Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “work management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

NSI directed to continue SPAN's functions

During a series of network management retreats in June and July 1990, representatives from NASA Headquarters Codes O and S agreed on networking roles and responsibilities for their respective organizations. The representatives decided that NASA Science Internet (NSI) will assume management of both the Space Physics Analysis Network (SPAN) and the NASA Science Network (NSN). SPAN is now known as the NSI/DECnet, and NSN is now known as the NSI/IP. Some management functions will be distributed between Ames Research Center (ARC) and Goddard Space Flight Center (GSFC). NSI at ARC has the lead role for requirements generation and networking engineering. Advanced Applications and the Network Information Center is being developed at GSFC. GSFC will lead the NSI User Services, but NSI at Ames will continue to provide the User Services during the transition. The transition will be made as transparent as possible for the users. DECnet service will continue, but is now directly managed by NSI at Ames. NSI will continue to work closely with routing center managers at other NASA centers, and has formed a transition team to address the change in management. An NSI/DECnet working group had also been formed as a separate engineering group within NSI to plan the transition to Phase 5, DECnet's approach to Open System Integration (OSI). Transition is not expected for a year or more due to delays in produce releases. Plans to upgrade speeds in tail circuits and the backbone are underway. The proposed baseline service for new connections is up to 56 Kbps; 9.6 Kbps lines will gradually be upgraded as requirements dictate. NSI is in the process of consolidating protocol traffic, tail circuits, and the backbone. Currently NSI's backbone is fractional T1; NSI will go to full T1 service as soon as it is feasible.

Rounds, Fred↗

Records Management: Preserving the Past to Make the Future

As an intern in the Records Management Office at NASA, I have learned the importance of records management and teamwork. I work in building 60 with Kevin Coleman, the Records and Forms Manager and History Officer, and Deborah Demaline, the senior records specialist. Prior to my internship, I had never paid attention to records and their role in operating a business. However, after my first assignment of identifying files and filling out a C-277 form, I realized the importance of preserving each file. Since NASA is a government agency, keeping our records in a safe and easily accessible area is a major priority. As the records have accumulated over the years, and the destruction of records has been put on hold due to the fairly recent tobacco litigation; the amount of NASA s records has been quickly accumulating. Currently, our records are stored at Plum Brook in Sandusky, Ohio. Recently, rain has leaked through the bunkers and caused damage to some of our records boxes. Plum Brook has been experiencing difficulty in finding the funds to repair the damage. NASA Glenn is reluctant to give Plum Brook more money because the staff at the Sandusky site has not shown us a detailed summary of what they are doing with the funds we give them annually. Even though storing our records at Plum Brook comes with little cost, there are plenty other companies that offer a records storage area and a special software database for easy record retrieval. My assignment is to do a feasibility study on these companies to see how they compare in providing the appropriate criteria for NASA Glenn's needs. Other research I am doing is on which companies will allow us to convert our physical records into an electronic database for quicker retrieval and to eliminate the cost of storing our records in a facility altogether. The two studies have required me to not only work closely with the Records Management Department, but also the Information Technology staff. It has been important for me to thoroughly understand the criteria both departments here at NASA Glenn need in order to make the system effective for the entire organization. The interaction that I am experiencing with different organizations within NASA Glenn and the various companies we are looking at has enhanced my communication skills. Without proficient communication skills, it is difficult to seek how each company meets all of NASA's standards. This includes webx conferences, teleconferences, face-to-face meetings, knowing the appropriate time to ask questions, knowing what those appropriate questions are, and most importantly, being a good listener. During the meetings and conferences I attend, I ensure that I understand where each party is coming from and listen carefully to the points people make. In addition to working with the feasibility study, I will later work on a marketing plan to encourage employees to take care in storing their records and learn the importance of the History Office. Also, the department is trying to develop a special presentation for new employees during their orientation. Assisting Deborah Demaline in taking inventory at Plum Brook is another task that must be done to ensure that the records have been properly placed.

