Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “mobile resources”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Interactive data line study and experiment

The paper considers the utility of having remote terminals on a Landsat image processing system and the development of efficient data transfer strategies such as data compression. The approach is to link an image processing terminal (located in a mobile van) to a multiuser host computer via the Communications Technology Satellite and a leased phone line. The host computer will share time between the remote state users and local users. The terminal includes a minicomputer, a color video display, and a communications interface, and the user has access to all of the resources of the host facility via the data link. While at present the terminal acts in the display-only mode, the computing capability of the terminal can be varied from display-only up to a stand-alone image processing system. An analysis of trade-offs between data link and remote terminal capacities is described with attention to the evaluation of the system by state users and the selection of a system architecture suitable to unique needs.

Rasmussen, D. N.↗

Space Mobile Network Concepts for Missions Beyond Low Earth Orbit

The Space Mobile Network (SMN) is an architectural framework that will allow for quicker, more efficient and more easily available space communications services, providing user spacecraft with an experience similar to that of terrestrial mobile network users. While previous papers have described SMN concept using examples of users in low-Earth orbit, the framework can also be applied beyond the near-Earth environment.This paper details how SMN concepts such as user-initiated services, which will enable users to request access to high-performance link resources in response to real-time science or operational events, would be applied in and beyond the near-Earth regime. Specifically, the paper explores the application of user-initiated services to direct-to-Earth (DTE), relay, and DTE/relay hybrid scenarios in near-Earth, lunar, martian and other space regimes.

Israel, David J.↗

Space Mobile Network Concepts for Missions Beyond Low Earth Orbit

The Space Mobile Network (SMN) is an architectural framework that will allow for quicker, more efficient and more easily available space communications services, providing user spacecraft with an experience similar to that of terrestrial mobile network users. While previous papers have described SMN concept using examples of users in low-Earth orbit, the framework can also be applied beyond the near-Earth environment. This paper details how SMN concepts such as user-initiated services, which will enable users to request access to high-performance link resources in response to real-time science or operational events, would be applied in and beyond the near-Earth regime. Specifically, the paper explores the application of user-initiated services to direct-to-Earth (DTE), relay, and DTE/relay hybrid scenarios in near-Earth, lunar, Martian and other space regimes.

CubeSat and Autonomy↗

Space Mobile Network Concepts for Missions Beyond Low Earth Orbit

The Space Mobile Network (SMN) is an architectural framework that will allow for quicker, more efficient and more easily available space communications services, providing user spacecraft with an experience similar to that of terrestrial mobile network users. While previous papers have described SMN concept using examples of users in low-Earth orbit, the framework can also be applied beyond the near-Earth environment. This paper details how SMN concepts such as user-initiated services, which will enable users to request access to high-performance link resources in response to real-time science or operational events, would be applied in and beyond the near-Earth regime. Specifically, the paper explores the application of user-initiated services to direct-to-Earth (DTE), relay, and DTE/relay hybrid scenarios in near-Earth, lunar, martian and other space regimes.

