Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “outage management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Collaborative Distribution System Restoration Planning and Real-Time Dispatch Considering Behind-the-Meter DERs

Modern distribution systems are becoming more resilient against power outages thanks to the flexible generation capacity provided by the increasing integration of distributed energy resources (DERs). Compared to utility-scale DERs, which can be directly controlled by system operators, small-scale, behind-the-meter DERs are much more difficult to coordinate despite being the vast majority. Two major obstacles to the implementation of DERs for service restoration are the coordination of behind-the-meter DERs and the management of uncertainty. In this paper, a novel distribution system restoration strategy is proposed to overcome these two obstacles. The flexibility of be-hind-the-meter DERs is quantified and integrated into the restoration planning models within a hierarchical structure. The model predictive control technique is employed to enable adaptive restoration planning solution adjustments to accommodate fault scenarios and forecast errors. Besides, real-time power dispatch models are proposed to maintain power balance using available DER capability. Comprehensive integration of adaptive restoration planning schemes and real-time dispatch results are achieved through a collaborative restoration framework. Finally, the effectiveness of the proposed restoration strategy is verified through a modified IEEE 123-bus system and a real-world utility system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Land and Atmosphere Near-Real-Time Capability for Earth Observing System

The past decade has seen a rapid increase in availability and usage of near-real-time data from satellite sensors. The EOSDIS (Earth Observing System Data and Information System) was not originally designed to provide data with sufficiently low latency to satisfy the requirements for near-real-time users. The EOS (Earth Observing System) instruments aboard the Terra, Aqua and Aura satellites make global measurements daily, which are processed into higher-level 'standard' products within 8-40 hours of observation and then made available to users, primarily earth science researchers. However, applications users, operational agencies, and even researchers desire EOS products in near-real-time to support research and applications, including numerical weather and climate prediction and forecasting, monitoring of natural hazards, ecological/invasive species, agriculture, air quality, disaster relief and homeland security. These users often need data much sooner than routine science processing allows, usually within 3 hours, and are willing to trade science product quality for timely access. While Direct Broadcast provides more timely access to data, it does not provide global coverage. In 2002, a joint initiative between NASA (National Aeronautics and Space Administration), NOAA (National Oceanic and Atmospheric Administration), and the DOD (Department of Defense) was undertaken to provide data from EOS instruments in near-real-time. The NRTPE (Near Real Time Processing Effort) provided products within 3 hours of observation on a best-effort basis. As the popularity of these near-real-time products and applications grew, multiple near-real-time systems began to spring up such as the Rapid Response System. In recognizing the dependence of customers on this data and the need for highly reliable and timely data access, NASA's Earth Science Division sponsored the Earth Science Data and Information System Project (ESDIS)-led development of a new near-real-time system called LANCE (Land, Atmosphere Near-Real-Time Capability for EOS) in 2009. LANCE consists of special processing elements, co-located with selected EOSDIS data centers and processing facilities. A primary goal of LANCE is to bring multiple near-real-time systems under one umbrella, offering commonality in data access, quality control, and latency. LANCE now processes and distributes data from the Moderate Resolution Imaging Spectroradiometer (MODIS), Atmospheric Infrared Sounder (AIRS), Advanced Microwave Scanning Radiometer Earth Observing System (AMSR-E), Microwave Limb Sounder (MLS) and Ozone Monitoring Instrument (OMI) instruments within 3 hours of satellite observation. The Rapid Response System and the Fire Information for Resource Management System (FIRMS) capabilities will be incorporated into LANCE in 2011. LANCE maintains a central website to facilitate easy access to data and user services. LANCE products are extensively tested and compared with science products before being made available to users. Each element also plans to implement redundant network, power and server infrastructure to ensure high availability of data and services. Through the user registration system, users are informed of any data outages and when new products or services will be available for access. Building on a significant investment by NASA in developing science algorithms and products, LANCE creates products that have a demonstrated utility for applications requiring near-real-time data. From lower level data products such as calibrated geolocated radiances to higher-level products such as sea ice extent, snow cover, and cloud cover, users have integrated LANCE data into forecast models and decision support systems. The table above shows the current near-real-time product categories by instrument. The ESDIS Project continues to improve the LANCE system and use the experience gained through practice to seek adjustments to improve the quality and performance of the system. For example, anGC-compliant Web Map Service (WMS) will be added shortly that will allow users to download geo-referenced MODIS images for arbitrary bounding boxes. Further, an OGC-compliant Web Coverage Service (WCS) will be added later this year that will expedite user access to arbitrary data subsets or re-formatted products. AIRS images are now served through WMS and available in multiple formats (PNG, GeoTIFF, KMZ). NASA has established a LANCE User Working Group to steer the development of the system and create a forum for sharing ideas and experiences that are expected to further improve the LANCE capabilities. The LANCE system has proved a success by satisfying the growing needs of the applications and operational communities for land and atmosphere data in near-real-time. NASA's Earth Sciences Division was able to leverage existing science research capabilities to provide the near-real-time community with products and imagery that support monitoring of disasters in a timely manner.

