On Projection of Safe Operation for Grid-Following Inverters - Grid Parameter Estimation

This work investigates the projection of safe operation for grid-following inverters using a reference model. This work applies recursive-least square and model reference adaptive estimation techniques to estimate the unknown grid parameters. The estimated grid parameters are used in a dynamic reference model to project the safe operation of the inverter. This work also demonstrates that the controller nonlinearity and parameter variations can cause unsafe operations, such as unexpected instability at low power levels, namely hidden mode of instability. This instability issue in the nominal operating range may occur for given control parameters in a weak-grid condition. The dynamic reference model for PQ-controlled inverters is applied to analyze this instability issue using the estimated grid parameters. Both adaptive identification techniques can estimate the unknown parameters accurately, and the dynamic reference model can safeguard inverters from an unsafe operation, i.e., hidden instability, by examining the incoming new power setpoints before engaging them to the local controller. The findings are experimentally verified using a small-scale two-level 208 V, 5 kVA inverter feeding a 12 kW NHR 9410 power grid emulator.

Hossen, Tareq↗

Study of Seamless Microgrid Transition Operation Using Grid-Forming Inverters: Preprint

This paper investigates operational techniques to achieve smooth microgrid (MG) transitions by dispatching the grid-forming (GFM) inverter. In traditional approaches, the GFM inverter must switch between grid-following (GFL) and GFM control mode during MG transition operation. Today's inverter technology allows GFM inverters to always operate in GFM control mode, so it is worthy to explore how to use them to achieve smooth MG transition operation. This paper proposes three operational techniques: a traditional scheme of switching between GFL and GFM control; a new scheme of consistent GFM control and shifting the droop intercept up before islanding operation; and a new scheme of consistent GFM control and shifting the droop intercept up before synchronization operation. A full hardware setup is established to compare the three techniques and showcase their implementations in real-world applications. As expected, the third technique outperforms the others and exhibits the best transition performance because the GFM inverter maintains the same operating points during the transition operation. Therefore, we conclude that ensuring smooth MG transition operation requires the GFM inverter(s) to maintain the same operating points (v, f, P, Q, and phase angle) during the transition operation in addition to minimizes the point of common coupling power flow.

grid-following control↗

Statistical Analysis of Inter-Area Oscillations in the U.S. Eastern Interconnection: A 2017-2023 Perspective

Recent advancements and the accumulation of high-resolution, long-term phasor measurement unit (PMU) data have provided detailed insights into inter-area oscillations in power grids. This study conducts a comprehensive statistical analysis of inter-area oscillations within the United States Eastern Interconnection from 2017 to 2023. Utilizing data captured by the advanced wide-area Frequency Monitoring Network (FNET/GridEye), this investigation examines the occurrence patterns, dominant frequencies, damping ratios, and excitation mechanisms of these oscillations. Our analysis sheds light on the evolving statistical behaviors of inter-area oscillations, offering updated and critical information for grid operators and planners. The insights gained from this study can be instrumental in enhancing the operational resilience of the power network and guiding strategic developments in grid infrastructure to accommodate future challenges. Additionally, the study discusses emerging challenges associated with the modernization of the power grid, including increased renewable penetration, dynamic load variability, and cyber-physical vulnerabilities that complicate oscillation monitoring and control.

Inter-area oscillations↗

Communication Network Layer State Estimation Measurement Model for a Cyber-Secure Smart Grid

Network communication has been proven to be a very important tool and a key factor in the recent development and progress of the power grid operation. It is also considered as the foundation for the smart grid because information and communication are integrated into electricity distribution to achieve reliable and accurate knowledge of the power grid. In previous years, absorbing energy from substations and delivering it to customers was the only type of interaction we knew between utility companies and customers. Presently, the growing connections of small distributed generation units caused by the cost reduction of most of the technologies used in generation and storage of electrical energy, along with the potential benefits of renewable energy have pushed many researchers to look into the improvement of information and communication technologies (ICT) in order to ensure a bidirectional flow of power and data. Moreover, the evolution of information and communication technologies and its applications to smart grid have converted the smart grid into a cyber-physical system where vulnerabilities and additional security challenges such as cyber-threats and cyber-attacks have emerged. Previously, we have demonstrated that using machine learning-based processing on data gathered from communication networks and the power grid was a promising solution for detecting cyber threats by implementing a co-simulation of cyber-security for cross-layer strategy. Since the majority of the challenges observed can only be solved in the network communication layer, we present in this work a physics-based state estimation model of the communication network system towards enhanced cyber-physical security of the smart grid. Information integration with the previously developed machine learning model is developed, providing a enhanced cyber-physical security application for the smart grid. Easy-to-implement model, without hard-to-derive parameters, highlight potential aspects of the model for real-life applications.