Israel, David J.↗

The Training Process of the Organization Development and Training Office

The Organization Development and Training Office provides training and development opportunities to employees at NASA Glenn Research Center, as a division of the Office of Human Resources and Workforce Planning. Center-wide required trainings, new employee trainings, workshops and career development programs are organized by the OD&TO staff. They also arrange all academic, non-academic, headquarters, fellowship and learning center sponsored courses. They also service organizations wishing to work more effectively by facilitating teambuilding exercises. Equal Opportunity programs and upward mobility programs such as the STEP and GO programs for administrative staff. In working with my mentor I am very involved with Cuyahoga Community College classes, mandatory supervisory training and administrative staff workshops. My largest tasks are in the secretarial training category. The Supporting Organizations And Relationships workshop for administrative personnel, commonly known as SOAR, began last year and continued this summer with follow-up workshops. Months before a workshop or class is brought to Glenn, a need has to be realized. In this case, administrative staff did not feel they had an opportunity to receive relevant training and develop skills through teambuilding, networking and communication. A Statement of work is then created as several companies are contacted about providing the training. After the company best suited to meet the target group s needs is selected, the course is announced with an outline of all pertinent information. A reservation for a facility is made and applications or nominations, depending on the announcement s guidelines, are received from interested employees. Confirmations are sent to participants and final preparations are made but there are still several concluding steps. A training office staff member also assists the facilitator with setting up the facility and introducing the class. After the class, participants evaluations are read and summarized to determine the effectiveness of the class and instructor. In addition to the SOAR workshops, I have several projects and daily tasks to complete. Coding training applications, which require me to be familiar with Glenn s budgetary allocations and policies on training, is an ongoing process. It also requires verifying information reported by an employee via her C-478 form, more commonly known as the training application. I am also the point of contact for the Cuyahoga Community College Advising Sessions held here at NASA Glenn which involves coordinating counselors visits with employees schedules. Two databases had to be created. The first database holds information on administrative staff, and the other tracks supervisors training histories. Through these assignments I gained experience in Microsoft Access 2002 and spreadsheet creation, communicating with co-workers, and successfully facilitating a training to serve specific purposes. With trainings and evaluations to assessment them, the Organization Development and Training Office can assure a quality product and continued customer satisfaction.

Johnson, Melissa S.↗

The Kinematic Navigation and Cartography Knapsack (KNaCK): Demonstrating SLAM (Simultaneous Localization and Mapping) LiDAR as a Tool for Exploration and Mapping of Lunar Pits and Caves.

Renewed interest in deep space exploration has made establishing a persistent human presence on the Moon and eventually Mars a priority. Sustained habitation of the Moon will require in-situ resource utilization (ISRU) and protection from radiation at the lunar surface. Lunar caves are of interest to the space community because they could provide shelter from radiation, access to water deposits, and a space for habitation, as well as hold information about the geology, volcanology, and evolution of the Moon. Developing the tools to explore, map, and characterize these voids is key to understanding the Moon as a planetary body and to establishing a permanent human presence there. Our team is currently developing tools that enable ultra-high resolution terrain mapping and navigation using mobile light detection and ranging (LIDAR) technology and simultaneous localization and mapping (SLAM) algorithms in fully GPS-denied and no-light environments. 3D mapping with LiDAR and SLAM is relatively under-used, particularly in the context of planetary exploration and planetary analog environments. The backpack mounted LiDAR instrument currently under development by the KNaCK (Kinematic Navigation and Cartography Knapsack) team has demonstrated the potential of mobile SLAM LiDAR for lunar, planetary, and terrestrial cave exploration, study, and utilization. A description of the instrument and associated SLAM algorithms used for mapping in GPS-denied environments are referenced here.

LiDAR↗

Lunar Applications in Reconfigurable Computing

NASA s Constellation Program is developing a lunar surface outpost in which reconfigurable computing will play a significant role. Reconfigurable systems provide a number of benefits over conventional software-based implementations including performance and power efficiency, while the use of standardized reconfigurable hardware provides opportunities to reduce logistical overhead. The current vision for the lunar surface architecture includes habitation, mobility, and communications systems, each of which greatly benefit from reconfigurable hardware in applications including video processing, natural feature recognition, data formatting, IP offload processing, and embedded control systems. In deploying reprogrammable hardware, considerations similar to those of software systems must be managed. There needs to be a mechanism for discovery enabling applications to locate and utilize the available resources. Also, application interfaces are needed to provide for both configuring the resources as well as transferring data between the application and the reconfigurable hardware. Each of these topics are explored in the context of deploying reconfigurable resources as an integral aspect of the lunar exploration architecture.

