Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “pra”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Structural Health Monitoring Analysis for the Orbiter Wing Leading Edge

This viewgraph presentation reviews Structural Health Monitoring Analysis for the Orbiter Wing Leading Edge. The Wing Leading Edge Impact Detection System (WLE IDS) and the Impact Analysis Process are also described to monitor WLE debris threats. The contents include: 1) Risk Management via SHM; 2) Hardware Overview; 3) Instrumentation; 4) Sensor Configuration; 5) Debris Hazard Monitoring; 6) Ascent Response Summary; 7) Response Signal; 8) Distribution of Flight Indications; 9) Probabilistic Risk Analysis (PRA); 10) Model Correlation; 11) Impact Tests; 12) Wing Leading Edge Modeling; 13) Ascent Debris PRA Results; and 14) MM/OD PRA Results.

Yap, Keng C.↗

Applications of the International Space Station Probabilistic Risk Assessment Model

Recently the International Space Station (ISS) has incorporated more Probabilistic Risk Assessments (PRAs) in the decision making process for significant issues. Future PRAs will have major impact to ISS and future spacecraft development and operations. These PRAs will have their foundation in the current complete ISS PRA model and the current PRA trade studies that are being analyzed as requested by ISS Program stakeholders. ISS PRAs have recently helped in the decision making process for determining reliability requirements for future NASA spacecraft and commercial spacecraft, making crew rescue decisions, as well as making operational requirements for ISS orbital orientation, planning Extravehicular activities (EVAs) and robotic operations. This paper will describe some applications of the ISS PRA model and how they impacted the final decision. This paper will discuss future analysis topics such as life extension, requirements of new commercial vehicles visiting ISS.

Grant, Warren↗

Exit Presentation Fall 2013

Our current International Space Station Probabilistic Risk Assessment (ISS PRA) model assumes all collisions between a visiting vehicle (VV) and the ISS result in worst case loss of the ISS crew and the vehicle (LOCV). Drawing results from the Mir-Progress collision, we know this assumption is inaccurate because that collision did not lead to LOCV. Therefore the PRA team is conducting a study to determine the likelihood of LOCV when a collision occurs between a VV and the ISS. Kinetic energy is calculated and converted to pounds of TNT for the moving VVs when they collide with the ISS. Different scenarios are evaluated to obtain collision related data such as translational kinetic energy and rotational kinetic energy. These calculated data are integrated into the results from the expert elicitation performed on the Mir- Progress collision. As a result of this study, the PRA model will now calculate the probability of a VV collision with ISS, the probability that collision will result in Loss of Soyuz Crew (LOC) or Loss of ISS Crew and Vehicle (LOCV).

Yang, Qi Rong↗

Dynamic Modeling of Ascent Abort Scenarios for Crewed Launches

For the last 30 years, the United States' human space program has been focused on low Earth orbit exploration and operations with the Space Shuttle and International Space Station programs. After over 40 years, the U.S. is again working to return humans beyond Earth orbit. To do so, NASA is developing a new launch vehicle and spacecraft to provide this capability. The launch vehicle is referred to as the Space Launch System (SLS) and the spacecraft is called Orion. The new launch system is being developed with an abort system that will enable the crew to escape launch failures that would otherwise be catastrophic as well as probabilistic design requirements set for probability of loss of crew (LOC) and loss of mission (LOM). In order to optimize the risk associated with designing this new launch system, as well as verifying the associated requirements, NASA has developed a comprehensive Probabilistic Risk Assessment (PRA) of the integrated ascent phase of the mission that includes the launch vehicle, spacecraft and ground launch facilities. Given the dynamic nature of rocket launches and the potential for things to go wrong, developing a PRA to assess the risk can be a very challenging effort. Prior to launch and after the crew has boarded the spacecraft, the risk exposure time can be on the order of three hours. During this time, events may initiate from either the spacecraft, the launch vehicle, or the ground systems, thus requiring an emergency egress from the spacecraft to a safe ground location or a pad abort via the spacecraft's launch abort system. Following launch, again either the spacecraft or the launch vehicle can initiate the need for the crew to abort the mission and return home. Obviously, there are thousands of scenarios whose outcome depends on when the abort is initiated during ascent and how the abort is performed. This includes modeling the risk associated with explosions and benign system failures that require aborting a spacecraft under very dynamic conditions, particularly in the lower atmosphere, and returning the crew home safely. This paper will provide an overview of the PRA model that has been developed of this new launch system, including some of the challenges that are associated with this effort.

