Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “multi year plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Electrification Futures Study: Scenarios of Electric Technology Adoption and Power Consumption for the United States

This report is the second in a series of Electrification Futures Study (EFS) publications, a multi-year research project to explore widespread electrification in the future energy system of the United States. The report presents scenarios of electric end-use technology adoption and resulting electricity consumption in the United States. The scenarios are used to characterize changes to end-use sectors under futures with increased electrification and to quantify how those changes might impact the amount and shape of electricity consumption. These scenarios were developed primarily using expert judgment and an energy system accounting framework. Of course, technology adoption will ultimately depend on a set of complex considerations that are not fully assessed using our methodology, but which are discussed extensively throughout the report. These interacting factors include technology and fuel cost trade-offs, infrastructure needs, environmental policies, and consumer preference. Within each of these factors are barriers that might challenge increased electrification - such as higher upfront costs or unfamiliarity with new electric technologies - but also opportunities that could yield greater adoption - such as increased productivity or expanded value streams enabled by electric and/or grid-connected technologies. Understanding and quantifying these factors are needed to both evaluate the implications of a potential increased electrification future and to influence the degree of future electrification. Overall, the report represents an initial step to inform researchers and decision-makers with data and context to plan for a potential future in which electricity powers an expanded share of the U.S. energy economy.This report is the second in a series of Electrification Futures Study (EFS) publications, a multi-year research project to explore widespread electrification in the future energy system of the United States. The report presents scenarios of electric end-use technology adoption in all major sectors - transportation, commercial and residential buildings, and industry - and resulting electricity consumption in the United States. The scenarios are used to characterize changes to end-use sectors under futures with increased electrification and to quantify how those changes might impact the amount and shape of electricity consumption. These scenarios were developed primarily using expert judgment and an energy system accounting framework. Of course, technology adoption will ultimately depend on a set of complex considerations that are not fully assessed using our methodology, but which are discussed extensively throughout the report. These interacting factors include technology and fuel cost trade-offs, infrastructure needs, environmental policies, and consumer preference. Within each of these factors are barriers that might challenge increased electrification - such as higher upfront costs or unfamiliarity with new electric technologies - but also opportunities that could yield greater adoption, such as increased productivity or expanded value streams enabled by electric and grid-connected technologies. Understanding and quantifying these factors are needed to both evaluate the implications of a potential increased electrification future and to influence the degree of future electrification. Overall, the report represents an initial step to inform researchers and decision-makers with data and context to plan for a potential future in which electricity powers an expanded share of the U.S. energy economy.

2050↗

Multi-Resolution UAV Path Replanning for Inspection of Tailings Dams

Autonomous inspection of large and complex structures with a commercial unmanned aerial vehicle (UAV) is a challenging problem that has been addressed in recent years. In this paper, we address the global motion planning problem of creating autonomous inspection missions for UAVs considering photogrammetry constraints. We focus on the inspection of large tailings dams, which are dam structures used to store waste byproducts of mining. Our method uses a prior sparse point cloud of the dam to generate a voxel grid, where paths satisfying photogrammetry constraints are tested for collisions. We then apply the A* algorithm as a local planner to avoid obstacles within the global mission. Moreover, we address the problem of changing routes online by using octree-based multi-resolution grids for efficient and fast pathfinding. Our results, obtained using tridimensional maps of an actual coal mine tailings dam, show that using octrees for multi-resolution motion planning is faster than using a fixed voxel grid in online missions while inspecting large structures.