Somervill, Kevin↗

A robotic system for automation of logistics functions on the Space Station

Spacecraft inventory management is currently performed by the crew and as systems become more complex, increased crew time will be required to perform routine logistics activities. If future spacecraft are to function effectively as research labs and production facilities, the efficient use of crew time as a limited resource for performing mission functions must be employed. The use of automation and robotics technology, such as automated warehouse and materials handling functions, can free the crew from many logistics tasks and provide more efficient use of crew time. Design criteria for a Space Station Automated Logistics Inventory Management System is focused on through the design and demonstration of a mobile two armed terrestrial robot. The system functionally represents a 0 gravity automated inventory management system and the problems associated with operating in such an environment. Features of the system include automated storage and retrieval, item recognition, two armed robotic manipulation, and software control of all inventory item transitions and queries.

Martin, J. C.↗

A dynamic case-based planning system for space station application

We are currently investigating the use of a case-based reasoning approach to develop a dynamic planning system. The dynamic planning system (DPS) is designed to perform resource management, i.e., to efficiently schedule tasks both with and without failed components. This approach deviates from related work on scheduling and on planning in AI in several aspects. In particular, an attempt is made to equip the planner with an ability to cope with a changing environment by dynamic replanning, to handle resource constraints and feedback, and to achieve some robustness and autonomy through plan learning by dynamic memory techniques. We briefly describe the proposed architecture of DPS and its four major components: the PLANNER, the plan EXECUTOR, the dynamic REPLANNER, and the plan EVALUATOR. The planner, which is implemented in Smalltalk, is being evaluated for use in connection with the Space Station Mobile Service System (MSS).

Oppacher, F.↗

NASA Tech Briefs, March 2014

Topics include: Data Fusion for Global Estimation of Forest Characteristics From Sparse Lidar Data; Debris and Ice Mapping Analysis Tool - Database; Data Acquisition and Processing Software - DAPS; Metal-Assisted Fabrication of Biodegradable Porous Silicon Nanostructures; Post-Growth, In Situ Adhesion of Carbon Nanotubes to a Substrate for Robust CNT Cathodes; Integrated PEMFC Flow Field Design for Gravity-Independent Passive Water Removal; Thermal Mechanical Preparation of Glass Spheres; Mechanistic-Based Multiaxial-Stochastic-Strength Model for Transversely-Isotropic Brittle Materials; Methods for Mitigating Space Radiation Effects, Fault Detection and Correction, and Processing Sensor Data; Compact Ka-Band Antenna Feed with Double Circularly Polarized Capability; Dual-Leadframe Transient Liquid Phase Bonded Power Semiconductor Module Assembly and Bonding Process; Quad First Stage Processor: A Four-Channel Digitizer and Digital Beam-Forming Processor; Protective Sleeve for a Pyrotechnic Reefing Line Cutter; Metabolic Heat Regenerated Temperature Swing Adsorption; CubeSat Deployable Log Periodic Dipole Array; Re-entry Vehicle Shape for Enhanced Performance; NanoRacks-Scale MEMS Gas Chromatograph System; Variable Camber Aerodynamic Control Surfaces and Active Wing Shaping Control; Spacecraft Line-of-Sight Stabilization Using LWIR Earth Signature; Technique for Finding Retro-Reflectors in Flash LIDAR Imagery; Novel Hemispherical Dynamic Camera for EVAs; 360 deg Visual Detection and Object Tracking on an Autonomous Surface Vehicle; Simulation of Charge Carrier Mobility in Conducting Polymers; Observational Data Formatter Using CMOR for CMIP5; Propellant Loading Physics Model for Fault Detection Isolation and Recovery; Probabilistic Guidance for Swarms of Autonomous Agents; Reducing Drift in Stereo Visual Odometry; Future Air-Traffic Management Concepts Evaluation Tool; Examination and A Priori Analysis of a Direct Numerical Simulation Database for High-Pressure Turbulent Flows; and Resource-Constrained Application of Support Vector Machines to Imagery.

