Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “transmissive”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Forecasted Dynamic Line Ratings for Regional Transmission Lines

This report was prepared for the Wind Energy Technology Office for the FY 2022, quarter 3 deliverable. This details the use of forecasted dynamic line rating as an improvement over static rating for three transmission lines in three regions of interest. A selection of wind plants across Idaho, the Columbia River Gorge and offshore wind in the NYSERDA territory were modeled for their concurrent cooling effects for dynamic line rating. Regional transmission lines for the wind plant interconnections were determined and a CFD domain was created to determine local wind flows over the lines. A dynamic line rating for each of the lines was calculated for both weather observation data and HRRR model forecast data. The comparison of peaks in the wind power production were compared to the DLR peaks. It was determined that for shorter regional transmission lines, the effect of concurrent cooling that commonly occur with gen-tie lines were still valid. Concurrent cooling effects drop as the length of the regional transmission lines increase in distance from the wind plants. In addition, the accuracy of the forecasted ampacity to the weather observation data for ampacity was assessed. In general, the accuracy was best for the INL region with the NOAA-maintained sites. The Columbia River Gorge and Long Island sites showed similar levels of accuracy for the forecasted DLR. The accuracy levels were around 11% for the INL region, 15% for Columbia River Gorge and 7% for New York Long Island. The higher error for the Columbia Gorge region is likely due to the sparse availability of weather stations available, whereas both the INL site and Long Island are well instrumented.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A transmissive concentrator photovoltaic module with cells directly cooled by silicone oil for solar cogeneration systems

Hybrid concentrator photovoltaic-thermal systems can cogenerate electricity and heat by beam-splitting incoming concentrated light onto photovoltaic cells and a thermal receiver to increase total conversion efficiency and potentially reduce system cost. To demonstrate this, we have designed and prototyped a transmissive spectrum-splitting concentrator photovoltaic module that maximizes solar energy conversion by utilizing the entire solar spectrum. Visible light is collected using infrared-transmissive triple-junction photovoltaic cells to achieve an in-band module efficiency of 43.3% for light of wavelength λ < 873 nm, while 44.2% of out-of-band light with λ > 873 nm is transmitted through for collection by a thermal receiver. During testing on a dual-axis tracked parabolic concentrator dish at up to 166 suns, cell temperatures were maintained at 119 °C or below via a novel active cooling method. This cooling system strictly flows silicone oil directly across both sides of the cells, without inhibiting optical transmission, as verified through experimentation and simulation. The module was validated outdoors for 572 sun·hrs, and achieved a maximum thermal receiver temperature of 180 °C. 86.1% of incident solar power is collected at 166 suns average concentration collectively among the electrical, cooling, and thermal receiver subsystems. The remaining 13.9% is lost to mirror reflectivity, dish shadowing, receiver reflection, and thermal losses. The ability to directly cool the cells with an inert silicone oil offers the potential for reduced system cost relative to previous transmissive hybrid concentrator photovoltaic-thermal systems, including microfluidic-cooled designs. This solar cogeneration capability is valuable in a wide range of commercial and industrial applications.

14 SOLAR ENERGY↗

Black-to-Transmissive dual polymer complementary electrochromics with high coloration efficiency

In a complementary electrochromic device (ECD), both the anode and the cathode can synergistically change color in response to an electrical bias, allowing for a high coloration efficiency. Complementary ECD that can switch from black to transmissive state is rare, due to the difficulty of pairing two electrochromic electrodes. In this study, we report the construction of high coloration efficiency complementary ECDs by pairing polyazoisoindigo (PAI), an n-type electrochromic polymer that undergoes green-to-transmissive switching, with p-type magenta (ECP-M) and red (ECP-R) electrochromic polymers to obtain black-to-transmissive ECD. Physical modeling tool, COMSOL, is introduced for complementary color matching. Through balancing the charge densities of two electrochromic electrodes, black-to-transmissive ECDs with record-high coloration efficiencies of 688 cm 2 /C and 437 cm 2 /C have been achieved for PAI|ECP-M and PAI|ECP-R, respectively. This study provides a general protocol for the design and fabrication of complementary ECDs.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

