Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power system simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

High-Fidelity Large-Signal Order Reduction Approach for Composite Load Model

With the increasing penetration of electronic loads and distributed energy resources, conventional load models cannot capture their dynamics. Therefore, a new comprehensive composite load model is developed by Western Electricity Coordinating Council (WECC). However, this model is a complex high-order non-linear system with multi-time-scale property, which poses challenges on power system studies with heavy computational burden. In order to reduce the model complexity, the authors firstly develop a large-signal order reduction (LSOR) method using singular perturbation theory. In this method, the fast dynamics are integrated into the slow ones to preserve transient characteristics of the former. Then, accuracy assessment conditions are proposed and embedded into the LSOR to improve and guarantee the accuracy of reduced-order model. Finally, the reduced-order WECC composite load model is derived by using the proposed algorithm. Overall, simulation results show that the reduced-order large-signal model significantly alleviates the computational burden while maintaining similar dynamic responses as the original composite load model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NPP Simulators for Coupled Thermal and Electric Power Dispatch

The Light Water Reactor Sustainability (LWRS) program within the United States Department of Energy supports extending the operation of the U.S. commercial nuclear power plant (NPP) fleet. Within the LWRS program, the Flexible Plant Operation and Generation (FPOG) Pathway works to diversify the revenue streams of light water reactors (LWRs) by opening opportunities for the co-generation of non-electric products in addition to supplying electrical power to the grid. Recent events have added greater motivation to these efforts. For example, the recent Inflation Reduction Act (IRA) passed by the U.S. federal government offers substantial tax incentives for producing clean hydrogen, the technology readiness level of dispatchable and high-efficiency hydrogen production has dramatically increased in a short time, and societal response to world climate change is driving a transition away from fossil fuels. Producing hydrogen with maximum efficiency using nuclear power requires dispatching both electrical and thermal power from the nuclear plant to the hydrogen plant, so testing concepts of operations for combined electrical and thermal power dispatch (TPD) from an NNP to a hydrogen plant is of interest. This report documents achievement of the Light Water Reactor Sustainability (LWRS) program milestone “Install and demonstrate a vendor-developed simulator on the Human Systems Simulation Laboratory (HSS) for dispatch of LWR electrical power to a close-coupled electrolysis plant” with a due date of Dec. 22, 2022. Several factors provide motivation for this effort. Coupling the power generation deck of a nuclear power plant to a hydrogen production facility introduces new possibilities for operational transients that must be addressed. In particular, the performance of the integrated system during startup and shutdown of the hydrogen production facility, as well as offnormal conditions, need to be evaluated to ensure there are no adverse effects on the operation of the existing NPP. The concept of operations involving the NPP, the hydrogen plant, and the electric power grid must be tested using NPP simulators and operating procedures that have been modified for TPD operations. These tests must also include dynamic simulations of the coupled tertiary thermal and electric loads as well as coordinated activities with NPP operators, tertiary load operators and grid power coordinators. The report summarizes progress in developing and testing full-scope NPP simulators at the HSSL, including a generic BWR simulator from GSE Systems, Inc. and generic PWR simulator from Westinghouse. In the case of the TPD-GBWR Simulator from GSE Systems, Inc., a BWR is thermally coupled to a high temperature electrolysis (HTE) plant that produces hydrogen and oxygen from de-ionized water. The hydrogen plant is not explicitly simulated but only included as a transient heat sink. A thermal power dispatch (TPD) system transfers heat between the steam systems at the BWR and the hydrogen plant. Operational results from two versions of the modified simulator are presented. The first version uses synthetic oil as a heat transfer fluid in a closed delivery heat loop (DHL) that generates steam at the hydrogen plant. The second version uses steam as the heat transfer fluid in a delivery steam line (DSL) to provide steam to the hydrogen plant. For both versions, the estimated thermal power delivery distance is approximately one kilometer. The amount of thermal power dispatched in the simulators is 15% of the total reactor thermal power such that the simulators provide a tool to study the feasibility of coupling a BWR to industrial processes that benefit from a combination electrical and thermal power dispatch. Ongoing work within a CRADA is also developing a full-scope PWR simulator provided by Westinghouse for both thermal and electric power coupling. This simulator is based on a PWR plant with two three-loop Westinghouse reactors. Westinghouse PWRs are sufficiently similar that a simulator of a three-loop reactor is an appropriate representation for two-loop and four-loop PWR reactors. The three-loop simulator will initially be modified for close-coupling to a 100 MW HTE hydrogen production plant that will require approximately 25 MW of thermal power while operating at its maximum rated capacity. The simulator testing will include full coupling to dynamic simulations of a hydrogen production plant and a representative bulk electric grid. The simulator provided by Westinghouse is similar to the GPWR simulator that INL has already obtained from GSE Systems but has a few important added benefits. First, the Westinghouse simulator is based on digital controls and has additional screens that can be called up to show parameter trends to assist operators in decision-making. The Westinghouse simulator also has upgrades to the controls and hardware representations, such as valve actuators, that make it more realistic and flexible in terms of accurately sim