Murphy, Kevin J.↗

Gateway Autonomy for Enabling Deep Space Exploration

The Gateway spacecraft is an important stepping-stone to exploration of the solar system, integrating commercial and international partners into a tightly coupled system, enabling cislunar activities, and implementing key technologies for missions to Mars. Autonomy is a capability area necessary to handle long communication outages where intervention from Earth is impossible, to prepare to operate with long communication delays that will be common in interplanetary travel, and to make spaceflight more affordable and accessible by reducing sustaining operations costs. The Gateway Concept of Operations states that one of Gateway’s goals is to “focus on infrastructure and systems that will allow autonomous operations aboard the Gateway with robotics, automated systems, advanced communications, and distributed computing.” Gateway’s Vehicle Systems Manager (VSM) and associated Autonomous Spacecraft Management Architecture (ASMA) are key products towards delivering autonomous capability. The primary functions of the control architecture are Mission Management and Timeline Execution, Resource Management, Fault Management, and Vehicle Control and Operation (VCO). In each of these areas, there is an initial level of capability to be delivered at launch, with plans to continue development and grow to greater capability. The initial deployment of VSM will focus on maintaining vehicle safety by focusing on full fault management capabilities and deploying only enough resource and timeline planning functionality to support that. The final deployment of VSM will add significant planning and control optimization functionality to support nominal operations for up to 21 days without ground support, even accommodating fault and failure conditions. While the VSM is the vehicle-level representation of autonomous reasoning, distributed automation is essential to provide the right scope and abstraction of information to process. Module and system support of automation and simplicity of interfaces are two important design paradigms that Gateway is focusing on to garner a systems approach to autonomy. Distribution of reasoning can increase complexity, so Gateway is also taking a strict hierarchical approach to information flow and decision making. VSM is not the only capability necessary to achieve an autonomous spacecraft. Robotics support for maintenance of the spacecraft will be essential to provide continued vehicle functionality even when crew is not present. Technical and programmatic challenges exist when implementing autonomous robotics operations. These challenges include sufficient network flexibility to support data transfer to the rest of the vehicle to coordinate module-to-module robotic walk-offs and finding the proper interfaces to allow sufficient dexterity. Communication system upgrades planned for Gateway include Delay Tolerant Networking to best utilize the complex network of relays that will be part of mature cislunar operations. Distributed computing and management will provide failure tolerance, robustness, and growth of capabilities while still allowing significant reuse of heritage software on heritage systems as well as reuse of common applications across a spacecraft to minimize new development, but this requires adherence to key standards and interfaces. The Gateway program has demonstrated significant progress towards these capabilities and has identified challenges other spacecraft developers should be aware of from the start.

