Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “evolvable hardware”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Software-Hardware Co-design of Heterogeneous SmartNIC System for Recommendation Models Inference and Training

Deep Learning Recommendation Models (DLRMs) are critical applications in various domains and have evolved as one of the single largest machine learning applications. Trillions of DLRM parameters exceed the on-chip memory capacity of GPUs. Large-scale multi-node systems are required for distributed DLRM inference and training, which suffer from the all-to-all communication bottleneck, mainly limiting the scalability of ever-growing DLRMs. In recent years, SmartNICs have evolved with coupled computation and communication capabilities providing opportunities for a powerful heterogeneous device in the system. However, there isn't such a distributed system that fully leverages the abundant smartNIC resources that resolve the scalability issue of DLRMs. In this work, we proposed a software-hardware co-design of a heterogeneous smartNIC system that resolves the communication bottleneck of distributed DLRMs, mitigates the memory bandwidth pressure, and improves computation efficiency. We provide a set of smartNIC designs of cache systems (including local cache and remote cache) and smartNIC computation kernels which reduce data movement, relieve memory lookup intensity, and improve the GPU's computation efficiency. In addition, we propose a graph algorithm that improves the data locality of queries within batches which optimizes the overall system performance with higher data reuse. Our evaluation shows that our system achieves 2.1x latency speedup for inference and 1.6x throughput speedup for training.

Guo, Anqi↗

Resilience of the Electric Grid Through Trustable IoT-Coordinated Assets

The electricity grid has evolved from a physical system to a cyberphysical system with digital devices that perform measurement, control, communication, computation, and actuation. The increased penetration of distributed energy resources (DERs) including renewable generation, flexible loads, and storage provides extraordinary opportunities for improvements in efficiency and sustainability. However, they can introduce new vulnerabilities in the form of cyberattacks, which can cause significant challenges in ensuring grid resilience. We propose a framework in this paper for achieving grid resilience through suitably coordinated assets including a network of Internet of Things devices. A local electricity market is proposed to identify trustable assets and carry out this coordination. Situational Awareness (SA) of locally available DERs with the ability to inject power or reduce consumption is enabled by the market, together with a monitoring procedure for their trustability and commitment. With this SA, we show that a variety of cyberattacks can be mitigated using local trustable resources without stressing the bulk grid. Multiple demonstrations are carried out using a high-fidelity cosimulation platform, real-time hardware-in-the-loop validation, and a utility-friendly simulator.

distributed energy resources↗

Energy Efficient Engine (E3) combustion system component technology performance report

The Energy Efficient Engine (E3) combustor effort was conducted as part of the overall NASA/GE E3 Program. This effort included the selection of an advanced double-annular combustion system design. The primary intent of this effort was to evolve a design that meets the stringent emissions and life goals of the E3, as well as all of the usual performance requirements of combustion systems for modern turbofan engines. Numerous detailed design studies were conducted to define the features of the combustion system design. Development test hardware was fabricated, and an extensive testing effort was undertaken to evaluate the combustion system subcomponents in order to verify and refine the design. Technology derived from this effort was incorporated into the engine combustion hardware design. The advanced engine combustion system was then evaluated in component testing to verify the design intent. What evolved from this effort was an advanced combustion system capable of satisfying all of the combustion system design objectives and requirements of the E3.

Burrus, D. L.↗

Towards Superior Software Portability with SHAD and HPX C++ Libraries

As hardware architectures and software stacks complexity grows, development productivity, performance and software portability, quickly evolve from desirable features to actual needs. SHAD, the Scalable High-performance Algorithms and Data-structures C++ library is designed to mitigate these issues: it provides general purpose building blocks as well as high-level custom utilities, and offers a shared-memory programming abstraction which facilitates the programming of complex systems, scaling up to High Performance Computing clusters. SHAD’s portability is achieved through an abstract runtime interface, which decouples the upper layers of the library and hides the low level details of the underlying architecture. This layer enables SHAD to interface with different runtime/threading systems, e.g. Intel TBB and Global Memory and Threading (GMT). However, current backends targeting distributed systems, rely on a centralized controller which may possibly limit scalability up to hundreds of nodes and creates a network hot spot due to all to one communication for synchronization, and possibly resulting in degraded performance at high process counts. In this research, we explore HPX, the C++ standard library for parallelism and concurrency, as an additional backend in support of the SHAD library, and present the methodologies in support of local and remote task executions in SHAD with respect to HPX. Finally, we evaluate the proposed system by comparing against existing backends of SHAD and analyzing their performance on C++ Standard Template Library algorithms.

