Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “traffic volume”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

NASA TLA workload analysis support. Volume 1: Detailed task scenarios for general aviation and metering and spacing studies

The techniques required to produce and validate six detailed task timeline scenarios for crew workload studies are described. Specific emphasis is given to: general aviation single pilot instrument flight rules operations in a high density traffic area; fixed path metering and spacing operations; and comparative workload operation between the forward and aft-flight decks of the NASA terminal control vehicle. The validation efforts also provide a cursory examination of the resultant demand workload based on the operating procedures depicted in the detailed task scenarios.

Sundstrom, J. L.↗

Proceedings of the Sixth NASA Langley Formal Methods (LFM) Workshop

Today's verification techniques are hard-pressed to scale with the ever-increasing complexity of safety critical systems. Within the field of aeronautics alone, we find the need for verification of algorithms for separation assurance, air traffic control, auto-pilot, Unmanned Aerial Vehicles (UAVs), adaptive avionics, automated decision authority, and much more. Recent advances in formal methods have made verifying more of these problems realistic. Thus we need to continually re-assess what we can solve now and identify the next barriers to overcome. Only through an exchange of ideas between theoreticians and practitioners from academia to industry can we extend formal methods for the verification of ever more challenging problem domains. This volume contains the extended abstracts of the talks presented at LFM 2008: The Sixth NASA Langley Formal Methods Workshop held on April 30 - May 2, 2008 in Newport News, Virginia, USA. The topics of interest that were listed in the call for abstracts were: advances in formal verification techniques; formal models of distributed computing; planning and scheduling; automated air traffic management; fault tolerance; hybrid systems/hybrid automata; embedded systems; safety critical applications; safety cases; accident/safety analysis.

Rozier, Kristin Yvonne↗

Aerial Vehicle Routing and Scheduling for UAS Traffic Management: A Monte Carlo Tree Search Approach

Numerous unmanned aircraft systems operating at low altitudes to deliver goods and services may one day become ubiquitous in our cities. In the Unmanned Aircraft Systems (UAS) Traffic Management (UTM) framework, such a concept is envisioned, where aerial vehicles operate beyond visual line of sight (BVLOS) within specifically reserved and time stamped “corridors” in the airspace. For example, these corridors or operational intent volumes can connect an aerial vehicle’s origin site to its destination site for package delivery operations. There may also be more than one corridor available for an aerial vehicle to choose from and often different corridors may intersect with one another. Thus, it is imperative to ensure flight trajectories belonging to different aerial vehicles are not in conflict. Per the UTM CONOPs, we assume that a vehicle almost always stays inside its corridor or operational volume. This work provides a framework for strategic deconfliction of UTM or package delivery drones, where we schedule the departure time of all vehicles subject to various temporal constraints (including the corridor deconfliction at the intersections). We present the “multi-route weighted package delivery problem” which serves as an exemplifying model for strategic deconfliction in UTM. In the multi-route weighted package delivery problem, a graph network is given which consists of a set of depots (source) and drop-off (destination) nodes, with multiple routes (defined as a sequence of waypoints) connecting the depots to drop-off nodes. In addition, routes are weighted by the associated ground risk and total travel distance for package delivery. The goal is for a known set of aerial vehicles to depart from the depots, choose a route and take off time, while avoiding conflicts with other aerial vehicles, and minimizing both risk and distance traveled. We provide a mixed integer linear programming (MILP) formulation of the problem, as well as a heuristic solution based on Monte Carlo Tree Search (MCTS) – a method used in game theory and artificial intelligence – to overcome limitations inherent to optimal solvers. Computational results show the advantages of using MCTS over the MILP formulation; the former can provide a sub-optimal solution quickly, and may sometimes even reach an optimal solution, whereas the latter may not even produce a solution in reasonable time. Furthermore, results from both the MILP formulation and MCTS methods were validated using a preliminary agent-based simulator implementing the UTM concept of operations. Thus, the MCTS method can be seen as a scalable solution to the complex multi-route weighted package delivery problem and may possibly be extended to similar complex optimization problems.

