HBU R and D Cask Transportation Options - 20436
The TN-32B HBU Demonstration Cask was successfully loaded in November 2017 with 32 high burnup (HBU) fuel assemblies at Dominion's North Anna Nuclear Plant and is collecting thermal data as intended. The first two phases of this very successful project sponsored by DOE and EPRI was designed to collect thermal data of HBU fuel to support extended storage. The next phase of the project requires the cask be licensed for transportation so the cask can be relocated to a site (to be determined by DOE) to facilitate long term monitoring and additional research on the fuel. This is a unique challenge given the constraints that exist for this particular bolted metal cask. The TN-32B cask is a 234,288 lb. (storage configuration) dry storage system that was selected for this project and it was modified to provide thermal data and the ability to collect gas samples after loading. Several major issues must be addressed to obtain the transport license including protecting the seven lid penetrations that were made to allow for the insertion of the thermocouples into the selected fuel assemblies after the cask was loaded. In order to protect the integrity of the research, the payload must remain as is. Therefore, the cask system must be placed into the transportation configuration without rewetting the fuel, replacing the lid and without removing the thermocouple instrumentation that is currently installed. A critical portion of the design and engineering that was performed in the first two phases of the project was to ensure that future transportation of the cask was integrated into the approach. Efforts were made to accommodate requirements such as containment boundary leakage testing, installation of impact limiter brackets and lid bolts suitable for transportation. Due to the science requirements of the project, the fuel selected was intended to yield the highest payload temperatures permitted to provide the greatest value for the researchers. This resulted in higher than usual external dose rates and surface temperatures that warranted performing as much preparatory work prior to cask loading to ensure ALARA and personnel safety to the greatest extent practical rather than working on a loaded cask. In addition to the work performed prior to cask load, there are remaining challenges such as protecting the modified lid, design and fabrication of impact limiters that accommodate the modified cask lid and preserving the thermocouple connections for continued monitoring. The project team is currently performing the necessary calculations, engineering, and design to support the licensing as required by the US NRC. Pre-application meetings have been held to inform the regulator of the planned technical approach to ensure compliance with the applicable regulations. The current plan is to obtain the transportation C of C by the end of 2021. (authors)