99 GENERAL AND MISCELLANEOUS↗

A Tale of Two Simulators—A Comparative Human-in-the-Loop Nuclear Power Plant Operations Study on Thermal Power Dispatch for Hydrogen Production

A study was designed for a reconfigurable, full-scale, full-scope nuclear power plant control room simulator to compare two different thermal power dispatch systems, on separate simulator platforms, demonstrating a TPD concept of operation. A TPD system can provide a desirable alternative revenue source for utilities but requires addressing new and unique operational issues. The selection of representative scenarios and the scenario-based experimental design are presented as key elements to capture evidence for validating the developed TPD concept of operations overcome these operational issues.

Ulrich, Thomas A.↗

Distribution system simulator

In a series of tests performed under the Department of Energy auspices, power line carrier propagation was observed to be anomalous under certain circumstances. To investigate the cause, a distribution system simulator was constructed. The simulator was a physical simulator that accurately represented the distribution system from below power frequency to above 50 kHz. Effects such as phase-to-phase coupling and skin effect were modeled. Construction details of the simulator, and experimental results from its use are presented.

Bahrami, K. A.↗

A parametric study of motor starting for a 2- to 10-kilowatt Brayton power system

A study of the motor starting of a Brayton cycle power system was conducted to provide estimates of system sensitivity to several controllable parameters. These sensitivity estimates were used as a basis for selection of an optimum motor-start scheme to be implemented on the 2- to 10-kilowatt Brayton power system designed and presently under test. The studies were conducted with an analog simulation of the Brayton power system and covered a range of frequencies from 400 Hz (33 percent design) to 1200 Hz (design), voltage-to-frequency ratios of 0.050 (50 percent design) to 0.100 (design), turbine-inlet temperatures of 800 K (1440 R, 70 percent design) to 1140 K (2060 deg R, design), and prestart pressure levels of 14.5 psia to 29.0 psia. These studies have shown the effect of selected system variables on motor starting. The final selection of motor-start variables can therefore be made on the basis of motor-start inverter complexity, battery size and weight, desired steady-state pressure level after startup, and other operational limitations. In general, the study showed the time required for motor starting to be inversely proportional to motor frequency, voltage, turbine-inlet temperature, and pressure level. An increase in any of these parameters decreases startup time.

Cantoni, D. A.↗

Probabilistic Resource Adequacy Suite (PRAS)

Powered By PRAS features the Probabilistic Resource Adequacy Suite (PRAS), an open-source, research-oriented collection of tools for analyzing the resource adequacy of bulk power systems. PRAS performs low-fidelity, high-speed simulations of multi-region power system operations, considering hundreds of thousands of years of unplanned resource outages to quantify the risk and potential nature of energy supply shortfalls in probabilistic terms.

demand↗

PCS-G systems analysis

Digital computer simulation of SNAP 8 power conversion system G startup and shutdown for systems analysis

Favero, L. R.↗

Geographically Distributed Co-Simulation for the Interplay of Integrated Energy Systems and Power Grid

The increased penetration of renewable generation induces unbalanced demand-supply on a power grid, while integrated energy systems (IES) can provide high part-load efficiency and high flexibility to support grid resilience. To study the transients and improve dynamic operability, it’s important to investigate the interplay between IES and power grid concurrently using real-time co-simulation approaches. In this presentation, we showed the previous co-simulation test between NETL and INL and discussed how this co-simulation can be beneficial for both IES and power grid research. In addition, we gave an overview about the SuperLab2.0 project, which was a federated national platform to address future power grid challenges. (Virtual presentation to the MILLENNIUM CLEAN and SUSTAINABLE POWER workshop 2025).