42 ENGINEERING↗

Large Scale Computing and Storage Requirements for High Energy Physics

The National Energy Research Scientific Computing Center (NERSC) is the leading scientific computing facility for the Department of Energy's Office of Science, providing high-performance computing (HPC) resources to more than 3,000 researchers working on about 400 projects. NERSC provides large-scale computing resources and, crucially, the support and expertise needed for scientists to make effective use of them. In November 2009, NERSC, DOE's Office of Advanced Scientific Computing Research (ASCR), and DOE's Office of High Energy Physics (HEP) held a workshop to characterize the HPC resources needed at NERSC to support HEP research through the next three to five years. The effort is part of NERSC's legacy of anticipating users needs and deploying resources to meet those demands. The workshop revealed several key points, in addition to achieving its goal of collecting and characterizing computing requirements. The chief findings: (1) Science teams need access to a significant increase in computational resources to meet their research goals; (2) Research teams need to be able to read, write, transfer, store online, archive, analyze, and share huge volumes of data; (3) Science teams need guidance and support to implement their codes on future architectures; and (4) Projects need predictable, rapid turnaround of their computational jobs to meet mission-critical time constraints. This report expands upon these key points and includes others. It also presents a number of case studies as representative of the research conducted within HEP. Workshop participants were asked to codify their requirements in this case study format, summarizing their science goals, methods of solution, current and three-to-five year computing requirements, and software and support needs. Participants were also asked to describe their strategy for computing in the highly parallel, multi-core environment that is expected to dominate HPC architectures over the next few years. The report includes a section that describes efforts already underway or planned at NERSC that address requirements collected at the workshop. NERSC has many initiatives in progress that address key workshop findings and are aligned with NERSC's strategic plans.

43 PARTICLE ACCELERATORS↗

SU-E-T-529: Is MFO-IMPT Robust Enough for the Treatment of Head and Neck Tumors? A 2-Year Outcome Analysis Following Proton Therapy On the First 50 Oropharynx Patients at the MD Anderson Cancer Center

Purpose: Multi-field optimization intensity modulated proton therapy (MFO-IMPT) for oropharyngeal tumors has been established using robust planning, robust analysis, and robust optimization techniques. While there are inherent uncertainties in proton therapy treatment planning and delivery, outcome reporting are important to validate the proton treatment process. The purpose of this study is to report the first 50 oropharyngeal tumor patients treated de-novo at a single institution with MFO-IMPT. Methods: The data from the first 50 patients with squamous cell carcinoma of the oropharynx treated at MD Anderson Cancer Center from January 2011 to December 2014 on a prospective IRB approved protocol were analyzed. Outcomes were analyzed to include local, regional, and distant treatment failures. Acute and late toxicities were analyzed by CTCAE v4.0. Results: All patients were treated with definitive intent. The median follow-up time of the 50 patients was 25 months. Patients by gender were male (84%) and female (16%). The average age was 61 years. 50% of patients were never smokers and 4% were current smokers. Presentation by stage; I–1, II–0, III– 9, IVA–37 (74%), IVB–3. 88% of patients were HPV/p16+. Patients were treated to 66–70 CGE. One local failure was reported at 13 months following treatment. One neck failure was reported at 12 months. 94% of patients were alive with no evidence of disease. One patient died without evidence of disease. There were no Grade 4 or Grade 5 toxicities. Conclusion: MFO-IMPT for oropharyngeal tumors is robust and provides excellent outcomes 2 years after treatment. A randomized trial is underway to determine if proton therapy will reduce chronic late toxicities of IMRT.

60 APPLIED LIFE SCIENCES↗

Feedback following the Industry Engagement of the NNSA Unique Identifier and Global Monitoring 5 year plan

The National Nuclear Security Administration s project for developing a unique identifier and a concept for a global monitoring system for UF6 cylinders made significant progress on developing functional requirements and a concept of operation for such a system. The multi-laboratory team is working to define the functional requirements for both the unique identifier and the global monitoring system and to develop a preliminary concept of operations to discuss with key industry stakeholders. Team members began meeting with industry representatives in January 2013 to discuss the preliminary concept and solicit feedback and suggestions. The team has met with representatives from United States Enrichment Corporation, Cameco, URENCO, Honeywell/ConverDyn, and others. This paper presents an overview of the preliminary concept of operations and shares the feedback obtained from the industry engagement meetings.

