Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ALLOCATIONS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Dynamic advance reservation with delayed allocation

A method of scheduling data transmissions from a source to a destination, includes the steps of: providing a communication system having a number of channels and a number of paths, each of the channels having a plurality of designated time slots; receiving two or more data transmission requests; provisioning the transmission of the data; receiving data corresponding to at least one of the two or more data transmission requests; waiting until an earliest requested start time T.sub.s; allocating at the current time each of the two or more data transmission requests; transmitting the data; and repeating the steps of waiting, allocating, and transmitting until each of the two or more data transmission requests that have been provisioned for a transmission of data is satisfied. A system to perform the method of scheduling data transmissions is also described.

24 POWER TRANSMISSION AND DISTRIBUTION↗

shiftNMFk 1.1: Robust Nonnegative matrix factorization with kmeans clustering and signal shift, for allocation of unknown physical sources, toy version for open sourcing with publications

This code is a toy (short) version of CODE-2016-83. From a general perspective, the code represents an unsupervised adaptive machine learning algorithm that allows efficient and high performance de-mixing and feature extraction of a multitude of non-negative signals mixed and recorded by a network of uncorrelated sensor arrays. The code identifies the number of the mixed original signals and their locations. Further, the code also allows deciphering of signals that have been delayed in regards to the mixing process in each sensor. This code is high customizable and it can be efficiently used for a fast macro-analyses of data. The code is applicable to a plethora of distinct problems: chemical decomposition, pressure transient decomposition, unknown sources/signal allocation, EM signal decomposition. An additional procedure for allocation of the unknown sources is incorporated in the code.

Alexandrov, Boian S.↗

Preventing conflicts among bid curves used with transactive controllers in a market-based resource allocation system

Disclosed herein are representative embodiments of methods, apparatus, and systems for distributing a resource (such as electricity) using a resource allocation system. One of the disclosed embodiments is a method for operating a transactive thermostatic controller configured to submit bids to a market-based resource allocation system. According to the exemplary method, a first bid curve is determined, the first bid curve indicating a first set of bid prices for corresponding temperatures and being associated with a cooling mode of operation for a heating and cooling system. A second bid curve is also determined, the second bid curve indicating a second set of bid prices for corresponding temperatures and being associated with a heating mode of operation for a heating and cooling system. In this embodiment, the first bid curve, the second bid curve, or both the first bid curve and the second bid curve are modified to prevent overlap of any portion of the first bid curve and the second bid curve.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Model-Free Building Temperature Control and Power Allocation Under Measurement Time Delays

Taking a step towards a greener planet has created an increased need for a higher integration of renewable energy resources into the electric grid. Nonetheless, the intermittency and uncertainty associated with renewable generation have slowed down this integration. Demand response (DR) has been recently adopted to address this challenge by utilizing demand side flexibility and enabling the participation of many grid-interactive efficient buildings (GEBs). However, existing DR methods require significant modeling and/or training efforts and are computationally expensive. To address the aforementioned issues, we propose a model-free control (MFC)-based strategy that is robust to the time delays in the temperature measurements of the thermostatically controlled loads (TCLs). It assigns to each GEB a local controller to maintain the TCLs’ temperatures within desired comfort levels, while the load aggregator (LA) allocates the assigned reference power provided by the distribution system operator (DSO) to support a specific grid service, such as demand peak reduction, load shifting, balancing supply and demand, and consuming the solar photovoltaic power locally. We investigate the effects of such loss of information on the local control action as well as on meeting the power allocation constraint. We conclude that, for an appropriate choice of design parameters, the proposed MFC controller is satisfactorily robust to measurement time delays.

Telsang, Bhagyashri↗

Dynamic kernel memory space allocation

A processing unit includes one or more processor cores and a set of registers to store configuration information for the processing unit. The processing unit also includes a coprocessor configured to receive a request to modify a memory allocation for a kernel concurrently with the kernel executing on the at least one processor core. The coprocessor is configured to modify the memory allocation by modifying the configuration information stored in the set of registers. In some cases, initial configuration information is provided to the set of registers by a different processing unit. The initial configuration information is stored in the set of registers prior to the coprocessor modifying the configuration information.

