Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integrated planning and learning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

The Los Angeles 100% Renewable Energy Study (LA100): Chapter 12. Synthesis

The City of Los Angeles has set ambitious goals to transform its electricity supply, aiming to achieve a 100% renewable energy power system by 2045, along with aggressive electrification targets for buildings and vehicles. To reach these goals, and assess the implications for jobs, electricity rates, the environment, and environmental justice, the Los Angeles City Council passed a series of motions directing the Los Angeles Department of Water and Power (LADWP) to determine the technical feasibility and investment pathways of a 100% renewable energy portfolio standard. The Los Angeles 100% Renewable Energy Study (LA100) is a first-of-its-kind objective, rigorous, and science-based power systems analysis to determine what investments could be made to achieve these goals. The LA100 final report is presented as a collection of 12 chapters and an executive summary, each of which is available as an individual download. This chapter reviews high-level findings, costs, benefits, and lessons learned from integrating this diverse suite of models and conducting a high-fidelity 100% renewable energy study.

100% Renewable↗

Using Multimodal Input for Autonomous Decision Making for Unmanned Systems

Autonomous decision making in the presence of uncertainly is a deeply studied problem space particularly in the area of autonomous systems operations for land, air, sea, and space vehicles. Various techniques ranging from single algorithm solutions to complex ensemble classifier systems have been utilized in a research context in solving mission critical flight decisions. Realized systems on actual autonomous hardware, however, is a difficult systems integration problem, constituting a majority of applied robotics development timelines. The ability to reliably and repeatedly classify objects during a vehicles mission execution is vital for the vehicle to mitigate both static and dynamic environmental concerns such that the mission may be completed successfully and have the vehicle operate and return safely. In this paper, the Autonomy Incubator proposes and discusses an ensemble learning and recognition system planned for our autonomous framework, AEON, in selected domains, which fuse decision criteria, using prior experience on both the individual classifier layer and the ensemble layer to mitigate environmental uncertainty during operation.

Neilan, James H.↗

Operational Integration Assessment (OIA) of Midterm UAM Operations: Class C Airspace Tabletop Exercise and Integration Checkpoint

The National Aeronautics and Space Administration (NASA), in collaboration with the Federal Aviation Administration (FAA), is conducting research into evolving today’s air traffic management system towards a more automated and operationally flexible airspace to accommodate Urban Air Mobility (UAM) operations at scale. UAM operations, enabled by electric Vertical Takeoff and Landing (eVTOL) aircraft, may change the role of aviation in the movement of people and goods and provide practical, cost-effective air transport in metropolitan areas. FAA UAM Concept of Operations v2.0 describes three evolutionary stages of UAM operations: Initial, Midterm, and Mature State operations. Midterm operations are comprised of many complex changes to the national airspace system (NAS). The Operational Integration Assessment (OIA) was created as a capability to address the need to study the progression and identify interdependencies of those changes that may occur during the midterm UAM operations timeframe. The OIA includes a series of tabletop exercises and integration checkpoints planned to explore various use cases from end-to-end, evaluated by NASA’s Air Traffic Management eXploration (ATM-X) project in partnership with the FAA’s William J. Hughes Technical Center (WJHTC) and industry partners. The use cases were exercised in an immersive, integrated live-virtual-constructive (LVC) airspace simulation environment, called the NASA/FAA Laboratory Integrated Test Environment (NFLITE), as part of an effort to learn how UAM operations can scale beyond the as-is NAS and through the transition to higher-tempo and highly automated operations of the future. This document describes the events of the tabletop exercise held from January 24-26, 2023, at the National Airspace Research & Technology Park (NARTP) in Egg Harbor Township, New Jersey, adjacent to the WJHTC and the subsequent integration checkpoint performed on March 28, 2023,at NASA Langley Research Center (LaRC) in Hampton, Virginia.