Mathieu, Reynold↗

Energy Services Interface: Requirements Document

This energy services interface (ESI) requirements document represents a process step in the path for creating an ESI specification, which will describe the technical characteristics of an ESI. This document outlines the concepts that need to be covered in the ESI specification, such as principal functions of the ESI, grid services communicated through the ESI, and the ESI lifecycle. It provides context for the Department of Energy’s (DOE’s) Grid Modernization Laboratory Consortium (GMLC) to engage industry participants in the development of the ESI specification. To do this, it describes the desired contents of the ESI specification and provides examples of the type of material that needs to be included in it. The purpose of the ESI specification is to define the requirements that are to be addressed in information and communications technology (ICT) interface standards for enabling the integration of a facility containing responsive distributed energy resources (DER facility) to an electric system consistent with the fundamental ESI principles. In this context, a DER facility may consist of a single DER with a communicating controller or may be as complex as a microgrid campus with several buildings and many DERs. The ESI specification is not a technical interface standard, but the requirements in the specification can be used to check that existing, augmented, or new interface standards meet the interoperability requirements of the ESI concept, which is explained further in this document. In this way, the ESI specification can be used to guide standards advancement work in multiple standards development organizations. To explain the scope of the ESI specification, this ESI requirements document provides examples of situations (or illustrative applications) for using an ESI to coordinate DER flexibility for grid operations. These examples originate from foundational work for describing common grid-DER service agreements that are anticipated to be supported using this interface.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Leveraging Cloud Platforms for Grid Modernization

Overview of the DOE funded Grid Operator Analytics and Assessment tools for Inverter-Based Resources Dominated Grid (GOAAT-IBR) Project, including insight to the lab setup and event analysis and dashboards that are being developed for this project.

Aminifar, Ph.D., Farrokh↗

Eastern Interconnection Wide-Area Oscillation Assessment and Study Report

To meet the government mandates such as Renewable Portfolio Standards (RPS), conventional synchronous generators with rotating mass are being displaced by inverter-based resources (IBRs), leading to high penetration of renewable energy sources (RES). As a result, the inherent properties and characteristics of the transformed generation mix may significantly impact the grid behaviour, and it is of paramount significance that the impact and the consequences of the resource mix change is thoroughly understood to adopt measures to maintain reliable grid operations. Of great concern is the inter-area low-frequency oscillation, which usually propagates through a large region and has a system-wide impact. Such oscillations may lead to unnecessary or inadvertent tripping of generators, that may be simply reacting to the oscillation originating from geographically remote sites. Such tripping of generators can lead to cascading outages, system split and load loss events. Over the years, several system-wide oscillation events have been observed across all three North American interconnections. This project titled Wide-area Oscillation Assessment and Trending Study, sponsored by the Office of Electricity (OE) of the Department of Energy (DOE), aims to conduct the required research to capture and investigate the potential changes in wide-area oscillatory performance of the system as a result of resource mix transition. The Pacific Northwest National Laboratory (PNNL) conducted this research and technical staff of Federal Energy Regulatory Commission (FERC) served as advisors to the project. The primary objective of this study is to assess whether there are significant trends in the power system wide-area oscillatory behaviours, as a result of the generation-mix changes due to the increased penetration of RES in the U.S. Eastern Interconnection (EI). The analysis presented in this report can serve as reference for future grid planning and operation of the EI system. This research conducted in this project evaluates the wide-area oscillatory behaviour of the EI, using a model-based approach for potential future resource mixes, and the measurement-based analysis with 21-month phasor measurement unit (PMU) time series. The oscillation modes in EI system along with the impact of the changes of the generation mix on the frequency and damping ratio (DR) of the oscillations have been studied.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High Value Opportunities to Advance Automation in Electric Grid Control Rooms

Grid operators and electric utilities are increasingly driven to develop automated processes and introduce decision support tools to reduce cognitive demand on System Operations staff and aid in the operational decision-making process. However, System Operation staff are traditionally hesitant to implement and accept new solutions, automation processes, and tools within the control room. This paper explores high-value opportunities to advance automation in electric grid control rooms for the purpose of improving grid safety, reliability, and resiliency during normal and emergency operating conditions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

