Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “electric load”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Reducing microgrid availability to reduce costs for coastal Puerto Rican communities

Renewable microgrids are sustainable, resilient solutions to mitigate and adapt to climate change. Making electric loads nearly 100% available (i.e., power remains on) during outages increases cost. Near 100% availability is required when human life or high-cost assets are involved, but availability can be reduced for less consequential loads leading to lower costs. This study analyses costs for photo-voltaic and lithium-ion battery microgrids with availability ranging from 0–99%. We develop a methodology to analyse three Puerto Rican coastal communities. Here, we consider power outage effects for hurricanes, earthquakes, and everyday outages. The results show cost versus availability from 0–99%. There is 27–31% cost reduction at 80% availability in comparison to 99% availability. A regression model of microgrid availability versus three ratios: 1) the annual generation to demand ratio, 2) storage to interruption energy ratio, and 3) peak storage to load ratio produced a coefficient of determination of 0.99949 with 70% of the data used for training and 30% for testing. The results can therefore be extended to other coastal Puerto Rican communities of varying sizes that have ratios within the ranges analysed in this study. This can empower decision makers to rapidly analyse designs that have availabilities well below 100%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

An 85 nW IoT Node-Controlling SoC for MELs Power-Mode Management and Phantom Energy Reduction

This paper presents an ultra-low power (ULP) node-controlling system-on-chip (SoC) used for power-mode management and phantom energy reduction of miscellaneous electric loads (MELs). The SoC is powered from a single 2.5 V voltage supply enabled by the integrated power management unit (PMU) and can control up to 16 MELs due to the on-chip 16-channel correlator and the 32b RISC-V microprocessor. To further reduce the system power consumption, two clock domains have been adopted for the correlator and the processor separately. Fabricated in 65-nm CMOS, the measured minimum power consumption of the proposed SoC is only 85 nW at 0.45 V voltage supply and 1 kHz clock frequency. The measured maximum operating frequency can go up to 148 kHz with a 0.55 V supply. An application experiment successfully demonstrates that the SoC controls the power modes of MELs from wake-up to cut-off to save the average power and phantom energy.

power-mode management, phantom energy, phantom pow↗

Adaptive Computing for Scale-Up Problems

Adaptive Computing is an application-agnostic outer loop framework to strategically deploy simulations and experiments to guide decision making for scale-up analysis. Resources are allocated over successive batches, which makes the allocation adaptive to some objective such as optimization or model training. The framework enables the characterization and management of uncertainties associated with predictive models of complex systems when scale-up questions lead to significant model extrapolation. A key advancement of this framework is its integration of multi-fidelity surrogate modeling, uncertainty management, and automated orchestration of various computing and experimentation resources into a single integrated software package. This enables efficient multi-fidelity modeling across multiple computing resources by incorporating real-world constraints such as relative queue times and throughput on individual machines into the multi-fidelity sampling decision. We discuss applications of this framework to problems in the renewable energy space, including biofuels production, material synthesis, perovskite crystal growth, and building electrical loads.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Ubiquitous Power Electronics in Future Power Systems: Recommendations to fully utilize fast control capabilities

Power electronics is becoming ubiquitous in power systems because the rapid growth of variable renewable generation such as wind and solar, responsive load, electric vehicles, energy storage, as well as DC transmission. As a result, a high percentage of electricity will be generated, transmitted or consumed by power electronics in the future power system. Such a high penetration of power electronics is changing power system operation landscapes and dynamic characteristics. Two major kinds of impact are reduced system mechanical inertia by inverter-based resources displacing conventional generation and active participation of many distributed energy resources through inverters. This has caused significant reliability challenges for power system operation. The mitigation approach so far has mostly focused on accommodating power electronics inverters as passive devices or creating synthetic inertias to make inverter-based generation behaving as conventional generators. However, the high-speed control capabilities of power electronics present new opportunities for achieving an optimal performance beyond conventional power systems. A lower-inertia system can be more responsive for improving reliability, and distributed small resources can be more adaptive and scalable for better flexibility and resilience. Power electronic inverters are capable of multiple fast control functions. To fully utilized the ubiquitous power electronics in power systems requires technology advancements in the following areas: data and communications to capture the new dynamic behaviors introduced by power electronics; modeling and simulation to understand the behaviors of power electronics and its interactions with other components in the context of power systems; control and optimization methods for fully utilizing the capabilities of power electronics for a new paradigm of performance beyond the traditional inertia-heavy system; and significant upgrades in power electronics hardware to cater to the new control capabilities. If properly controlled and optimized, power electronics can help transform the power system to be responsive, adaptive, and scalable.

