Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “outage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

224 records · Page 13

Decommissioning of Air Sparge System at Vertical Processing Facility, Solid Waste Management Unit 077 Implementation Report

This document discusses the decommissioning of the air sparge (AS) system at the Vertical Processing Facility (VPF), Solid Waste Management Unit 077 at Kennedy Space Center, Florida completed between January 30, 2023, and February 8, 2023. A 2005 Resource Conservation and Recovery Act Facility Investigation identified chlorinated volatile organic compound impacts at the site. Following assessment activities, an AS system was in operation intermittently from April 2012 through October 2017, when the system was permanently shutdown due to equipment failure. Trichloroethene and vinyl chloride remained above their groundwater cleanup target levels in several monitoring wells and the site was moved into the Industrial Area Long Term Monitoring Program. VPF continues to be sampled biennially; the most recent event was May 2022. Successful implementation of this decommissioning project will reduce the risk of accidental AS and soil vapor extraction well damage and will lower operating costs associated with maintaining obsolete AS systems. Decommissioning the AS system at VPF included vegetation clearing to access AS wells and associated piping, abandonment of all on site AS wells, temporary electrical outage, and site restoration. At the completion of demobilization and site restoration activities, the site was returned to its original or better than original condition.

Jason J Bublitz↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Autonomous Navigation of a Lunar Relay Using GNSS and Other Measurements

Many of the highest priority destinations at the Moon lack a continuous view of Earth, such as the lunar poles or lunar far side. Exploration of these sites will require spacecraft in cislunar space to relay communications and provide position, navigation, and timing (PNT) services. Accurate knowledge of relay position, velocity, and time is essential to these services. This paper describes a concept for a PNT Instrument being developed for the Lunar Communications Relay and Navigation Systems (LCRNS) Project. The instrument is intended as a payload that would enable autonomous, on-board, real-time navigation and timing using Global Navigation Satellite System (GNSS), optical navigation, and one-way measurements from Earth-based ground stations. Hardware-in-the-loop simulations using flight software are used to realistically characterize performance on hardware platforms with a path to flight. These results provide preliminary validation of the proposed PNT Instrument, demonstrate the benefits of augmenting GNSS with other measurements, and serve as an insightful reference for the design of future lunar missions, including those that will operate within the LunaNet framework of standards. This instrument concept relies on several technologies developed at NASA Goddard Space Flight Center (GSFC). For GNSS observables, the instrument relies on the high-altitude NavCube 3 mini (NC3m) GNSS receiver specifically designed for cislunar applications. The autoNGC system, which consists of flight software and a hardware platform, is responsible for fusing the observables using its extended Kalman filter, the Goddard Enhanced Onboard Navigation System (GEONS). Optical navigation observables are processed within autoNGC (“autonomous Navigation, Guidance, and Control”) using the Goddard Image Analysis & Navigation Tool (GIANT) which is also responsible for simulating high-fidelity images for test and analysis. In addition to describing the PNT Instrument and its components, the paper will present predicted performance based on simulation results. As a baseline, it will present GNSS-only hardware-in-the loop results using a NC3m test unit to process Spirent-simulated GPS signals in a potential lunar relay trajectory: a 12-hour elliptical frozen lunar orbit (ELFO). GEONS then processes the GPS pseudorange and time differenced carrier phase measurements to estimate and propagate the relay state (position, velocity, and time). These results extend previously published work that showed preliminary ELFO performance. Previous work has shown the importance of other measurement types, so additional simulations are performed which augment GNSS with ground station observables and several methods of optical navigation, including celestial navigation, limb-finding (e.g., observations of the lunar horizon), and terrain relative navigation (TRN). TRN involves correlating simulated predicted images of the lunar surface with actual imagery; misalignments of landmarks identified in each image are translated into relay state updates. TRN is valuable as a measurement of the relay’s state relative to the Moon, especially during GNSS outages or after maneuvers. One-way Pseudorange and Doppler measurements from Earth-based ground stations are also simulated. The full set of observables is processed using autoNGC. These simulations make use of autoNGC and NC3m test units, a lab atomic clock, and a pulse-per-second (PPS) generation and distribution system. This combination of subsystems, and the hardware platforms used in this analysis, represents a PNT Instrument that could be flown on a lunar relay. Results from the hardware-in-the-loop simulations presented in this paper provide a preliminary assessment of the achievable navigation performance of this instrument concept. PNT Instrument performance is compared to the GPS-only performance, and a discussion is provided on the apparent merits and challenges of each measurement type.

Ben Ashman↗

ENLIGHTEN: Electrical Network Line Inspection Guided by High-Speed Technology & Electromagnetic Navigation

Natural disasters are a major cause of power outages, primarily due to their damage to power line infrastructure. As a result, the current state of power maintenance, with a heavy reliance on manual labor, is in trouble. Its lack of speed and autonomy must be addressed to ensure power security for households and institutions worldwide. This innovative approach explores how High-Speed Unmanned Aerial Vehicle (HSUAV) technology can inspect power line infrastructure rapidly in response to natural disaster scenarios. The HSUAV technology will be accompanied by enhanced sensory equipment including light detection and ranging (LiDAR), thermal imaging, and electromagnetic field (EMF) navigation. It would also be supplemented by innovative forms of machine learning models and recharging systems to efficiently detect anomalies in power line infrastructure. The proposed system, ENLIGHTEN, can help restore power in affected communities after a devastating natural disaster, greatly improving relief efforts. In the future, ENLIGHTEN can be expanded beyond the United States and shared worldwide, effectively mitigating the consequences on a larger scale.