UAM↗

Recent Progress of JT-60SA Project toward Plasma Operation

Superconducting tokamak JT-60SA plays an essential role in fusion research and development by supporting and complementing ITER project, providing directions to the DEMO design activity and fostering next generation scientists and engineers. Since the incident of the Equilibrium Field coil #1 during the Integrated Commissioning (IC) in March 2021, both EU and JA Implementing agencies (IAs) have examined how to ensure safety operation of JT-60SA by mitigating the risk of possible discharge occurrence inside the cryostat. Based on the experience of the Global Paschen tests, the IAs have established a strategy of risk mitigation measures, which is a combination of (i) reinforcement of insulation, (ii) avoiding unnecessary voltage application to the coil systems and (iii) immediate de-energization of the coils when deteriorated vacuum condition is detected. Thanks to the considerable efforts of the Integrated Project Team (IPT) members, the IC restarted in May 2023. After the confirmation of superconducting state of coil systems (TF, EF and CS), the coil energization test and the plasma operation (OP-1) starts. The first plasma was successfully achieved on 23 October 2023 with a limited value of applied voltage and current to the coils. The plasma configuration control will be also confirmed with low plasma current and low auxiliary heating power conditions. Based on the IO-F4E-QST collaboration, activities of JT-60SA have been shared with the IO and provided an important lesson learned for ITER assembly and commissioning, and will provide an outstanding contribution to fusion research at large. After OP-1, Maintenance & Enhancement phase 1 (M/E-1) starts from January 2024, in which in-vessel components are installed, and heating system and diagnostic system are extensively upgraded to allow high power heating experiment planned in OP-2. In order to make the best use of JT-60SA, newly organized JT-60SA experiment team will refine the research plan in the future high heating power operation phase.

Broader Approach activities↗

Mic-hackathon 2024: hackathon on machine learning for electron and scanning probe microscopy

Microscopy is one of the primary sources of information on materials structure and functionality at the nanometer and atomic scales. The data generated through microscopy is often contained in well-structured datasets, enriched with extensive metadata and sample histories, although not always with the same level of detail or storage format. The broad incorporation of data management plans by major funding agencies ensures the preservation and accessibility of this data. However, deriving insights from these rich datasets remains challenging due to the lack of established code ecosystems, standardized benchmarks, and integration strategies. Correspondingly, the efficiency of data usage is very low, and time expenditures at the analysis stage are enormous. In addition to post-acquisition data analysis, the emergence of application programming interfaces by major microscope manufacturers now creates opportunities for real-time ML-based data analytics to enable automated decision making, and particularly ML-agent controlled real-time microscope operation. Despite these opportunities, there is a significant gap in integrating the ML community with the broader microscopy community, limiting the value that these methods bring to physics and materials discovery and materials optimization. Hackathons address these challenges by fostering collaboration between ML experts and microscopy professionals, encouraging the development of innovative solutions that leverage ML for microscopy and preparing the workforce of the future both for microscopy-intensive domains areas, instrument manufacturers, and ML scientists interested in real world applications for fundamental research, materials optimization, and manufacturing. The hackathon generated benchmark datasets and digital twins of microscopes that further contribute to the development of the field and establish data analysis ecosystems. All the codes can be found at GitHub(https://github.com/KalininGroup/Mic-hackathon-2024-codes-publication/tree/1.0.0.1) and Zenodo (https://zenodo.org/records/15579940).

97 MATHEMATICS AND COMPUTING↗

Planning and reasoning in the JPL telerobot testbed

The Telerobot Interactive Planning System is developed to serve as the highest autonomous-control level of the Telerobot Testbed. A recent prototype is described which integrates an operator interface for supervisory control, a task planner supporting disassembly and re-assembly operations, and a spatial planner for collision-free manipulator motion through the workspace. Each of these components is described in detail. Descriptions of the technical problem, approach, and lessons learned are included.