Huang, Zhenyu↗

Allocation and Operation of A Hydropneumatic Energy Storage with Building Microgrid

Behind-meter application for a recently invented hydropneumatic Ground-Level Integrated Diverse Energy Storage (GLIDES) is focused in this research. Considering possible uncertainties from solar radiation and electricity load in a building microgrid, two-stage stochastic programming is adopted for 15-min operation and a mixed-integer nonlinear stochastic model is built with integrated energy systems of GLIDES, solar panel and power generating unit. In order to make the model computationally tractable, we use sample average approximate method to decrease associated complexity with sample size and improve solving efficiency. The experimental results in deterministic and stochastic operation indicate that best candidate solution from SAA are superior to the solution from expected value problem in terms of optimality gap and variance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Hybrid Framework Combining Model-Based and Data-Driven Methods for Hierarchical Decentralized Robust Dynamic State Estimation

This paper combines model-based and data-driven methods to develop a hierarchical, decentralized, robust dynamic state estimator (DSE). A two-level hierarchy is proposed, where the lower level consists of robust, model-based, decentralized DSEs. The state estimates sent from the lower level are received at the upper level, where they are filtered by a robust data-driven DSE after a principled sparse selection. This selection allows us to shrink the dimension of the problem at the upper level and hence significantly speed up the computational time. The proposed hybrid framework does not depend on the centralized infrastructure of the control centers; thus it can be completely embedded into the wide-area measurement systems. This feature will ultimately facilitate the placement of hierarchical decentralized control schemes at the phasor data concentrator locations. Also, the network model is not necessary; thus, a topology processor is not required. Finally, there is no assumption on the dynamics of the electric loads. The proposed framework is tested on the 2,000-bus synthetic Texas system, and shown to be capable of reconstructing the dynamic states of the generators with high accuracy, and of forecasting in the advent of missing data.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling a Bulb-Style Kaplan Unit Hydrogovernor and Turbine in Mathworks-Simulink and RTDS-RSCAD

Some run-of-river (ROR) hydropower plants use a horizontal bulb-style Kaplan turbine. This turbine and the corresponding governor are not represented well in standard high-fidelity power-system modeling platforms. This paper presents the characterization, development, and modeling of bulb-style Kaplan turbine and associated hydrogovernor equipment in two platforms: Simulink from the MathWorks, Inc., and RSCAD from RTDS Technologies, Inc. The developed models enable accurate assessment of the response of a bulb-style Kaplan hydropower unit to changes in electrical loading and water conditions. The resulting models enable accurate digital real-time simulation with hardware-in-the-loop testing of this class of turbine, which was not previously possible. This, in turn, improves the ability to innovate these technologies and hybridize them in a lab setting, accelerating the potential for innovation in this type of ROR hydropower plant.

13 HYDRO ENERGY↗

Joint Planning of Electricity Transmission and Hydrogen Transportation Networks

The abundance and uneven distribution of renewable energy might cause congestion and curtailment in electric power systems. Transmission expansions can potentially alleviate transmission congestion and reduce renewable energy curtailment. On the other hand, with the substantial cost reduction of electrolyzer technology and the continuing rise of hydrogen demand, converting surplus renewable energy to hydrogen provides synergistic benefits to power and hydrogen systems, but consequently requires joint planning of the two systems. To this end, we propose a joint planning approach for power transmission and hydrogen transportation networks to coordinately optimize the investment and operation of power and hydrogen infrastructure. In our proposed model, detailed truck routing, pipeline, and hydrogen storage are formulated to quantify the flexibility of hydrogen transportation system. A robust joint planning approach is also proposed to address various uncertainties from renewable energy, electric load, and hydrogen demand. Furthermore, our numerical simulations show that the proposed joint planning model can save the total system cost, reduce renewable energy curtailment, and increase the utilization level of transmission lines.