IAEA↗

Safety & Mission Assurance (SMA) Activities in Support of Artemis I and Plans for Artemis II

The Artemis I mission in 2022 accomplished humanity’s first venture beyond Low-Earth Orbit (LEO) with a human-rated spacecraft in over fifty years. Artemis comprises several key Program elements – Multi-Purpose Crew Vehicle (MPCV) Orion Crew Module, Service Module, Launch Abort System; the Space Launch System (SLS) and the Exploration Ground System (EGS). Much of our human spaceflight experience with crewed lunar missions is captured in historical program documents, but first-hand knowledge is limited to a few spaceflight veterans. Missions to LEO have offered the opportunity of direct, near-instantaneous communications and assistance, and the ability to return to Earth within a matter of hours in case of emergency. Outward-bound missions do not have these features and will require a more autonomous and reliable spacecraft. The assessment of compliance with applicable safety requirements and adequacy of hazard controls and verifications is the responsibility of the MPCV Safety and Engineering Review Panel (MSERP), along with a Joint [NASA/ESA] Safety and Engineering Review Panel (JSERP) for the review of the European Service Module (ESM). The MSERP has two features that are relatively unique amongst NASA safety panels. First, NASA Engineering was added as a Panel co-chair, which enhanced the Engineering organization’s engagement and level of understanding of hazard analysis methodology and results. The MSERP has representation from each office, including Flight Operations Directorate (FOD) and Health and Medical Technical Authority, supporting the Orion Program in addition to the Engineering and Safety Technical Authority co-chairs. Second, the JSERP has a second set of co-chairs from ESA Engineering and ESA Product Assurance and Safety organizations, which recognizes the international arrangement as one of partnership. This paper will focus on SMA processes, activities, and plans for the Orion element and explore unique challenges associated with Artemis II as we approach the flight of the first crewed Orion vehicle.

Paul J. Collier↗

Solar Absorptivity Degradation of Spacecraft Materials Due to UV and Charged Particles in the Gateway Environment

Gateway will be an outpost in cislunar space designed to survive a 15-year mission to support human Moon landings and future deep space exploration. The Gateway Passive Thermal Control System (PTCS) Group has identified charged particle and UV degradation of potential Gateway materials as a knowledge gap for the Near Rectilinear Halo Orbit (NRHO) and transit environment, especially the slow spiral transit planned for the first two modules. Solar absorptivity degradation is important to quantify because the end-of-life absorptivity impacts thermal performance of the system. To address this, ground testing has been completed at NASA Goddard Space Flight Center in which potential Gateway materials, including radiators, multi-layer insulation (MLI), and structural materials are subjected to the expected transit plus 15-year on-orbit charged particle fluence (9.86x1015 protons/cm2 at 2.5 keV and 3.1x1016 electrons/cm2 at 10 keV) and 5093 Equivalent Solar Hours (ESH). Reflectivity of a single sample of each material was measured in atmosphere and in vacuum inside the chamber after exposure to incremental levels of ESH and charged particle fluence. Increase in absorptivity of most samples were seen throughout the test including large differences in absorptivity of materials of the same category. Future planned testing will validate these results and include additional materials of interest.

Optical Property↗

Evaluating Heuristics for Planning Effective and Efficient Inspections

A significant body of knowledge concerning software inspection practice indicates that the value of inspections varies widely both within and across organizations. Inspection effectiveness and efficiency can be measured in numerous ways, and may be affected by a variety of factors such as Inspection planning, the type of software, the developing organization, and many others. In the early 1990's, NASA formulated heuristics for inspection planning based on best practices and early NASA inspection data. Over the intervening years, the body of data from NASA inspections has grown. This paper describes a multi-faceted exploratory analysis performed on this · data to elicit lessons learned in general about conducting inspections and to recommend improvements to the existing heuristics. The contributions of our results include support for modifying some of the original inspection heuristics (e.g. Increasing the recommended page rate), evidence that Inspection planners must choose between efficiency and effectiveness, as a good tradeoff between them may not exist, and Identification of small subsets of inspections for which new inspection heuristics are needed. Most Importantly, this work illustrates the value of collecting rich data on software Inspections, and using it to gain insight into, and Improve, inspection practice.