Gutierrez, Anthony↗

The Myth of Fungible FTE: A Quantitative Assessment of Matrixed Resource Allocation

Matrix organizations allow scientific facilities to share specialized personnel across projects, operations, maintenance, and strategic initiatives. Nominal staffing allocations, however, may not capture the schedule consequences of fragmented individual commitments, limited access to specialist groups, and intermittent availability of key decision makers. We developed a stochas- tic, daily-time-step simulation of a hypothetical medium-sized accelerator-facility project com- prising sequential phases and parallel tasks. Each task requires role-specific work measured in FTE-days. Ordinary personnel may be unavailable because they contribute concurrently to other institutional activities, while designated key roles have independently specified daily un- availability probabilities. An organization-wide priority factor scales the number of people from each functional group who can effectively contribute to the project. It is interpreted as a composite proxy for project access and workforce fragmentation across competing commit- ments. We examined project completion time as a function of this factor and Project Lead unavailability using 100 Monte Carlo runs per condition. Increasing priority factor from 0.1 to 1.0 reduced median completion time from 1708.5 days (interquartile range 1681.5–1735.25) to 390 days (interquartile range 379–399). At priority factor = 0.1, increasing Project Lead unavailability from 0.5 to 0.9 increased median completion time from 1713.5 days (interquartile range 1691–1733.25) to 4,417 days (interquartile range 4271.75–4550.5). The model quantifies the commonly expected sensitivity of project schedules to fragmented resource commitments and limited coordination availability. Within this model, the results also indicate a possible threshold regime in which small increases in workforce availability yield only modest sched- ule improvements until sufficient capacity becomes accessible, after which project performance improves sharply. With further validation and calibration, this quantitative framework could support resource-allocation decisions during initial project planning and subsequent schedule rebaselining.

Bai, Mei [SLAC National Accelerator Laboratory (SL↗

Relatively rare root endophytic bacteria drive plant resource allocation patterns and tissue nutrient concentration in unpredictable ways

Plant endophytic bacterial strains can influence plant traits such as leaf area and root length. Yet, the influence of more complex bacterial communities in regulating overall plant phenotype is less explored. Here, in two complementary experiments, we tested whether we can predict plant phenotype response to changes in microbial community composition. In the first study, we inoculated a single genotype of Populus deltoides with individual root endophytic bacteria and measured plant phenotype. Next, data from this single inoculation were used to predict phenotypic traits after mixed three-strain community inoculations, which we tested in the second experiment. By itself, each bacterial endophyte significantly but weakly altered plant phenotype relative to noninoculated plants. In a mixture, bacterial strain Burkholderia BT03, constituted at least 98% of community relative abundance. Yet, plant resource allocation and tissue nutrient concentrations were disproportionately influenced by Pseudomonas sp. GM17, GM30, and GM41. We found a 10% increase in leaf mass fraction and an 11% decrease in root mass fraction when replacing Pseudomonas GM17 with GM41 in communities containing both Pseudomonas GM30 and Burkholderia BT03. Our results indicate that interactions among endophytic bacteria may drive plant phenotype over the contribution of each strain individually. Additionally, we have shown that low-abundance strains contribute to plant phenotype challenging the assumption that the dominant strains will drive plant function.

59 BASIC BIOLOGICAL SCIENCES↗

Electric vehicle supply equipment location and capacity allocation for fixed-route networks

Electric vehicle (EV) supply equipment location and allocation (EVSELCA) problems for freight vehicles are becoming more important because of the trending electrification shift. Some previous works address EV charger location and vehicle routing problems simultaneously by generating vehicle routes from scratch. Although such routes can be efficient, introducing new routes may violate practical constraints, such as drive schedules, and satisfying electrification requirements can require dramatically altering existing routes. To address the challenges in the prevailing adoption scheme, we approach the problem from a fixed -route perspective. We develop a mixed -integer linear program, a clustering approach, and a metaheuristic solution method using a genetic algorithm (GA) to solve the EVSELCA problem. The clustering approach simplifies the problem by grouping customers into clusters, while the GA generates solutions that are shown to be nearly optimal for small problem cases. A case study examines how charger costs, energy costs, the value of time (VOT), and battery capacity impact the cost of the EVSELCA. Charger equipment costs were found to be the most significant component in the objective function, leading to a substantial reduction in cost when decreased. VOT costs exhibited a significant decrease with rising energy costs. Further, an increase in VOT resulted in a notable rise in the number of fast chargers. Longer EV ranges decrease total costs up to a certain point, beyond which the decrease in total costs is negligible.