Petro, Kathryn↗

Mariner Venus/Mercury '73 - A strategy of cost control

The Mariner Venus/Mercury '73 project kept within its originally established goals for schedule, performance, and cost. Underlying this development success was the availability of the Mariner technology. But meeting the goals demanded management determination, planning, and discipline to make optimum use of state-of-the-art technology. The present work points out management approaches and techniques that kept schedules and controlled costs, the intent being to stimulate thought about how to do the same with future spacecraft and payloads.

Biggs, J. R.↗

Improving PCM Waste Management Through New Approaches to Screening for LLW Treatment and Disposal - 20145

A major step forward in the management of Plutonium Contaminated Material (PCM) Waste has been taken at the Sellafield site with the introduction of new capabilities to enable wastes previously conservatively designated as PCM Intermediate Level Waste (ILW) to be re-classified for treatment as Low Level Waste (LLW). The Sellafield site, located in the North West of England, within the United Kingdom (UK), has operated plutonium processing plants and waste facilities for almost 70 years. During this time management of the raw PCM waste produced has presented a variety of challenges. The waste is currently processed by high force waste compaction in the Waste Treatment Complex (WTC). The WTC converts 200 litre drums of raw PCM waste into a compacted, grout encapsulated monolith form within stainless steel containment, ready for emplacement within the UK's Geological Disposal Facility (GDF) when it becomes available. To help progress some of the wastes waiting for treatment, recent improvements have been made with the introduction of new waste assay instrumentation which enables the identification of a 'candidate' waste potentially suitable for disposal via the LLW treatment route. Opening a new LLW route for previously designated PCM has been a major advance in PCM waste management policy. It has required a range of technical assessment arrangements to be developed, tested and commissioned and involved the engagement of a wide range of stakeholders. In particular, very detailed technical analysis methods have been developed to ensure that there is a robust and conservative approach to the final sentencing of waste. Following completion of commissioning tests, the first 86 m{sup 3} of previously designated PCM waste was successfully treated through the LLW route and consigned to LLW disposal in June 2019. The direct benefit of sentencing waste to the correct waste route (LLW) is the significant cost savings across the complete range of waste management activities. This work is also strategically important for demonstrating to a range of stakeholders including workforce and regulators, that waste previously designated as PCM can be re-classified in a systematic and justifiable way without increasing risk to personnel or the wider environment. By ensuring that waste is being managed appropriately it will be possible to carry out more remediation work safely, in less time, and at a lower cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Persistence and potential of soil organic carbon in nature‐based climate solutions: A review of managed disturbances

Societal Impact Statement Implementing nature-based climate solutions is important for mitigating climate change, which is a global issue, but requires local adjustments in management practices. Using the association between soil carbon and minerals as a proxy for carbon persistence, we evaluated the effect of different management regimes on soil carbon sequestration and loss. We identified areas where management practices that increase carbon inputs should be prioritized and areas where management should focus on avoiding severe disturbances. Using this storage-potential-and-persistence framework to identify how to increase or maintain soil organic carbon storage locally will increase the effectiveness of nature-based climate solutions globally. Summary Increasing soil organic carbon storage could reduce the pace of climate change, but the longevity of this nature-based climate solution depends on the persistence of carbon in soils, not just the input rates into soils. We apply a framework for considering how soil carbon persistence—namely, via the association with minerals—sheds light on soil carbon sequestration. We review how management of disturbances, such as prescribed burning, forestry, and grazing, can change soil carbon storage, persistence, and potential. Past work demonstrated that management of disturbances can sequester soil carbon, but it remains unclear how the potential stabilization of that accrual and vulnerability to loss varies across disturbance types and geographies. We found that there is substantial geographical heterogeneity in the overlap among estimates of carbon accrual, disturbance occurrence, and potential stabilization: Fire-prone grasslands and intensively grazed rangelands occur in areas estimated to have high potential to store mineral-associated organic carbon, and studies also find that adjusted fire and grazing can promote mineral-associated organic carbon. Plantation forestry and burned area span large regions where particulate organic matter is the dominant form, and studies find that particulate organic carbon is disproportionately lost following intense wildfires and forest harvests. Thus, areas with high mineral-associated organic carbon deficits should be prioritized for practices that increase carbon inputs; whereas areas with high proportions of particulate organic carbon should be prioritized for practices that help to avoid severe disturbances. Taken together, the distribution of and changes in persistence mechanisms shed light on the durability of nature-based climate solutions.