Wu, Nanmiao↗

Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 4: Design of the IPAD system. Part 1: IPAD system design requirements, phase 1, task 2

System requirements, software elements, and hardware equipment required for an IPAD system are defined. An IPAD conceptual design was evolved, a potential user survey was conducted, and work loads for various types of interactive terminals were projected. Various features of major host computing systems were compared, and target systems were selected in order to identify the various elements of software required.

Garrocq, C. A.↗

Emerging computer technologies and the news media of the future

The media environment of the future may be dramatically different from what exists today. As new computing and communications technologies evolve and synthesize to form a global, integrated communications system of networks, public domain hardware and software, and consumer products, it will be possible for citizens to fulfill most information needs at any time and from any place, to obtain desired information easily and quickly, to obtain information in a variety of forms, and to experience and interact with information in a variety of ways. This system will transform almost every institution, every profession, and every aspect of human life--including the creation, packaging, and distribution of news and information by media organizations. This paper presents one vision of a 21st century global information system and how it might be used by citizens. It surveys some of the technologies now on the market that are paving the way for new media environment.

Vrabel, Debra A.↗

Learning Lessons from the X-37 Project

The X-37 was planned as an automated vehicle capable of flight-testing new aerospace technologies in combined environments that are beyond the capability of existing ground or flight platforms. Flight demonstration with the X-37 architecture and configuration in relevant environments was planned to reduce the risk of developing launch vehicle technologies for sustainable, affordable exploration and other aerospace applications. Current plans are for the X-37 Approach and Landing Test Vehicle (ALTV) to be atmospheric tested in 2005 from Scaled Composite's White Knight carrier aircraft at up to 40,000 feet over California's Mojave Spaceport, with and turnaround maintenance performed. The fight Operations Control Center will conduct the mission, using a streamlined operations concept. Taxi-tow and captive-carry tests will be conducted prior to the atmospheric-test series. Sponsored by the Defense Advanced Research Projects Agency (DARPA) with NASA participation, technical objectives are to: (1) mature Computed Air Data System/Remote Pressure Sensor technology, (2) manage energy during Terminal Area Energy Management/Heading Alignment Cone maneuvers, and (3) validate the aerodatabase. The X-37 Project began in 1999 under a cooperative agreement as an element of NASA's Future X Program and transitioned to a NASA Research Announcement under the Space Launch Initiative. In mid-2004, NASA transferred ownership to DARPA, with its heritage of performing high-risk, high-payoff research and development. NASA contributes technical expertise, including risk analysis and system integration. The Boeing Company is the prime contractor, with nationwide suppliers. This recent partnership exemplifies the synergy attainable when NASA Centers, other Government agencies, and industry work together toward a common goal - contributing to the knowledge base for U.S. exploration and other aerospace endeavors. The X-37 team represents a range of space transportation disciplines - from engineering to management. Some members have been with the project since its inception. All have gained priceless experience during the design, manufacturing, and testing of the ALTV, as well as through developing advanced orbital flight technologies, such as state-of-the-art Thermal Protection Systems and hot structures. Throughout this process, the X-37 Project team captures lessons that are directly applicable to other such efforts. The upcoming ALTV flights offer another dimension of data and first-hand experience that will prove invaluable to those designing new generations of reusable spacecraft. And ongoing technology developments will expand the aerospace knowledge base. Delivering prototype hardware is always a risky proposition. During the course of the X-37 effort, the team has experienced many challenging opportunities, delivering significant accomplishments and learning numerous lessons in the process. The ability to manage the risk landscape is key to overcoming obstacles, especially technical hurdles that are encountered in progressing hardware from design to flight. The approach to managing risk under this partnership is evolving but, in general, the team allocates resources to reduce the likelihood of severe-consequence risks, thus maximizing mission success and ensuring that the X-37 Project delivers value to its stakeholders. As the team sharpens its focus on operations, it continues to contribute knowledge to those who would undertake high-risk, high-payoff research and development and provides valuable experience to implement the exploration vision.

