Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “work management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Bibliography of Lewis Research Center technical publications announced in 1989

This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1989. All the publications were announced in the 1989 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

Source record↗

Publications of the Jet Propulsion Laboratory 1989

This bibliography describes and indexes by primary author the externally distributed technical reporting, released during 1989, that resulted from scientific and engineering work performed, or managed, by JPL. Three classes of publications are included: JPL publications in which the information is complete for a specific accomplishment; articles from the quarterly Telecommunications and Data Acquisition (TDA) Progress Report; and articles published in the open literature.

Source record↗

Space Station Freedom - Configuration management approach to supporting concurrent engineering and total quality management

Some experiences of NASA configuration management in providing concurrent engineering support to the Space Station Freedom program for the achievement of life cycle benefits and total quality are discussed. Three change decision experiences involving tracing requirements and automated information systems of the electrical power system are described. The potential benefits of concurrent engineering and total quality management include improved operational effectiveness, reduced logistics and support requirements, prevention of schedule slippages, and life cycle cost savings. It is shown how configuration management can influence the benefits attained through disciplined approaches and innovations that compel consideration of all the technical elements of engineering and quality factors that apply to the program development, transition to operations and in operations. Configuration management experiences involving the Space Station program's tiered management structure, the work package contractors, international partners, and the participating NASA centers are discussed.

Gavert, Raymond B.↗

Bibliography of Lewis Research Center technical publications announced in 1990

This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1990. All the publications were announced in the 1990 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

Source record↗

Bibliography of Lewis Research Center Technical Publications announced in 1991

This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific engineering work performed and managed by the Lewis Research Center in 1991. All the publications were announced in the 1991 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

Source record↗

User observations on information sharing (corporate knowledge and lessons learned)

The sharing of 'corporate knowledge' and lessons learned in the NASA aerospace community has been identified by Johnson Space Center survey participants as a desirable tool. The concept of the program is based on creating a user friendly information system that will allow engineers, scientists, and managers at all working levels to share their information and experiences with other users irrespective of location or organization. The survey addresses potential end uses for such a system and offers some guidance on the development of subsequent processes to ensure the integrity of the information shared. This system concept will promote sharing of information between NASA centers, between NASA and its contractors, between NASA and other government agencies, and perhaps between NASA and institutions of higher learning.

Montague, Ronald A.↗

Publications of the Jet Propulsion Laboratory: 1990 and 1991

JPL Bibliography 39-32 describes and indexes by primary author the externally distributed technical reporting, released during calendar years 1990 and 1991, that resulted from scientific and engineering work performed or managed by the Jet Propulsion Laboratory (JPL). Three classes of publications are included: (1) JPL publications (90- and 91-series) in which the information is complete for a specific accomplishment; (2) articles from the quarterly Telecommunications and Data Acquisition (TDA) Progress Report (42-series); and (3) articles published in the open literature.

Source record↗

Development of a naming convention and data ma nagement system

This contract covered work in data management, acquisition, and analysis for the Earth Science and Applications Division (ESAD) of the Space Science Laboratory of MSFC. Under this contract, a naming convention and data management system were developed for ESAD data sets, data visualization, and standard data format issues were investigated, and specific data analysis and management needs were addressed for several ESAD projects and data sets. In the following sections, details of the research performed over the duration of this contract are summarized.

Mcnider, Richard T.↗

Bibliography of Lewis Research Center technical publications announced in 1992

This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1992. All the publications were announced in the 1992 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

Source record↗

Publications of the Jet Propulsion Laboratory, 1992

JPL Bibliography 39-33 describes and indexes by primary author the externally distributed technical reporting, released during calendar year 1992, that resulted from scientific and engineering work performed or managed by the Jet Propulsion Laboratory. Three classes of publications are included: (1) JPL Publication (92-series) in which the information is complete for a specific accomplishment; (2) articles from the quarterly Telecommunications and Data Acquisition (TDA) Progress Report (42-series) (each collection of articles in this class of publication presents a periodic survey of current accomplishments by the Deep Space Network as well as other developments in Earth-based radio technology); and (3) articles published in the open literature.

Source record↗

Bibliography of Lewis Research Center technical publications announced in 1993

This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1993. All the publications were announced in the 1993 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

Source record↗

Process maturity progress at Motorola Cellular Systems Division

We believe that the key success elements are related to our recognition that Software Process Improvement (SPI) can and should be organized, planned, managed, and measured as if it were a project to develop a new process, analogous to a software product. We believe that our process improvements have come as the result of these key elements: use of a rigorous, detailed requirements set (Capability Maturity Model, CMM); use of a robust, yet flexible architecture (IEEE 1074); use of a SPI project, resourced and managed like other work, to produce the specifications and implement them; and development of both internal and external goals, with metrics to support them.

