Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Clinical Decision Support - Overview and Update

We are entering a new era in space exploration to return to the moon and explore Mars. These ambitious goals will require significant changes to in-flight and habitat medical care due to constraints on mass, volume, power, crew time and medical evacuation capabilities. These constraints make it absolutely necessary to develop transformative solutions using new technologies. The Exploration Medical Capability (ExMC) Element of the Human Research Program (HRP) pushes the boundary of space medical systems to advance the care of astronauts on future exploration missions beyond low Earth orbit by identifying and testing next-generation medical care and crew health maintenance technologies. The Clinical Decision Support (CDS) project addresses the gap Medical-701 within the Inflight Medical Conditions risk: Enhance medical capabilities within an exploration medical system. For long-duration, deep space missions, computational and data resources will play an important role in maintaining crew health, wellness and performance where the crew will need to be more self-reliant. The aim of the CDS project is to develop and provide recommended requirements for an in-vehicle CDSS that acts as an assistant for delivering optimal health and performance and medical care during exploration missions. The CDSS is envisioned as a software-based tool that will augment a crewmembers’ knowledge, skills and abilities to assist in decision-making and crew health and performance (CHP) management thus increasing CHP systems capabilities. The human interface will be context aware and lessen the cognitive load to assimilate and use information as well as combine large disparate data sets in such a manner that provides the crew with actionable insight to decisions related to crew medical, health and performance management. Crew autonomy will be provided through a CDS that presents knowledge and data in a context aware manner to augment a crew members’ knowledge, skills and abilities during the process of observation, orientation, decisions and action. The CDS project addresses the need for crew members to operate independently during long duration space exploration missions that require medical Levels of Care (LoC) V, the highest level specified by NASA-STD-3001 and described in more detail by the ExMC interpretation of LoC document (NASA/TM-2017-219290), where significant changes to in-flight and habitat medical care necessitate increasing crew autonomy in decision making and task performance. The CDS project will develop and test a series of iterative and increasingly more complex system prototypes. These annual demonstrations of the data system integration with the crew health and performance domain will inform exploration medical system requirements for an on-board Clinical Decision Support System (CDSS) through a series of use cases that guide CDS prototype functionality. CDS concepts are based on ExMC Concept of Operations documents (presented separately) and will highlight architecture extensibility to other more complex analyses and tests using core crew health and performance integrated data management, processing and visualization capabilities. This approach also establishes how externally developed analyses and approaches could be added to expand a clinical decision support system and thus highlight how a comprehensive system can be commercially and/or globally developed. The CDS project will build upon the concept of an integrated data management approach based on the Medical Data Architecture (MDA) project to more fully address challenges associated with in-flight and habitat medical, health and performance care due to constraints on mass, volume, power, crew time and medical evacuation capabilities required for medical LoC V. These requirements will be derived through systems engineering approaches and software prototype developments over the course of the multi-year CDS project to address crew health and performance decision-making and task performance, often autonomously executed by the crew, in a manner that is consistent with the appropriate medical level of care for the mission. This presentation will provide an overview of the vision for the CDS project and highlight the initial accomplishments in project planning, implementation and requirements identification in fiscal year 2020.

clinical decision support system↗

Industrial Assessment Center Technical Field Manager

The work to be performed involves managing Industrial Assessment Centers through a portfolio of activities. The core activities to be performed are in the general areas of; quality assurance of IAC operations, enhancement of the student IAC experience, program development for improving assessments and implementing smart manufacturing projects, program outreach to carry assessment successes beyond the program, and program integration with other DOE/manufacturing assistance programs. The IAC Technical Field Management Organization (FMO) works in close collaboration with DOE and provides technical management for the IAC program working under policy guidelines established by DOE.

42 ENGINEERING↗

Performance evolution and expectations management: lessons from Tevatron and other machines

We review the LHC luminosity progress in 2010, discuss the luminosity evolution of the Tevatron collider at different stages of the Collider Runs, emphasize general dynamics of the process, compare with the performance of the other colliders analyze planned and delivered luminosity integrals, and discuss the expectation management lessons.

43 PARTICLE ACCELERATORS↗

Quality Assurance Strategy for Existing Homes: Final Quality Management Primer for High Performing Homes

This guide is designed to help Building America (BA) teams understand quality management and its role in transitioning from conventional to high performance home building and remodeling. It explains what quality means, the value of quality management systems, the unique need for QMS when building high performing homes, and the first steps to a implementing a comprehensive QMS. This document provides a framework and context for BA teams when they encounter builders and remodelers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cockpit resource management - Exploring the attitude-performance linkage

Measured attitudes regarding cockpit management were contrasted for pilots whose line flying performance was independently evaluated by check airmen as above or below average. A highly significant discriminant function was obtained indicating that these attitudes are significant predictors of behavior. The performance of 95.7 percent of the pilots was correctly classified by the analysis. Implications of the results for cockpit resource management training and pilot selection are discussed.