UAV systems, Power line management, Natural disast↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Localization of Ad-Hoc Lunar Constellations in Communication Failure Modes for Distributed Spacecraft Autonomy

As Lunar missions increase in complexity, inspired by NASA’s Artemis Program, they will require reliable and sufficient Position, Navigation, and Timing (PNT) capability to support the upcoming Lunar users. The navigation service should also be compatible with the smaller platforms, like CubeSats, being sent by the public and private sectors. A non-dedicated, ad-hoc Lunar navigation constellation can provide PNT services on-demand using the non-dedicated swarm assets. Swarm members cooperatively and autonomously localize themselves with minimal interaction from Earth, freeing up valuable bandwidth and ground segment resources. The autonomous localization of Lunar constellations utilizes neighbor two-way intersatellite link (ISL) measurements in a distributed extended Kalman filter (DEKF) system to minimize operating costs. Because the decentralized Lunar PNT system relies on relay communication amongst the agents, network failures or loss of assets among ad-hoc Lunar constellations may impact localization performance. This study presents an evaluation of localization performance under increasing levels of network degradation. A simulation of an ad-hoc Lunar PNT swarm is augmented to include system faults and the impacts of intermittent and permanent failures on localization performance are evaluated. We investigate three potential causes of network degradation: single spacecraft loss, multiple spacecraft loss, and antenna failure. The numerical assessments from the simulation show that the LPNT system under study, based on an autonomous decentralized concept of operation, is highly robust and resilient to communication failures. Minor faults, such as single spacecraft loss, solar interference, technical malfunctions, message delays, and antenna outages, have minimal impact on state estimation, with only a 4.47% and 3.75% degradation in median position error for assets and a representative ground user, respectively, compared to an ideal communication scenario. However, major faults, such as hardware failures or meteor strikes leading to the loss of multiple spacecrafts, are more concerning. The permanent loss of three spacecraft results in a more severe performance degradation, with median position error increasing by 23.3% for assets and 11.7% for a representative ground user, despite the Lunar PNT system remaining functional.

Yeji Kim↗

On-Orbit Measurements of Solar Exclusion Angle for Modular Agile Scalable Optical Terminal (MAScOT) on the ILLUMA-T Mission

The Integrated LCRD Low-Earth Orbit User Modem and Amplifier Terminal (ILLUMA-T) optical communications payload operated on the International Space Station (ISS) for 8 months, concluding in June 2024. ILLUMA-T made the ISS the first space-based user to communicate with NASA’s Laser Communications Relay Demonstration (LCRD). ILLUMA-T was also the first flight demonstration of the Modular, Agile, Scalable Optical Terminal (MAScOT) which will also be used in the Orion Artemis II Optical Communications (O2O) program, where it will provide an optical communications link for the crew aboard the Artemis II mission. Often optical and radio frequency communications systems have outages when they are pointing close to the Sun, where unwanted incident and scattered solar energy significantly reduces or prohibits operations. The MAScOT was designed to reduce the impact of any solar scatter through optical design, material choices, surface treatments and high cleanliness levels. Based on optical scattering models, a solar exclusion angle of 10 degrees was established for ILLUMA-T. This paper presents optical scattering modeling predictions, pre-launch laboratory testing results, and on-orbit measurements of solar scatter at angles ranging from 3 to 25 degrees.

optical communications↗

Science CONOPS for Application of Sport Mission Data to Study Large (~1000KM) Ionospheric Plasma Depletions

The Scintillation Prediction Observations Research Task (SPORT) mission is a single 6U CubeSat space weather satellite planned for an October 2022 launch into an ISS-like orbit. The primary purpose of the SPORT mission is to determine the longitudinal effects on equatorial plasma bubble (EPB) growth resulting from the offset dipole magnetic field of the Earth. By combining field and plasma measurements from SPORT with other low-altitude (i.e., alt < 1000 km) spacecraft, it is possible to investigate large-scale (> 1000 km) EPB structures. The types of investigation made possible by measurements from SPORT and other contemporaneous missions include 1) dynamics of depleted magnetic flux tubes; 2) dynamics of field-aligned EPB expansion versus propagation speed; 3) EPB vertical extent; and 4) EPB temporal evolution. To support these investigation types, the respective modes of conjunctions are: 1) simultaneous intersection of a magnetic flux tube; 2) intersection of magnetic flux tube separated in time; 3) Simultaneous Latitude/Longitude position conjunction; and 4) Non-simultaneous latitude/longitude position conjunction. This paper will summarize the SPORT satellite and data used for Science CONOPS to accomplish these objectives.

Ionospheres↗