A cost–benefit framework to evaluate capacity upgrade options in overhead line transmission planning

This paper presents the methodology behind the new Reconductoring Economic and Financial Analysis (REFA) tool, an open-access software, used by transmission utilities to evaluate transmission capacity enhancement options. The proposed methodology is intended to be used in a new planning stage, after the capacity expansion and prior to the individual transmission project engineering, allowing capacity upgrade options (reconductoring, rebuild or voltage upgrade), and respective conductor selection, to be compared under the same economic basis. Furthermore, the REFA tool implements a methodology to rank project options and conductor types based on economic criteria, considering an approximation of the ampacity and sag constraints. Results, using 5 real transmission lines in the US, show that least-cost combinations of project and conductor types can be very diverse, which emphasizes the need for the proposed methodology and tool.

Advanced conductors↗

Corroborating VNA and thermal measurements of transmission loss on the DIII-D ECH waveguide system

Electron cyclotron heating (ECH) and current drive (ECCD) will play a large role in tokamak-based fusion reactors. At the DIII-D tokamak, 110 GHz microwaves injected into the plasma can provide core heating and current drive as well as impurity control, neoclassical tearing mode mitigation, and breakdown assistance. Understanding the physics of these processes relies on accurate estimates of injected ECH power. DIII-D’s ECH system consists of six MW-class Microwave Power Products (MPP) gyrotron microwave sources. Operating the gyrotrons far from the tokamak removes them from magnetic field interference, so 31.75 mm inner-diameter corrugated waveguides transmit the microwave power the 80 m from the gyrotrons to steerable launchers in the tokamak chamber. Estimates of injected power rely on knowing the generated power at the source and then subtracting transmission loss. Conventional transmission loss measurements based on calorimetric dummy loads are onerous and only possible during extended maintenance periods. This work examines two tools that provide more flexibility for the transmission loss measurements. Furthermore, a resistive temperature detector (RTD) array installed along a waveguide measures heat lost to the transmission line, and low power time domain reflectometry (TDR) measurements with a vector network analyzer (VNA) allows loss measurements without burdensome hardware modifications.

ECH↗

Determinants of synapse diversity revealed by super-resolution quantal transmission and active zone imaging

Neural circuit function depends on the pattern of synaptic connections between neurons and the strength of those connections. Synaptic strength is determined by both postsynaptic sensitivity to neurotransmitter and the presynaptic probability of action potential evoked transmitter release (P r ). Whereas morphology and neurotransmitter receptor number indicate postsynaptic sensitivity, presynaptic indicators and the mechanism that sets P r remain to be defined. To address this, we developed QuaSOR, a super-resolution method for determining P r from quantal synaptic transmission imaging at hundreds of glutamatergic synapses at a time. We mapped the P r onto super-resolution 3D molecular reconstructions of the presynaptic active zones (AZs) of the same synapses at the Drosophila larval neuromuscular junction (NMJ). We find that P r varies greatly between synapses made by a single axon, quantify the contribution of key AZ proteins to P r diversity and find that one of these, Complexin, suppresses spontaneous and evoked transmission differentially, thereby generating a spatial and quantitative mismatch between release modes. Transmission is thus regulated by the balance and nanoscale distribution of release-enhancing and suppressing presynaptic proteins to generate high signal-to-noise evoked transmission.

59 BASIC BIOLOGICAL SCIENCES↗

Characterizing HVDC Transmission Flexibility under Extreme Operating Conditions

System operators rely on system flexibility, traditionally mainly from generation, to handle unexpected reliability and resilience events, ranging from excessive resource forecast errors to extreme events like heatwaves, earthquakes, and cyberattacks. Flexible transmission, such as controllable high voltage direct current (HVDC) transmission systems present an opportunity to increase overall system flexibility to accommodate operational challenges. This paper provides a methodology to study contributions to system flexibility by controllable, power electronics based transmission. The Western Electricity Coordinating Council (WECC) system is used as an example to study contributions from existing and future HVDC lines. Under extreme system conditions, it is identified that HVDC transmission flexibility can contribute with 24.8 to 28% of avoided unserved energy, and in some areas, the benefits amount to 50 to 70%.