Shull, Forrest J.↗

Controls and process planning strategies for 5-axis laser directed energy deposition of Ti-6Al-4V using an 8-axis industrial robot and rotary motion

Interest in multi-axis additive manufacturing has grown significantly in recent years due to associated benefits that range from improved quality to support for greater geometric complexity. A method of 5-axis Laser Hot-Wire Directed Energy Deposition is developed and demonstrated in this study using an 8-axis industrial robot, comprised of a 6-axis serial link robot and a 2 degree-of-freedom positioner. Coordinated 5-axis motion is used to print Ti-6Al-4V objects predominantly through build plate rotation. Methods of slicing and toolpath generation are presented, including the use of an alternating toolpath direction philosophy and the manipulation of the CAD model surface normal vectors for determining the required build plate tilt angles for maintaining consistent deposition orientations relative to gravity. Another objective of the study was to determine the limits of conventional slicing and layer height control techniques for printing geometries with significant unsupported overhangs. A comparison is made between the behavior of normal and conformal bead alignment in this regard, and the performance of the layer height controller is reported as it relates to process stability and the limits of printing overhang geometries. Unsupported overhangs were successfully printed at 35° without build plate tilt and 45° with build plate tilt. Toolpath velocity and net-shape printing performance are reported as well, with 3D scans of the printed surfaces used for net-shape characterization. In all, the printing of three geometries is presented, including the overhang geometry, a 5-axis toolpath geometry, and a large-scale, multi-bead demonstrator part, which exceeded 500 mm in height and weighed 44 kg (97 lbs).

36 MATERIALS SCIENCE↗

EEB Hub Regional Sankey Diagram: Philadelphia Authority for Industrial Development Historical and Forecast Energy by Planned Use at the Philadelphia Navy Yard

The Energy Efficient Buildings Hub (EEB Hub) is a DOE-funded center, focused on improving the energy use in commercial and large-scale residential buildings. One of the Hub’s goals has been to develop the means and methods to reduce energy use in commercial buildings by 20 percent by 2020. Understanding energy use in buildings is a key component to managing energy use at multiple scales, from the building to the city, to the region. Sankey diagrams are an accessible tool to visualize energy flows, and help identify opportunities to deploy energy saving technologies. A campus-level Sankey diagram was previously generated from 2010-2011 data for ~100 metered Navy Yard buildings to quantify natural gas and electricity usage by principal building activity. As these properties are renovated, the energy consumption and building principal activities are being updated and modified. To depict the multi-year time lapse of regional electricity distribution in the Navy Yard, LLNL generated Sankey diagrams using data from 36 properties (buildings, developments, equipment) used to develop Philadelphia Authority for Industrial Development’s (PIDC) Navy Yard Master Energy Plan (NYEMP). The diagrams presented in this report depict ~10 building use types and the yearly changes in forecasted usage in GWh from 2011 to 2022. The forecast captures increases in regional energy use from planned building additions and renovations and yearly increases for existing buildings. From 2009 to 2022, there is approximately 5.6 million square feet of planned additions and renovations. The largest addition of properties are for office (~ 2.3 million square feet for dedicated office, and larger for shared office space) and residential space (~1 million square feet). Until 2014, the largest user of energy is for flex space, reaching a forecasted 11.4 GWh. In 2015-2016, the largest forecasted user is for a data center reaching ~25.7 GWh. After 2016, the largest consumers are either for office space (reaching 63.2 GWh forecast in 2022), or heavy industry (68 GWh forecast in 2022).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