Molly Anderson↗

Gateway Autonomy for Enabling Deep Space Exploration

The Gateway spacecraft is an important stepping-stone to exploration of the solar system, integrating commercial and international partners into a tightly coupled system, enabling cislunar activities, and implementing key technologies for missions to Mars. Autonomy is a capability area necessary to handle long communication outages where intervention from Earth is impossible, to prepare to operate with long communication delays that will be common in interplanetary travel, and to make spaceflight more affordable and accessible by reducing sustaining operations costs. The Gateway Concept of Operations states that one of Gateway’s goals is to “focus on infrastructure and systems that will allow autonomous operations aboard the Gateway with robotics, automated systems, advanced communications, and distributed computing.” Gateway’s Vehicle Systems Manager (VSM) and associated Autonomous Spacecraft Management Architecture (ASMA) are key products towards delivering autonomous capability. The primary functions of the control architecture are Mission Management and Timeline Execution, Resource Management, Fault Management, and Vehicle Control and Operation (VCO). In each of these areas, there is an initial level of capability to be delivered at launch, with plans to continue development and grow to greater capability. The initial deployment of VSM will focus on maintaining vehicle safety by focusing on full fault management capabilities and deploying only enough resource and timeline planning functionality to support that. The final deployment of VSM will add significant planning and control optimization functionality to support nominal operations for up to 21 days without ground support, even accommodating fault and failure conditions. While the VSM is the vehicle-level representation of autonomous reasoning, distributed automation is essential to provide the right scope and abstraction of information to process. Module and system support of automation and simplicity of interfaces are two important design paradigms that Gateway is focusing on to garner a systems approach to autonomy. Distribution of reasoning can increase complexity, so Gateway is also taking a strict hierarchical approach to information flow and decision making. VSM is not the only capability necessary to achieve an autonomous spacecraft. Robotics support for maintenance of the spacecraft will be essential to provide continued vehicle functionality even when crew is not present. Technical and programmatic challenges exist when implementing autonomous robotics operations. These challenges include sufficient network flexibility to support data transfer to the rest of the vehicle to coordinate module-to-module robotic walk-offs and finding the proper interfaces to allow sufficient dexterity. Communication system upgrades planned for Gateway include Delay Tolerant Networking to best utilize the complex network of relays that will be part of mature cislunar operations. Distributed computing and management will provide failure tolerance, robustness, and growth of capabilities while still allowing significant reuse of heritage software on heritage systems as well as reuse of common applications across a spacecraft to minimize new development, but this requires adherence to key standards and interfaces. The Gateway program has demonstrated significant progress towards these capabilities and has identified challenges other spacecraft developers should be aware of from the start.

Molly Anderson↗

Implementation of Increased Salt and Decreased Sludge Volumes in the Defense Waste Processing Facility - 19597

The Savannah River Site (SRS) Liquid Waste System (LWS) safely stores and treats high-level radioactive waste. The LWS consists of 51 waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities such as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). The disposition of high-level waste (HLW) into a glass waste form poured into canisters at the DWPF began in 1996. DWPF processed a sludge only flowsheet until 2008 when the Actinide Removal Process (ARP) and Modular Caustic Side Solvent Extraction Unit (MCU) began treating the salt waste from the underground liquid storage tanks by striking with monosodium titanate (MST) to remove actinides, when necessary to meet downstream acceptance criteria, and removing the MST and entrained sludge solids (SS) by filtration before using an organic solvent to strip the cesium from the salt, creating two new concentrated HLW streams. This change caused the DWPF to begin processing under both a sludge-only and a coupled operations flowsheet where salt streams would only be added when available. This strategy allows for continuous glass canister production at DWPF. Recently, DWPF completed a 10-month melter replacement in December 2017 and the Concentrate, Storage, and Transfer Facility (CSTF) has completed repairs to the 3H Evaporator system. These facility outages have caused delays in preparing the next batch of sludge feed for DWPF. Concurrent with these facility outages, the Salt Waste Processing Facility (SWPF) has been undergoing system testing and commissioning, working toward startup. SWPF is designed to process salt waste in the same manner as ARP/MCU, but with much higher throughput volumes produced per unit time. In order to process the SWPF salt streams efficiently, DWPF will implement a coupled operation only flowsheet. Based on the facility outages mentioned above, efforts have been made to identify strategies to minimize sludge volumes and maximize salt volumes in the DWPF until the next sludge batch is ready for processing in DWPF. Savannah River Remediation (SRR) recently performed an evaluation that examines the effects of reducing the volume of sludge and maximizing the addition of the cesium-rich concentrated salt solution in each Sludge Receipt and Adjustment Tank (SRAT) batch in order to extend the existing sludge batch as long as possible until the next sludge batch is ready. These effects include a reduction of weight percent solids in the DWPF processing vessels, an increase in cycle time, a new canister heat generation value that remains within regulatory limits, and higher gamma source that remains within bulk facility gamma shielding. Balancing the above parameters resulted in a small reduction of sludge volume per SRAT batch under SWPF operation and maximizing the salt volumes for both ARP/MCU and SWPF operation. This slight reduction in sludge volume and increase in salt volumes allows SRR to mitigate some of the schedule impact incurred by the facility outages. This strategy was evaluated for both ARP/MCU and SWPF operation. This strategy has been successfully implemented under ARP/MCU operation using small step changes in the current process. This paper provides an overview of the evaluation performed for DWPF with ARP/MCU and DWPF with SWPF operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned for Responsible Use of Cloud in the Cirrus Project, Following the CrowdStrike Outage Event