HVDC transmission, PCM, Balancing authorities↗

An Integrated Transmission-Distribution Co-Simulation for a Distribution System with High Renewable Penetration

Traditionally, transmission and distribution system dynamic simulations are performed independently. However, dynamic co-simulation of transmission-distribution systems can be beneficial in analyzing distribution systems with high penetration of distributed renewable resources. The authors describe a framework for conducting transmission-distribution dynamic co-simulation (TDDS). A model of a real network including detailed models of solar photovoltaic units in the distribution system is constructed. The initial operating point of the network is validated against field measurements. The TDDS tool is used to simulate a single line-to-ground fault on the distribution system, highlighting the need for conducting transmission-distribution co-simulations.

14 SOLAR ENERGY↗

Joint Planning of Electricity Transmission and Hydrogen Transportation Networks

The abundance and uneven distribution of renewable energy might cause congestion and curtailment in electric power systems. Transmission expansions can potentially alleviate transmission congestion and reduce renewable energy curtailment. On the other hand, with the substantial cost reduction of electrolyzer technology and the continuing rise of hydrogen demand, converting surplus renewable energy to hydrogen provides synergistic benefits to power and hydrogen systems, but consequently requires joint planning of the two systems. To this end, we propose a joint planning approach for power transmission and hydrogen transportation networks to coordinately optimize the investment and operation of power and hydrogen infrastructure. In our proposed model, detailed truck routing, pipeline, and hydrogen storage are formulated to quantify the flexibility of hydrogen transportation system. A robust joint planning approach is also proposed to address various uncertainties from renewable energy, electric load, and hydrogen demand. Furthermore, our numerical simulations show that the proposed joint planning model can save the total system cost, reduce renewable energy curtailment, and increase the utilization level of transmission lines.

08 HYDROGEN↗

Noncontact Monitoring of Overhead Transmission Lines Using Space Potential Phasor Measurements

Power system reliability requirements necessitate the development of measurement systems to monitor the operational state of critical transmission lines. Here in this article, a novel noncontact method for monitoring overhead transmission lines is proposed. The method is based on measuring the amplitude and relative phase of the transmission line's space potential at two or more strategically located points in space along with the use of passive phase shifters to enhance the sensitivity of the measurements. Applications of voltage unbalance and conductor sag measurements are demonstrated along with the results of conductor sag measurements on an operating 230-kV transmission line. It is shown that using enhanced relative phase measurements can significantly improve the sensitivity of the measurements.

47 OTHER INSTRUMENTATION↗

Transmission Innovation Symposium: Modernizing the U.S. Electrical Grid

The foundation of the United States Department of Energy (DOE) Transmission Reliability research program was established 20 years ago by a series of commissioned white papers. Those white papers described the dramatic institutional and regulatory changes that the U.S. electricity transmission grid was undergoing at the time and articulated the technical challenges that these changes created. The challenges outlined in the white papers were the basis for the initial research goals of the DOE Transmission Reliability program. To a large extent, the reliability research needs outlined in the original white papers have now been met. As a result, now is an appropriate time to step back and review the technical challenges that the industry currently faces and to use those challenges as the basis for identifying the next set of targets for DOE’s transmission-related research and development (R&D) programs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transmission Alternatives for California North Coast Offshore Wind, Volume 4: Cost-Benefit Analysis Report

The purpose of this report is to compare the costs and benefits of installing offshore wind power plants with capacities up to 500 megawatts (MW) in the Humboldt Wind Energy Area offshore California, focusing on identifying the costs related to transmission upgrades and possible alternatives such as energy storage. We identify several options that result in lower costs than upgrading transmission to provide full deliverability. Our estimates of the levelized cost of energy (LCOE) assuming full deliverability range from $80/MWh for a 144-MW plant to $73/MWh for a 480-MW plant with a 2030 commercial operation date; however, the additional cost of transmission upgrades increases these values to between $86/MWh and $98/MWh. Based on curtailment and revenue estimates developed using a production cost model, the LCOEs for plant capacities of 144 MW and 168 MW with Energy Only deliverability are lower than the combined cost of energy and transmission upgrades for full deliverability. The addition of a 4-hour, 15-MW battery energy storage system increases revenue for both plant sizes, with the 144 MW + storage scenario producing the most revenue relative to LCOE.

