Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Performance of the Center-Of-Curvature Optical Assembly During Cryogenic Testing of the James Webb Space Telescope

Cryogenic testing of the James Webb Space Telescope (JWST) included center-of-curvature metrology of the 18-segment primary mirror (PM). The Center-of-Curvature Optical Assembly (COCOA) consisted of a multiple-wavelength interferometer, a reflective null, coarse and fine alignment systems, and two displacement measuring interferometer systems. The COCOA enabled alignment and phasing of the segments from millimeter-level errors down to the nanometer level. This paper describes the COCOA, the test setup, the testing performed, and the performance of the COCOA in aligning the PM segments and measuring the final PM wavefront error.

Hadaway, James↗

GMI Spin Mechanism Assembly Design, Development, and Test Results

The GMI Spin Mechanism Assembly (SMA) is a precision bearing and power transfer drive assembly mechanism that supports and spins the Global Microwave Imager (GMI) instrument at a constant rate of 32 rpm continuously for the 3 year plus mission life. The GMI instrument will fly on the core Global Precipitation Measurement (GPM) spacecraft and will be used to make calibrated radiometric measurements at multiple microwave frequencies and polarizations. The GPM mission is an international effort managed by the National Aeronautics and Space Administration (NASA) to improve climate, weather, and hydro-meteorological predictions through more accurate and frequent precipitation measurements [1]. Ball Aerospace and Technologies Corporation (BATC) was selected by NASA Goddard Space Flight Center (GSFC) to design, build, and test the GMI instrument. The SMA design has to meet a challenging set of requirements and is based on BATC space mechanisms heritage and lessons learned design changes made to the WindSat BAPTA mechanism that is currently operating on orbit and has recently surpassed 8 years of Flight operation.

Woolaway, Scott↗

Design, construction and long life endurance testing of cathode assemblies for use in microwave high-power transmitting tubes

The ability of state of the art cathode types to produce current densities of 2A/sq cm, respectively, over a minimum designed life of 30,000 hours of continuous operation without failures was demonstrated. The performance of the state of the art cathode types was evaluated by endurance testing while operating under identical electrical geometrical, and vacuum conditions that realistically duplicate the operating conditions present in a transmitter tube. Although there has been considerable life testing done on high current density types of cathodes, these have beem primarily limited to diodes. A diode and high power microwave tube are grossly different devices. A comparison of these two devices is provided. A diode and high power microwave tube are quite different; one could therefore assume different internal environments, especially in the cathode region. Therefore, in order to establish life capabilities of the cathodes just mentioned, they should be tested in a vehicle which has an internal environment similar to that of a high power microwave tube.

Gorshe, R.↗

Cost effective dynamic design and test requirements for Shuttle payloads

The results of a study examining current spacecraft dynamic design and test requirements for the cost effective design and development of Shuttle payloads are presented. Dynamic environments, payload configurations, design/test requirements, test levels, assembly level of testing, simulation methods, prototype role, load limiting, test facilities, and flight measurements are discussed as they relate to the development of a cost effective design and test philosophy for Shuttle Spacelab payloads. It is concluded that changes to current design/test practices will minimize long range payload costs. However, changes to current practices need be quantitatively evaluated before an orderly progression to more cost effective methods can be achieved without undue risk of mission failures. Of major importance is optimization of test levels and plans for payloads and payload subsystems which will result in minimum project costs.

Stahle, C. V.↗

Hybrid Analog/Digital Receiver

Advanced hybrid analog/digital receiver processes intermediate-frequency (IF) signals carrying digital data in form of phase modulation. Uses IF sampling and digital phase-locked loops to track carrier and subcarrier signals and to synchronize data symbols. Consists of three modules: IF assembly, signal-processing assembly, and test-signal assembly. Intended for use in Deep Space Network, but presumably basic design modified for such terrestrial uses as communications or laboratory instrumentation where signals weak and/or noise strong.