U.S. Department of Energy-National Lab Equity Summit: Grid Planning and Operations (Workshop Report)

This report summarizes the U.S. DOE and national laboratories equity summit that was held on February 5, 2024, and focused on grid planning and operations. The objectives of the summit were to connect DOE and lab researchers working on grid-related equity issues, share information on current and planned grid-related equity projects and initiatives, and inspire and educate participants by hearing from our panelists about solutions and challenges to integrating equity in grid planning and operations. The summit included two panels of industry leaders. The first was a state and community perspectives panel that included representatives from a state public utility commission (Oregon Public Utility Commission), a state energy office (Washington Department of Commerce), a state utility consumer advocate (Connecticut Consumer Counsel), and industry consultants (Elevated Engagement and ArkSpring Consulting). Panelists shared successes they have seen, critical challenges related to equity and grid planning and operations, and other considerations. The second panel addressed utility perspectives and included representatives from two utilities (Commonwealth Edison and Tacoma Power), the National Rural Electric Cooperative (NRECA), and a former utility employee and legal consultant. Panelists discussed the role of the utility concerning equity, the most significant technical and data modeling needs and opportunities, and the role the labs could help advance equity in grid planning and operations. There was also a session on partner organization presentations. Argonne National Laboratory made a short presentation on the Grid Modernization Laboratory Consortium (GMLC) project they are leading on equity-informed power system planning. NARUC, NASEO, and the Clean Energy States Alliance, as partners of the GMLC project also shared updates on relevant activities and resources. During the summit, there were two rounds of lightning presentations by national labs and DOE highlighting research that addresses equity and grid planning and operations (Tables 5 and 6 and slides in the Appendix). The goal of the lightning rounds was to share information between participants to encourage collaboration and leverage ongoing research at labs and DOE. The summit included two interactive exercises where summit participants shared their perspectives on relevant equity projects and initiatives (Table 2), key challenges regarding equity and grid planning and operations (Table 3), and promising innovations or progress (Table 4). At the end of the session, participants were asked to share essential insights from the event (Table 7) and an action they plan to take as a result of the event. Participants agreed that the event was useful in helping them share and learn from each other. The project team plans to use the information from the summit as a starting point to help inform future research and technical assistance. In 2026, another Equity Summit will be held (virtually or in person) as part of the same project to help raise awareness and disseminate research and resources completed during the project's duration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Series FACTS Devices for Increasing Resiliency in Severe Weather Conditions

Severe weather conditions are low-probability, high-impact events that affect grid operations. The majority of power outages are caused by severe weather conditions. Grid resiliency to weather events can be enhanced by decreasing the reliance on its affected sections. One way to do this is to reduce the power flow through lines vulnerable to severe weather. If a line is disconnected, its initial power flow is distributed through the neighbor lines, which may cause congestion in the grid. FACTS devices can be used to control the power flow of lines that have a higher chance of power outages. Most previous works do not consider weather events in power flow control. In this work, a linearized optimal power flow (OPF)–based algorithm is developed to minimize the real power flow of vulnerable lines considering the thermal limits of lines to prevent infeasible solutions; the simulation is fast, making it suitable for large-scale systems. The proposed optimization problem is presented as a mixed-integer linear program (MILP), making it capable of using short-term load forecasting due to its high solution speed. The proposed optimization problem considers multiple lines with different outage probabilities and the uncertainties of the weather forecast. Moreover, it estimates the power reduction in vulnerable lines due to changes in the series FACTS devices. The performance of the proposed optimization problem is tested on IEEE 14-, 30-, and 118-bus systems for several scenarios. The results are validated with the AC power flow results from MATPOWER.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Synchrophasor Measurements-based Events Detection Using Deep Learning

Deep learning algorithms have been developed for phasor measurement units (PMUs) analysis aiming at providing grid operators to observe and react to significant real-time changes in the grid associated with multiple factors (e.g., power generation and load variations, different type of faults, and equipment mailfunction), or for offline post-event system diagnostics. In this study, a Long Short-Term Memory (LSTM)-based deep neural network (DNN) is adopted and evaluated to identify the most appropriate model configurations for event detection and longer-term anomalous pattern extraction. The proposed DNN model shows the potential on long-term predictions with the ability to capture nonlinear and nonstationary mixture complex patterns in PMU datasets. Real-world PMU in the WECC system were used for model development and validation.

deep learning↗

Enabling Principles for Dual Participation by Energy Storage as a Transmission and Market Asset

