Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “issues management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Pilot education and safety awareness programs

Guidelines necessary for the implementation of safety awareness programs for commuter airlines are discussed. A safety office can be viewed as fulfilling either an education and training function or a quality assurance function. Issues such as management structure, motivation, and cost limitations are discussed.

Shearer, M.↗

A customer-friendly Space Station

This paper discusses the relationship of customers to the Space Station Program currently being defined by NASA. Emphasis is on definition of the Program such that the Space Station will be conducive to use by customers, that is by people who utilize the services provided by the Space Station and its associated platforms and vehicles. Potential types of customers are identified. Scenarios are developed for ways in which different types of customers can utilize the Space Station. Both management and technical issues involved in making the Station 'customer friendly' are discussed.

Pivirotto, D. S.↗

Critical issues in NASA information systems

The National Aeronautics and Space Administration has developed a globally-distributed complex of earth resources data bases since LANDSAT 1 was launched in 1972. NASA envisages considerable growth in the number, extent, and complexity of such data bases, due to the improvements expected in its remote sensing data rates, and the increasingly multidisciplinary nature of its scientific investigations. Work already has begun on information systems to support multidisciplinary research activities based on data acquired by the space station complex and other space-based and terrestrial sources. In response to a request from NASA's former Associate Administrator for Space Science and Applications, the National Research Council convened a committee in June 1985 to identify the critical issues involving information systems support to space science and applications. The committee has suggested that OSSA address four major information systems issues; centralization of management functions, interoperability of user involvement in the planning and implementation of its programs, and technology.

Source record↗

System security in the space flight operations center

The Space Flight Operations Center is a networked system of workstation-class computers that will provide ground support for NASA's next generation of deep-space missions. The author recounts the development of the SFOC system security policy and discusses the various management and technology issues involved. Particular attention is given to risk assessment, security plan development, security implications of design requirements, automatic safeguards, and procedural safeguards.

Wagner, David A.↗

Independent Orbiter Assessment (IOA): Assessment of the reaction control system, volume 1

The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA effort first completed an analysis of the aft and forward Reaction Control System (RCS) hardware, and Electrical Power Distribution and Control (EPD and C), generating draft failure modes and potential critical items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. The IOA results were then compared to the proposed Post 51-L NASA FMEA/CIL baseline. This report documents the results of that comparison for the Orbiter RCS hardware and EPD and C systems. The IOA product for the RCS analysis consisted of 208 hardware and 2064 EPD and C failure mode worksheets that resulted in 141 hardware and 449 EPD and C potential critical items (PCIs) being identified. A comparison was made of the IOA product to the NASA FMEA/CIL baseline. After comparison and discussions with the NASA subsystem manager, 96 hardware issues, 83 of which concern CIL items or PCIs, and 280 EPD and C issues, 158 of which concern CIL items or PCIs, and 280 EPD and C issues, 158 of which concern CIL items or PCIs, remain unresolved. Volume 1 contains the subsystem description, assessment results, and some of the IOA worksheets.

Prust, Chet D.↗

Microbiology on Space Station Freedom

This panel discussion convened in Houston, Texas, at the Lunar and Planetary Institute, on November 6 to 8, 1989, to review NASA's plans for microbiology on Space Station Freedom. A panel of distinguished scientists reviewed, validated, and recommended revisions to NASA's proposed acceptability standards for air, water, and internal surfaces on board Freedom. Also reviewed were the proposed microbiology capabilities and monitoring plan, disinfection procedures, waste management, and clinical issues. In the opinion of this advisory panel, ensuring the health of the Freedom's crews requires a strong goal-oriented research effort to determine the potential effects of microorganisms on the crewmembers and on the physical environment of the station. Because there are very few data addressing the fundamental question of how microgravity influences microbial function, the panel recommended establishing a ground-based microbial model of Freedom, with subsequent evaluation using in-flight shuttle data. Sampling techniques and standards will be affected by both technological advances in microgravity-compatible instrumentation, and by changes in the microbial population over the life of the station.