Kenny Chour↗

STS payloads mission control study continuation phase A-1. Volume 2-C, task 3: Identification of joint activities and estimation of resources in preparation for joint flight operations

Payload mission control concepts are developed for real time flight operations of STS. Flight planning, training, simulations, and other flight preparations are included. Payload activities for the preflight phase, activity sequences and organizational allocations, and traffic and experience factors to establish composite man-loading for joint STS payload activities are identified for flight operations from 1980 to 1985.

Source record↗

A flight investigation of simulated data-link communications during single-pilot IFR flight. Volume 2: Flight evaluations

Key problems in single pilot instrument flight operations are in the management of flight data and the processing of cockpit information during conditions of heavy workload. A flight data console was developed to allow simulation of a digital data link to replace the current voice communications stem used in air traffic control. This is a human factors evaluation of a data link communications system to determine how such a system might reduce cockpit workload, improve flight proficiency, and be accepted by general aviation pilots. The need for a voice channel as backup to a digital link is examined. The evaluations cover both airport terminal area operations and full mission instrument flight. Results show that general aviation pilots operate well with a digital data link communications system. The findings indicate that a data link system for pilot/ATC communications, with a backup voice channel, is well accepted by general aviation pilots and is considered to be safer, more efficient, and result in less workload than the current voice system.

Parker, J. F., Jr.↗

Analysis of Convective Weather Impact on Pre-Departure Routing of Flights from Fort Worth Center to New York Center

In response to severe weather conditions, Traffic Managers specify flow constraints and reroutes to route air traffic around affected regions of airspace. Providing analysis and recommendations of available reroute options and associated airspace capacities would assist Traffic Managers in making more efficient decisions in response to convective weather. These recommendations can be developed by examining historical data to determine which previous reroute options were used in similar weather and traffic conditions. This paper describes the initial steps and methodology used towards this goal. The focus of this work is flights departing from Fort Worth Center destined for New York Center. Dominant routing structures used in the absence of convective weather are identified. A method to extract relevant features from the large volume of weather data available to quantify the impact of convective weather on this routing structure over a given time range is presented. Finally, a method of estimating flow rate capacity along commonly used routes during convective weather events is described. Results show that the flow rates drop exponentially as a function of the values of the proposed feature and that convective weather on the final third of the route was found to have a greater impact on the flow rate restriction than other portions of the route.

traffic flow management↗

Hydrogen and Electric Charging Infrastructure for Heavy-Duty Trucks: A Nationally Scalable Megaregion Assessment

Decarbonizing regional and long-haul freight is challenging due to the limitations of battery-electric commercial vehicles and infrastructure constraints. Hydrogen fuel cell medium- and heavy-duty vehicles (MHDVs) offer a viable alternative, aligning with the decarbonization goals of the Department of Energy and commercial entities. Historically, alternative fuels like compressed natural gas and liquefied propane gas have faced slow adoption due to barriers like infrastructure availability. To avoid similar issues, effective planning and deploying zero-emission hydrogen fueling infrastructure is crucial. This research develops deployment plans for affordable, accessible, and sustainable hydrogen refueling stations, supporting stakeholders in the decarbonized commercial vehicle freight system. It aims to benefit underserved and rural energy-stressed communities by improving air quality, reducing noise pollution, and enhancing energy resiliency. This research also provides a blueprint for replacing diesel in over-the-road Class 8 freight truck applications with hydrogen fueling solutions. The study focuses on the Texas Triangle Megaregion (I-45, I-35, and I-10), the I-10 corridor between San Antonio, TX, and Los Angeles, CA, and the I-5/CA-99 corridors between Los Angeles, CA, and San Francisco, CA. This area represents a significant portion of U.S. heavy-duty freight movement, carrying ~8.5% of the national freight volume. Using the OR-AGENT (Optimal Regional Architecture Generation for Efficient National Transport) modeling framework, the study conducts an advanced assessment of commercial vehicles, road and freight networks, and energy systems. The framework integrates data on freight mobility, traffic, weather, and energy pathways to deliver a region-specific, optimized vehicles powertrain architectures, infrastructure deployment solutions, operational logistics, and energy pathways. By considering all vehicle origin-destination pairs utilizing these corridors and all feasible fueling station location options, the framework's genetic algorithm identifies the minimum number and optimal locations of hydrogen refueling stations, ensuring no vehicle is stranded. It also determines fuel schedules and quantities at each station. A roadmap for station deployment based on multiple adoption trajectories ensures a strategic rollout of hydrogen refueling infrastructure.