Source record↗

Preliminary Results from a Model-Driven Architecture Methodology for Development of an Event-Driven Space Communications Service Concept

NASA's next generation space communications network will involve dynamic and autonomous services analogous to services provided by current terrestrial wireless networks. This architecture concept, known as the Space Mobile Network (SMN), is enabled by several technologies now in development. A pillar of the SMN architecture is the establishment and utilization of a continuous bidirectional control plane space link channel and a new User Initiated Service (UIS) protocol to enable more dynamic and autonomous mission operations concepts, reduced user space communications planning burden, and more efficient and effective provider network resource utilization. This paper provides preliminary results from the application of model driven architecture methodology to develop UIS. Such an approach is necessary to ensure systematic investigation of several open questions concerning the efficiency, robustness, interoperability, scalability and security of the control plane space link and UIS protocol.

Roberts, Christopher J.↗

Show Me the Money! Evaluating A Graduated Incentive Structure to Keep Respondents Engaged Through 101 Surveys in 28 Days

We report the results of a survey test conducted in advance of a series of community response tests (CRTs) to evaluate response to noise from NASA’s X-59 aircraft. The CRTs will require a substantial number of observations to generate a dose response curve for noise exposure and related annoyance levels and the timeframe is limited due to resource and scheduling constraints with an experimental aircraft. Within each CRT area, we will recruit a sample of residents in advance and ask them to fill out a brief survey each time the aircraft passes over. Respondents will be asked to fill out the survey either on the web or as part of an application they are able to download onto their mobile phones. Respondents will be notified each time the plane flies over, asking for their reactions. On many days, respondents will be asked to fill out the survey for multiple flights. Typical incentives are used during the recruitment phase (pre-incentive for a household screener and post-paid for a background survey completed by the selected respondent) and post-paid for an end of study survey. To improve response rates over such a demanding survey schedule (101 surveys in 28 days) we will implement a weekly incentive based upon participation rates, with higher incentives for greater participation and increasing rates each week. The survey test will follow the proposed methodology of the CRTs. We will report on the participation rates by incentive amount and the effectiveness of the incentive structure in obtaining and maintaining response rates over the 4 weeks. We will examine how quickly participation fades over the 4-week period and consider whether the incentive schedule could be improved by altering the distribution of payments. Finally, we will compare how these rates varied across web and app respondents. We will use the results of this work to confirm or improve the design of the CRTs, ensuring the collection of data needed by NASA to evaluate the impact of this innovative technology.

incentives↗

101 Surveys in 28 Days - Evaluating Response Rates to a Demanding Request

We report the results of a survey test conducted in advance of a series of community response tests (CRTs) to evaluate response to noise from NASA’s X-59 aircraft. The CRTs will require a substantial number of observations to generate a dose response curve and the timeframe is limited due to resource and scheduling constraints with an experimental aircraft. Within each CRT area, we will recruit a sample of residents in advance and ask them to fill out a brief survey each time the aircraft passes over. Respondents will be asked to fill out the survey either on the web or as part of an application they are able to download onto their mobile phones. On many days, respondents will be asked to fill out the survey for multiple passes. The survey test followed the proposed methodology of the CRTs, albeit gauging reactions to normal in-situ aircraft events. To demonstrate initial interest, we will present response rates to the recruitment portion of the survey test which used an ABS frame. We will then evaluate the ongoing response rates among the recruited population to a demanding survey schedule involving 101 surveys over a 28-day period. The response rate evaluation will focus on demographics, mode (app vs. web) and whether and how these change over time. We will use the results of this work to confirm or improve the design of the CRTs, ensuring the collection of data needed by NASA to evaluate the impact of this innovative technology.

