Advanced Anti-Fouling Coatings to Improve the Efficiency of Coal Power Plants

As the total cost of carbon to generate energy has become a global concern, operators are increasingly looking at all parts of the generation cycle to find areas where efficiency gains may be found. It has been long identified that fouling of heat exchangers is a persistent cause of up to 2.5% of global CO 2 emissions. Unfortunately, practice has also demonstrated that unless a powerful economic driver exists to encourage preemptive mitigation of fouling, there will always be a strong tendency for operators to minimize any form of intervention due to high costs and challenges in scheduling downtime. The objective of this proposed research effort was to demonstrate how existing power plants could lower their carbon emissions and significantly improve heat transfer efficiency using new surface treatment materials to control fouling in a variety of heat exchange equipment. The surface treatment material which was optimized and deployed in this effort is now known commercially as HeatX. It is a low-surface energy, water- and oil-repellent, abrasion resistant material which can be applied in-situ to a wide variety of previously worn/used/in-service substrates. Once applied, it provides a barrier against corrosion, scale deposit formation, and biofilm adhesion on the circulating water-containing tube-side. Alternatively, if applied to the tube exterior, the non-wetting nature of the surface was demonstrated to promote dropwise condensation, subsequently lowering condenser backpressure and increasing overall plant efficiency. As part of this cooperative effort, the Department of Energy’s support was crucial to de-risk and demonstrate the concept of HeatX, while validating both the performance and economic benefit in multiple pilot field studies. The HeatX material properties were optimized in this effort for full field applicability to heat exchangers and condensers, and Oceanit developed the necessary procedures and protocols to provide enough material to support extended length, multi-year demonstrations in the power generation, desalination, and refining industries, making this technology broadly applicable and ready for commercial transition. Field deployment case studies at thermal power plants have shown that the HeatX treatment can provide economic savings of up to $15,000 per day for an operator based on avoiding maintenance costs and lowering fuel usage. The complete mitigation of fouling effects can increase the efficiency of equipment by up to 7%, in a field where gains of 0.5% are generally seen as operationally significant. The HeatX treatment has also demonstrated exceptional lifetime and compatibility with a wide variety of seawater and hydrocarbon environments, further increasing both the return on investment and the effective emission reduction. Such efficiency improvements correlate to massive carbon savings. For every 1 GW of capacity, operators can see carbon emissions reductions of 300,000 tons of CO 2 per year. When looking at the bigger picture, improved condenser function across the U.S. has the potential to prevent 221.3 million tons of CO 2 emissions, equivalent to the sequestration capacity of 129 million acres of forest. If applied on a global scale, 1.26 billion metric tons of CO 2 could be averted from the atmosphere, the same amount of carbon sequestrated by 1.5 billion acres of forest annually or 262,000 wind turbines operating annually. As businesses across multiple industries take a more active role in focusing on environmental, social, and governance (ESG) solutions as part of their core business operations, HeatX will be an attractive technology for commercial investment.

01 COAL, LIGNITE, AND PEAT↗

Valuing EV Managed Charging for Bulk Power Systems

When and where electric vehicle (EV) charging occurs has significant implications for power systems supporting widespread EV adoption, especially with high shares of wind and solar generation. This study extends previous works by leveraging detailed simulation models for EV adoption, EV use, EV charging, and bulk power system operations, and by linking them with methods for describing charging flexibility at both the individual vehicle and aggregate levels. This technical potential study focuses on how the value of EV managed charging (EVMC) changes depending on charging flexibility type (within-charging session or within-week scheduling), dispatch mechanism (direct load control or one of several price-based mechanisms), and managed charging participation rate. We show that naively aggregating EV charging flexibility from individual vehicles into megawatt-scale resources grossly overestimates the flexibility of the fleet, because such aggregate models can unrealistically pair, e.g., one already-fully-charged vehicle's ability to increase load with another already-charging vehicle's ability to accept more charge, effectively requesting a charging rate that is infeasible for the latter vehicle. We find per-vehicle bulk system value is highest at low participation rates for all dispatch mechanisms. Factoring in production cost savings, avoided firm capacity savings, and combustion-related power sector emissions savings, we estimate the value of EVMC at low participation rates (5%) to be $33/vehicle-year to $69/vehicle-yr for within-session charging flexibility and $40/vehicle-yr to $120/vehicle-yr for within-week charging flexibility in an envisioned 2038 New England power system and monetary value reported in 2016 U.S. dollars. At 100% participation, per-vehicle value declines to $25/vehicle-yr to $31/vehicle-yr for within-session charging flexibility and to $29/vehicle-yr to $36/vehicle-yr for within-week charging flexibility; however, 100% participation yields the highest total system savings.