Pierson, Duane L.↗

Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

Koenig, John C.↗

Space information systems in the Space Station era; Proceedings of the AIAA/NASA International Symposium on Space Information Systems, Washington, DC and Greenbelt, MD, June 22, 23, 1987

Technological and planning issues for data management, processing, and communication on Space Station Freedom are discussed in reviews and reports by U.S., European, and Japanese experts. The space-information-system strategies of NASA, ESA, and NASDA are discussed; customer needs are analyzed; and particular attention is given to communication and data systems, standards and protocols, integrated system architectures, software and automation, and plans and approaches being developed on the basis of experience from past programs. Also included are the reports from workshop sessions on design to meet customer needs, the accommodation of growth and new technologies, and system interoperability.

Gerard, Mireille↗

Integration of Design, Thermal, Structural, and Optical Analysis, Including Thermal Animation

In many industries there has recently been a concerted movement toward 'quality management' and the issue of how to accomplish work more efficiently. Part of this effort is focused on concurrent engineering; the idea of integrating the design and analysis processes so that they are not separate, sequential processes (often involving design rework due to analytical findings) but instead form an integrated system with smooth transfers of information. Presented herein are several specific examples of concurrent engineering methods being carried out at Langley Research Center (LaRC): integration of thermal, structural and optical analyses to predict changes in optical performance based on thermal and structural effects; integration of the CAD design process with thermal and structural analyses; and integration of analysis and presentation by animating the thermal response of a system as an active color map -- a highly effective visual indication of heat flow.

Amundsen, Ruth M.↗

Branch target buffer design and optimization

Consideration is given to two major issues in the design of branch target buffers (BTBs), with the goal of achieving maximum performance for a given number of bits allocated to the BTB design. The first issue is BTB management; the second is what information to keep in the BTB. A number of solutions to these problems are reviewed, and various optimizations in the design of BTBs are discussed. Design target miss ratios for BTBs are developed, making it possible to estimate the performance of BTBs for real workloads.

Perleberg, Chris H.↗

Final postflight hardware evaluation report RSRM-28 (STS-53)

The final report for the Clearfield disassembly evaluation and a continuation of the KSC postflight assessment for the RSRM-28 (STS-53) RSRM flight set is presented. All observed hardware conditions were documented on PFOR's and are included in Appendices A through C. Appendices D and E contain the measurements and safety factor data for the nozzle and insulation components. This report, along with the KSC Ten-Day Postflight Hardware Evaluation Report (TWR-64215), represents a summary of the RSRM-28 hardware evaluation. The as-flown hardware configuration is documented in TWR-63638. Disassembly evaluation photograph numbers are logged in TWA-1989. The RSRM-28 flight set disassembly evaluations described were performed at the RSRM Refurbishment Facility in Clearfield, Utah. The final factory joint demate occurred on July 15, 1993. Additional time was required to perform the evaluation of the stiffener rings per special issue 4.1.5.2 because of the washout schedule. The release of this report was after completion of all special issues per program management direction. Detailed evaluations were performed in accordance with the Clearfield PEEP, TWR-50051, Revision A. All observations were compared against limits that are also defined in the PEEP. These limits outline the criteria for categorizing the observations as acceptable, reportable, or critical. Hardware conditions that were unexpected and/or determined to be reportable or critical were evaluated by the applicable team and tracked through the PFAR system.

Starrett, William David, Jr.↗

Minimum accommodation for aerobrake assembly, phase 2

A multi-element study was done to assess the practicality of a Space Station Freedom-based aerobrake system for the Space Exploration Initiative. The study was organized into six parts related to structure, aerodynamics, robotics and assembly, thermal protection system, inspection, and verification, all tied together by an integration study. The integration activity managed the broad issues related to meeting mission requirements. This report is a summary of the issues addressed by the integration team.

Katzberg, Stephen J.↗

The successful management of programs for human factors certification of advanced aviation technologies