Bigler, Mark↗

Reliability Analysis and Standardization of Spacecraft Command Generation Processes

center dot In order to reduce commanding errors that are caused by humans, we create an approach and corresponding artifacts for standardizing the command generation process and conducting risk management during the design and assurance of such processes. center dot The literature review conducted during the standardization process revealed that very few atomic level human activities are associated with even a broad set of missions. center dot Applicable human reliability metrics for performing these atomic level tasks are available. center dot The process for building a "Periodic Table" of Command and Control Functions as well as Probabilistic Risk Assessment (PRA) models is demonstrated. center dot The PRA models are executed using data from human reliability data banks. center dot The Periodic Table is related to the PRA models via Fault Links.

human errors.↗

Estimating Orion Heat Shield Failure Due To Ablator Cracking During The EFT-1 Mission

The Orion EFT-1 heatshield suffered from two major certification challenges: First, the mechanical properties used in design were not evident in the flight hardware and second, the flight article itself cracked during fabrication. The combination of these events motivated the Orion Program to pursue an engineering-level Probabilistic Risk Assessment (PRA) as part of heatshield certification rationale. The PRA provided loss of Mission (LOM) likelihoods considering the probability of a crack occurring during the mission and the likelihood of subsequent structure over-temperature. The methods and input data for the PRA are presented along with a discussion of the test data used to anchor the results. The Orion program accepted an EFT-1 Loss of Vehicle (LOV) risk of 1-in-160,000 due to in-mission Avcoat cracking based on the results of this analysis. Conservatisms in the result, along with future considerations for Exploration Missions (EM) are also addressed.

Avcoat↗

Synthesizing a New Launch Vehicle Failure Probability Based on Historical Flight Data

New launch vehicles have historically had significantly higher failure rates in early flights than what has been predicted using Probabilistic Risk Assessment - PRA. This is because PRAs typically model a mature vehicle where a significant portion of the early failure probability contributors have been eliminated due to testing and improvements after actual field operation. To capture a more accurate early flight failure probability estimate, this paper develops a method that estimates ascent failure probability starting with the first flight based on historical launch vehicle records. With new launch vehicles being developed, such as the Space Launch System - SLS, a PRA model must be extended to cover early flight failure probability contributions that are either not covered in the mature-vehicle PRA or are underestimated. These failure probability contributions include design errors, quality control deficiencies, installation errors, and environmental impacts. There are also failure dependencies due to systemic errors that still exist due to limited entire-system testing.

Cross, Robert B.↗

Comparative Analysis of Static and Dynamic Probabilistic Risk Assessment

Implementation of risk-informed design allows the design team to thoroughly explore the risks of a system while iterating the operations concept, design, and requirements until the system meets mission objects and is achievable within constraints. To arrive at a space system design that is likely to meet all constraints placed upon mass, cost, performance and risk, the system requirements must be understood and traded against each other as early as the conceptual design phase. Depending on the project phase and the goals of the risk analysis, various PRA methodologies could be used to produce quantitative risk estimates to enable such a process. In order to better understand the applicability, advantages, and limitations of various PRA methodologies, a comparative analysis of three bottom-up, component-based PRA approaches was performed. The three methods examined are a traditional static fault tree, a fault tree hybrid, and a dynamic Monte Carlo simulation. Each approach was used to assess a generic reaction control system (RCS) thruster pod and mission. The methods are assessed in terms of the process of modeling a system, the actionable information produced for the design team, and the overall fidelity of the quantitative risk evaluation generated. The paper also discusses the applicability of each methodology to the different phases of system development.