Borgstahl, Ron↗

X-33 Base Region Thermal Protection System Design Study

The X-33 is an advanced technology demonstrator for validating critical technologies and systems required for an operational Single-Stage-to-Orbit (SSTO) Reusuable Launch Vehicle (RLV). Currently under development by a unique contractor/government team led by Lockheed- Martin Skunk Works (LMSW), and managed by Marshall Space Flight Center (MSFC), the X-33 will be the prototype of the first new launch system developed by the United States since the advent of the space shuttle. This paper documents a design trade study of the X-33 base region thermal protection system (TPS). Two candidate designs were evaluated for thermal performance and weight. The first candidate was a fully reusable metallic TPS using Inconel honeycomb panels insulated with high temperature fibrous insulation, while the second was an ablator/insulator sprayed on the metallic skin of the vehicle. The TPS configurations and insulation thickness requirements were determined for the predicted main engine plume heating environments and base region entry aerothermal environments. In addition to thermal analysis of the design concepts, sensitivity studies were performed to investigate the effect of variations in key parameters of the base TPS analysis.

Lycans, Randal W.↗

Code JEF Facilities Engineering Home Page for the Internet

There are always many activities going on in JEF. We work on and manage the Construction of Facilities (C of F) projects at NASA-Ames. We are constantly designing or analyzing a new facility or project, or a modification to an existing facility. Every day we answer numerous questions about engineering policy, codes and standards, we attend design reviews, we count dollars and we make sure that everything at the Center is designed and built according to good engineering judgment. In addition, we study literature and attend conferences to make sure that we keep current on new legislation and standards.

Mahaffey, Valerie A.↗

Data Management System

CENTRA 2000 Inc., a wholly owned subsidiary of Auto-trol technology, obtained permission to use software originally developed at Johnson Space Center for the Space Shuttle and early Space Station projects. To support their enormous information-handling needs, a product data management, electronic document management and work-flow system was designed. Initially, just 33 database tables comprised the original software, which was later expanded to about 100 tables. This system, now called CENTRA 2000, is designed for quick implementation and supports the engineering process from preliminary design through release-to-production. CENTRA 2000 can also handle audit histories and provides a means to ensure new information is distributed. The product has 30 production sites worldwide.

Source record↗

How Systems Engineering and Risk Management Defend Against Murphy's Law and Human Error

Systems Engineering and Risk Management processes can work synergistically to defend against the causes of many mission ending failures. Defending against mission ending failures is facilitated by fostering a team that has a healthy respect for Murphy's Law and a team with a of curiosity for how things work, how they can fail, and what they need to know. This curiosity is channeled into making the unknowns known or what is uncertain more certain. Efforts to assure mission success require the expenditure of energy in the following areas: 1. Understanding what defines Mission Success as guided by the customer's needs, objectives and constraints. 2. Understanding how the system is supposed to work and how the system is to be produced, fueled by the curiosity of how the system should work and how it should be produced. 3. Understanding how the system can fail and how the system might not be produced on time and within cost, fueled by the curiosity of how the system might fail and how production might be difficult. 4. Understanding what we need to know and what we need learn for proper completion of the above three items, fueled by the curiosity of what we might not know in order to make the best decisions.

Bay, Michael↗

The NASA Deep Space Network (DSN) Array

The DSN Array Project is currently working with Senior Management at both JPL and NASA to develop strategies towards starting a major implementation project. Several studies within NASA are concluding, all of which recommend that any future DSN capability include arraying of antennas to increase performance. Support of Deep Space, Lunar, and CEV (crewed exploration vehicle) missions is possible. High data rate and TDRSS formatting is being investigated. Any future DSN capacity must include Uplink. Current studies ongoing to investigate and develop technologies for uplink arraying; provides advantages in three ways: 1) N2 effect. EIRP grows as N2(-vs-N for a downlink array); 2) Improved architectural options (can separate uplink and downlink); and 3) Potential for more cost effective transmitters for fixed EIRP.

communications↗

Threads of Mission Success

This viewgraph presentation reviews the many parts of the JPL mission planning process that the project manager has to work with. Some of them are: NASA & JPL's institutional requirements, the mission systems design requirements, the science interactions, the technical interactions, financial requirements, verification and validation, safety and mission assurance, and independent assessment, review and reporting.

Industry Day↗