Sujan, Vivek [ORNL] (ORCID:0000000269882342)↗

The 30/20 GHz fixed communications systems service demand assessment. Volume 1: Executive summary

Demand for telecommunications services is forecasted for the period 1980-2000, with particular reference to that portion of the demand associated with satellite communications. Overall demand for telecommunications is predicted to increase by a factor of five over the period studied and the satellite portion of demand will increase even more rapidly. Traffic demand is separately estimated for voice, video, and data services and is also described as a function of distance traveled and city size. The satellite component of projected demand is compared with the capacity available in the C and Ku satellite bands and it is projected that new satellite technology and the implementation of Ka band transmission will be needed in the decade of the 1990's.

Gamble, R. B.↗

Study of quiet turbofan STOL aircraft for short-haul transportation. Volume 4: Markets

A marketing study to determine the acceptance and utilization of a STOL aircraft short-haul air transportation system was conducted. The relationship between STOL characteristics and the economic and social viability of STOL as a short-haul reliever system was examined. A study flow chart was prepared to show the city pair and traffic split analysis. The national demand for STOL aircraft, as well as the foreign and military markets, were analyzed.

Source record↗

A study of a space communication system for the control and monitoring of the electric distribution system. Volume 1: Summary

It is technically feasible to design a satellite communication system to serve the United States electric utility industry's needs relative to load management, real-time operations management, remote meter reading, and to determine the costs of various elements of the system. A definition of distribution control and monitoring functions is given. Associated communications traffic is quantified. A baseline conceptual design in terms of operating capability and equipment is described, important factors to be considered in designing a system are examined, and preliminary cost data are provided. Factors associated with implementation are discussed and conclusions and recommendations are listed.

Vaisnys, A.↗

Journal of Air Transportation, Volume 12, No. 1

Topics discussed include: a) Data Mining Methods Applied to Flight Operations Quality Assurance Data: A Comparison to Standard Statistical Methods; b) Financial Comparisons across Different Business Models in the Canadian Airline Industry; c) Carving a Niche for the "No-Frills" Carrier, Air Arabia, in Oil-Rich Skies; d) Situational Leadership in Air Traffic Control; and e) The Very Light Jet Arrives: Stakeholders and Their Perceptions.

Bowers, Brent D.↗

Satellite Power Systems (SPS) concept definition study. Volume 5: Special emphasis studies

Satellite configurations based on the Satellite Power System baseline requirements were analyzed and a preferred concept selected. A satellite construction base was defined, precursor operations incident to establishment of orbital support facilities identified, and the satellite construction sequence and procedures developed. Rectenna construction requirement were also addressed. Mass flow to orbit requirements were revised and traffic models established based on construction of 60 instead of 120 satellites. Analyses were conducted to determine satellite control, resources, manufacturing, and propellant requirements. The impact of the laser beam used for space-to-Earth power transmission upon the intervening atmosphere was examined as well as the inverse effect. The significant space environments and their effects on spacecraft components were investigated to define the design and operational limits imposed by the environments on an orbit transfer vehicle. The results show that LEO altitude 300 nmi and transfer orbit duration 6 months are preferrable.