Probablistic↗

Using Bayesian Estimation to Quantify the Risks of Spaceflight

Complex PRA is the best method and current gold standard, as it allows us to reflect changes (improvements) in individual spacecraft system risks over time. Yet, Bayesian methods – using simple inputs – allowed us to get estimates that are in line with high-complexity PRA. Here Bayesian estimation acts as a “gut check” on PRA (supposing a “reasonable” prior is used). Frequentist calculations can overestimate P(failure), especially when total number of trials are few (e.g., after Challenger). In general, Bayesian probability estimation can be used in any risk assessment situation to integrate what we think we know ahead of time with what we observe over time.

Reynolds, Robert J.↗

The Challenger tragedy was caused by an Apollo mistake, terminating risk analysis

NASA’s view of risk changed between early Apollo and the Space Shuttle. Risk was a known serious problem at the beginning of Apollo and the risk estimates were disturbingly high. To avoid public concern, risk analysis was discontinued. Risk analysis was avoided in Shuttle, leading to an unnecessarily risky design. The immediate cause of the Challenger tragedy was the mistaken decision to launch in cold weather. The fundamental cause was the high risk of the Shuttle design. Before Challenger, management thought and testified that the probability of an accident was 1 in 100,000. After Challenger, Probabilistic Risk Analysis (PRA) found a roughly 1 in 100 chance of a Shuttle failure. The recent Orion design uses the safer Apollo approach, with a hardened capsule, launch abort escape, and the crew placed above the rocket tanks and engines. During Apollo it was estimated that, “assuming all elements from propulsion to rendezvous and life support were done as well or better than ever before, that 30 astronauts would be lost before 3 were returned safely to the Earth.” The chance of astronaut survival was only 10%. After the Apollo 1 tragedy, the awareness of risk led to an intense focus on achieving safety. “The only possible explanation for the astonishing success – no losses in space and on time – was that every participant at every level in every area far exceeded the norm of human capabilities.” During Apollo, a NASA PRA found that the chance of success was “less than 5 percent.” The NASA Administrator felt that “the numbers could do irreparable harm,” and discontinued numerical risk assessment. This led to decreasing understanding of risk. The head of Apollo reliability and safety decided, “Statistics don’t count for anything,” and that risk is reduced by “attention taken in design.” The great and initially unexpected success of Apollo appeared to validate the neglect of PRA. Continuing to neglect the mathematical estimation of risk led Shuttle into a high risk design that produced tragic results. The initial design of the Shuttle emphasized increasing capability and reducing cost without analysis or even mention of risk. A retired NASA official stated, “some NASA people began to confuse desire with reality. … One result was to assess risk in terms of what was thought acceptable without regard for verifying the assessment. … Note that under such circumstances real risk management is shut out.” Not computing risk led to removing launch abort, removing crew escape, selecting less reliable Solid Rocket Boosters, placing the crew compartment next to the rocket boosters, and accepting more stressed shielding tile designs. Accepting these specific risks directly caused the shuttle disasters. The Challenger tragedy is frequently taught as a case of management failure. The focus is on the Challenger launch decision hours before, which is a dramatic example of bad management. However, the true cause of the Challenger disaster occurred decades earlier in the Apollo era. When the easily predictable failures occurred, failure investigations focused on how they might have been avoided. The Shuttle was cancelled after the space station was completed because of its high risk. The ultimate cause of the Shuttle tragedies was the choice by the Apollo-era NASA administrator to avoid a negative public reaction to realistic risk analysis.