fire↗

Life Sciences Research Facility automation requirements and concepts for the Space Station

An evaluation is made of the methods and preliminary results of a study on prospects for the automation of the NASA Space Station's Life Sciences Research Facility. In order to remain within current Space Station resource allocations, approximately 85 percent of planned life science experiment tasks must be automated; these tasks encompass specimen care and feeding, cage and instrument cleaning, data acquisition and control, sample analysis, waste management, instrument calibration, materials inventory and management, and janitorial work. Task automation will free crews for specimen manipulation, tissue sampling, data interpretation and communication with ground controllers, and experiment management.

Rasmussen, Daryl N.↗

Formulation of consumables management models: Test plan for the mission planning processor working model

The test plan and test procedures to be used in the verification and validation of the software being implemented in the mission planning processor working model program are documented. The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. An overview of the working model is presented. Execution of the test plan will comprehensively exercise the working model software. An overview of the test plan, including a testing schedule, is presented along with the test plan for the unit, module, and system levels. The criteria used to validate the working model results for each consumables subsystem is discussed.

Connelly, L. C.↗

Center Planning and Development Student Engineer at KSC

This summer I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning & Development (CPD) Directorate. CPD works with commercial companies who are interested in using KSC's unique capabilities for spaceflight, spacecraft processing, ground systems and Research & Development (R&D) projects that fall in line with NASA's Mission and Vision. CPD is divided into three (3) groups: (1) AD-A, which works on the Master Planning for the center, (2) AD-B (where I am), which works on project control, management and integration, and (3) AD-C, which works on partnership development. CPD's main goal is to make KSC the world's preeminent multi-user spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group of employees having a wide knowledge of not only the Space Shuttle, but also Expendable Launch Vehicles (ELV). The director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree from ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering documents, weekly notes for CPD and senior management, engineering familiarizations with facilities at KSC, leading a tour for the Embry-Riddle Aeronautical University Career Services office, and working on actual agreements/proposals that will be used in the partnership process with multiple partners, along with other projects. Most of the work I have done is sensitive information and cannot be disclosed.

Engineer↗

Demonstration of the On-the-Fly Shielding Analysis Method: Spent Fuel and Waste Disposition

This report documents work performed supporting the US Department of Energy (DOE) Office of Nuclear Energy (NE) Spent Fuel and Waste Disposition (SFWD) Integrated Waste Management activities under work breakdown structure element 1.08.02.04.01, “Data and Tools Development, Validation, and Maintenance.” In particular, this report fulfills milestone M3SF-21OR020401016, “Implement on-the-fly dose analysis methodology in UNF-ST&DARDS” within work package SF-21OR02040101, “Commercial SNF Characterization - ORNL.” The Used Nuclear Fuel - Storage, Transportation & Disposal Analysis Resource and Data System (UNFST& DARDS) enables automated dose rate calculations for spent nuclear fuel (SNF) transportation packages and storage casks using a Monte Carlo radiation transport code. The explicit method uses a detailed model of the SNF system and its contents. Therefore, a dose rate calculation is required for each as-loaded transportation package or storage cask because the SNF assemblies within a canister typically have unique irradiation characteristics. An alternate method, referred to as the “on-the-fly” shielding analysis method, has been proposed that requires only a set of Monte Carlo dose rate calculations for each transportation packaging/storage cask design. The results of the Monte Carlo dose rate calculations are independent of the SNF assembly irradiation and decay characteristics. The dose rate values may then be combined with the radiation source strength of the SNF assemblies associated with a particular transportation packaging/storage cask design to determine actual dose rates. This report presents on-the-fly dose rate calculations for a representative SNF storage cask and verification of the on-the-fly dose rate calculation results by comparison with reference dose rate calculations using the explicit Monte Carlo dose rate calculation. The on-the-fly shielding analysis method was implemented in UNF-ST&DARDS. A Python program was developed to process the MAVRIC dose rate results obtained by source particle type, energy group, and fuel geometry region. A Python processor created binary files, which were saved as a special UNF-ST&DARDS library for on-the- fly shielding analyses. UNF-ST&DARDS uses the precalculated on-the-fly binary libraries generated by the Python data processor and directly executes the Python code for on-the-fly dose analysis. This Python code unzips the pre-generated binary files mentioned above, reads the data, and combines them with user-specified sources for dose and uncertainty calculations. The Python programs were verified using Excel calculations and by comparison with the values obtained with the MAVRIC post-processing utilities applied to the 3dmap files. This method can currently be used to determine dose rates for as-loaded HI-STORM FW storage casks. The UNF-ST&DARDS analysis wizard for on-the-fly shielding analysis is described in this report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Upper Class E Traffic Management (ETM) NASA R&D Update