Turner, Susan↗

Learning Lessons from the X-37 Project

The X-37 was planned as an automated vehicle capable of flight-testing new aerospace technologies in combined environments that are beyond the capability of existing ground or flight platforms. Flight demonstration with the X-37 architecture and configuration in relevant environments was planned to reduce the risk of developing launch vehicle technologies for sustainable, affordable exploration and other aerospace applications. Current plans are for the X-37 Approach and Landing Test Vehicle (ALTV) to be atmospheric tested in 2005 from Scaled Composite s White Knight carrier aircraft at up to 40,000 feet over California's Mojave Spaceport, with landing and turnaround maintenance performed. The Flight Operations Control Center will conduct the mission, using a streamlined operations concept. Taxi-tow and captive-carry tests will be conducted prior to the atmospheric-test series. Sponsored by the Defense Advanced Research Projects Agency (DARPA) with NASA participation, technical objectives are to: (1) mature Computed Air Data System/Remote Pressure Sensor technology, (2) manage energy during Terminal Area Energy Management/Heading Alignment Cone maneuvers, and (3) validate the aerodatabase. The X-37 Project began in 1999 under a cooperative agreement as an element of NASA's Future X Program and transitioned to a NASA Research Announcement under the Space Launch Initiative. In mid-2004, NASA transferred ownership to DARPA, with its heritage of performing high-risk, high-payoff research and development (R&D). NASA contributes technical expertise, including risk analysis and system integration. The Boeing Company is the prime contractor, with nationwide suppliers. This partnership exemplifies the synergy attainable when NASA Centers, other Government agencies, and industry work together toward a common goal - contributing to the knowledge base for U.S. exploration and other aerospace endeavors. The X-37 team represents a range of space transportation disciplines - from engineering to management. Some members have been with the project since its inception. All have gained priceless experience during the design, manufacturing, and testing of the ALTV, as well as through developing advanced orbital flight technologies, such as state-of-the-art Thermal Protection Systems and hot structures. Throughout this process, the X-37 Project team captures lessons that are directly applicable to other such efforts. The upcoming ALTV flights offer another dimension of data and first-hand experience that will prove invaluable to those designing new generations of reusable spacecraft. And ongoing technology developments will expand the aerospace knowledge base. Delivering prototype hardware is always a risky proposition. During the course of this effort, the X-37 team has experienced many challenging opportunities, delivering significant accomplishments and learning numerous lessons in the process. The ability to manage the risk landscape is key to overcoming obstacles, especially technical hurdles that are encountered in progressing hardware from design to flight. The approach to managing risk under this partnership is evolving but, in general, the team allocates resources to reduce the likelihood of severe-consequence risks, thus maximizing mission success and ensuring that the X-37 Project delivers value to its stakeholders. As the team sharpens its focus on operations, it continues to contribute knowledge to those who would undertake high-risk, high-payoff R&D and provides valuable experience to implement the Vision for Space Exploration.

Turner, Susan↗

Component-Level Electronic-Assembly Repair (CLEAR) Operational Concept

This Component-Level Electronic-Assembly Repair (CLEAR) Operational Concept document was developed as a first step in developing the Component-Level Electronic-Assembly Repair (CLEAR) System Architecture (NASA/TM-2011-216956). The CLEAR operational concept defines how the system will be used by the Constellation Program and what needs it meets. The document creates scenarios for major elements of the CLEAR architecture. These scenarios are generic enough to apply to near-Earth, Moon, and Mars missions. The CLEAR operational concept involves basic assumptions about the overall program architecture and interactions with the CLEAR system architecture. The assumptions include spacecraft and operational constraints for near-Earth orbit, Moon, and Mars missions. This document addresses an incremental development strategy where capabilities evolve over time, but it is structured to prevent obsolescence. The approach minimizes flight hardware by exploiting Internet-like telecommunications that enables CLEAR capabilities to remain on Earth and to be uplinked as needed. To minimize crew time and operational cost, CLEAR exploits offline development and validation to support online teleoperations. Operational concept scenarios are developed for diagnostics, repair, and functional test operations. Many of the supporting functions defined in these operational scenarios are further defined as technologies in NASA/TM-2011-216956.