Harry W. Jones↗

Accounting for Point Estimate Uncertainty in Space Systems Reliability and Risk Analysis

Understanding and accounting for uncertainty in risk analysis is a critical step in the management and communication of risk in engineered systems. The component and system-level analysis to determine the probability of a negative outcome and its consequence is often quantified by a point estimate. Many Program and Enterprise decisions involving technical concerns and issues rely on reliability engineering activities to produce quantified risk analysis to inform the decision making process. At NASA, it is common to use a Probabilistic Risk Analysis (PRA) to inform the overall risk to Loss of Mission or Loss of Crew that involves integration across all spacecraft subsystem fault trees to produce an overall probability of mission failure. The point estimate is an estimate of this overall probability and is an immediate result of a fault tree model. It is the result of a model where the probability of each event is taken to be equal to its mean. The value provides an approximation of the overall mean without running any uncertainty calculations (e.g., no sampling). Using only the point estimate can lead to a false sense of precision and the point estimate may not match the resulting mean when uncertainty is taken into consideration. This paper will explore five conditions that can cause the PRA model mean to diverge from the point estimate and will provide engineers and managers insight into the importance of understanding uncertainty in the elements of PRA models.

Paul J Collier↗

Sensorimotor Application of Proposed Methods to Combine the Effects of Multiple Countermeasures for PRisM

Risk associated with human systems is challenging to quantify but is critical for the mission planning and decision making required to enable future Lunar and Martian missions. To address this gap, the Crew Health and Performance-Probabilistic Risk Assessment (CHP-PRA) project is developing an integrated computational model for CHP mission risk. Much like how MEDPRAT is designed to allow medical resource trades informed by medical risk, CHP-PRA will enable analogous trades in human system risks across multiple CHP functions and capabilities. Human performance is one component of the risk intended to be captured by CHP-PRA through the Performance Risk Model (PRisM). The sensorimotor risk area provides a good frame of reference for investigating the structure of a performance model because most tasks that astronauts are expected to perform require input from the sensory system and/or movement/motor control. Additionally, sensorimotor countermeasures are an area of particular concern for NASA’s Human Research Program because of the increased sensorimotor risk associated with surface operations in Lunar and Martian missions. Thus, a tool that can quickly compare risk reductions of potential countermeasures would be beneficial in guiding research and development of effective countermeasures. In this proof of concept, we present a systematic way to combine multiple performance data sets for humans subjected to different countermeasures such that we can predict the countermeasure(s) that optimize astronaut performance on relevant tasks. PRisM assumes that both the tests that are used to measure countermeasure effectiveness (input data) and the tasks we use to represent astronaut performance, can be broken down and represented as a function/vector of the human systems required to perform that test/task. Through mathematical combination, test data are used to predict performance on astronaut tasks that use similar systems. We propose that when combining countermeasures evaluated using the same test, that only one value should be used to represent their combined effectiveness. We start our analysis with the assumption that two countermeasures together will perform better than each countermeasure individually. Our initial implementation of this framework compares various space motion sickness countermeasures and the most up to date analysis will be demonstrated at the IWS.

Caroline R Austin↗

Nuclear Material Control and Accountability System Effectiveness Tool (MSET)