response rates↗

Mars Surface Systems Common Capabilities and Challenges for Human Missions

This paper describes the current status of common systems and operations as they are applied to actual locations on Mars that are representative of Exploration Zones (EZ) - NASA's term for candidate locations where humans could land, live and work on the Martian surface. Given NASA's current concepts for human missions to Mars, an EZ is a collection of Regions of Interest (ROIs) located within approximately 100 kilometers of a centralized landing site. ROIs are areas that are relevant for scientific investigation and/or development/maturation of capabilities and resources necessary for a sustainable human presence. An EZ also contains a habitation site that will be used by multiple human crews during missions to explore and utilize the ROIs within the EZ. The Evolvable Mars Campaign (EMC), a description of NASA's current approach to these human Mars missions, assumes that a single EZ will be identified within which NASA will establish a substantial and durable surface infrastructure that will be used by multiple human crews. The process of identifying and eventually selecting this single EZ will likely take many years to finalized. Because of this extended EZ selection process it becomes important to evaluate the current suite of surface systems and operations being evaluated for the EMC as they are likely to perform at a variety of proposed EZ locations and for the types of operations - both scientific and development - that are proposed for these candidate EZs. It is also important to evaluate proposed EZs for their suitability to be explored or developed given the range of capabilities and constraints for the types of surface systems and operations being considered within the EMC. Four locations identified in the Mars Exploration Program Analysis Group (MEPAG)'s Human Exploration of Mars Science Analysis Group (HEM-SAG) report are used in this paper as representative of candidate EZs that will emerge from the selection process that NASA has initiated. A field station site plan is developed for each of these four HEM-SAG sites. Because of the difficulty in getting equipment and supplies to the surface of Mars, specific assessments have been conducted to identify those systems and processes that can perform in multiple, sometimes completely unrelated, situations. Examples of common systems that are assessed at all of these sites include: (a) habitation and associated logistics storage systems, (b) a centralized power plant capable of supplying power to a geographically distributed (but within the central habitation zone) set of systems, (c) mobility systems that can be used to off-load and move payloads to specific locations at the central field station location that could also be used to traverse long distances to reach some of the more remote ROIs and (d) robotic systems that can support various activities (such as system set up and maintenance) at the field station that could also be used to explore scientific ROIs and used to support site-specific ISRU (In Situ Resource Utilization) production activities.

Toups, Larry↗

EMU Shoulder Injury Tiger Team Report

The number and complexity of extravehicular activities required for the completion and maintenance of the International Space Station is unprecedented. It is not surprising that training to perform these space walks presents a risk of overuse musculoskeletal injuries. The goal of this tiger team, created in December 2002, was to identify the different factors contributing to the risk of EVA training-related shoulder injury in the Neutral Buoyancy Lab at the Sonny Carter Training Facility and to make recommendations that would either significantly reduce or eliminate those risks. Since 1999, concerns have been expressed about the risk of shoulder injury associated with EVA training at the NBL, particularly in inverted body positions (McMonigal, 1999). A survey was developed and administered to 42 astronauts and astronaut candidates; the results suggest a causal relationship between EVA training at the NBL and the observed injuries. Also, during the tiger team review, it became evident that training in the extravehicular mobility unit may also result in other types of injuries, including fingernail delamination, elbow pain, knee pain, foot pain, and nerve compression leading to transient loss of sensation in certain areas of the upper or lower extremity. A multi-directorate team to detect, evaluate and respond to the medical issues associated with EVA training should be implemented immediately and given the appropriate resources and authority to reduce the risk of injury to crew during training to a level as low as reasonably achievable.