Peters, Stephen↗

NASA's J-2X Engine Builds on the Apollo Program for Lunar Return Missions

In January 2006, NASA streamlined its U.S. Vision for Space Exploration hardware development approach for replacing the Space Shuttle after it is retired in 2010. The revised CLV upper stage will use the J-2X engine, a derivative of NASA s Apollo Program Saturn V s S-II and S-IVB main propulsion, which will also serve as the Earth Departure Stage (EDS) engine. This paper gives details of how the J- 2X engine effort mitigates risk by building on the Apollo Program and other lessons learned to deliver a human-rated engine that is on an aggressive development schedule, with first demonstration flight in 2010 and human test flights in 2012. It is well documented that propulsion is historically a high-risk area. NASA s risk reduction strategy for the J-2X engine design, development, test, and evaluation is to build upon heritage hardware and apply valuable experience gained from past development efforts. In addition, NASA and its industry partner, Rocketdyne, which originally built the J-2, have tapped into their extensive databases and are applying lessons conveyed firsthand by Apollo-era veterans of America s first round of Moon missions in the 1960s and 1970s. NASA s development approach for the J-2X engine includes early requirements definition and management; designing-in lessons learned from the 5-2 heritage programs; initiating long-lead procurement items before Preliminary Desi& Review; incorporating design features for anticipated EDS requirements; identifying facilities for sea-level and altitude testing; and starting ground support equipment and logistics planning at an early stage. Other risk reduction strategies include utilizing a proven gas generator cycle with recent development experience; utilizing existing turbomachinery ; applying current and recent main combustion chamber (Integrated Powerhead Demonstrator) and channel wall nozzle (COBRA) advances; and performing rigorous development, qualification, and certification testing of the engine system, with a philosophy of "test what you fly, and fly what you test". These and other active risk management strategies are in place to deliver the J-2X engine for LEO and lunar return missions as outlined in the U.S. Vision for Space Exploration.

Snoddy, Jimmy R.↗

Development of the XV-15 tiltrotor research aircraft - Lessons learned

The initial ground rules that guided the decision process during the initial stages of the XV-15 tiltrotor aircraft development are reviewed and reevaluated. A full flight-envelope nonlinear simulation mathematical model is outlined, along with the advantages of a multiaircraft program. Direct involvement of government engineers in all aspects of the program is considered to be beneficial, while the ejection-seat test requirement is not. Utilization of existing components - a rotor, transmissions, and engines - is analyzed, and emphasis is placed on integrated system test plans responsible for producing two reliable aircraft through a complete checkout of the aircraft subsystems before the start of the fligth program. Wind-tunnel and fatigue test requirements are presented, and the decision to go with an all mechanical control system design is addressed.

Schroers, Laurel G.↗

The Story Behind the Numbers: Lessons Learned from the Integration of Monitoring Resources in Addressing an ISS Water Quality Anomaly

Beginning in June of 2010 an environmental mystery was unfolding on the International Space Station (ISS). The U.S. Water Processor Assembly (WPA) began to produce water with increasing levels of total organic carbon (TOC). A surprisingly consistent upward TOC trend was observed through weekly in-flight total organic carbon analyzer (TOCA) monitoring. As TOC is a general organics indicator, return of water archive samples was needed to make better-informed crew health decisions and to aid in WPA troubleshooting. TOCA-measured TOC was more than halfway to its health-based screening limit before archive samples could be returned on Soyuz 22 and analyzed. Although TOC was confirmed to be elevated, somewhat surprisingly, none of the typical target compounds were the source. After some solid detective work, it was confirmed that the TOC was associated with a compound known as dimethylsilanediol (DMSD). DMSD is believed to be a breakdown product of silicon-containing compounds present on ISS. A toxicological limit was set for DMSD and a forward plan developed for operations given this new understanding of the source of the TOC. This required extensive coordination with ISS stakeholders and innovative use of available in-flight and archive monitoring resources. Behind the numbers and scientific detail surrounding this anomaly, there exists a compelling story of multi-disciplinary awareness, teamwork, and important environmental lessons learned.

McCoy, Torin↗

Mission Planning for Robotic and Human Exploration

Mission planning for spaceflight is a complex challenge for ground operators managing robotic or human missions. It requires integrating the needs of various disciplines and creating an effective, efficient, and safe plan to execute. NASA uses specialized tools to meet planning requirements and constraints. This talk will provide an overview of spaceflight mission planning as well as the software tools the Human-Computer Interaction Group has built to support scheduling and planning. Also, it identifies the future scheduling and planning challenges for human Mars missions and how we leverage Earth Analogs to learn about Mars operations.