A disruption in CrowdStrike’s Falcon cybersecurity platform on July 19th, 2024, caused worldwide chaos. This event highlights the imperative need for cloud security measures for networks that are critically reliant on cloud technology. This incident negatively impacted air travel, government networks, and critical infrastructure sectors such as hospitals and financial institutions. While no electric utilities had a physical impact, and few had an IT impact, there were issues created by loss of cloud services, and other interrelated industries. For utilities and energy distribution organizations, understanding and mitigating these risks is essential. The Cirrus tool offers a strategic solution engineered to weave cloud integration seamlessly into the fabric of operational management, thereby enhancing resilience and streamlining efficiency in the face of digital challenges.

25 ENERGY STORAGE↗

Enhancing Distribution System Resiliency through a Novel Transactive Energy Systems Framework

Restoration of end-use loads during bulk transmission system outages is a key challenge for electric utilities. During those outages, utilities often do not have enough resources to fully restore the end-use loads. Additionally, not all available switching options are feasible due to voltage and load limits. Incentivizing non-utility flexible assets to provide their flexibility during resiliency events is a potential solution to improve resiliency. This paper presents a new transactive energy system framework (TESF) to incentivize distributed energy resources (DERs) to provide reactive power for supporting the self-healing functions of distribution management system (DMS). TESF engages non-utility DERs during resiliency events by incentivizing them through transactive signals computed using marginal cost of producing reactive power and marginal benefit of additional switching operations. TESF calculates additional switching options, which DMS then leverages to identify new optimal switching plans to restore additional loads. Test system consisting of multiple IEEE-13 node distribution feeders is used to demonstrate the performance of the proposed method. For the given system configuration and use-case, TESF results in 24.82 % additional load restoration and one additional switching operation.

Distribution system, reconfiguration, resiliency, ↗

Foundational Report Series: Advanced Distribution Management Systems for Grid Modernization, Business Case Calculations for DMS

Distribution Management System (DMS) applications require a substantial commitment of technical and financial resources. In order to proceed beyond limited-scale demonstration projects, utilities must have a clear understanding of the business case for committing these resources that recognizes the total cost of ownership. Many of the benefits provided by investments in DMSs do not translate easily into monetary terms, making cost-benefit calculations difficult. For example, Fault Location Isolation and Service Restoration (FLISR) can significantly reduce customer outage duration and improve reliability. However, there is no well-established and universally-accepted procedure for converting these benefits into monetary terms that can be compared directly to investment costs. This report presents a methodology to analyze the benefits and costs of DMS applications as fundamental to the business case.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A methodology for determining the dynamic exchange of resources in nuclear fuel cycle simulation

We report simulation of the nuclear fuel cycle can be performed using a wide range of techniques and methodologies. Past efforts have focused on specific fuel cycles or reactor technologies. The CYCLUS fuel cycle simulator seeks to separate the design of the simulation from the fuel cycle or technologies of interest. In order to support this separation, a robust supply–demand communication and solution framework is required. Accordingly an agent-based supply-chain framework, the Dynamic Resource Exchange (DRE), has been designed implemented in CYCLUS. It supports the communication of complex resources, namely isotopic compositions of nuclear fuel, between fuel cycle facilities and their managers (e.g., institutions and regions). Instances of supply and demand are defined as an optimization problem and solved for each timestep. Importantly, the DRE allows each agent in the simulation to independently indicate preference for specific trading options in order to meet both physics requirements and satisfy constraints imposed by potential socio-political models. To display the variety of possible simulations that the DRE enables, example scenarios are formulated and described. Important features include key fuel-cycle facility outages, introduction of external recycled fuel sources (similar to the current mixed oxide (MOX) fuel fabrication facility in the United States), and nontrivial interactions between fuel cycles existing in different regions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Makah Tribe Strategic Energy Plan