33 ADVANCED PROPULSION SYSTEMS↗

Alternative mixed integer linear programming optimization for joint job scheduling and data allocation in grid computing

This paper presents a novel approach to the joint optimization of job scheduling and data allocation in grid computing environments. We formulate this joint optimization problem as a mixed integer quadratically constrained program. To tackle the nonlinearity in the constraint, we alternatively fix a subset of decision variables and optimize the remaining ones via Mixed Integer Linear Programming (MILP). We solve the MILP problem at each iteration via an off-the-shelf MILP solver. Our experimental results show that our method significantly outperforms existing heuristic methods, employing either independent optimization or joint optimization strategies. We have also verified the generalization ability of our method over grid environments with various sizes and its high robustness to the algorithm setting.

97 MATHEMATICS AND COMPUTING↗

Criteria Air Pollutant and Greenhouse Gases Emissions from U.S. Refineries Allocated to Refinery Products

Using Greenhouse Gas Reporting Program data (GHGRP) and National Emissions Inventory data from 2014, we investigate U.S. refinery greenhouse gas (GHG) emissions (CO2, CH4, and N2O) and criteria air pollutant (CAP) emissions (VOC, CO, NOx, SO2, PM10, and PM2.5). The study derives (1) combustion emission factors (EFs) of refinery fuels (e.g., refinery catalyst coke and refinery combined gas), (2) U.S. refinery GHG emissions and CAP emissions per crude throughput at the national and regional levels, and (3) GHG and CAP emissions attributable to U.S. refinery products. The latter two emissions were further itemized by source: combustion emission, process emission, and facility-wide emission. We estimated U.S. refinery product GHG and CAP emissions via energy allocation at the refinery process unit level. The unit energy demand and unit flow information were adopted from the Petroleum Refinery Life Cycle Inventory Model (PRELIM version 1.1) by fitting individual U.S. refineries. This study fills an important information gap because it (1) evaluates refinery CAP emissions along with GHG emissions and (2) provides CAP and GHG emissions not only for refinery main products (gasoline, diesel, jet fuel, etc.) but also for refinery secondary products (asphalt, lubricant, wax, light olefins, etc.).

allocation↗

Resolving Mixtures of Soot Characterized by SP-AMS Spectra Using a Latent Dirichlet Allocation Model

Soot produced by detonation or combustion events exhibits different chemical properties depending on the fuel, device construction, and environmental conditions in which the event occurs. These properties can be useful for defining relevant signatures for probabilistically identifying the different types of events that occurred, based on the soot that is produced from these events. However, it is rare to observe samples of soot from a detonation or combustion that are not contaminated by outside particles. In this paper, we present a method for resolving mixtures of soot to determine the contributions of sources that may be present in samples of recovered soot. We use Latent Dirichlet Allocation to describe the generative process for a sample of recovered soot, and use Variational Bayesian Inference to learn about the parameters associated with the generative model. We demonstrate the utility of this method by considering real samples of mixtures of soot under various frameworks to show that the model is able to identify the different components present in a sample of soot as well as their mixing proportions.

54 ENVIRONMENTAL SCIENCES↗

An Approximation Algorithm for a Task Allocation, Sequencing and Scheduling Problem Involving a Human-Robot Team

Here we present an approximation algorithm for a Task Allocation, Sequencing and Scheduling Problem (TASSP) involving a team of human operators and robots. The robots have to travel to a given set of targets and collaboratively work on the tasks at the targets with the human operators. The problem aims to find a sequence of targets for each robot to visit and schedule the tasks at the targets with the human operators such that each target is visited exactly once by some robot, the scheduling constraints are satisfied and the maximum mission time of any robot is minimum. This problem is a generalization of the single Traveling Salesman Problem and is NP-Hard. Given k robots and m human operators, an algorithm is developed for solving the TASSP with an approximation ratio equal to 5/2- 1/k when m ≥ k and equal to 7/2 -1/k otherwise. Computational results are also presented to corroborate the performance of the proposed algorithm.

42 ENGINEERING↗

Machine Learning-Based Prediction of Distribution Network Voltage and Sensor Allocation

Increasing penetration levels of fast-varying energy resources might negatively affect power system operation. At the same time, sensor deployment throughout distribution networks improves system awareness and enables the development of new and advanced voltage control solutions. Such control techniques rely on accurate prediction in anticipation of voltage violation scenarios. This paper analyzes various approaches to voltage prediction in a distribution system, and it is shown that combining multiple techniques into a single regressor improves its predictive power. Moreover, a two-step regressor is proposed in which initial predictions based on a global regressor are refined by local regressors; in this case, prediction errors decrease significantly. Additionally, a clustering approach is employed to perform sensor allocation so that only the most influential buses are selected for monitoring without diminishing prediction accuracy.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The Latent Dirichlet Allocation model applied to airborne LiDAR data: A case study on mapping forest degradation associated with fragmentation and fire in the Amazon region