50-Year Window to Establish a Space Faring Civilization

Humankind may only have a short window of 50 years to become a space-faring civilization, after which time the opportunity to do so may become too difficult or impractical to pursue. Current policies for space exploration and infrastructure development implicitly assume a gradualistic approach to technology, budgets, and mission execution -- the common thought has been that there will be plenty of time in humankind's future to become a space-based species, and whatever we are unable to accomplish will be borne by the generations that follow. However, considering natural events, available energy, and human tendencies, the timing to make the most effective effort to achieve multi-planet status might be now, before momentum is lost and we become distracted by Peak Oil and changing energy economies -- restarting a space program after such turmoil may be more difficult than would be practical without cheap, storable, high-energy density petroleum. "Space-faring civilization" is defined as an economically profitable space-based economy that demands the presence of humans off-world in order to sustain a high level of prosperity. An initial foothold for a space-based economy that would fit within the 50-year window might include Earth dependence on rare-earth elements or other hard-to-obtain minerals mined from moons or asteroids, or a permanent settlement on another planet. Using published sources, notional mass and energy requirements for a minimal self-sustaining Mars settlement is calculated, and the number of launch vehicles discussed. Setting the launch schedule to match that of current NASA projections, it could take more than 26 years of semi-annual launches to build up such a self-sustaining human settlement -- a cost and commitment that has not been acknowledged nor planned for. Considering the time required to establish a multi-planet species, this paper frames the required window of decision that, if not taken, could condemn the species to Earth subject to whatever natural or human-made calamities that endanger single-planet civilizations.

human exploration↗

Columbia River Treaty 2014/2024 Review: Phase 1 Technical Studies

Since 1964, the Columbia River Treaty has provided significant benefits to the United States and Canada through coordinated river management by the two countries. It remains the standard against which other international water coordination agreements around the world are compared. When the Treaty was negotiated, its goals were to provide significant flood control and power generation benefits to both countries. However, the Treaty contains two provisions that may significantly change these benefits as early as the year 2024. First, in 2024 the 60 years of purchased flood control space in Canadian Treaty projects expires. Instead of a coordinated and managed plan to regulate both Canadian and U.S. projects for flood control, the Treaty calls for a shift to a Canadian operation under which the United States can call upon Canada for flood control assistance. The United States can request this “called upon” assistance as needed but only to the extent necessary to meet forecast flood control needs in the United States that cannot adequately be met by U.S. projects. When called upon is requested, the United States will then have to pay Canada for its operational costs and any economic losses resulting from the called upon flood control operation. Second, while the Treaty has no specified end date, it does allow either Canada or the United States the option to terminate most of the provisions of the Treaty on or after Sept. 16, 2024, with a minimum of 10 years advance written notice. Thus, the year 2024 is the first year a notice of termination would take effect assuming written notice of termination is given by the Canadian or U.S. governments by 2014. Unless the Treaty is terminated or the federal governments elect to modify the Treaty, its provisions continue indefinitely, except for the changes in flood control discussed above. Given the significance of both of these provisions, it is important that the parties to the Treaty understand the implications for post-2024 Treaty planning and Columbia River operations. The U.S. Army Corps of Engineers and the Bonneville Power Administration, the agencies that implement the Treaty in the United States on behalf of the U.S. Entity (see Treaty Governance sidebar), are conducting a multi-year effort to understand these implications. This effort is called the 2014/2024 Columbia River Treaty Review.

Columbia River Treaty, United States, Canada, tech↗

Model Request for Proposals to Provide Energy and other Attributes from an Offshore Wind Power Project

This document provides a model RFP for new generation. The 'base' RFP is for a single-source offshore wind RFP. Required modifications are noted should a state or utility seek multi-source bids (e.g., all renewables or all sources). The model is premised on proposals meeting threshold requirements (e.g., a MW range of generating capacity and a range in terms of years), RFP issuer preferences (e.g., likelihood of commercial operation by a date certain, price certainty, and reduction in congestion), and evaluation criteria, along with a series of plans (e.g., site, environmental effects, construction, community outreach, interconnection, etc.). The Model RFP places the most weight on project risk (45%), followed by project economics (35%), and environmental and social considerations (20%). However, if a multi-source RFP is put forward, the sponsor would need to either add per-MWh technology-specific, life-cycle climate (CO2), environmental and health impact costs to bid prices under the 'Project Economics' category or it should increase the weight given to the 'Environmental and Social Considerations' category.