Scheduling and planning↗

Inductive Learning Approaches for Improving Pilot Awareness of Aircraft Faults

Neural network flight controllers are able to accommodate a variety of aircraft control surface faults without detectable degradation of aircraft handling qualities. Under some faults, however, the effective flight envelope is reduced; this can lead to unexpected behavior if a pilot performs an action that exceeds the remaining control authority of the damaged aircraft. The goal of our work is to increase the pilot s situational awareness by informing him of the type of damage and resulting reduction in flight envelope. Our methodology integrates two inductive learning systems with novel visualization techniques. One learning system, the Inductive Monitoring System (IMS), learns to detect when a simulation includes faulty controls, while two others, Inductive Classification System (INCLASS) and multiple binary decision tree system (utilizing C4.5), determine the type of fault. In off-line training using only non-failure data, IMS constructs a characterization of nominal flight control performance based on control signals issued by the neural net flight controller. This characterization can be used to determine the degree of control augmentation required in the pitch, roll, and yaw command channels to counteract control surface failures. This derived information is typically sufficient to distinguish between the various control surface failures and is used to train both INCLASS and C4.5. Using data from failed control surface flight simulations, INCLASS and C4.5 independently discover and amplify features in IMS results that can be used to differentiate each distinct control surface failure situation. In real-time flight simulations, distinguishing features learned during training are used to classify control surface failures. Knowledge about the type of failure can be used by an additional automated system to alter its approach for planning tactical and strategic maneuvers. The knowledge can also be used directly to increase the pilot s situational awareness and inform manual maneuver decisions. Our multi-modal display of this information provides speech output to issue control surface failure warnings to a lesser-used communication channel and provides graphical displays with pilot-selectable !eve!s of details to issues additional information about the failure. We also describe a potential presentation for flight envelope reduction that can be viewed separately or integrated with an existing attitude indicator instrument. Preliminary results suggest that the inductive approach is capable of detecting that a control surface has failed and determining the type of fault. Furthermore, preliminary evaluations suggest that the interface discloses a concise summary of this information to the pilot.

Spikovska, Lilly↗

Building Tune-Up Accelerator Program (Final Technical Report)

In 2016, the City of Seattle passed a mandatory Building Tune-Up requirement for all commercial buildings 50,000 square feet (SF) and larger as part of its Climate Action strategy. The requirement is phased in by size with large buildings (greater than 200,000 SF) required first. This allowed Seattle’s Office of Sustainability & Environment (OSE) to offer the Building Tune-Up Accelerator (TUA) Program to the “mid-size” building market (less than 100,000 SF) to meet the requirements early. With funding from the US DOE, a package of technical and financial support was developed for building owners and energy service providers to encourage this hard-to-reach market to participate in the tune-up—and even go beyond requirements for greater energy savings. Seattle City Light, the municipal electric utility, offered participants a simple per square foot financial incentive. Partners at the University of Washington Integrated Design Lab, Smart Buildings Center and Pacific Northwest National Lab (PNNL) offered service provider trainings, analytical tools and technical support. This final technical report summarizes the program, projected energy and emissions savings and lessons learned from program development to implementation to final evaluation for the 102 buildings that participated.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Feasibility Study to Interactive Workshop: Building End-user Capacity to Integrate Earth Observation Data into Federally Endangered Atlantic Salmon (Salmo salar) Habitat Monitoring in Main

Changes in temperature and precipitation patterns, along with alterations in land cover threaten ongoing conservation efforts for Federally Endangered Atlantic salmon (Salmo salar) in Maine. Earth observation data offers a unique perspective for habitat monitoring that can complement habitat restoration and conservation activity on the ground. As a dual capacity building program, the NASA DEVELOP National Program strives to build the capacity of program participants by leveraging Earth observation data to address environmental concerns across the globe, while also building capacity in partner organizations to integrate Earth observation data into their decision making practices. Between September 2021 and August 2022, three NASA DEVELOP teams demonstrated the feasibility of utilizing NASA Earth observations including Aqua Moderate Resolution Imaging Spectroradiometer (MODIS), Terra MODIS, Landsat 5 Thematic Mapper (TM), Landsat 8 Operation Land Imager (OLI), and Shuttle Radar Topography Mission (SRTM) in conjunction with Sentinel-2 MultiSpectral Instrument (MSI) to assess temperature, precipitation, and land use land cover (LULC) over time throughout salmon habitat in Maine. While the first two teams completed projects that were categorized as NASA DEVELOP’s traditional feasibility projects, the third and final project team generated resources and planned an interactive workshop to transfer project methods to end-user organizations. Ultimately, the goal of this work was to not only inform the partner’s ongoing salmon population recovery and habitat restoration initiatives but provide tools that allow partner organizations to continue integrating Earth observation data into their work beyond their partnership with the program. This project serves as a case study within the NASA DEVELOP Program and provides lessons learned for moving beyond traditional feasibility studies to more interactive partner engagement and knowledge transfer practices.