The U.S. Department of Energy’s (DOE) Energy Transitions Initiative Partnership Project (ETIPP) connects remote and island communities, regional partners, and the DOE national laboratories to support communities as they seek to build resilience in their energy systems. The Makah Tribe faces several energy challenges, including frequent power outages and the potential for an extended outage due to an earthquake or tsunami. The Tribe joined ETIPP in 2022 to address those challenges, seeking to build energy resilience and sovereignty in the community. The Makah Tribe, Spark Northwest, the Pacific Northwest National Laboratory (PNNL), and the National Renewable Energy Laboratory (NREL) collaborated to develop a strategic energy plan as part of the second cohort of ETIPP communities. The long-term energy vision of the Makah Tribe includes increasing energy efficiency in the community, improving energy management capacity, and developing the renewable energy generation and storage sufficient to independently power the Reservation for one year. Additionally, the ETIPP team worked with Makah leadership, staff, and community members to identify a set of community priorities, values, and goals to guide energy development as the Tribe takes the incremental steps toward their vision for energy sovereignty. Those energy values include ecosystem-based management, energy sovereignty and project ownership, workforce development and capacity, economic opportunity, community wellbeing and priorities, and emergency disaster resilience. To understand what would be needed for a year for energy independence, the PNNL team conducted an assessment to determine the current energy usage of the Tribe and also modeled several scenarios for future energy use. Using the energy usage values, the team estimated how two types of renewable energy technology, specifically locally deployed solar and small-scale wind, could contribute towards the energy independence goal. The energy baseline and resource assessment produced the following key findings:

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A digital twin platform for building performance monitoring and optimization: Performance simulation and case studies

Advancements in sensor technology, data analytics, affordable compute, and communication infrastructure have paved the way for Digital Twin technology in optimizing building operations and controls. This study presents the development of an open and interoperable web-based Digital Twin platform for integrating diverse data streams and facilitating effective user interactions. The platform utilizes modern technologies for the web framework and time-series data management, ensuring scalability and responsiveness. The backend supports seamless integration of diverse data sources and emulators, incorporating data from building sensors and meters, external weather Application Programming Interfaces, and advanced EnergyPlus simulation models of the building and its energy systems including the Distributed Energy Resources that are formulated in Functional Mockup Units. A simulation case study was conducted with FlexLab, a test facility on Lawrence Berkeley National Laboratory campus. The case study includes normal operations, Distributed Energy Resource integration, and power outage scenarios, to illustrate the Digital Twin’s ability to provide critical insights into energy performance and thermal resilience. The results demonstrated the platform’s potential as a decision-support tool for optimizing building energy performance and enhancing resilience against extreme weather events. Future work will focus on deploying the Digital Twin platform to a real building for field validation, extending its capabilities to cover more scenarios such as bidirectional Electric Vehicle interactions, and enhancing user engagement.

EnergyPlus↗

Relationship between Weather, Traffic and Delay Based on Empirical Methods

The steady rise in demand for air transportation over the years has put much emphasis on the need for sophisticated air traffic flow management (TFM) within the National Airspace System (NAS). The NAS refers to hardware, software and people, including runways, radars, networks, FAA, airlines, etc., involved in air traffic management (ATM) in the US. One of the metrics that has been used to assess the performance of NAS is the actual delays provided through FAA's Air Traffic Operations Network (OPSNET). The OPSNET delay data includes those reportable delays, i.e. delays of 15 minutes or more experienced by Instrument Flight Rule (IFR) flights, submitted by the FAA facilities. These OPSNET delays are caused by the application of TFM initiatives in response to, for instance, weather conditions, increased traffic volume, equipment outages, airline operations, and runway conditions. TFM initiatives such as, ground stops, ground delay programs, rerouting, airborne holding, and miles-in-trail restrictions, are actions which are needed to control the air traffic demand to mitigate the demand-capacity imbalance due to the reduction in capacity. Consequently, TFM initiatives result in NAS delays. Of all the causes, weather has been identified as the most important causal factor for NAS delays. Therefore, in order to accurately assess the NAS performance, it has become necessary to create a baseline for NAS performance and establish a model which characterizes the relation between weather and NAS delays.