Oeftering, Richard C.↗

Space Suit Portable Life Support System (PLSS) 2.0 Pre-Installation Acceptance (PIA) Testing

Following successful completion of the space suit Portable Life Support System (PLSS) 1.0 development and testing in 2011, the second system-level prototype, PLSS 2.0, was developed in 2012 to continue the maturation of the advanced PLSS design which is intended to reduce consumables, improve reliability and robustness, and incorporate additional sensing and functional capabilities over the current Space Shuttle/International Space Station Extravehicular Mobility Unit (EMU) PLSS. PLSS 2.0 represents the first attempt at a packaged design comprising first generation or later component prototypes and medium fidelity interfaces within a flight-like representative volume. Pre-Installation Acceptance (PIA) is carryover terminology from the Space Shuttle Program referring to the series of test sequences used to verify functionality of the EMU PLSS prior to installation into the Space Shuttle airlock for launch. As applied to the PLSS 2.0 development and testing effort, PIA testing designated the series of 27 independent test sequences devised to verify component and subsystem functionality, perform in situ instrument calibrations, generate mapping data to define set-points for control algorithms, evaluate hardware performance against advanced PLSS design requirements, and provide quantitative and qualitative feedback on evolving design requirements and performance specifications. PLSS 2.0 PIA testing was carried out from 3/20/13 - 3/15/14 using a variety of test configurations to perform test sequences that ranged from stand-alone component testing to system-level testing, with evaluations becoming increasingly integrated as the test series progressed. Each of the 27 test sequences was vetted independently, with verification of basic functionality required before completion. Because PLSS 2.0 design requirements were evolving concurrently with PLSS 2.0 PIA testing, the requirements were used as guidelines to assess performance during the tests; after the completion of PIA testing, test data served to improve the fidelity and maturity of design requirements as well as plans for future advanced PLSS functional testing.

Watts, Carly↗

Space Suit Portable Life Support System (PLSS) 2.0 Pre-Installation Acceptance (PIA) Testing

Following successful completion of the space suit Portable Life Support System (PLSS) 1.0 development and testing in 2011, the second system-level prototype, PLSS 2.0, was developed in 2012 to continue the maturation of the advanced PLSS design. This advanced PLSS is intended to reduce consumables, improve reliability and robustness, and incorporate additional sensing and functional capabilities over the current Space Shuttle/International Space Station Extravehicular Mobility Unit (EMU) PLSS. PLSS 2.0 represents the first attempt at a packaged design comprising first generation or later component prototypes and medium fidelity interfaces within a flight-like representative volume. Pre-Installation Acceptance (PIA) is carryover terminology from the Space Shuttle Program referring to the series of test sequences used to verify functionality of the EMU PLSS prior to installation into the Space Shuttle airlock for launch. As applied to the PLSS 2.0 development and testing effort, PIA testing designated the series of 27 independent test sequences devised to verify component and subsystem functionality, perform in situ instrument calibrations, generate mapping data, define set-points, evaluate control algorithms, evaluate hardware performance against advanced PLSS design requirements, and provide quantitative and qualitative feedback on evolving design requirements and performance specifications. PLSS 2.0 PIA testing was carried out in 2013 and 2014 using a variety of test configurations to perform test sequences that ranged from stand-alone component testing to system-level testing, with evaluations becoming increasingly integrated as the test series progressed. Each of the 27 test sequences was vetted independently, with verification of basic functionality required before completion. Because PLSS 2.0 design requirements were evolving concurrently with PLSS 2.0 PIA testing, the requirements were used as guidelines to assess performance during the tests; after the completion of PIA testing, test data served to improve the fidelity and maturity of design requirements as well as plans for future advanced PLSS functional testing.