Helmreich, R. L.↗

Novel Earned Value Management System Maturity Framework and Its Relation to Project Performance

Earned value management systems (EVMS) are used by industry practitioners to successfully manage projects and programs; however, there has been no past study to characterize and evaluate the impact of EVMS maturity on project performance. This paper introduces a novel framework, developed to measure the EVMS maturity, composed of 56 attributes arrayed across ten subprocesses, which together make up an integrated project/program management system. This paper describes how the framework was conceived and developed, based on literature review and data collected from industry workshops. Then, it examines the relationship between EVMS maturity and ten project performance metrics through statistical analyses. The study analyzed project data from 35 projects and programs worth over $21.8 billion in total cost. For this sample, results showed statistically significant differences between projects with high and low EVMS maturity; on average, projects exhibiting high EVMS maturity have 54% less cost overruns and 19% less change orders versus their performance measurement baseline. Higher maturity projects and programs also achieve better customer satisfaction, meet business objectives more often, and are more often in compliance with EVMS standards and guidelines. This paper contributes to the body of knowledge by providing a practical and novel framework for assessing the maturity of earned value management systems. Practitioners can use the framework to improve their integrated project and program management.

99 GENERAL AND MISCELLANEOUS↗

Dynamic Thermal Management for High-Performance Storage Systems

Thermal-aware design of disk drives is important because high temperatures can cause reliability problems. Dynamic Thermal Management (DTM) techniques have been proposed to operate the disk at the average case temperature, rather than at the worse case by modulating the activities to avoid thermal emergencies. The thermal emergencies can be caused by unexpected events, such as fan-breaks, increased inlet air temperature, etc. One of the DTM techniques is a delay-based approach that adjusts the disk seek activities, cooling down the disk drives. Even if such a DTM approach could overcome thermal emergencies without stopping disk activity, it suffers from long delays when servicing the requests. Thus, in this chapter, we investigate the possibility of using a multispeed disk-drive (called dynamic rotations per minute (DRPM)) that dynamically modulates the rotational speed of the platter for implementing the DTM technique. Using a detailed performance and thermal simulator of a storage system, we evaluate two possible DTM policies (- time-based and watermark-based) with a DRPM disk-drive and observe that dynamic RPM modulation is effective in avoiding thermal emergencies. However, we find that the time taken to transition between different rotational speeds of the disk is critical for the effectiveness of the DRPM based DTM techniques.

99 GENERAL AND MISCELLANEOUS↗

Data base management system analysis and performance testing with respect to NASA requirements

Several candidate Data Base Management Systems (DBM's) that could support the NASA End-to-End Data System's Integrated Data Base Management System (IDBMS) Project, later rescoped and renamed the Packet Management System (PMS) were evaluated. The candidate DBMS systems which had to run on the Digital Equipment Corporation VAX 11/780 computer system were ORACLE, SEED and RIM. Oracle and RIM are both based on the relational data base model while SEED employs a CODASYL network approach. A single data base application which managed stratospheric temperature profiles was studied. The primary reasons for using this application were an insufficient volume of available PMS-like data, a mandate to use actual rather than simulated data, and the abundance of available temperature profile data.

Martin, E. A.↗

FRMAC Laboratory Analysis RadResponder Gap Analysis and Web Portal Enhancements

The Federal Radiological Monitoring and Assessment Center (FRMAC) relies on accurate and defensible analytical laboratory data to support its mission. FRMAC Laboratory Analysis personnel are responsible for (1) receiving samples, (2) managing samples, and (3) providing data quality assurance. Currently, the RadResponder software application does not meet all these needs. With some modifications, RadResponder could meet the needs for sample receiving functions, but it does not meet the needs of sample management and data quality assurance functions. The FRMAC Laboratory Analysis team has discussed and reviewed the following options moving forward: Option 1: Make minor revisions to RadResponder to improve sample receiving capability, purchase and configure a commercial laboratory information management system (LIMS) to perform sample management and data quality assurance, and build an interface between RadResponder and the commercial-off-the-shelf LIMS. Option 2: Make major revisions to RadResponder for all FRMAC Laboratory Analysis functions to support required sample management and data quality assurance activities. Option 3: Create a custom-built LIMS system to interface with RadResponder. Note: All three options will require the development of a Laboratory Analysis web portal and will require funding for ongoing maintenance and training. The FRMAC Laboratory Analysis team highly recommends Option 1 as the best and most efficient path forward. Commercial-off-the-shelf LIMS products have been proven successful in the laboratory community for decades. Option 1 leverages these proven technologies and takes advantage of RadResponder's current strengths.