Because the electric transmission system is sized to meet the highest levels of customer demand, much of its designed capacity goes unused during average operating conditions. As a uniquely flexible and scalable asset capable of providing multiple grid services, energy storage can be deployed to support the transmission system and then also provide services to energy markets when not needed for transmission. This paper reviews the technical barriers in transmission planning practices and energy market design that prevent the realization of dual-use energy storage projects that provide both regulated transmission and competitive market services. Current practices create barriers against the identification of energy storage in the transmission planning process and against the participation of a regulated transmission asset in competitive energy markets. A review of regional transmission plans identifies best practices for including energy storage in the planning process by directing planners to proactively identify such projects or by providing clear mechanisms for stakeholders to propose them. Creating a market participation model for dual-use energy storage assets requires establishing when an asset will be allowed to participate in the market, how it will participate in the market, and where it will recover its costs. In answering these questions, key principles must be satisfied, such as prioritizing reliability, incrementally building on existing market design, and balancing competing objectives. Several policy options exist for satisfying those principles, giving grid operators and stakeholders significant flexibility in developing a dual-use participation model in accordance with regional policies and conditions. By objectively framing the issue and identifying policy options, this paper may inform subsequent proceedings on dual-use energy storage and be a resource to regional market operators, utilities, developers, regulators, policymakers, and other stakeholders as they collectively work on this complex issue.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Regional Real-Time PV Spinning Reserve Estimator

Curtailed photovoltaic (PV) generation is a zero-marginal-cost spinning reserve that can be used for a number of active power control services. Unlike traditional spinning reserve providers, however, i.e., fossil-fueled generators, which have well-defined operating characteristics, e.g., available headroom or potential high limit (PHL), PV plants have by nature variable and uncertain operating characteristics. To ensure the effective coordination between PV plants and the system operator during an active power control event, accurate knowledge of the PV PHL is essential. It ensures that enough headroom is reserved by the PV plants to deliver the award services in real time and informs feasible dispatch decisions made by the market operator. To tackle this challenge, a novel reference-control grouping-based PV plant reserve estimation method has been proposed by the National Renewable Energy Laboratory under past projects funded by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Solar Energy Technologies Office. The estimation method separates inverters within a plant into two groups: a control group and a reference group. While the reference group is reserved to operate at its PHL, the control group can be curtailed to provide the grid services. Real-time outputs from the reference inverters are used to estimate the PHL for the whole plant based on the ratio between capacities of the reference group and of the plant. This work further enhances the methodology by (1) improving the model accuracy through machine learning; (2) automating the reference inverter selection through correlation analysis; (3) considering estimation look-ahead windows; and (4) applying to regional spinning reserve estimation. Significant performance improvement has been observed based on real-world data collected by CAISO, Southern Company, and Terabase Energy. Compared with the original scaling method, the newly proposed machine learning-based approach reduces the estimation errors by 30% and 13% at the plant level and region level, respectively. Results obtained from this project are intended to be used by grid operators, market operators, balancing authorities, and PV plant owners and operators to facilitate PV participation in ancillary service markets. Regulators, policymakers, and system planners can also consider the results of this work in their decision-making processes. In addition to the performance improvement on the existing reference-control based grouping method, we also investigated how the variability of PV generation from a single PV inverter can be used to represent the variability of PV generation at the plant level.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Hydropower Game: An Interactive Learning Tool for the Future Hydropower Workforce