08 HYDROGEN↗

Switch Opening and Exchange Method for Stochastic Distribution Network Reconfiguration

The purpose of distribution network reconfiguration (DNR) is to determine the optimal topology of an electricity distribution network, which is an efficient measure to reduce network power losses. Electricity load demand and photovoltaic (PV) output are uncertain and vary with time of day, and will affect the optimal network topology. Single-hour deterministic DNR is incapable of handling this uncertainty and variability. Therefore, this paper proposes to solve a multi-hour stochastic DNR (SDNR). Existing solution methods for DNR are either inaccurate or excessively time-consuming, and are therefore incapable of solving multi-hour SDNRs for large distribution networks. In this regard, a switch opening and exchange (SOE) method is proposed. Starting from a looped network with all switches closed, the SOE consists of three steps. The first step is to sequentially open the switches until all of the loops are opened. The second and third steps modify the status of branches obtained in the first step to obtain better radial topologies. Five test systems are used to validate the accuracy and fast solution speed of the SOE and the superiority of multi-hour SDNR over single-hour deterministic DNR.

distribution network reconfiguration↗

OpenStudio System-level KPI Reporting Measure v1.0

This is a OpenStudio measure that calculates and reports the system-level key performance indicators (KPIs) for evaluating building energy performance at the system level. The systems are defined by the service it provides in commercial buildings, which include (1) lighting, (2) Miscellaneous Electric Loads (MELs), (3) Heating, Ventilation and Air Conditioning (HVAC), and (4) Service Water Heating (SWH).

Li, Han↗

dsgrid (Demand-Side Grid Toolkit) [SWR-21-52]

The demand-side grid model harnesses decades of sector-specific energy modeling expertise to understand current and future U.S. electricity load for power systems analyses. The API provides tools for submitting datasets to dsgrid projects, validating individual datasets and project data as a whole, querying, analysis, and visualization.

Hale, Elaine↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2020

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While many projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2020, as well as data on "completed" and "withdrawn" projects for five of the ISOs (CAISO, ISO-NE, MISO, NYISO, PJM). We find that the total capacity active in the queues is growing year-over-year, with over 750 GW of generation and an estimated 200 GW of storage capacity as of the end of 2020. Solar (462 GW) accounts for a large – and growing – share of generator capacity in the queues. Substantial wind (209 GW) capacity is also in development, 29% of which is for offshore projects (61 GW). In total, about 680 GW of zero-carbon capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 159 GW of solar hybrids (primarily solar+battery) and 13 GW of wind hybrids are currently active in the queues. However, much of this proposed capacity will not ultimately be built. Among a subset of queues for which data are available, only 24% of the projects seeking connection from 2000 to 2015 have subsequently been built. Completion percentages appear to be declining, and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: in four ISOs, the typical duration from connection request to commercial operation increased from ~1.9 years for projects built in 2000-2009 to ~3.5 years for those built in 2010-2020. There are growing calls for queue reform to reduce cost, lead times, and speculation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Renewable Portfolio Standard Assessment for Alaska's Railbelt

This memorandum for the Governor of Alaska evaluates the technical feasibility of reaching 80% renewable electricity by 2040 in the Railbelt corridor of Alaska, which represents 75% of Alaska's electric load. This analysis was developed to inform renewable energy portfolio standard (RPS) legislation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Introducing Small Scale Waste-to-Energy Technology in Microgrids (Cooperative Research and Development Final Report, CRADA Number CRD-17-00703)

Cogent has developed an innovative, proprietary waste-to-energy (WTE) system, the HelioStorm(TM) Gasifier, capable of efficiently operating on small amounts of heterogeneous municipal solid waste feedstocks, converting them into a clean syngas that can be used to fuel an electricity generator, all with rapid on/off cycle times. NREL will work with Cogent to complete a computer simulation of an integrated HelioStorm(TM) plasma gasifier system and dual fuel diesel generator. Cogent will test the performance of an actual HelioStorm(TM) WTE system and dual fuel diesel generator at their test facility using steady state electrical loads and provide a report describing the performance of the integrated system.

09 BIOMASS FUELS↗

Smart, Connected Manufactured Housing Solutions through High-Performance Design. Final CRADA report