17 WIND ENERGY↗

Exploration Technologies for Operations

Although the International Space Station (ISS) assembly has been completed, the Operations support teams continue to seek more efficient and effective ways to prepare for and conduct the ISS operations and future exploration missions beyond low earth orbit. This search for improvement has led to a significant collaboration between the NASA research and advanced software development community at NASA Ames Research Center and the Mission Operations community at NASA Johnson Space Center. Since 2001, NASA Ames Research Center has been developing and applying its advanced intelligent systems and human systems integration research to mission operations tools for several of the unmanned Mars missions operations. Since 2006, NASA Ames Research Center has also been developing and applying its advanced intelligent systems and human systems integration research to mission operations tools for manned operations support with the Mission Operations Directorate at NASA Johnson Space Center. This paper discusses the completion of the development and deployment of a variety of intelligent and human systems technologies adopted for manned mission operations. The technologies associated with the projects include advanced software systems for operations and human-centered computing. Human-centered computing looks to the processes and procedures that people do to perform any given job, then attempts to identify opportunities to improve these processes and procedures. In particular, for mission operations, improvements are quantified by specifically identifying how a tool can increase a persons efficiency, enhance a persons functional capability, andor improve the assurance of a persons decisions. The Ames development team has collaborated with the Mission Operations team to identify areas of efficiencies through technology infusion applications in support of the Plan, Train, and Fly activities of human-spaceflight mission operations. The specific applications discussed in this paper are in the areas of mission planning systems, mission operations design modeling and workflow automation, advanced systems monitoring, mission control technologies, search tools, training management tools, spacecraft solar array management, spacecraft power management, and spacecraft attitude planning. We discuss these specific projects between the Ames Research Center and the Johnson Space Centers Mission Operations Directorate, and how these technologies and projects are enhancing the mission operations support for the International Space Station. We also discuss the challenges, problems, and successes associated with long-distance and multi-year development projects between the research team at Ames and the Mission Operations customers at Johnson Space center. Finally, we discuss how these technology infusion applications and underlying technologies might be used in the future to support on-board operations of the crew and spacecraft systems as human exploration expands beyond low earth orbit to destinations in the solar system where communications delays will require more on-board autonomy and planning by the crew. Longer communications delays will require that the ground mission operations support will be primarily strategic in nature, while the tactical level of planning, systems monitoring and control, and failure analysisisolationrecovery will be the responsibility of both the spacecraft autonomous systems and the crew. Our expectation is that the technologies

mission operations↗

Multi-beam operation of LANSCE accelerator facility

The Los Alamos Neutron Science Center (LANSCE) accelerator facility has been in operation for 50 years performing important scientific support for national security. The unique feature of the LANSCE accelerator facility is multi-beam operation, delivering beams to five experimental areas. The near-term plans are to replace obsolete and almost end-of-life systems of the LANSCE linear accelerator with a modern 100-MeV Front End with significant improvement in beam quality. This paper summarizes experimental results obtained during the operation of the LANSCE accelerator facility and considers plans to expand the performance of the accelerator for near- and long-term operations.

47 OTHER INSTRUMENTATION↗

LANSCE Risk Mitigation (LRM) Risk Report for Module 2/FY14 Outage

The LANSCE Risk Mitigation Project (LRM) is a multi-year project being undertaken to increase the operating life-time of the accelerator (LINAC) portion of the LANSCE facility. The FY14 Outage is the first phase of LRM. Final planning for this outage is taking place during FY13. The main technical goal of the FY14 Outage is restoration of the 120 Hz macro-pulse repetition rate capability through the upgrade of the Module 2 portion of the 201 MHz drift tube LINAC (DTL) part of the facility.