Nicole Ramberg-Pihl↗

Standardizing UI/UX across accelerator labs

During February 26–28, 2025, the first-ever particle accelerator user interface/user experience (UI/UX) workshop was held at SLAC. Attendees had backgrounds ranging from software development to control systems management and human factors (HF) science. The workshop began with participants discussing the current state of UI/UX procedures and practices at their respective laboratories to share experiences and learn from one another. Additional discussions focused on how to effectively integrate UI/UX best practices into actionable goals for developers, managers, and operators when working on new or existing interfaces. The goal of the working group is to create a website that will guide developers, managers, scientists, and end users at accelerator laboratories in incorporating UI/UX best practices into software development. The working group continues to meet virtually toward this goal, and is planning a second workshop for next year.

Tran, Tiffany [SLAC]↗

Engineering Lessons Learned and Technical Standards Integration: Capturing Key Technologies for Future Space Missions

Capturing engineering lessons learned derived from past experiences and new technologies, then integrating them with technical standards, provides a viable process for enhancing engineering capabilities. The development of future space missions will require ready access, not only to the latest technical standards, but also to lessons learned derived from past experiences and new technologies. The integration of this information such that it is readily accessible by engineering and programmatic personnel is a key aspect of enabling technology. This paper addresses the development of a new and innovative Lessons Learned/Best Practices/Applications Notes--Standards Integration System, including experiences with its initial implementation as a pilot effort within the NASA Technical Standards Program. Included are metrics on the Program, feedbacks from users, future plans, and key issues that are being addressed to expand the System's utility. The objective is the enhancement of engineering capabilities on all aspects of systems development applicable to the success of future space missions.

Mellen, Daniele P.↗

Science Objectives for Human Exploration of Mars Workshop Report

The Science Objectives for Human Exploration of Mars Workshop was held in Denver, Colorado on May 4–6, 2022. The workshop was co-sponsored by NASA’s Science Mission Directorate and the Exploration Systems Development Mission Directorate to actively engage the planetary science community to determine what planetary science should be done by human crews on the martian surface and how those science objectives can be achieved. Sessions at the Science Objectives for Human Exploration of Mars Workshop were organized around specific planetary science objectives and mission architecture concepts that were identified during the workshop as the highest priority for human exploration. The intent of this workshop was to synthesize a notional, integrated concept of operations for each scenario to aid in planning and refining the mission architecture for the first human mission to Mars. Results from the Planetary Decadal Survey Report were released xx days before the workshop and were briefed to workshop participants who incorporated the findings in the discussions. With the Artemis missions, humans will return to the Moon using innovative technologies to explore the lunar surface. We will apply what we learn about exploration architecture, surface infrastructure, and science and exploration operations on and around the Moon to conduct successful missions with the first astronauts to Mars. A human mission to Mars will be a landmark achievement and a golden opportunity to make groundbreaking scientific discoveries on Mars. The potential scope of the science activities and impact of achieving those objectives are extraordinary.

Mars↗

Strategic Options for International Participation in Space Exploration: Lessons from U.S.-Japan Defense Cooperation