ADVANCED PROPULSION SYSTEMS↗

Numerical Simulation of an Enclosed Laminar Jet Diffusion Flame in Microgravity Environment: Comparison with ELF Data

Enclosed diffusion flames are commonly found in practical combustion systems, such as the power-plant combustor, gas turbine combustor, and jet engine after-burner. In these systems, fuel is injected into a duct with a co-flowing or cross-flowing air stream. The diffusion flame is found at the surface where the fuel jet and oxygen meet, react, and consume each other. In combustors, this flame is anchored at the burner (i.e., fuel jet inlet) unless adverse conditions cause the flame to lift off or blow out. Investigations of burner stability study the lift off, reattachment, and blow out of the flame. Flame stability is strongly dependent on the fuel jet velocity. When the fuel jet velocity is sufficiently low, the diffusion flame anchors at the burner rim. When the fuel jet velocity is increased, the flame base gradually moves downstream. However, when the fuel jet velocity increases beyond a critical value, the flame base abruptly jumps downstream. When this "jump" occurs, the flame is said to have reached its lift-off condition and the critical fuel jet velocity is called the lift-off velocity. While lifted, the flame is not attached to the burner and it appears to float in mid-air. Flow conditions are such that the flame cannot be maintained at the burner rim despite the presence of both fuel and oxygen. When the fuel jet velocity is further increased, the flame will eventually extinguish at its blowout condition. In contrast, if the fuel jet velocity of a lifted flame is reduced, the flame base moves upstream and abruptly returns to anchor at the burner rim. The fuel jet velocity at reattachment can be much lower than that at lift off, illustrating the hysteresis effect present in flame stability. Although there have been numerous studies of flame stability, the controlling mechanisms are not well understood. This uncertainty is described by Pitts in his review of various competing theories of lift off and blow out in turbulent jet diffusion flames. There has been some research on the stability of laminar flames, but most studies have focused on turbulent flames. It is also well known that the airflow around the fuel jet can significantly alter the lift off, reattachment and blow out of the jet diffusion flame. Buoyant convection is sufficiently strong in 1-g flames that it can dominate the flow-field, even at the burner rim. In normal-gravity testing, it is very difficult to delineate the effects of the forced airflow from those of the buoyancy-induced flow. Comparison of normal-gravity and microgravity flames provides clear indication of the influence of forced and buoyant flows on the flame stability. The overall goal of the Enclosed Laminar Flames (ELF) investigation (STS-87/USMP-4 Space Shuttle mission, November to December 1997) is to improve our understanding of the effects of buoyant convection on the structure and stability of co-flow diffusion flame, e.g., see http://zeta.lerc.nasa.gov/expr/elf.htm. The ELF hardware meets the experiment hardware limit of the 35-liter interior volume of the glovebox working area, and the 180x220-mm dimensions of the main door. The ELF experiment module is a miniature, fan-driven wind tunnel, equipped with a gas supply system. A 1.5-mm diameter nozzle is located on the duct's flow axis. The cross section of the duct is nominally a 76-mm square with rounded corners. The forced air velocity can be varied from about 0.2 to 0.9 m/s. The fuel flow can be set as high as 3 std. cubic centimeter (cc) per second, which corresponds to a nozzle exit velocity of up to 1.70 m/s. The ELF hardware and experimental procedure are discussed in detail in Brooker et al. The 1-g test results are repeated in several experiments following the STS-87 Mission. The ELF study is also relevant to practical systems because the momentum-dominated behavior of turbulent flames can be achieved in laminar flames in microgravity. The specific objectives of this paper are to evaluate the use reduced model for simulation of flame lift-off and blowout.

Jia, Kezhong↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