This report documents the Interim Measure (IM) completed at Un-Numbered Operational Areas (UNOA) potential release location (PRL) 229, at Kennedy Space Center (KSC), Florida. This document has been prepared for the National Aeronautics and Space Administration (NASA), in accordance with HydroGeoLogic, Inc.’s (HGL) Contract 80KSC019D0012, Task Order 80KSC019F0224. The purpose of this IM report is to document the field results of the 2022 IM conducted between December 13, 2021, and February 11, 2022, and to present the recommendations based on the IM findings. IM activities were completed at the UNOA PRL 229 to remove railroad ties and benzo(a)pyrene equivalent (BAPE)/total recoverable petroleum hydrocarbons (TRPH)-affected soil in accordance with the IM Work Plan (IMWP) (Jacobs/CORE, 2019a). The objectives of the IM were to mitigate human health risks by reducing site contaminants to the residential soil cleanup target level (SCTL) based on the 95 percent upper confidence limit on the mean. A second objective was to reduce low molecular weight and high molecular weight polynuclear aromatic hydrocarbon (PAH) concentrations below ecological screening values for terrestrial receptors. Prior to excavation operations, railroad ties from all areas were consolidated. In total, 50.67 tons of railroad ties were transported from the site to JED Landfill in St. Cloud, Florida. The cumulative excavation footprint spanned an area of 9,710 square ft. In total, 908.54 tons of soil was transported from the site to JED Landfill. To backfill the excavation area, 880 cubic yards of clean fill was trucked to the site from S&LMaterials, Inc. borrow pit in Christmas, Florida. Following completion of backfill, the site restoration activities included grading the disturbed areas to match the existing elevations and vegetation planting by the site restoration subcontractor. The IM implementation activities were presented to the KSC Remediation Team during its meeting on May 3, 2022. The Remediation Team reached consensus on the completion of the IM reducing the area affected by BAPE/TRPH above the State of Florida residential soil cleanup target levels.