A nuclear material control and accountability (MC&A) system effectiveness tool (MSET) has been developed in the United States for use in evaluating material protection, control, and accountability (MPC&A) systems in nuclear facilities. The project was commissioned by the National Nuclear Security Administration's Office of International Material Protection and Cooperation. MSET was developed by personnel with experience spanning more than six decades in both the U.S. and international nuclear programs and with experience in probabilistic risk assessment (PRA) in the nuclear power industry. MSET offers significant potential benefits for improving nuclear safeguards and security in any nation with a nuclear program. MSET provides a design basis for developing an MC&A system at a nuclear facility that functions to protect against insider theft or diversion of nuclear materials. MSET analyzes the system and identifies several risk importance factors that show where sustainability is essential for optimal performance and where performance degradation has the greatest impact on total system risk. MSET contains five major components: (1) A functional model that shows how to design, build, implement, and operate a robust nuclear MC&A system (2) A fault tree of the operating MC&A system that adapts PRA methodology to analyze system effectiveness and give a relative risk of failure assessment of the system (3) A questionnaire used to document the facility's current MPC&A system (provides data to evaluate the quality of the system and the level of performance of each basic task performed throughout the material balance area [MBA]) (4) A formal process of applying expert judgment to convert the facility questionnaire data into numeric values representing the performance level of each basic event for use in the fault tree risk assessment calculations (5) PRA software that performs the fault tree risk assessment calculations and produces risk importance factor reports on the facility's MC&A (software widely used in the aerospace, chemical, and nuclear power industries) MSET was peer reviewed in 2007 and validated in 2008 by benchmark testing at the Idaho National Laboratory in the United States. The MSET documents were translated into Russian and provided to Rosatom in July of 2008, and MSET is currently being evaluated for potential application in Russian Nuclear Facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Exploration of High-Dimensional Scalar Function for Nuclear Reactor Safety Analysis and Visualization

The next generation of methodologies for nuclear reactor Probabilistic Risk Assessment (PRA) explicitly accounts for the time element in modeling the probabilistic system evolution and uses numerical simulation tools to account for possible dependencies between failure events. The Monte-Carlo (MC) and the Dynamic Event Tree (DET) approaches belong to this new class of dynamic PRA methodologies. A challenge of dynamic PRA algorithms is the large amount of data they produce which may be difficult to visualize and analyze in order to extract useful information. We present a software tool that is designed to address these goals. We model a large-scale nuclear simulation dataset as a high-dimensional scalar function defined over a discrete sample of the domain. First, we provide structural analysis of such a function at multiple scales and provide insight into the relationship between the input parameters and the output. Second, we enable exploratory analysis for users, where we help the users to differentiate features from noise through multi-scale analysis on an interactive platform, based on domain knowledge and data characterization. Our analysis is performed by exploiting the topological and geometric properties of the domain, building statistical models based on its topological segmentations and providing interactive visual interfaces to facilitate such explorations. We provide a user’s guide to our software tool by highlighting its analysis and visualization capabilities, along with a use case involving dataset from a nuclear reactor safety simulation.

97 MATHEMATICS AND COMPUTING↗

Impact of Passive Safety on FHR Instrumentation Systems Design and Classification

Fluoride salt-cooled high-temperature reactors (FHRs) will rely more extensively on passive safety than earlier reactor classes. 10CFR50 Appendix A, General Design Criteria for Nuclear Power Plants, establishes minimum design requirements to provide reasonable assurance of adequate safety. 10CFR50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, provides guidance on how the safety significance of systems, structures, and components (SSCs) should be reflected in their regulatory treatment. The Nuclear Energy Institute (NEI) has provided 10 CFR 50.69 SSC Categorization Guideline (NEI-00-04) that factors in probabilistic risk assessment (PRA) model insights, as well as deterministic insights, through an integrated decision-making panel. Employing the PRA to inform deterministic requirements enables an appropriately balanced, technically sound categorization to be established. No FHR currently has an adequate PRA or set of design basis accidents to enable establishing the safety classification of its SSCs. While all SSCs used to comply with the general design criteria (GDCs) will be safety related, the intent is to limit the instrumentation risk significance through effective design and reliance on inherent passive safety characteristics. For example, FHRs have no safety-significant temperature threshold phenomena, thus enabling the primary and reserve reactivity control systems required by GDC 26 to be passively, thermally triggered at temperatures well below those for which core or primary coolant boundary damage would occur. Moreover, the passive thermal triggering of the primary and reserve shutdown systems may relegate the control rod drive motors to the control system, substantially decreasing the amount of safety-significant wiring needed. Similarly, FHR decay heat removal systems are intended to be running continuously to minimize the amount of safety-significant instrumentation needed to initiate operation of systems and components important to safety as required in GDC 20. This paper provides an overview of the design process employed to develop a pre-conceptual FHR instrumentation architecture intended to lower plant capital and operational costs by minimizing reliance on expensive, safety related, safety-significant instrumentation through the use of inherent passive features of FHRs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Probabilistic Risk Assessment of Flexible Power Operation of a Nuclear Power Plant

