and potentially predict medical events and performance decrements. Inclusion of advanced training tools using extended reality will enable increasingly autonomous medical care to aid a CMO when ground support is unavailable or time-delayed beyond required action window, e.g., emergent medical situations. EIMO CDSS would require very large datasets to train pre-flight and significant amounts of data are needed to support ML via in-flight CDSS operations. An additional challenge will be to find sufficient data to train a model relevant to astronaut demographics. The rapid, accelerating evolution of this field creates a propitious solution space to leverage multi-modal AI through public-private partnership(s). The status of multi-modal AI systems today would preclude their use for long duration missions as they remain unreliable and are subject to “digital hallucinations” and other errors that could pose operational risk. A federated labs structure is being considered to test and optimize data flow from the multiple input vectors leading to field testing in suitable ground/flight analogs. Critical to the success of an EIMO CDSS will be integration and interoperability and success will be defined by a system that can serve as an in-flight medical consult for the CMO providing critical support during medical contingencies. Benefits to terrestrial medicine may be significant as an outflow of the EIMO medical system, particularly for remote areas and communities lacking significant infrastructure, personnel and resources.

Medical Operations↗

Implementation of Remaining Useful Lifetime Transformer Models in the Fleet-Wide Prognostic and Health Management Suite

Research and development efforts are required to address aging and reliability concerns of the existing fleet of nuclear power plants. As most plants continue to operate beyond the license life (i.e., towards 60 or 80 years), plant components are more likely to incur age-related degradation mechanisms. To assess and manage the health of aging plant assets across the nuclear industry, the Electric Power Research Institute has developed a web-based Fleet-Wide Prognostic and Health Management (FW-PHM) Suite for diagnosis and prognosis. FW-PHM is a set of web-based diagnostic and prognostic tools and databases, comprised of the Diagnostic Advisor, the Asset Fault Signature Database, the Remaining Useful Life Advisor, and the Remaining Useful Life Database, that serves as an integrated health monitoring architecture. The main focus of this paper is the implementation of prognostic models for generator step-up transformers in the FW-PHM Suite. One prognostic model discussed is based on the functional relationship between degree of polymerization, (the most commonly used metrics to assess the health of the winding insulation in a transformer) and furfural concentration in the insulating oil. The other model is based on thermal-induced degradation of the transformer insulation. By utilizing transformer loading information, established thermal models are used to estimate the hot spot temperature inside the transformer winding. Both models are implemented in the Remaining Useful Life Database of the FW-PHM Suite. The Remaining Useful Life Advisor utilizes the implemented prognostic models to estimate the remaining useful life of the paper winding insulation in the transformer based on actual oil testing and operational data.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Why (just) information is not enough: The contributions of information services in the management of healthcare information

Information is at the centre of every hospital activity including clinical decisions and healthcare service delivery systems. Although information is an important hospital asset, several issues related to its management and organization needs to be addressed within the hospitals. The management of healthcare information is a strategic goal related to the reduction of healthcare service provision costs, and to the improvement of quality and safety of healthcare services. By discussing the rather obvious necessity for information organization and management in the healthcare domain, this work aims at the role of healthcare information services, i.e. hospital libraries and patient medical records. Finally, a typology of information services’ contributions to hospital environment is presented.

99 GENERAL AND MISCELLANEOUS↗