Williams, David R.↗

Operational Lessons Learned from the Ares I-X Flight Test

The Ares I-X flight test, launched in 2009, is the first test of the Ares I crew launch vehicle. This development flight test evaluated the flight dynamics, roll control, and separation events, but also provided early insights into logistical, stacking, launch, and recovery operations for Ares I. Operational lessons will be especially important for NASA as the agency makes the transition from the Space Shuttle to the Constellation Program, which is designed to be less labor-intensive. The mission team itself comprised only 700 individuals over the life of the project compared to the thousands involved in Shuttle and Apollo missions; while missions to and beyond low-Earth orbit obviously will require additional personnel, this lean approach will serve as a model for future Constellation missions. To prepare for Ares I-X, vehicle stacking and launch infrastructure had to be modified at Kennedy Space Center's Vehicle Assembly Building (VAB) as well as Launch Complex (LC) 39B. In the VAB, several platforms and other structures designed for the Shuttle s configuration had to be removed to accommodate the in-line, much taller Ares I-X. Vehicle preparation activities resulted in delays, but also in lessons learned for ground operations personnel, including hardware deliveries, cable routing, transferred work and custodial paperwork. Ares I-X also proved to be a resource challenge, as individuals and ground service equipment (GSE) supporting the mission also were required for Shuttle or Atlas V operations at LC 40/41 at Cape Canaveral Air Force Station. At LC 39B, several Shuttle-specific access arms were removed and others were added to accommodate the in-line Ares vehicle. Ground command, control, and communication (GC3) hardware was incorporated into the Mobile Launcher Platform (MLP). The lightning protection system at LC 39B was replaced by a trio of 600-foot-tall towers connected by a catenary wire to account for the much greater height of the vehicle. Like Shuttle, Ares I-X will be stacked on a MLP and rolled out to the pad on a Saturn-era crawler-transporter. While Ares I-X was only held in place by the four hold-down posts on its aft skirt during rollout, a new vehicle stabilization system (VSS) attached to the vertical service structure kept the vehicle from undue swaying prior to launch at the pad, LC 39B. Following the launch, the flight test vehicle first stage was recovered with the aid of new parachutes resized to accommodate the five-segment-long first stage, which had a much greater length and mass than the Shuttle s reusable solid rocket boosters. After splashdown, recovery divers exercised extra care when handling the first stage to ensure that the flight data recorders in the fifth segment simulator were not damaged by exposure to sea water. The data recovered from the Ares I-X flight test will be very valuable in verifying the predicted environments and models used to design the vehicle. Lessons learned from Ares I-X will be shared with the Ares Projects through written and verbal reports and through integration of mission team members into the Project workforce.

Davis, Stephan R.↗

NASA In-Situ Resource Utilization (ISRU) Technology and Development Project Overview

Since the Vision for Space Exploration (VSE) was released in 2004, NASA, in conjunction with international space agencies, industry, and academia, has continued to define and refine plans for sustained and affordable robotic and human exploration of the Moon and beyond. With the goal of establishing a lunar Outpost on the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, a change in how space exploration is performed is required. One area that opens up the possibility for the first time of breaking our reliance on Earth supplied consumables and learn to live off the land is In-Situ Resource Utilization (ISRU). ISRU, which involves the extraction and processing of space resources into useful products, can have a substantial impact on mission and architecture concepts. In particular, the ability to make propellants, life support consumables, and fuel cell reagents can significantly reduce the cost, mass, and risk of sustained human activities beyond Earth. However, ISRU is an unproven capability for human lunar exploration and can not be put in the critical path of lunar Outpost success until it has been proven. Therefore, ISRU development and deployment needs to take incremental steps toward the desired end state. To ensure ISRU capabilities are available for pre-Outpost and Outpost deployment by 2020, and mission and architecture planners are confident that ISRU can meet initial and long term mission requirements, the ISRU Project is developing technologies and systems in three critical areas: (1) Regolith Excavation, Handling and Material Transportation; (2) Oxygen Extraction from Regolith; and (3) Volatile Extraction and Resource Prospecting, and in four development stages: (I) Demonstrate feasibility; (II) Evolve system w/ improved technologies; (III) Develop one or more systems to TRL 6 before start of flight development; and (IV) Flight development for Outpost. To minimize cost and ensure that ISRU technologies, systems, and functions are integrated properly into the Outpost, technology development efforts are being coordinated with other development areas such as Surface Mobility, Surface Power, Life Support, EVA, and Propulsion. Lastly, laboratory and field system-level tests and demonstrations will be performed as often as possible to demonstrate improvements in: Capabilities (ex. digging deeper); Performance (ex. lower power); and Duration (ex. more autonomy or more robustness). This presentation will provide the status of work performed to date within the NASA ISRU project with respect to technology and system development and field demonstration activities, as well as the current strategy to implement ISRU in future robotic and human lunar exploration missions.

Sanders, Gerald B.↗