Hanley, G. M.↗

Journal of Air Transportation, Volume 11, No. 2

The following topics were covered: How Do Airlines Perceive That Strategic Alliances Affect Their Individual Branding?; Airline Choice for Domestic Flights in Sao Paulo Metropolitan Area: An Application of the Conditional Logit Model; Consequences of Feeder Delays for the Success of A380 Operations; Inside the Mechanics of Network Development: How Competition and Strategy Reorganize European Air Traffic; The Opportunities and Threats of Turning Airports into Hubs; Another Approach to Enhance Airline Safety: Using System Safety Tools; A Simulation Based Approach for Contingency Planning for Aircraft Turnaround Activities in Airline Hubs; and The Council on Aviation Accreditation: Part One- Historical Foundation.

Bowen, Brent↗

Geostationary platform systems concepts definition study. Volume 2: Technical, book 2

A selected concept for a geostationary platform is defined in sufficient detail to identify requirements for supporting research and technology, space demonstrations, GFE interfaces, costs, and schedules. This system consists of six platforms in geostationary orbit (GEO) over the Western Hemisphere and six over the Atlantic, to satisfy the total payload set associated with the nominal traffic model. Each platform is delivered to low Earth orbit (LEO) in a single shuttle flight, already mated to its LEO to GEO transfer vehicle and ready for deployment and transfer to GEO. An alternative concept is looked at briefly for comparison of configuration and technology requirements. This alternative consists of two large platforms, one over the Western Hemisphere consisting of three docked modules, and one over the Atlantic (two docked modules), to satisfy a high traffic model. The modules are full length orbiter cargo bay payloads, mated at LEO to orbital transfer vehicles (OTVs) delivered in other shuttle flights, for transfer to GEO, rendezvous, and docking. A preliminary feasibility study of an experimental platform is also performed to demonstrate communications and platform technologies required for the operational platforms of the 1990s.

Source record↗

Speaking Volumes About 3-D

In 1999, Genex submitted a proposal to Stennis Space Center for a volumetric 3-D display technique that would provide multiple users with a 360-degree perspective to simultaneously view and analyze 3-D data. The futuristic capabilities of the VolumeViewer(R) have offered tremendous benefits to commercial users in the fields of medicine and surgery, air traffic control, pilot training and education, computer-aided design/computer-aided manufacturing, and military/battlefield management. The technology has also helped NASA to better analyze and assess the various data collected by its satellite and spacecraft sensors. Genex capitalized on its success with Stennis by introducing two separate products to the commercial market that incorporate key elements of the 3-D display technology designed under an SBIR contract. The company Rainbow 3D(R) imaging camera is a novel, three-dimensional surface profile measurement system that can obtain a full-frame 3-D image in less than 1 second. The third product is the 360-degree OmniEye(R) video system. Ideal for intrusion detection, surveillance, and situation management, this unique camera system offers a continuous, panoramic view of a scene in real time.

Source record↗

Wide area detection system: Conceptual design study

An integrated sensor for traffic surveillance on mainline sections of urban freeways is described. Applicable imaging and processor technology is surveyed and the functional requirements for the sensors and the conceptual design of the breadboard sensors are given. Parameters measured by the sensors include lane density, speed, and volume. The freeway image is also used for incident diagnosis.

Hilbert, E. E.↗

Payload analysis for space shuttle applications (study 2.2). Volume 3: Payload system operations analysis (task 2.2.1)

The technical and cost analysis that was performed for the payload system operations analysis is presented. The technical analysis consists of the operations for the payload/shuttle and payload/tug, and the spacecraft analysis which includes sortie, automated, and large observatory type payloads. The cost analysis includes the costing tradeoffs of the various payload design concepts and traffic models. The overall objectives of this effort were to identify payload design and operational concepts for the shuttle which will result in low cost design, and to examine the low cost design concepts to identify applicable design guidelines. The operations analysis examined several past and current NASA and DoD satellite programs to establish a shuttle operations model. From this model the analysis examined the payload/shuttle flow and determined facility concepts necessary for effective payload/shuttle ground operations. The study of the payload/tug operations was an examination of the various flight timelines for missions requiring the tug.

Source record↗