Sridhar, Banavar↗

Environmental Cracking and Irradiation Resistant Stainless Steels by Additive Manufacturing

Metal additive manufacturing (AM), or metal 3D printing is an emergent advanced manufacturing method that can create near net shape geometries directly from computer models. This technology can provide the capability to rapidly fabricate complex parts that may be required to enhance the integrity of reactor internals components. Such opportunities may be observed during a plant refueling outage and AM parts can be rapidly custom designed, manufactured and deployed within the outage interval. Additive manufacturing of stainless steel (SS) components can add business benefits on fast delivery on repair hardware, installation tooling, new design prototypes tests, etc. For the nuclear industry, the supply chain is always an issue for reactor service. AM can provide through-life supply chain (40-60 years) for high-value low-volume components. In the meantime, the capability of generating complex geometries and functional gradient materials will improve the performance, reduce the overall component cost, plant asset management cost and increase the plant reliability by the improvement in materials performance in nuclear environments. While extensive work has been conducted regarding additively manufacturing of austenitic SS parts, most efforts focused only on basic attributes such as porosity, residual stress, basic tensile properties, along with components yield and process monitoring. Little work has been done to define and evaluate the material requirements for nuclear applications. Technical gaps exist, which limit this technology adoption in the nuclear industry, which includes high manufacturing cost, unknown risks, limited nuclear related data, lack of specification and qualification methods, and no prior business experience. The main objective of this program was to generate research data to address all these technical gaps and establish a commercial practice to use AM technology in the nuclear power industry. The detailed objectives are listed as follows: (1) Evaluate nuclear related properties of AM 316L SS, including microstructure, tensile properties, impact toughness, stress corrosion cracking (SCC), corrosion fatigue (CF), irradiation effects, and irradiation assisted stress corrosion cracking (IASCC). (2) Understand the correlations among laser processing, heat treatment, microstructure and SCC/irradiation properties; (3) Optimize and improve the manufacturing process to achieve enhanced nuclear application properties; (4) Fabricate, evaluate, qualify and test a prototype reactor component to demonstrate the commercial viability and cost benefit; (5) Create regulatory approval path and commercialization plans for the production of a commercial reactor component.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Wind Energy Management System Integration Project Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation) and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. In order to improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively, by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. In this report, a new methodology to predict the uncertainty ranges for the required balancing capacity, ramping capability and ramp duration is presented. Uncertainties created by system load forecast errors, wind and solar forecast errors, generation forced outages are taken into account. The uncertainty ranges are evaluated for different confidence levels of having the actual generation requirements within the corresponding limits. The methodology helps to identify system balancing reserve requirement based on a desired system performance levels, identify system “breaking points”, where the generation system becomes unable to follow the generation requirement curve with the user-specified probability level, and determine the time remaining to these potential events. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (California ISO) real life data have shown the effectiveness of the proposed approach. A tool developed based on the new methodology described in this report will be integrated with the California ISO systems. Contractual work is currently in place to integrate the tool with the AREVA EMS system.