42 ENGINEERING↗

Advanced Composite Structures and Materials Technologies for Launch Vehicles

The NASA's Advanced Composites Technologies (ACT) Project has the potential to develop composite materials and structures technologies for the largest composite aerospace structures ever made. The objective the ACT Project of is to develop mid-technology readiness level (TRL) composite materials and structures technologies to TRL 6 for specific heavy lift Ares V launch vehicle and Altair lunar lander applications. To accomplish this objective, the ACT Project has four major technical elements: materials and manufacturing; structural concepts development and assessment of lightweight components; testing and evaluation; and highly loaded composite struts. The Project uses capabilities from across NASA to form multi-disciplinary, cross-center teams to meet the milestones of these technical elements. This presentation will describe the activities and plans for the ACT Project. Studies from the first execution year of the project will be summarized including results from materials selection and structural concept evaluation studies. Plans for continuing activities include studies for nondestructive evaluation/structural health monitoring, damage tolerance, joints, and material and structural testing, and these studies will be described. A major emphasis this fiscal year is the start of work for a manufacturing demonstration barrel. This structure will be composed of six, 5-m-diameter, 3-m-long curved panels that when assembled, result in a 10-m-diameter barrel. Activities related to the development of this structure will also be described.

Mark J Shuart↗

TH-C-BRC-00: Emerging Technologies in SRS/SBRT Delivery

The delivery techniques for SRS/SBRT have been under rapid developments in recent years, which pose new challenges to medical physicists ranging from planning and quality assurance to imaging and motion management. This educational course will provide a general overview of the latest delivery techniques in SRS/SBRT, and discuss the clinical processes to address the challenges of each technique with special emphasis on dedicated gamma-ray based device, robotic x-band linac-based system and conventional C-arm s-band linac-based SRS systems. (1). Gamma-ray based SRS/SRT: This is the gold standard of intracranial SRS. With the advent of precision imaging guidance and frameless patient positioning capabilities, novel stereoscopic CBCT and automatic dose adaption solution are introduced to the Gamma-ray based SRS for the first time. The first North American system has been approved by the US regulatory for patient treatments in the spring of 2016. (2). Robotic SRS/SBRT system: A number of technological milestones have been developed in the past few years, including variable aperture collimator, sequential optimization technique, and the time reduction technique. Recently, a new robotic model allows the option of a multi-leaf collimator. These technological advances have reduced the treatment time and improved dose conformity significantly and could potentially expand the application of radiosurgery for the treatment of targets not previously suitable for robotic SRS/SBRT or fractionated stereotactic radiotherapy. These technological advances have created new demanding mandates on hardware and patient quality assurance (QA) tasks, as well as the need for updating/educating the physicists in the community on these requirements. (3). Conventional Linac based treatments: Modulated arc therapy (MAT) has gained wide popularities in Linac-based treatments in recent years due to its high delivery efficiency and excellent dose conformities. Recently, MAT has been introduced to deliver highly conformal radiosurgery treatments to multiple targets simultaneously via a single isocenter to replace the conventional multi-iso multi-plan treatments. It becomes important to understand the advantages and limitations of this technique, and the pitfalls for implementing this technique in clinical practice. The planning process of single-iso multi-target MAT will be described, and its plan quality and delivery efficiency will be compared with multi-iso plans. The QA process for verifying such complex plans will be illustrated, and pitfalls in imaging and patient set up will be discussed. Overall, this session will focus on the following areas: 1) Update on the emerging technology in current SRS/SBRT delivery. 2) New developments in treatment planning and Quality Assurance program. 3) Imaging guidance and motion management. Learning Objectives: To understand the SRS/SBRT principles and its clinical applications, and gain knowledge on the emerging technologies in SRS/SBRT. To review planning concepts and useful tips in treatment planning. To learn about the imaging guidance procedures and the quality assurance program in SRS/SBRT. National Institutes of Health, Varian Medical System; L. Ren, The presenter is funded by National Institutes of Health and Varian Medical System.

60 APPLIED LIFE SCIENCES↗