Brown, D. H.↗

Space Station and Shuttle Payloads: Rack Insertion Device Pneumatic Assembly Setup and Test

As part of my KSC summer internship, I was given the very cool task of writing a test preparation sheet (TPS). A TPS is a set of instructions for certain procedures or tasks, and serves as the documentation for the tasks. TPSs guide task leaders and technicians throughout the work procedures, safely, informing them of what steps will be hazardous, what precautions must be taken, and what to do in the case of an accident or emergency. I was placed in Boeing's Resupply & Return Division (R&R). R&R is responsible for sending up food and supplies to the International Space Station (ISS) with the use of three Italian Multi Purpose Logistics Modules - Leonardo, Donatello, and Raffaello. The supplies are loaded into Resupply Stowage Racks (RSRs) or Resupply Stowage Platforms (RSPs) (though, both are usually referred to as racks), depending on their size and shape. These racks are loaded into the modules with the help of a specialized crane known as the Rack Insertion Device (RID). The RID rests on four pneumatic air jacks, these allow for an operator to raise or lower the RID. The pneumatic air system supplies the air jacks with the necessary air pressure required to lift the RID.

Conde, Nathan↗

Origami-Inspired Optical Shield for a Starshade Inner Disk Testbed: Design, Fabrication, and Analysis

In 2019, a 10 m-diameter starshade inner disk test article was assembled; this test article demonstrated deployment accuracy sufficient for starshade mission concepts. Here, we describe the design, fabrication, and computational structural analysis of a key inner disk component realized for this effort: the origami-folded optical shield. The optical shield is a 10 m-diameter lightweight cover that makes the inner disk opaque. It stows within a 2.3 m-diameter volume by using an origami-inspired wrapping pattern, and is deployed passively by the inner disk perimeter truss. The fold pattern was generated by a custom algorithm based one existing generative design approaches. This prototype demonstrated critical functions: stowage in a compact volume, static equilibrium when stowed and deployed, and low strain when stowed. Four separate computational structural analysis models of the optical shield were de- veloped, at varying levels of fidelity and using a variety of software solutions: Abaqus, RAPID, and ADAMS. These models were intended to pathfind approaches for modeling the stowage and deployment of the inner disk, and to demonstrate that the optical shield is amenable existing structural modeling approaches. These models were found to adequately capture pertinent stowage and deployment behavior of the optical shield prototype.

Hoffman, Laura↗

Wide-Field InfraRed Survey Telescope (WFIRST) Slitless Spectrometer: Design, Prototype, and Results

The slitless spectrometer plays an important role in the Wide-Field InfraRed Survey Telescope (WFIRST) mission for the survey of emission-line galaxies. This will be an unprecedented very wide field, HST quality 3D survey of emission line galaxies. The concept of the compound grism as a slitless spectrometer has been presented previously. The presentation briefly discusses the challenges and solutions of the optical design, and recent specification updates, as well as a brief comparison between the prototype and the latest design. However, the emphasis of this paper is the progress of the grism prototype: the fabrication and test of the complicated diffractive optical elements and powered prism, as well as grism assembly alignment and testing. Especially how to use different tools and methods, such as IR phase shift and wavelength shift interferometry, to complete the element and assembly tests. The paper also presents very encouraging results from recent element tests to assembly tests. Finally we briefly touch the path forward plan to test the spectral characteristic, such as spectral resolution and response.

Grism↗

Hybrid Wing Body Multi-Bay Test Article Analysis and Assembly Final Report

This report summarizes work performed by The Boeing Company, through its Boeing Research & Technology organization located in Huntington Beach, California, under the Environmentally Responsible Aviation (ERA) project. The report documents work performed to structurally analyze and assemble a large-scale Multi-bay Box (MBB) Test Article capable of withstanding bending and internal pressure loadings representative of a Hybrid Wing Body (HWB) aircraft. The work included fabrication of tooling elements for use in the fabrication and assembly of the test article.

Velicki, Alexander↗

Internal Thermal Control System Hose Heat Transfer Fluid Thermal Expansion Evaluation Test Report

During assembly of the International Space Station, the Internal Thermal Control Systems in adjacent modules are connected by jumper hoses referred to as integrated hose assemblies (IHAs). A test of an IHA has been performed at the Marshall Space Flight Center to determine whether the pressure in an IHA filled with heat transfer fluid would exceed the maximum design pressure when subjected to elevated temperatures (up to 60 C (140 F)) that may be experienced during storage or transportation. The results of the test show that the pressure in the IHA remains below 227 kPa (33 psia) (well below the 689 kPa (100 psia) maximum design pressure) even at a temperature of 71 C (160 F), with no indication of leakage or damage to the hose. Therefore, based on the results of this test, the IHA can safely be filled with coolant prior to launch. The test and results are documented in this Technical Memorandum.