Anchondo, Ian↗

A Discussion of Oxygen Recovery Definitions and Key Performance Parameters for Closed-Loop Atmosphere Revitalization Life Support Technology Development

Over the last 55 years, NASA has evolved life support for crewed space exploration vehicles from simple resupply during Project Mercury to the complex and highly integrated system of systems aboard the International Space Station. As NASA targets exploration destinations farther from low Earth orbit and mission durations of 500 to 1000 days, life support systems must evolve to meet new requirements. In addition to having more robust, reliable, and maintainable hardware, limiting resupply becomes critical for managing mission logistics and cost. Supplying a crew with the basics of food, water, and oxygen become more challenging as the destination ventures further from Earth. Aboard ISS the Atmosphere Revitalization Subsystem (ARS) supplies the crew's oxygen demand by electrolyzing water. This approach makes water a primary logistics commodity that must be managed carefully. Chemical reduction of metabolic carbon dioxide (CO2) provides a method of recycling oxygen thereby reducing the net ARS water demand and therefore minimizing logistics needs. Multiple methods have been proposed to achieve this recovery and have been reported in the literature. However, depending on the architecture and the technology approach, "oxygen recovery" can be defined in various ways. This discontinuity makes it difficult to compare technologies directly. In an effort to clarify community discussions of Oxygen Recovery, we propose specific definitions and describe the methodology used to arrive at those definitions. Additionally, we discuss key performance parameters for Oxygen Recovery technology development including challenges with comparisons to state-of-the-art.

Abney, Morgan B.↗

EVA Systems Technology Gaps and Priorities 2017

Performance of Extra-Vehicular Activities (EVA) has been and will continue to be a critical capability for human space flight. Human exploration missions beyond LEO will require EVA capability for either contingency or nominal activities to support mission objectives and reduce mission risk. EVA systems encompass a wide array of products across pressure suits, life support systems, EVA tools and unique spacecraft interface hardware (i.e. EVA Translation Paths and EVA Worksites). In a fiscally limited environment with evolving transportation and habitation options, it is paramount that the EVA community's strategic planning and architecture integration products be reviewed and vetted for traceability between the mission needs far into the future to the known technology and knowledge gaps to the current investments across EVA systems. To ascertain EVA technology and knowledge gaps many things need to be brought together, assessed and analyzed. This includes an understanding of the destination environments, various mission concept of operations, current state of the art of EVA systems, EVA operational lessons learned, and reference advanced capabilities. A combined assessment of these inputs should result in well-defined list of gaps. This list can then be prioritized depending on the mission need dates and time scale of the technology or knowledge gap closure plan. This paper will summarize the current state of EVA related technology and knowledge gaps derived from NASA's Exploration EVA Reference Architecture and Operations Concept products. By linking these products and articulating NASA's approach to strategic development for EVA across all credible destinations an EVA could be done in, the identification of these gaps is then used to illustrate the tactical and strategic planning for the EVA technology development portfolio. Finally, this paper illustrates the various "touch points" with other human exploration risk identification areas including human health and performance.

Johnson, Brian J.↗

Energy Efficient Engine combustor test hardware detailed design report

The Energy Efficient Engine (E3) Combustor Development effort was conducted as part of the overall NASA/GE E3 Program. This effort included the selection of an advanced double-annular combustion system design. The primary intent was to evolve a design which meets the stringent emissions and life goals of the E3 as well as all of the usual performance requirements of combustion systems for modern turbofan engines. Numerous detailed design studies were conducted to define the features of the combustion system design. Development test hardware was fabricated, and an extensive testing effort was undertaken to evaluate the combustion system subcomponents in order to verify and refine the design. Technology derived from this development effort will be incorporated into the engine combustion system hardware design. This advanced engine combustion system will then be evaluated in component testing to verify the design intent. What is evolving from this development effort is an advanced combustion system capable of satisfying all of the combustion system design objectives and requirements of the E3. Fuel nozzle, diffuser, starting, and emissions design studies are discussed.