This slide set has been prepared for the 2022 Federal UxS Workshop to be held at NASA Ames Research Center. The presentation is designed to present the Upper Class E Traffic Management concept and work structure that it falls under and provide the audience with an update on recent progress, ongoing work, and future plans for research and testing.

Upper E↗

On-board fault management for autonomous spacecraft

The dynamic nature of the Cargo Transfer Vehicle's (CTV) mission and the high level of autonomy required mandate a complete fault management system capable of operating under uncertain conditions. Such a fault management system must take into account the current mission phase and the environment (including the target vehicle), as well as the CTV's state of health. This level of capability is beyond the scope of current on-board fault management systems. This presentation will discuss work in progress at TRW to apply artificial intelligence to the problem of on-board fault management. The goal of this work is to develop fault management systems. This presentation will discuss work in progress at TRW to apply artificial intelligence to the problem of on-board fault management. The goal of this work is to develop fault management systems that can meet the needs of spacecraft that have long-range autonomy requirements. We have implemented a model-based approach to fault detection and isolation that does not require explicit characterization of failures prior to launch. It is thus able to detect failures that were not considered in the failure and effects analysis. We have applied this technique to several different subsystems and tested our approach against both simulations and an electrical power system hardware testbed. We present findings from simulation and hardware tests which demonstrate the ability of our model-based system to detect and isolate failures, and describe our work in porting the Ada version of this system to a flight-qualified processor. We also discuss current research aimed at expanding our system to monitor the entire spacecraft.

Fesq, Lorraine M.↗

Learning from Inconsistency

This position paper argues that inconsistencies that occur during the development of a software specification offer an excellent way of learning more about the development process. We base this argument on our work on inconsistency management. Much attention has been devoted recently to the need to allow inconsistencies to occur during software development, to facilitate flexible development strategies, especially for collaborative work. Recent work has concentrated on reasoning in the presence of inconsistency, tracing inconsistencies with 'pollution markers' and supporting resolution. We argue here that one of the most important aspects of inconsistency is the learning opportunity it provides. We are therefore concerned with how to capture this learning outcome so that its significance is not lost. We present a small example of how apprentice software engineers learn from their mistakes, and outline how an inconsistency management tool could support this learning. We then argue that the approach can be used more generally as part of continuous process improvement.

Easterbrook, Steve↗

The Management and Security Expert (MASE)

The Management and Security Expert (MASE) is a distributed expert system that monitors the operating systems and applications of a network. It is capable of gleaning the information provided by the different operating systems in order to optimize hardware and software performance; recognize potential hardware and/or software failure, and either repair the problem before it becomes an emergency, or notify the systems manager of the problem; and monitor applications and known security holes for indications of an intruder or virus. MASE can eradicate much of the guess work of system management.

Miller, Mark D.↗

The Curiosity Effect

This conference aims to improve how we learn through integrative project and discovery-based methods. My talk highlights areas in my experience as a scientist, and most recently working for our national space agency, NASA, where we work in teams with a "discovery-based" mindset. When you demonstrate broad curiosity, you become open to different viewpoints and ways to approach and manage situations. Sometimes working only from "what you have been trained to do" or "what you know" is not enough, especially when the rules may be changing. Increasing our openness in our learning, and sharing what we know, can lead to a more diverse and innovative community, solving problems in new ways, overcoming resistance to new ideas, and hopefully creating a dynamic and faring-forward society. Let us not kill curiosity, at any age, in any situation. Let us remind ourselves, at any time, in any circumstance, to continue to learn, to mentor, to stimulate, to engage and reconnect with that "open sense of possibility."