Co-simulation↗

Development and refinement of test bed simulations

Lewis Research Center of NASA, with support from Rocketdyne, was engaged in non-real time computer simulation effort for the Space Station Freedom Electric Power System (EPS) EASY5, a simulation package, is used as the primary tool for this activity. Early in the design of the EPS, two test beds were set up at Lewis. The Integrated Test Bed (ITB), that combines and upgrades these test beds, is in the planning stage. The test beds are designed to functionally represent many of the components of the EPS and their interconnections. The simulation effort is primarily directed towards these test beds. Model verification is performed using test bed data.

Dravid, Narayan V.↗

Development and refinement of test bed simulations

Lewis Research Center of NASA, with support from Rocketdyne, has engaged in a nonreal-time computer simulation effort for the Space Station Freedom Electric Power System (EPS). EASYS, a simulation package, is used as the primary tool for this activity. Early in the design of the EPS, two test beds were set up at Lewis. The Integrated Test Bed (ITB) that combines and upgrades these test beds is in the planning stage. The test beds are designed to functionally represent many of the components of the EPS and their interconnections. The simulation effort is primarily directed towards these test beds. Model verification is performed using test bed data.

Dravid, N. V.↗

Optimized allocation method of the VSC-MTDC system for frequency regulation reserves considering the cost

In recent years, the interconnection of asynchronous power grids through the VSC-MTDC system has been proposed and extensively studied in light of the potential benefits of economical bulk power exchanges and frequency regulation reserves sharing. This paper proposed an optimized allocation method for sharing frequency regulation reserves among the interconnected power systems and the corresponding frequency regulation control of the VSC-MTDC system under emergency frequency deviation events. Firstly, the frequency regulation reserve classification is proposed. In the classification, the available frequency response capacity reserves of each interconnection are divided into commercial reserves and regular reserves. While the commercial reserves are procured through long-term contracts, the regular reserves are purchased based on market prices of frequency regulation services. Secondly, based on the proposed frequency regulation reserve classification, a novel frequency regulation control is then introduced for the VSC-MTDC system. This control method could minimize the costs of the disturbed power grid for the needed frequency response supports from the other power grids. Simulation verifications are performed on a modified IEEE 39 bus system and a highly reduced power system model representing the North American grids. The simulation verification indicates that the developed frequency regulation control significantly reduced ancillary service costs of the disturbed power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Description and simulation of an integrated power and attitude control system concept for space-vehicle application

An Integrated Power and Attitude Control System (IPACS) concept with potential application to a broad class of space missions is discussed. A description is given of the basic concept of combining the onboard energy storage and attitude control functions by storing energy in spinning flywheels which are used to provide control torques. A shuttle-launched Research and Applications Module (RAM) A303B solar-observatory mission having stringent pointing requirements (1.0 arc second) is selected to investigate possible interactions between energy storage and attitude control. A simulation of this spacecraft involving actual laboratory-model control-system hardware is presented. Simulation results are discussed which indicate that the IPACS concept, even in a failure-mode configuration, can readily meet the RAM A303B pointing requirements.

Will, R. W.↗

Off-Road Vehicle Energy-Saving Potential

The U.S. Department of Energy’s (DOE’s) Vehicle Technology Office (VTO) has played a critical role in enabling electrification and reducing fuel consumption in the automotive sector. However, the off-road vehicle sector accounts for 8% of transportation fuel, and that share is likely to increase over time as onroad vehicles move towards electrification. DOE can again play a key role in the off-road vehicle market by providing tools that can be used by academia and the industry to evaluate the impact of advanced technologies. The need for a pre-competitive simulation tool was also identified during a 2019 DOE-led workshop at Argonne National Laboratory that included OEMs and suppliers to this market. Autonomie, a powerful and robust system simulation tool for vehicle energy consumption and performance analysis, was developed by Argonne National Laboratory in collaboration with General Motors. Its application covers energy consumption and performance analysis throughout the entire vehicle development process by leveraging its plug-and-play powertrain and vehicle model architecture and development environment

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