This report documents a Seedling project supported by the U.S. Department of Energy (DOE) Water Power Technologies Office (WPTO), conducted by Argonne National Laboratory (ANL) and the National Laboratory of the Rockies (NLR). The Seedling and Sapling Program provides small grants over short duration to enable early-stage research at national laboratories. This funding mechanism is intended to cultivate innovative ideas and expand research road maps in hydropower and marine energy technologies. Under this Seedling award, the project team developed an educational outreach tool, or “serious game”, built in Python and powered by the Pygame library, aimed at teaching fundamental hydropower concepts through an engaging, interactive learning experience. The game features multiple lessons covering several hydropower topics while allowing for expansion and customization in the instance of future funding availability: • Hydropower Plant Types: Players explore and compare the mechanics and applications of run-of-river, dam hydropower, and pumped-storage hydropower. • Flow Dynamics and Power Generation: Interactive tasks demonstrate how release rate and hydraulic head combine to determine power output. • Grid Operations and Load Following: Simulations illustrate how hydropower facilities respond to fluctuating electricity demand to balance the grid. • Market Integration: Levels scaffold understanding of how hydropower interfaces with the broader energy market, including operational and economic considerations. The tool was showcased at several science, technology, engineering, and mathematics (STEM) outreach events, where it was demoed to students, educators, and the general public. These events provided valuable opportunities to collect feedback on the gameplay, storyline, and educational objectives from a wide audience. The game was presented at STEMapalooza, Introduce a Girl to Engineering Day, STEMCON, and Clean Currents 2025. Insights gathered during these demonstrations informed refinements to the game’s user experience and strengthened its effectiveness as an educational tool for teaching hydropower concepts. This report outlines the game’s design philosophy, educational objectives, technical implementation, user experience insights, and potential for broader deployment within educational and workforce development contexts. It emphasizes how gamified learning can demystify complex hydropower science and inspire interest in water-power technologies. The project’s success demonstrates the value of Seedling funding in fostering creative, lowcost educational tools that support DOE’s mission to advance energy literacy and innovation. The report concludes with recommendations for expanding the tool by adding new levels, integrating assessment metrics, and exploring commercialization or deployment pathways through future Sapling funding. The official webpage of the Hydropower Game, which includes a link to the educational tool, can be accessed at www.anl.gov/hydropower/hydropower-game.

13 HYDRO ENERGY↗

Medium Voltage Testbed for Comparing Advanced Power Line Sensors vs. Transformers with Electrical Grid Events

Electrical utilities have relied upon potential transformers (PTs) and current transformers (CTs) for very accurate metering and to provide reliable signals for protective relays. These devices measure phase voltages and currents and are commissioned by electrical engineers. PTs/CTs can detect and react to various electrical anomalies that could adversely affect electrical grid operations. Less expensive alternative sensing technologies offer the possibility of wider deployment, particularly in grids that employ distributed energy resources. In this work, the performance of an advanced medium-voltage sensor is compared with that of a reference PT and a CT and experimentally evaluated for different power grid scenarios on an advanced outdoor power line sensor testbed at the U.S. Department of Energy’s Oak Ridge National Laboratory. The sensor is based on a capacitive divider for voltage monitoring and a Rogowski coil with an integrator for current monitoring. This study simulated a power grid model based on a utility circuit at the Riverside EPB of Chattanooga. The simulation circuit was created with MATLAB/Simulink software and was integrated into an RT-LAB project to run with the OP4510 real-time simulator at the OPLST. During the tests, the real-time simulations were run for 40 s, and the signal to record the test event with the power meter was set at 30 s for the event-trigger circuit. The advanced outdoor power line sensor testbed has a real-time simulator that is used to generate transient scenarios (e.g., electrical faults, capacitor bank operation, and service restoration), while the analog signals are recorded by the same high-resolution power meter. The behaviors of analog signals, harmonic components, total harmonic distortion, and crest factors are assessed for this power line sensor and compared with those of the reference PT/CT because of the absence of testing standards for advanced outdoor power line sensors. The results showed that this OPLS technology responded identically to the PT and CT under all conditions.

Piesciorovsky, Emilio [ORNL]↗

Machine Learning Derived Dynamic Operating Reserve Requirements in High-Renewable Power Systems

Accurately forecasting wind and solar power output poses challenges for deeply decarbonized electricity systems. Grid operators must commit resources to provide reserves to ensure reliable operations in the face of forecast errors, a process which can increase fuel consumption and emissions. We apply neural network-based machine learning to expand the usefulness of median point forecast data by creating probabilistic distributions of short-term uncertainty in demand, wind, and solar forecasts that adapt to prevailing grid conditions. Machine learning derived estimates of forecast errors compare favorably to estimates based on incumbent methods. Reserves derived from machine learning are usually smaller than values derived using incumbent methods, which enables fuel savings during most hours. Machine learning reserves are generally larger than incumbent reserves during times of higher forecast error, potentially improving system reliability. Performance is tested using multi-stage production simulation modeling of the California Independent System Operator (CAISO) system. Machine learning reserves provide production cost and greenhouse gas (GHG) emission reductions of approximately 0.3% relative to historical 2019 requirements. Savings in the 2030 timeframe are highly dependent on battery storage capacity. At lower levels of battery capacity, savings of 0.4% from machine learning reserves are shown. Significant quantities of battery storage are expected to be added to meet California's resource adequacy needs and GHG reduction targets. Addition of these batteries saturate reserve needs and results in minimal within-hour balancing costs in 2030.