This report focuses on HVAC, domestic hot water, and miscellaneous electric loads via voluntary opportunities that may arise from partnerships with utilities, as well as future US Environmental Protection Agency ENERGY STAR and DOE Zero Energy Ready Manufactured Home programs. Phase I of this project has begun the technical dialogue toward developing an implementation plan among DOE’s Oak Ridge National Laboratory, Clayton Manufactured Homes, and US Department of Housing and Urban Development Code manufactured housing stakeholders. These activities have focused on delivering high-performance design through integration of technology. Project tasks include the following: Identifying baseline energy analysis resources opportunities from a variety of DOE and utility stakeholders; Developing a smart home and business solution by leveraging existing utility programs working with Smart Homes Partners resources such as ACE IoT Solutions, Google Nest, and Ecobee; Developing improved smarter ventilation systems with industry ventilation partners such as the Madison Group; Developing improved building science QA/QC testing equipment with manufacturers such as The Energy Conservatory, and supporting other feasible concepts vetted under DOE’s Advanced Buildings Collaborative with Slipstream, reinventing HVAC in manufactured housing; and, Developing smart home short- and long-term viable technical solutions in coordination with Clayton Manufactured Homes in new and/or revitalized community scales for future Phase II prototype demonstrations, which may include design (and perhaps construction) of single-section homes targeting rental property developers and multi-section homes targeting low- to middle-income affordable housing community developers Given the ongoing US Department of Energy (DOE) rulemaking activities, baseline energy analysis assessments of envelope prescriptive and Uo (i.e., the overall thermal energy efficiency of the home in British thermal units per square foot of exterior heat loss/gain surfaces) measures were removed from the scope of Phase I of this project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development and testing of residential micro-CHP powered by opposed piston engine (CRADA Final Report)

A micro–combined heat and power (mCHP) prototype powered by innovative opposed piston engine technology was developed to simultaneously provide electricity and heat to residential or light commercial buildings. The mCHP prototype targeted at residential applications includes an opposed-piston four-stroke (OP4S) engine, generator, rectifier, inverter, battery energy storage system, 52 gal water tank, and application accessories for hot water supply and space heating. The OP4S engine can use renewable or regular natural gas, as well as hydrogen, to generate mechanical power and waste heat in form of hot coolant and exhaust gas simultaneously. The waste heat is recovered and stored in the water tank and can be used as a regular hot water supply and/or for space heating application. The tests show that the mCHP prototype enabled power outputs in the range of 3.2 –7.4 kW with up to 26.4% of AC electricity efficiency and up to 93.1% of the overall mCHP efficiency under stoichiometric combustion modes λ=~1.0. The mCHP was also run under lean combustion mode conditions at λ=~1.3. The lean mode operation enables more than 30% improvement in electrical energy efficiency. The maximum AC efficiency of the lean combustion mode attained was 35.2%, with the engine efficiency is approaching 40%. The exceptional electrical efficiency breaks the typical upper boundary of 30% for ICE-based mCHP. The engine exhaust temperatures in the lean modes are substantially less than in the stoichiometric modes. Moreover, the lean cases achieve high overall mCHP efficiencies: the overall mCHP efficiencies are all greater than 93%. Considering the mCHP prototype can achieve low-cost, flexible matching of thermal and electrical loads through reducing the complexity of distribution and installation, and high efficiency the novel technology will promote mCHP acceptance in the US residential and light commercial markets.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Long-Duration Energy Storage: Resiliency for Military Installations

This report provides a quantitative techno-economic analysis of a long-duration energy storage (LDES) technology, when coupled to on-base solar photovoltaics (PV), to meet the U.S. Department of Defense's (DoD's) 14-day requirement to sustain critical electric loads during a power outage and significantly reduce an installation's carbon footprint. The LDES modeled is Antora Energy's battery energy storage system (BESS). It is currently at a technology readiness level (TRL) of 7 and not ready for full-scale deployment. To support decisions on the value of near-term demonstrations, this analysis looked at the potential value of Antora Energy's BESS if deployed in the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Northern California and Southern Oregon Offshore Wind Transmission Study: Volume 1 (Revised)

Offshore wind (OSW) power based on floating technology in the coastal waters of the U.S. Pacific Ocean has great potential to contribute to climate mitigation and renewable energy goals in California, Oregon, and other parts of the western U.S. To achieve development of OSW at scale, investments in transmission infrastructure are needed to deliver this power to major metropolitan areas because these are the primary electricity load centers. Currently the transmission infrastructure serving coastal regions where OSW is most likely to be developed has limited capacity and is designed to bring power from the east to serve modest coastal loads. The development of OSW generation and the interconnection of this resource to the bulk power grid will require major investments in new transmission infrastructure and upgrades to existing infrastructure. This study investigated the development of up to 25.8 GW of OSW energy on the northern coast of California and the southern coast of Oregon. The focus of the study was to assess various transmission alternatives that could deliver OSW power to distant load centers while also providing energy benefits to rural coastal communities near to where OSW power may be developed.

17 WIND ENERGY↗