1. LiDAR data are being increasingly used to provide a detailed characterization of the vertical profile of forests. This characterization enables the generation of new insights on the influence of environmental drivers and anthropogenic disturbances on forest structure as well as on how forest structure influences important ecosystem functions and services. Unfortunately, extracting information from LiDAR data in a way that enables the spatial visualization of forest structure, as well as its temporal changes, is challenging due to the high dimensionality of these data. 2. In this study, we show how the Latent Dirichlet Allocation model applied to LiDAR data (LidarLDA) can be used to identify forest structural types and how the relative abundance of these forest types changes throughout the landscape. The code to fit this model is made available through the open-source r package LidarLDA in github. We illustrate the use of LidarLDA both with simulated data and data from a large-scale fire experiment in the Brazilian Amazon region. 3. Using simulated data, we demonstrate that LidarLDA accurately identifies the number of forest types as well as their spatial distribution and absorptance probabilities. For the empirical data, we found that LidarLDA detects both landscape-level patterns in forest structure as well as the strong interacting effect of fire and forest fragmentation on forest structure based on the experimental fire plots. More specifically, LidarLDA reveals that proximity to forest edge exacerbates the impact of fires, and that burned forests remain structurally different from unburned areas for at least 7 years, even when burned only once. Importantly, LidarLDA generates insights on the 3D structure of forest that cannot be obtained using more standard approaches that just focus on top-of-the-canopy information (e.g. canopy height models based on LiDAR data). 4. By enabling the mapping of forest structure and its temporal changes, we believe that LidarLDA will be of broad utility to the ecological research community.

54 ENVIRONMENTAL SCIENCES↗

Optimized allocation method of the VSC-MTDC system for frequency regulation reserves considering the cost

In recent years, the interconnection of asynchronous power grids through the VSC-MTDC system has been proposed and extensively studied in light of the potential benefits of economical bulk power exchanges and frequency regulation reserves sharing. This paper proposed an optimized allocation method for sharing frequency regulation reserves among the interconnected power systems and the corresponding frequency regulation control of the VSC-MTDC system under emergency frequency deviation events. Firstly, the frequency regulation reserve classification is proposed. In the classification, the available frequency response capacity reserves of each interconnection are divided into commercial reserves and regular reserves. While the commercial reserves are procured through long-term contracts, the regular reserves are purchased based on market prices of frequency regulation services. Secondly, based on the proposed frequency regulation reserve classification, a novel frequency regulation control is then introduced for the VSC-MTDC system. This control method could minimize the costs of the disturbed power grid for the needed frequency response supports from the other power grids. Simulation verifications are performed on a modified IEEE 39 bus system and a highly reduced power system model representing the North American grids. The simulation verification indicates that the developed frequency regulation control significantly reduced ancillary service costs of the disturbed power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Policy and Cost Allocation Considerations for Large Electric Load Interconnections: Emerging Policy Trends in Rate Structures, Interconnection, and Cost Impacts on Other System Users

Load growth in the United States is rapidly increasing: load from data centers alone has tripled over the past decade, and this growth is forecasted to continue accelerating. These and other large electric loads (LELs) promise economic benefits at the state and local level, but their deployment has also led to increasing concerns about grid impacts and potential cost shifts onto other ratepayers. Legislators, regulators, and other stakeholders are increasingly proposing and enacting policies in effort to balance these and other considerations. This white paper reviews state-level legislation, selected utility rate cases, and relevant federal orders in an effort to describe and categorize relevant trends in policies related to LEL cost allocation, interconnection, and deployment. Policy categories identified through this review include tax incentives, rate actions, and requirements related to interconnection, permitting, and reporting. By offering a taxonomy of policies, this white paper aims to offer a resource to policymakers and other stakeholders navigating this transformative moment for the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The JPL Resource Allocation Planning and Scheduling Office (RAPSO) process

The Jet Propulsion Laboratory's Resource Allocation Planning and Scheduling Office is chartered to divide the limited amount of tracking hours of the Deep Space Network amongst the various missions in as equitable allotment as can be achieved. To best deal with this division of assets and time, an interactive process has evolved that promotes discussion with agreement by consensus between all of the customers that use the Deep Space Network (DSN). Aided by a suite of tools, the task of division of asset time is then performed in three stages of granularity. Using this approach, DSN loads are either forecasted or scheduled throughout a moving 10-year window.

RAPSO Resource Allocation Planning and Scheduling ↗