STEM↗

Formal Validation of Fault Management Design Solutions

The work presented in this paper describes an approach used to develop SysML modeling patterns to express the behavior of fault protection, test the model's logic by performing fault injection simulations, and verify the fault protection system's logical design via model checking. A representative example, using a subset of the fault protection design for the Soil Moisture Active-Passive (SMAP) system, was modeled with SysML State Machines and JavaScript as Action Language. The SysML model captures interactions between relevant system components and system behavior abstractions (mode managers, error monitors, fault protection engine, and devices/switches). Development of a method to implement verifiable and lightweight executable fault protection models enables future missions to have access to larger fault test domains and verifiable design patterns. A tool-chain to transform the SysML model to jpf-Statechart compliant Java code and then verify the generated code via model checking was established. Conclusions and lessons learned from this work are also described, as well as potential avenues for further research and development.

Statechart↗

Assessing C2 Communications for UAS Traffic Management

The National Aeronautics and Space Administration's (NASA) Unmanned Aircraft Systems (UAS) Traffic Management (UTM) project works to develop tools and technologies essential for safely enabling civilian low-altitude UAS operations. Currently there is no established infrastructure to enable and safely manage the widespread use of low-altitude airspace and UAS operations, regardless of the type of UAS. The UTM technical challenge will develop comprehensive and validated airspace operations and integration requirements to safely enable large-scale persistent access to visual line of sight and autonomous beyond visual line of sight small UAS in low-altitude airspace. Within the UTM project, a number of communications technologies to support UTM command and control (C2) are under investigation. In particular, commercial networked cellular systems are being tested and assessed for their ability to meet the reliability, scalability, cybersecurity and redundancy required. NASA Glenn Research Center is studying some of the aspects of employing such networks for UTM C2 communications. This includes the development of a test platform for sensing and characterizing the airborne C2 communications environment at various altitudes and in various terrains and topologies, measuring such aspects as received signal strength and interference. System performance aspects such as latency in the link, handover performance, packet error loss rate, drop outs, coverage gaps and other aspects impacting UTM operation will also be assessed. In this paper we explore some of the C2 approaches being proposed and demonstrated in the UTM project, the reliability, availability and other general C2 performance requirements, and approaches to evaluating and analyzing UTM C2 links based on commercial cellular networks.

air traffic control↗

Assessing C2 Communications

The National Aeronautics and Space Administration's (NASA) Unmanned Aircraft Systems (UAS) Traffic Management (UTM) project works to develop tools and technologies essential for safely enabling civilian low-altitude UAS operations. Currently there is no established infrastructure to enable and safely manage the widespread use of low-altitude airspace and UAS operations, regardless of the type of UAS. The UTM technical challenge will develop comprehensive and validated airspace operations and integration requirements to safely enable large-scale persistent access to visual line of sight and autonomous beyond visual line of sight small UAS in low-altitude airspace. Within the UTM project, a number of communications technologies to support UTM command and control (C2) are under investigation. In particular, commercial networked cellular systems are being tested and assessed for their ability to meet the reliability, scalability, cybersecurity and redundancy required. NASA Glenn Research Center is studying some of the aspects of employing such networks for UTM C2 communications. This includes the development of a test platform for sensing and characterizing the airborne C2 communications environment at various altitudes and in various terrains and topologies, measuring such aspects as received signal strength and interference. System performance aspects such as latency in the link, handover performance, packet error loss rate, drop outs, coverage gaps and other aspects impacting UTM operation will also be assessed. In this paper we explore some of the C2 approaches being proposed and demonstrated in the UTM project, the reliability, availability and other general C2 performance requirements, and approaches to evaluating and analyzing UTM C2 links based on commercial cellular networks.

aircraft communications↗