Wieland, P. O.↗

From Paper to Production to Test: An Update on NASA's J-2X Engine for Exploration

The NASA/industry team responsible for developing the J-2X upper stage engine for the Space Launch System (SLS) Program has made significant progress toward moving beyond the design phase and into production, assembly, and test of development hardware. The J-2X engine exemplifies the SLS Program goal of using proven technology and experience from more than 50 years of United States spaceflight experience combined with modern manufacturing processes and approaches. It will power the second stage of the fully evolved SLS Program launch vehicle that will enable a return to human exploration of space beyond low earth orbit. Pratt & Whitney Rocketdyne (PWR) is under contract to develop and produce the engine, leveraging its flight-proven LH2/LOX, gas generator cycle J-2 and RS-68 engine capabilities, recent experience with the X-33 aerospike XRS-2200 engine, and development knowledge of the J-2S tap-off cycle engine. The J- 2X employs a gas generator operating cycle designed to produce 294,000 pounds of vacuum thrust in primary operating mode with its full nozzle extension. With a truncated nozzle extension suitable to support engine clustering on the stage, the nominal vacuum thrust level in primary mode is 285,000 pounds. It also has a secondary mode, during which it operates at 80 percent thrust by altering its mixture ratio. The J-2X development philosophy is based on proven hardware, an aggressive development schedule, and early risk reduction. NASA Marshall Space Flight Center (MSFC) and PWR began development of the J-2X in June 2006. The government/industry team of more than 600 people within NASA and PWR successfully completed the Critical Design Review (CDR) in November 2008, following extensive risk mitigation testing. Assembly of the first development engine was completed in May 2011 and the first engine test was conducted at the NASA Stennis Space Center (SSC), test stand A2, on 14 July 2011. Testing of the first development engine will continue through the autumn of 2011, be paused for test stand modifications to the passive diffuser, and then restart in the spring of 2012. This testing will be followed by specialized powerpack testing intended to examine the design and operating margins of the engine turbomachinery. The development plan beyond this point leads through more system-level, engine testing of several samples, analytical model validation activities, functional and performance verification, and then ultimate certification to support human spaceflight. This paper will discuss the J-2X development background, provide top-level information on design and development planning, and will explore some of the development challenges and mitigation activities pursued to date.

Kynard, Michael↗

Processes for fabricating and load testing NASA scatterometer antenna assemblies

The purpose of this paper is to present the processes used to fabricate and load test the NASA Scatterometer Antenna Assemblies. The fabrication processes include layup, curing and machining of antenna components, and the bonding and assembly of the components into the final antenna configuration. The design of each antenna consists of an aluminum waveguide bonded to a sandwich structure of Nomex honeycomb core with graphite/epoxy skins. A titanium end fitting with fiberglass/epoxy transitions is bonded into one end of each antenna. Several antenna components are fabricated using a process where aluminum foil is co-cured to a composite surface. The antenna assemblies are radiographically inspected, thermally cycled, and load tested prior to shipment.

Barth, James R.↗

Development of NASA's Sample Cartridge Assembly: Design, Thermal Analysis, and Testing

NASA's Sample Cartridge Assembly (SCA) project is responsible for designing and validating a payload that contains a materials research sample in a sealed environment. The SCA will be heated in the European Space Agency's (ESA) Low Gradient Furnace (LGF) that is housed inside the Material Science Research Rack (MSRR) located in the International Space Station (ISS). Sintered metals and crystal growth experiments in microgravity are examples of some of the types of materials research that may be performed with a SCA. The project's approach has been to use thermal models to guide the SCA through several design iterations. Various layouts of the SCA components were explored to meet the science and engineering requirements, and testing has been done to help prove the design. This paper will give an overview of the SCA design. It will show how thermal analysis is used to support the project. Also some testing that has been completed will also be discussed, including changes that were made to the thermal profile used during brazing.

O'Connor, Brian↗