17 WIND ENERGY↗

Web Proxy Auto Discovery for the WLCG

All four of the LHC experiments depend on web proxies (that is, squids) at each grid site to support software distribution by the CernVM FileSystem (CVMFS). CMS and ATLAS also use web proxies for conditions data distributed through the Frontier Distributed Database caching system. ATLAS & CMS each have their own methods for their grid jobs to find out which web proxies to use for Frontier at each site, and CVMFS has a third method. Those diverse methods limit usability and flexibility, particularly for opportunistic use cases, where an experiment’s jobs are run at sites that do not primarily support that experiment. This paper describes a new Worldwide LHC Computing Grid (WLCG) system for discovering the addresses of web proxies. The system is based on an internet standard called Web Proxy Auto Discovery (WPAD). WPAD is in turn based on another standard called Proxy Auto Configuration (PAC). Both the Frontier and CVMFS clients support this standard. The input into the WLCG system comes from squids registered in the ATLAS Grid Information System (AGIS) and CMS SITECONF files, cross-checked with squids registered by sites in the Grid Configuration Database (GOCDB) and the OSG Information Management (OIM) system, and combined with some exceptions manually configured by people from ATLAS and CMS who operate WLCG Squid monitoring. WPAD servers at CERN respond to http requests from grid nodes all over the world with a PAC file that lists available web proxies, based on IP addresses matched from a database that contains the IP address ranges registered to organizations. Large grid sites are encouraged to supply their own WPAD web servers for more flexibility, to avoid being affected by short term long distance network outages, and to offload the WLCG WPAD servers at CERN. The CERN WPAD servers additionally support requests from jobs running at non-grid sites (particularly for LHC@Home) which it directs to the nearest publicly accessible web proxy servers. Furthermore, the responses to those requests are geographically ordered based on a separate database that maps IP addresses to longitude and latitude.

97 MATHEMATICS AND COMPUTING↗

Resilient Solar and Storage Roadmap

Resilience to natural disasters is imperative for safe, economically productive cities. In the immediate aftermath of an earthquake, flood, or other disaster, one key element of resilience is continued operation of shelters and critical emergency management facilities. Operation of these facilities depends on reliable emergency power. Traditional emergency power systems use diesel generators with storage tanks, which provide power for only a few days in the absence of the electric or gas grid. However, a recent study has shown that gas and electric networks can require days or weeks to recover from a disaster, leaving facilities with generators at risk of running out of fuel. This has already been experienced in New York City after Hurricane Sandy where a combination of lengthy outages and high flood waters compromised the traditional diesel storage and generator backup infrastructure at hospitals and shelters. With the risk of natural disasters increasing due to climate change, we must turn to more resilient solutions for providing backup power to shelters, medical centers, and emergency operations centers. From 2015 to 2017, the City and County of San Francisco Solar and Storage for Resilience Project examined the use of microgrids and stand-alone solar electric generation with battery storage to provide resilient post-disaster power to critical facilities. The project evaluated 1,263 potential congregation and shelter sites across the city, 67 of which were identified as shelter sites with power requirements and opportunities to develop resilient infrastructure through solar and storage. Site visits were conducted for 18 of these buildings, spanning all 11 supervisor districts in San Francisco and a range of normal and emergency use types. The project team used observations from these site visits to create representative emergency power profiles for all 67 shelters in San Francisco. Using these profiles, the team found that 8.2 megawatts (MW) of photovoltaic panels and 12.9 MW of battery storage would be required to provide resilient backup power for San Francisco’s shelters following a disaster. Given the high capital cost of deploying this large resource, the project team investigated various financing options — a public-private partnership was found to be a viable pathway for financing resilient solar and storage. Given the added benefit of energy cost savings in normal operation, a public-private partnership financing model would save the City and County of San Francisco 6% over a traditional design-bid-build approach over a 20-year portfolio lifetime. This roadmap documents the project’s steps of identifying critical facilities, surveying power requirements, assessing renewable potential, evaluating financing options to develop the solar and storage systems for resiliency, and modeling individual sites for solar and storage installation. This roadmap also examines the challenges critical facilities face in providing resilient power, such as key technical, political, and financing barriers, as well as the opportunities and policy recommendations to further advance resilient solar and storage development in San Francisco. While this report focuses on a detailed study of San Francisco, the methods and outcomes are applicable to any city or town.