61 RADIATION PROTECTION AND DOSIMETRY↗

Preliminary performance assessment for the Waste Management Area C at the Hanford site in southeast Washington - 15331

A performance assessment of Single-Shell Tank Waste Management Area C located at the U.S. Department of Energy's Hanford Site in southeastern Washington is being conducted to satisfy the requirements of the Hanford Federal Facility Agreement and Consent Order, as well as other Federal requirements and State-approved closure plans and permits. The Waste Management Area C performance assessment assesses the fate, transport, and impacts of radionuclides and hazardous chemicals within residual wastes left in tanks and ancillary equipment and facilities in their assumed closed configuration and the subsequent risks to humans into the far future. The part of the performance assessment focused on radiological impacts is being developed to meet the requirements for a closure authorization under U.S. Department of Energy Order 435.1 that include a waste incidental to reprocessing determination for residual wastes remaining in tanks, ancillary equipment, and facilities. An additional part of the performance assessment will evaluate human health and environmental impacts from hazardous chemical inventories in residual wastes remaining in Waste Management Area C tanks, ancillary equipment, and facilities needed to meet the requirements for permitted closure under the Resource Conservation and Recovery Act of 1976. Preliminary results of the performance assessment are evaluating the groundwater and air pathways to determine radiation exposure once radionuclides are released to the environment due to degradation of the engineered barriers. Per DOE Order 435.1, results of the preliminary analyses are being compared to the performance objectives during the 1,000-year post-closure period of compliance. Per the Order, performance assessment results are also being compared to the performance measures related to acute and chronic inadvertent intruder analyses and groundwater protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NEAMS Nuclear Waste Management IPSC : evaluation and selection of tools for the quality environment.

The objective of the U.S. Department of Energy Office of Nuclear Energy Advanced Modeling and Simulation Nuclear Waste Management Integrated Performance and Safety Codes (NEAMS Nuclear Waste Management IPSC) is to provide an integrated suite of computational modeling and simulation (M&S) capabilities to quantitatively assess the long-term performance of waste forms in the engineered and geologic environments of a radioactive-waste storage facility or disposal repository. These M&S capabilities are to be managed, verified, and validated within the NEAMS Nuclear Waste Management IPSC quality environment. M&S capabilities and the supporting analysis workflow and simulation data management tools will be distributed to end-users from this same quality environment. The same analysis workflow and simulation data management tools that are to be distributed to end-users will be used for verification and validation (V&V) activities within the quality environment. This strategic decision reduces the number of tools to be supported, and increases the quality of tools distributed to end users due to rigorous use by V&V activities. This report documents an evaluation of the needs, options, and tools selected for the NEAMS Nuclear Waste Management IPSC quality environment. The objective of the U.S. Department of Energy (DOE) Office of Nuclear Energy Advanced Modeling and Simulation Nuclear Waste Management Integrated Performance and Safety Codes (NEAMS Nuclear Waste Management IPSC) program element is to provide an integrated suite of computational modeling and simulation (M&S) capabilities to assess quantitatively the long-term performance of waste forms in the engineered and geologic environments of a radioactive-waste storage facility or disposal repository. This objective will be fulfilled by acquiring and developing M&S capabilities, and establishing a defensible level of confidence in these M&S capabilities. The foundation for assessing the level of confidence is based upon the rigor and results from verification, validation, and uncertainty quantification (V&V and UQ) activities. M&S capabilities are to be managed, verified, and validated within the NEAMS Nuclear Waste Management IPSC quality environment. M&S capabilities and the supporting analysis workflow and simulation data management tools will be distributed to end-users from this same quality environment. The same analysis workflow and simulation data management tools that are to be distributed to end-users will be used for verification and validation (V&V) activities within the quality environment. This strategic decision reduces the number of tools to be supported, and increases the quality of tools distributed to end users due to rigorous use by V&V activities. NEAMS Nuclear Waste Management IPSC V&V and UQ practices and evidence management goals are documented in the V&V Plan. This V&V plan includes a description of the quality environment into which M&S capabilities are imported and V&V and UQ activities are managed. The first phase of implementing the V&V plan is to deploy an initial quality environment through the acquisition and integration of a set of software tools. An evaluation of the needs, options, and tools selected for the quality environment is given in this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operator Performance Evaluation of Fault Management Interfaces for Next-Generation Spacecraft

In the cockpit of the NASA's next generation of spacecraft, most of vehicle commanding will be carried out via electronic interfaces instead of hard cockpit switches. Checklists will be also displayed and completed on electronic procedure viewers rather than from paper. Transitioning to electronic cockpit interfaces opens up opportunities for more automated assistance, including automated root-cause diagnosis capability. The paper reports an empirical study evaluating two potential concepts for fault management interfaces incorporating two different levels of automation. The operator performance benefits produced by automation were assessed. Also, some design recommendations for spacecraft fault management interfaces are discussed.