17 WIND ENERGY↗

Northern California and Southern Oregon Offshore Wind Transmission Study: Volume 1 (Revised)

Offshore wind (OSW) power based on floating technology in the coastal waters of the U.S. Pacific Ocean has great potential to contribute to climate mitigation and renewable energy goals in California, Oregon, and other parts of the western U.S. To achieve development of OSW at scale, investments in transmission infrastructure are needed to deliver this power to major metropolitan areas because these are the primary electricity load centers. Currently the transmission infrastructure serving coastal regions where OSW is most likely to be developed has limited capacity and is designed to bring power from the east to serve modest coastal loads. The development of OSW generation and the interconnection of this resource to the bulk power grid will require major investments in new transmission infrastructure and upgrades to existing infrastructure. This study investigated the development of up to 25.8 GW of OSW energy on the northern coast of California and the southern coast of Oregon. The focus of the study was to assess various transmission alternatives that could deliver OSW power to distant load centers while also providing energy benefits to rural coastal communities near to where OSW power may be developed.

17 WIND ENERGY↗

Collaborative Enhancements to Unlock Interregional Transmission

Multiple recent studies highlight significant benefits associated with expansion of interregional transfer capabilities for efficiently adapting to these changes. Despite these proposed benefits, few, if any, interregional transmission projects have been built in recent memory . The objective of this report is to confront the barriers to interregional transmission that exist today and address them with potential reforms and collaborative solutions. This report identifies solutions with the potential for immediate beneficial impact on interregional transmission with the ultimate goal of allowing more effective identification and advancement of interregional transmission projects that create the most positive net value to the participating systems . It distinguishes between states, federal government, and planning regions as key actors in implementing solutions designed to be flexible to accommodate regional differences.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Financing Storage as a Transmission Asset: Initial Considerations for an Emerging Use Case

Deploying energy storage as an electric transmission system asset is a unique use case that, despite a body of policy and regulatory support, has received little attention or investment in the United States. The benefits of using storage on the transmission system—and the remaining barriers to that use—have been explored elsewhere. This paper complements that body of research by exploring the finance implications of using energy storage as a transmission asset (SATA). Because transmission infrastructure in the U.S. is generally subject to rate-of-return regulation, in which asset owners receive both a return of their invested capital and a return on that capital, storage assets deployed for that use are not subject to market volatility and have a much lower risk profile overall. That lower risk profile would, in theory, correspond to lower interest rates and other more favorable financing terms relative to a storage project deployed in a market setting. This paper draws from corollaries in other markets to estimate the expected finance impacts of SATA projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Studying the Impact of Momentary Cessation of IBRs Compliant With IEEE Std. 2800-2022 on Transmission Line Protection Elements

This paper examines the impact of inverter-based resource (IBR) momentary cessation timing on transmission system protection relays. IEEE Std. 2800 mandates voltage ride-through, requiring IBRs to remain online during voltage disturbances. However, for severe voltage dips (|V| = 0.1 p.u.), the standard permits current blocking. In practice, vendors implement momentary cessation with varying delays, potentially affecting relay operation if IBRs cease too early. This article studies the impact of the time IBRs enter momentary cessation on transmission line protective relays. Using an electromagnetic transient (EMT) simulation, this study models IBR momentary cessation with tunable delays in a realistic transmission network. COMTRADE files generated from EMT simulations are analyzed in MATLAB using detailed protective relay models. Results indicate that IBRs must sustain operation for at least one cycle to ensure proper relay response; otherwise, relays may fail to oper- ate. These findings guide IBR vendors in optimizing momentary cessation settings to enhance transmission line protection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