Burrus, D. L.↗

Ground Software Technologies – Embracing Change: Mission Drivers and Technology Opportunities to Enable Long Lived Missions

Mission lifecycles have proven to extend well beyond their original design. The benefits to this are countless but introduce challenges in today’s rapidly changing ground infrastructure and software technologies used to enable mission success. What remains constant is the risk posture missions maintain when accepting change and the use of new technologies. Larger missions are ready for change in early lifecycle development but near launch and especially in operations, few continue to evolve beyond what is set in place in phase C. This paper will discuss how the Advance Multi-Mission Operations System (AMMOS) intends to address, three driving missions concerns: Maintaining functionality (hardware/software) for decades, rapidly responding to security vulnerabilities in software, and finally the ability to quickly evolve infrastructure and software changes. These driving concerns are briefly described below: 1. Maintaining functionality (hardware/software) for decades. Hardware updates considerably faster than 10 years ago. Expectations that a system can remain in place for more than 10 years is no longer valid. Expecting to find hardware replacements for a system older than 5 years will increasingly become more and more challenging. How than do missions plan for hardware changes for long lived missions? Principle Objective: Provide abstraction by virtualizing and containerizing software abstract away any hardware dependencies and package up the application lightweight units. 2. Rapidly responding to security vulnerabilities in software. Cost is often the main impediment and largely driven by the revalidation and testing of system that undergo change. In todays, environment security updates are a major diver demanding systems remain up to date. How then do missions accept these changes and avoid large testing efforts? Principle Objective: Help reduce the cost of re-testing by automation of testing, deployment, and compartmentalizing change. 3. Ability to quickly evolve infrastructure and software changes. Responding quickly to change is similar to the second concern in this paper regarding security vulnerabilities. In this case, it address broader concerns of updating software and infrastructure on a more realistic timeline. How do missions stay up to date with the most recent versions of software and allowing for improved functionality? Principle Objective: Use continuous integration techniques at the system level to ensure rapid turnaround. This paper explores each of these concerns in more detail. It focuses the AMMOS’s current plans, challenges and current roadmap.

Giovannoni, Brian J.↗

NASA's Space Launch System: Moving Toward the Launch Pad

The National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center (MSFC), is making progress toward delivering a new capability for human space flight and scientific missions beyond Earth orbit. Designed with the goals of safety, affordability, and sustainability in mind, the SLS rocket will launch the Orion Multi-Purpose Crew Vehicle (MPCV), equipment, supplies, and major science missions for exploration and discovery. Supporting Orion's first autonomous flight to lunar orbit and back in 2017 and its first crewed flight in 2021, the SLS will evolve into the most powerful launch vehicle ever flown via an upgrade approach that will provide building blocks for future space exploration. NASA is working to deliver this new capability in an austere economic climate, a fact that has inspired the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history. This paper will summarize the planned capabilities of the vehicle, the progress the SLS Program has made in the 2 years since the Agency formally announced its architecture in September 2011, the path it is following to reach the launch pad in 2017 and then to evolve the 70 metric ton (t) initial lift capability to 130-t lift capability after 2021. The paper will explain how, to meet the challenge of a flat funding curve, an architecture was chosen that combines the use and enhancement of legacy systems and technology with strategic new developments that will evolve the launch vehicle's capabilities. This approach reduces the time and cost of delivering the initial 70 t Block 1 vehicle, and reduces the number of parallel development investments required to deliver the evolved 130 t Block 2 vehicle. The paper will outline the milestones the program has already reached, from developmental milestones such as the manufacture of the first flight hardware, to life-cycle milestones such as the vehicle's Preliminary Design Review (PDR). The paper will also discuss the remaining challenges both in delivering the 70-t vehicle and in evolving its capabilities to the 130-t vehicle, and how NASA plans to accomplish these goals. As this paper will explain, SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

Creech, Stephen D.↗

The Manufacturing Process for the NASA Composite Crew Module Demonstration Structure