In recent years there have been immense pressures to enact changes on the air traffic control organizations of most states. In addition, many of these states are or have been subject to great political, sociological and economic changes. Consequently, any new schemes must be considered within the context of national or even international changes. Europe has its own special problems, and many of these are particularly pertinent when considering human factors certification programs. Although these problems must also be considered in the wider context of change, it is usually very difficult to identify which forces are pressing in support of human factors aspects and which forces are resisting change. There are a large number of aspects which must be taken into account if human factors certification programs are to be successfully implemented. Certification programs would be new ventures, and like many new ventures it will be essential to ensure that managers have the skills, commitment and experience to manage the programs effectively. However, they must always be aware of the content and the degree of certainty to which the human factors principles can be applied - as Debons and Horne have carefully described. It will be essential to avoid the well known pitfalls which occur in the implementation of performance appraisal schemes. While most appraisal schemes are usually extremely well thought out, they often do not produce good results because they are not implemented properly and staff therefore do not have faith in them. If the manager does not have the commitment and interest in his/her staff as human beings, then the schemes will not be effective. Thus, one aspect of considering human factors certification schemes is within the context of a managed organization. This paper outlines some of the management factors which need to be considered for the air traffic control services. Many of the points received attention during the plenary sessions while others were covered by the working groups when the question arose of how various aspects of human factors certification programs would be managed. Management and organizational issues will certainly need to be included in any frame of reference by those who may be involved in developing certification programs.

Baldwin, Rod↗

The virtual windtunnel: Visualizing modern CFD datasets with a virtual environment

This paper describes work in progress on a virtual environment designed for the visualization of pre-computed fluid flows. The overall problems involved in the visualization of fluid flow are summarized, including computational, data management, and interface issues. Requirements for a flow visualization are summarized. Many aspects of the implementation of the virtual windtunnel were uniquely determined by these requirements. The user interface is described in detail.

Bryson, Steve↗

Control of Propellant Lead/Lag to the LAE in the AXAF Propulsion System

Control of the rate at which hypergolic propellants are supplied to a rocket engine prior to ignition is critically important. Potentially damaging explosions may result from excessive lead of either propellant into the combustion chamber. Because the injector fill process is governed by the engine as well as the propellant feed system design, proper management of this issue must take both into consideration. This was recognized early in the development of TRW's Advanced Columbium-Liquid Apogee Engine (LAE), which was flight-qualified in 1996 to maneuver the Advanced X-Ray Astrophysics Facility (AXAF) spacecraft into orbit. The LAE runs on hydrazine and nitrogen tetroxide (MON-3) at a nominal mixture ratio of 1.0. This paper describes the comprehensive test program conducted to ensure reliable startup operation of the LAE in the AYAF propulsion system. The most significant factors affecting chamber fuel lead were found to be: (1) engine location, (2) propellant saturation level, (3) amount of undissolved gas in the lines, and (4) off- nominal tank pressures. Hot-fire tests at a chamber fuel lead range over and above that expected for the LAEs in AXAF demonstrated extremely tolerant behavior of the engine. AY-AF is scheduled for launch on NASA's STS-93 in December 1998.

Casillas, A. R.↗

The Conference Proceedings of the 1998 Air Transport Research Group (ATRG) of the WCTR Society

This report (Volume 1) is comprised of 5 sessions of the Air Transport Research Group (ATRG) Conference held in Antwerp, Belgium, July 1998. The sessions contain 3-4 papers (presentations) each. The session numbers and their respective headings are: (1) Airline alliances; (2) Airline Competition and Market Structure; (4) Liberalization, Open Skies, and Policy Issues; (5) Yield Management and Other Models; and (11) Air Traffic Control (ATC) and Air Navigational Systems (ANS).

Oum, Tae Hoon↗

A Metadata Element Set for Project Documentation

Abstract NASA Goddard Space Flight Center is a large engineering enterprise with many projects. We describe our efforts to develop standard metadata sets across project documentation which we term the "Goddard Core". We also address broader issues for project management metadata.

Hodge, Gail↗

Design, Development, Testing, and Evaluation: Human Factors Engineering

While human-system interaction occurs in all phases of system development and operation, this chapter on Human Factors in the DDT&E for Reliable Spacecraft Systems is restricted to the elements that involve "direct contact" with spacecraft systems. Such interactions will encompass all phases of human activity during the design, fabrication, testing, operation, and maintenance phases of the spacecraft lifespan. This section will therefore consider practices that would accommodate and promote effective, safe, reliable, and robust human interaction with spacecraft systems. By restricting this chapter to what the team terms "direct contact" with the spacecraft, "remote" factors not directly involved in the development and operation of the vehicle, such as management and organizational issues, have been purposely excluded. However, the design of vehicle elements that enable and promote ground control activities such as monitoring, feedback, correction and reversal (override) of on-board human and automation process are considered as per NPR8705.2A, Section 3.3.

Adelstein, Bernard↗