Nuclear power plants (NPPs) are becoming cost prohibitive to operate. This is due to historically low natural gas prices and wind and solar prices often being less than the marginal cost of operating baseload coal and NPPs, which sometimes forces NPPs to pay for the electricity they create. Thus, the feasibility of using part of the heat from an NPP to create other commodities such as hydrogen is being evaluated; operating in this way is called flexible power operation (FPO). To change the NPP design and operation, a license review must happen. Part of the review is the Probabilistic Risk Assessment (PRA) which proves the safety of the design and operation by identifying sequences of events that result in plant failure and estimating their likelihood of occurrence. A Level 1 PRA model that evaluates the risk of removing heat from the secondary side of NPP was created. The model was developed using Systems Analysis Program for Hands-On Integrated Reliability Evaluations (SAPHIRE 8) software to calculate core damage frequency (CDF). It is a fault tree that represents the possible pathways that could lead to a loss of steam inventory in the secondary loop. A loss of steam inventory can induce steam generator tube rupture or other events that activates response systems to avoid core damage. This is the main concern for the Nuclear Regulatory Commission (NRC), the group in the United States that licenses NPPs. This model will calculate a total CDF of any of these pathways occurring which will be compared to the baseline CDF in a generic NPP PRA for licensing support.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Coupling RAVEN to SAPHIRE for Performing Time Dependent Probabilistic Risk Assessment

Cost Risk Analysis Framework Tool (CRAFT) was recently developed by Idaho National Laboratory (INL) to perform economical risk analysis by combining physics, risk and cost information of components in a Nuclear Power Plant (NPP) that can be quickly deployable through the nuclear industry to evaluate the risk associated to capital projects and asset management [1]. In this framework, RAVEN is coupled with SAPHIRE to perform the time dependent risk/safety assessment of NPPs. Traditionally, the risk associated to the NPPs can be determined by classical Probabilistic Risk Assessment (PRA) tools, such as SAPHIRE, under the assumption that all failure rates are constant over time. In some circumstances, however, the assumption is rendered invalid since that the failure rate of a component may gradually change in a systematic way, for example, because of aging and degradation. In addition, recent data analysis in [2] has suggested decreasing values of failure rates for several important components of NPPs. A PRA that includes these components should employ the time-dependent failure rates in order to accurately estimate the risk at any given time. This time-dependent PRA is achieved by the coupling between RAVEN and SAPHIRE.

42 ENGINEERING↗

Coupling RAVEN to SAPHIRE for Performing Time Dependent Probabilistic Risk Assessment

Cost Risk Analysis Framework Tool (CRAFT) was recently developed by Idaho National Laboratory (INL) to perform economical risk analysis by combining physics, risk and cost information of components in a Nuclear Power Plant (NPP) that can be quickly deployable through the nuclear industry to evaluate the risk associated to capital projects and asset management [1]. In this framework, RAVEN is coupled with SAPHIRE to perform the time dependent risk/safety assessment of NPPs. Traditionally, the risk associated to the NPPs can be determined by classical Probabilistic Risk Assessment (PRA) tools, such as SAPHIRE, under the assumption that all failure rates are constant over time. In some circumstances, however, the assumption is rendered invalid since that the failure rate of a component may gradually change in a systematic way, for example, because of aging and degradation. In addition, recent data analysis in [2] has suggested decreasing values of failure rates for several important components of NPPs. A PRA that includes these components should employ the time-dependent failure rates in order to accurately estimate the risk at any given time. This time-dependent PRA is achieved by the coupling between RAVEN and SAPHIRE.

42 ENGINEERING↗