This paper will describe the approaches and methods selected in fabrication of a carbon composite demonstration structure for the Composite Crew Module (CCM) Program. The program is managed by the NASA Safety and Engineering Center with participants from ten NASA Centers and AFRL. Multiple aerospace contractors are participating in the design development, tooling and fabrication effort as well. The goal of the program is to develop an agency wide design team for composite habitable spacecraft. The specific goals for this development project are: a).To gain hands on experience in design, building and testing a composite crew module. b) To validate key assumptions by resolving composite spacecraft design details through fabrication and testing of hardware. This abstract is based on Preliminary Design data..The final design will continue to evolve through the fall of 2007 with fabrication mostly completed by conference date. From a structures perspective, the.CCM can be viewed as a pressure module with variable pressure time histories and a series of both impact and quasi-static, high intensity point, line, and area distributed loads. The portion of the overall space vehicle being designed and. fabricated by the CCM team is just the pressure module and primary loading points. The heaviest point loads are applied and distributed to the pressure module at.an aluminum Service Module/Alternate Launch Abort System (SM/ALAS) fittings and at Main and Drogue Chute fittings. Significant line loads with metal to metal impact is applied at.the Lids ring. These major external point and line loads as well as pressure impact loads (blast and water landing) are applied to the lobed floor though the reentry shield and crushable materials. The pressure module is divided into upper and lower. shells that mate together with a bonded belly band splice joint to create the completed structural assembly. The benefits of a split CCM far outweigh the risks of a joint. These benefits include lower tooling cost and less manufacturing risk. Assembly of the top and bottom halves of the pressure shell will allow access to the interior of the shell throughout remaining fabrication sequence and can also potentially permit extensive installation of equipment and .crew facilities prior to final assembly of the two shell halves. A Pi pre-form is a woven carbon composite material which is provided in pre-impregnated form and frozen for long term storage. The cross-section shape allows the top of the pi to be bonded to a flat or curved surface with a second flat plate composite section bonded between two upstanding legs of the Pi. One of the regions relying on the merits of the Pi pre-form is the backbone. All connections among plates of the backbone structure, including the upper flanges, and to the lobe base of the pressure shell are currently joined by Pi pre-forms. The intersection of backbone composite plates is formed by application of two Pi pre-forms, top flanges and lobed surfaces are bonded with one Pi pre-form. The process of applying the pre-impregnated pi-preform will be demonstrated to include important steps like surface preparation, forming, application of pressure dams, vacuum bagging for consolidation, and curing techniques. Chopped carbon fiber tooling was selected over other traditional metallic and carbon fiber tooling. The requirement of schedule and cost economy for a moderate reuse cure tool warranted composite tooling options. Composite tooling schedule duration of 18 weeks compared favorably against other metallic tooling including invar tooling. Composite tooling also shows significant cost savings over low CTE metallic options. The composite tooling options were divided into two groups and the final decision was based on the cost, schedule, tolerance, temperature, and reuse requirements.

Pelham, Larry↗

AI Benchmark Democratization and Carpentry

Benchmarks are a cornerstone of modern machine learning, enabling reproducibility, comparison, and scientific progress. However, AI benchmarks are increasingly complex, requiring dynamic, AI-focused workflows. Rapid evolution in model architectures, scale, datasets, and deployment contexts makes evaluation a moving target. Large language models often memorize static benchmarks, causing a gap between benchmark results and real-world performance. Beyond traditional static benchmarks, continuous adaptive benchmarking frameworks are needed to align scientific assessment with deployment risks. This calls for skills and education in AI Benchmark Carpentry. From our experience with MLCommons, educational initiatives, and programs like the DOE's Trillion Parameter Consortium, key barriers include high resource demands, limited access to specialized hardware, lack of benchmark design expertise, and uncertainty in relating results to application domains. Current benchmarks often emphasize peak performance on top-tier hardware, offering limited guidance for diverse, real-world scenarios. Benchmarking must become dynamic, incorporating evolving models, updated data, and heterogeneous platforms while maintaining transparency, reproducibility, and interpretability. Democratization requires both technical innovation and systematic education across levels, building sustained expertise in benchmark design and use. Benchmarks should support application-relevant comparisons, enabling informed, context-sensitive decisions. Dynamic, inclusive benchmarking will ensure evaluation keeps pace with AI evolution and supports responsible, reproducible, and accessible AI deployment. Community efforts can provide a foundation for AI Benchmark Carpentry.

von Laszewski, Gregor [Virginia U.]↗