Hayashi, Miwa↗

Transmittal of the Calculation Package that Supports the Analysis of Performance of the Environmental Management Waste Management Facility Oak Ridge, Tennessee (Based 5-Cell Design Issued 8/14/09)

This document presents the results of an assessment of the performance of a build-out of the Environmental Management Waste Management Facility (EMWMF). The EMWMF configuration that was assessed includes the as-constructed Cells 1 through 4, with a groundwater underdrain that was installed beneath Cell 3 during the winter of 2003-2004, and Cell 5, whose proposed design is an Addendum to Remedial Design Report for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee, DOE/OR/01-1873&D2/A5/R1. The total capacity of the EMWMF with 5 cells is about 1.7 million cubic yards. This assessment was conducted to determine the conditions under which the approved Waste Acceptance Criteria (WAC) for the EMWMF found in the Attainment Plan for Risk/Toxicity-Based Waste Acceptance Criteria at the Oak Ridge Reservation, Oak Ridge, Tennessee [U.S. Department of Energy (DOE) 2001a], as revised for constituents added up to October 2008, would remain protective of public health and safety for a five-cell disposal facility. For consistency, the methods of analyses and the exposure scenario used to predict the performance of a five-cell disposal facility were identical to those used in the Remedial Investigation and Feasibility Study (RI/FS) and its addendum (DOE 1998a, DOE 1998b) to develop the approved WAC. To take advantage of new information and design changes departing from the conceptual design, the modeling domain and model calibration were upaded from those used in the RI/FS and its addendum. It should be noted that this analysis is not intended to justify or propose a change in the approved WAC.

54 ENVIRONMENTAL SCIENCES↗

Software design specification. Part 2: Orbital Flight Test (OFT) detailed design specification. Volume 3: Applications. Book 2: System management

The functions performed by the systems management (SM) application software are described along with the design employed to accomplish these functions. The operational sequences (OPS) control segments and the cyclic processes they control are defined. The SM specialist function control (SPEC) segments and the display controlled 'on-demand' processes that are invoked by either an OPS or SPEC control segment as a direct result of an item entry to a display are included. Each processing element in the SM application is described including an input/output table and a structured control flow diagram. The flow through the module and other information pertinent to that process and its interfaces to other processes are included.

Source record↗

A High Performance Computing Scheduling and Resource Management Primer

This primer introduces the concepts of High Performance Computing, scheduling, and resource management. It focuses first on the state of the art and then introduces the issues under consideration in the design of a next generation resource manager known as Flux. The Flux design addresses not just the challenges of resource management at a much larger scale of systems, but it also enables and promotes a much broader and richer model that invites collaboration with areas whose requirements cannot be met in current systems.

97 MATHEMATICS AND COMPUTING↗

A failure management prototype: DR/Rx

This failure management prototype performs failure diagnosis and recovery management of hierarchical, distributed systems. The prototype, which evolved from a series of previous prototypes following a spiral model for development, focuses on two functions: (1) the diagnostic reasoner (DR) performs integrated failure diagnosis in distributed systems; and (2) the recovery expert (Rx) develops plans to recover from the failure. Issues related to expert system prototype design and the previous history of this prototype are discussed. The architecture of the current prototype is described in terms of the knowledge representation and functionality of its components.

Hammen, David G.↗

Management Challenges in Developing Performance Assessments and Effectively Communicating Their Results - 13612

The end of the Cold War has left a legacy of approximately 37 million gallons of radioactive waste in the aging waste tanks at the Department of Energy's Savannah River Site (SRS). A robust program is in place to remove waste from these tanks, treat the waste to separate into a relatively small volume of high level waste and a large volume of low-level waste, and to actively dispose of the low-level waste on-site and close the cleaned waste tanks and associated ancillary structures. To support performance-based, risk-informed decision making, performance assessments have been developed for the low-level waste disposal facility and for the SRS Tank Farms. Although these performance assessments share many similar features, the nature of the hazards and associated containments differ. As a management team, we are challenged to effectively communicate both the similarities and differences of these performance assessments, how they should be used to support sound decision making for treatment, disposal and waste tank cleaning decisions, and in defending their respective assumptions to the regulatory community and the public but, equally important, to our own corporate decision makers and operations personnel. Effective development and defense of these performance assessments, and effective interpretation and communication of the results are key to making cost-effective, pragmatic decisions for the safe disposal of the low-level waste and stabilization and operational closure of the cleaned tanks and associated structures. This paper will focus on the importance and challenges in communicating key attributes, conclusions and operational implications within a company. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