14 SOLAR ENERGY↗

Solar and Energy Storage for Resiliency

Facilitated by a grant from the U.S. Department of Energy, the San Francisco Department of the Environment (SF Environment) is working to overcome regulatory, financial and technical barriers and create a roadmap to build resilience through the implementation of solar with energy storage. One key element of resilience is ensuring the continued operation of shelters and critical emergency management facilities in the immediate aftermath of an earthquake, flood, or other disaster, such as a nearby wildfire. To mitigate interruptions to emergency power at these facilities, the City and County of San Francisco (the “City”) has established “on call” contracts with national diesel generator suppliers. However, relying solely on these suppliers poses significant risks to the City, because the supply of diesel generators in San Francisco may be limited when they are most needed, especially during hurricane season when coastal states face an increased risk of power outages. Furthermore, although diesel generators can provide a few days of power when the electric grid is down, they rely on fuel to do so, and fuel supplies can be interrupted by disasters. To help the City address these challenges, a Resilient Solar and Storage Roadmap study was completed in 2017 that investigated the use of microgrids and standalone solar electric generation with battery storage at emergency shelters. The study identified 67 facilities across the City where solar and battery storage systems could be installed. Out of the 67 facilities, 42 are classified as community shelters, where people can live temporarily and receive medical attention for nonserious injuries, and 25 are libraries where people can gather and have free access to communication/information channels (internet access for communication, news, etc.). At present, none of the emergency shelter facilities have back-up power or generators on site. The Solar and Energy Storage for Resilience project (the “Project) is intended to provide electricity to 67 emergency shelters within the City in the wake of a disaster, by implementing stand-alone solar power generation with battery storage. This report aims to provide an assessment of the economic value and resilience benefits derived from the implementation of a solar and energy storage system at emergency shelters. This assessment is based on quantifiable metrics and grounded in a proven economic benefit-cost analysis (BCA) methodology, which help decision makers assess whether the benefits of a project or policy exceed its total costs from a societal perspective. This is a first-of -its-kind study and it is not meant to be comprehensive. The Project Team hopes that other organizations/municipalities will use this report as a reference and refine it for use in future economic assessments on resiliency at emergency shelters. While the report focuses on a study for the City and County of San Francisco, the methods are applicable to any city or town. The analysis is intended to help the City better prepare for the next large-scale grid outage by weighing the benefits and costs of implementing a solar energy system.

14 SOLAR ENERGY↗

2015 Summary Report on Industrial and Regulatory Engagement Activities

The Advanced Instrumentation, Information, and Control (II&C) Systems Technologies pathway of the Light Water Reactor Sustainability(LWRS) Program conducts a vigorous engagement strategy with the U.S. nuclear power industry, including the nuclear operating companies, major support organizations, the Nuclear Regulatory Commission (NRC), and suppliers. The goal of this engagement strategy is to develop a shared vision and common understanding across the nuclear industry of the need for II&C modernization, the performance improvement that can be obtained, and the opportunities for collaboration to enact this vision. The primary means of engaging the nuclear operating companies is through a Utility Working Group (UWG), composed of utility representatives that participate in formal meetings and bi-monthly phone calls to provide input on nuclear plant needs and priorities for II&C technologies. Two working groups were initiated during FY 2015 to provide a means for UWG members to focus on particular technologies of interest. The Outage Improvement Working Group consists of eight utilities that participate in periodic conference calls and have access to a share-point web page for acccess to project materials developed in the Advanced Outage Control Center pilot project. In the area of computer-based procedures and automated work packages, the II&C Pathway has worked with the Nuclear Information Technology Strategic Leadership (NITSL) to set up a monthly conference call with interested utility members to discuss various aspects of mobile worker technologies. Twenty one technical and project reports were delivered to the UWG during FY 2015, reflecting the work of the II&C Pathway pilot projects during the year. Distribution of these reports is one of the primary means of transferring to the nuclear industry the knowledge and experience gained during the development of advanced II&C technologies in support of LWR sustainability. Site visits to discuss pilot project activities and future plans were made to Arizona Public Service, Exelon, Duke Energy, Pacific Gas & Electric, SCANA, Southern Nuclear, South Texas Project, STARS Alliance, Tennessee Valley Authority, and Xcel. Discussions were also held on the pathway goals and activities with major industry support organizations during FY 2102, including the Institute of Nuclear Power Operations (INPO), the Nuclear Information Technology Strategic Leadership (NITSL), the Nuclear Energy Institute (NEI), and the Electric Power Research Institute. The Advanced II&C Pathway work was presented at five major industry conferences and Informal discussions were held with key NRC managers at industry conferences. In addition, discussions were held with NRC senior managers on digital regulatory issues through participation on the NEI Digital I&C Working Group. Meetings were held with major industry suppliers and consultants, to explore opportunities for collaboration and to provide a means of pilot project technology transfer. In the international area, discussions were held with Electricite’ de France (EdF) concerning possible collaboration in the area NPP configuration control using intelligent wireless devices.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