The President's Commission on Implementation of United States Space Exploration Policy suggests that after NASA establishes the Space Exploration vision architecture, it should pursue international partnerships. Two possible approaches were suggested: multiple independently operated missions and an integrated mission with carefully selected international components. The U.S.-Japan defense sectors have learned key lessons from experience with both of these approaches. U.S.-Japan defense cooperation has evolved over forty years from simple military assistance programs to more complex joint development efforts. With the evolution of the political-military alliance and the complexity of defense programs, these cooperative efforts have engaged increasingly industrial resources and capabilities as well as more sophisticated forms of planning, technology transfers and program management. Some periods of this evolution have been marked by significant frictions. The U.S.Japan FS-X program, for example, provides a poor example for management of international cooperation. In November 1988, the United States and Japan signed a Memorandum of Understanding (MOU) to co-develop an aircraft, named FS-X and later renamed F -2, as a replacement to the aging Japan support fighter F-l. The program was marked by numerous political disputes. After over a decade of joint development and testing, F -2 production deliveries finally began in 1999. The production run was curtailed due to much higher than anticipated costs and less than desired aircraft performance. One universally agreed "lesson" from the FSX/F-2 case was that it did not represent the ideal approach to bilateral cooperation. More recent cooperative programs have involved targeted joint research and development, including component development for ballistic missile defense systems. These programs could lay the basis for more ambitious cooperative efforts. This study examines both less-than-stellar international cooperation efforts as well as more successful initiatives to identify lessons from military programs that can help NASA encourage global investment in its Space Exploration Vision. The paper establishes a basis for examining related policy and industrial concerns such as effective utilization of dual-use technologies and trans-Pacific program management of large, complex cooperative programs.

Hudiburg, John J.↗

Gateway Program Safety and Mission Assurance Integration - the Future of Safe Deep Space Human Exploration

As a foundational element of the National Aeronautics and Space Administration (NASA) Artemis Campaign, the Gateway is an incrementally built cislunar spacecraft that will serve as a platform for deep space human exploration, science, and technology demonstration. The Gateway will be a unifying catalyst for international partners around the world to establish sustained deep space scientific investigations, lunar surface access, and missions to Mars. As human exploration moves farther away from Earth, spacecraft designs must prioritize and optimize mass and volume allocations, while minimizing human and spacecraft risk. To accomplish this objective, the Gateway Program Safety and Mission Assurance functions develop, implement, and ensure compliance with requirements, in concert with the accurate characterization and transparent communication of residual hazard risks, for integrated safety, reliability and maintainability and quality assurance. Safety and Mission Assurance was a key contributor during Gateway program pre-formulation and formulation activities where safety and reliability analysis was embedded in the Gateway Systems Engineering and Integration team. During these early program stages, a preliminary Gateway Integrated Hazard Analysis and Preliminary Gateway Probabilistic Risk Assessment assisted in Gateway architectural and operational definition as part of a risk-informed design process. As the deep space architecture has matured, the integrated Safety and Mission Assurance analyses have matured, new safety review processes have been developed, and requirements have been refined to ensure compliance with integrated safety and mission assurance objectives. The Gateway Program is currently concluding the preliminary design review informed milestone, where the primary objectives included: - Ensured completeness and consistency of the preliminary design, including the meeting of all requirements within appropriate margins and acceptable risk posture. - Identification of any major issues moving forward to the Critical Design phase. At this milestone, Safety and Mission Assurance provided numerous products, including Gateway Top Risks and Risk Mitigation Plans, updated integrated hazard analyses, updated probabilistic risk assessment, Crew Survival Analysis Report, and updated Safety and Mission Assurance Requirements and Plans. These products provide a many-faceted perspective on the inherent risk and available mitigations involved in flying the current proposed vehicle design and anticipated stack configurations. In addition, Safety and Mission Assurance identified top technical, process and workforce concerns to be addressed as the program progresses toward the critical design phase. This paper will detail the evolution of the Gateway Program Safety and Mission Assurance integration functions, provide its current status and lessons learned for future human spaceflight programs. Throughout this paper the key tenets of the Gateway Program Safety and Mission Assurance will be discussed: - Application of a risk-informed approach to identify and mitigate areas of highest risk. - Leverage of valuable processes and lessons learned from earlier spaceflight programs. - Development of Safety and Mission Assurance products to inform design risk trades. - Utilization of common Safety and Mission Assurance practices to identify safety risks for multiple perspectives: top-down, bottom-up, and across lines of integration. - Approval of safety hazards at the appropriate level of authority, keeping most deliberation closest to design expertise and elevating risks of greatest concern for program-level consideration. - Championing of Safety and Mission Assurance processes and forums to foster a pervasive safety culture that is transparent, inclusive, and collaborative between all partners. These tenets have allowed the Gateway Safety and Mission Assurance function to play a key role in optimized vehicle design evolution, and early identification and mitigation of Gateway program and Artemis mission risk.

Helen Vaccaro↗