A Generalized Framework for Service Restoration in a Resilient Power Distribution System

An electric power grid is one of the complex infrastructures, and because of its complex nature, there is simply no way that outages can be completely avoided. Thus, a modern society that depends on reliable electric supply requires a resilient electric system that can recover from disruptions while integrating emerging smart grid technologies. Here, this article presents a novel approach for service restoration in a modern power distribution system with controllable switches and distributed generation (DG) resources for any kind of outage. The proposed framework supports both the traditional service restoration using feeder reconfiguration and the grid-forming DG-assisted intentional islands that are dynamically sized using algorithms based on the fault scenario, available resources, and priority of loads. The problem is formulated as a mixed-integer linear program that incorporates critical system connectivity and operating constraints. Simulations are performed to demonstrate the effectiveness of the proposed approach using a large-scale four-feeder 1069-bus three-phase unbalanced distribution test system. It is demonstrated that the framework is effective in utilizing all available resources in quickly restoring the power supply to improve resiliency during extreme events and is scalable for a large-scale unbalanced power distribution system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic State Estimation for Radial Microgrid Protection

Dynamic state estimation (DSE) is a generalization of differential protection that offers a reduced likelihood of misoperation, particularly in the case of devices with nonlinear characteristics such as transformers which are being energized. It is also useful in cases where distance protection performs poorly, such as transmission lines with series compensation or mutually coupled transmission lines. DSE has been previously applied to microgrid branch protection. This study investigates the use of DSE for protection of radial portions of a microgrid or distribution system. This can be a challenge in microgrids or distribution systems with distributed generation on account of lack of fault current from inverter-interfaced generation, varying fault current between grid- connected and islanded modes, the potential for normally-meshed operation and unbalanced operation due to single-phase loads. Admittance relaying has been investigated as a solution for protection of microgrids, though it has been observed to have issues with grounded-wye connected loads, and additional relaying is necessary to prevent misoperation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection of Distributed Energy Resources in the Indian Context: IEEE 1547-2018 Adaptation for Locally-Appropriate Grid Code Development

The rapid growth of distributed energy resources (DERs) in India and ambitious renewable energy goals set forth by the Indian government have created the need for appropriate distribution interconnection standards to ensure continued system stability, reliability, and resilience. Existing DER interconnection codes in India, at the time of publishing this report, lack many of the critical grid support functionalities for DERs which may protect bulk system stability, such as event ride-through provisions, frequency droop control, or appropriate trip thresholds given the increasing importance of distributed generation. The formal adoption of IEEE 1547-2018 by the Bureau of Indian Standards (BIS) marks a significant step towards achieving appropriate interconnection of DERs, though the implementation of such a standard must be accompanied with careful consideration of the current codes, regulations, and operation of the Indian power system. Studies on the performance of the functionalities within 1547-2018, which properly incorporate local operating conditions, can inform decisions related to the adoption and adaptation of the clauses present in the standard. This report outlines several of these key considerations for stakeholders and provides analyses illustrating the performance of grid support functionalities on typical Indian distribution feeders.

1547↗

Individual and Collective Strategies to Limit the Impacts of Large Power Outages of Long Duration

As modern society becomes ever more dependent on the availability of electric power, the costs that could arise from individual and social vulnerability to large outages of long duration (LLD-outages) increases. During such an outage, even a small amount of power would be very valuable. Here, this article compares individual and collective strategies for providing limited amounts of electric power to residential customers in a hypothetical New England community during a large electric power outage of long duration. We develop estimates of the emergency load required for survival and assess the cost of strategies to address outages that last 5, 10, and 20 days in either winter or summer. We find that the cost of collective solutions could be as much as 10 to 40 times less than individual solutions (less than $2 per month per home). However, collective solutions would require community-wide coordination, and if local distribution system lines are destroyed, only individual back-up systems could provide contingency power until those lines are repaired. Costs might be reduced if more robust distributed generation were employed that could be operated continuously with the ability to sell power back to the grid. Our cost-effectiveness analysis only assesses what could be done, developing estimates of preparedness cost. A decision about what should be done would require additional input from a range of stakeholders as well as some form of analytical deliberative process.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Synthetic Ancillary Service Generator (SynAS) v1

The balance of demand and supply in the electric power grid is a crucial element to grid reliability. While balancing is typically provided by conventional power plants, with spinning generators, distributed energy resources (DER) and especially electric vehicles (EVs) pose a great potential to provide such service. This project conducted a field demonstration at the Los Angeles Air Force Base (LA-AFB) where a fleet of mixed-use bi-directional EVs were actively participating in the California Independent System Operator (CAISO) market for frequency regulation. While participation in regulation markets is promising, a major drawback in designing control systems and assessing potential revenue is the lack of example frequency regulation signals. This project introduces an open-source dataset for 143 days of four-second regulation data, and the SynAS Python module to synthetically generate frequency regulation signals of arbitrary length.

Black, DouglasR↗

A Transactive Approach for Service Restoration Utilizing Customer Load Flexibility and Grid-Edge Resources

This paper develops a transactive energy system model to restore electricity to customers in an isolated distribution system after an outage. The model is developed to engage a variety of customer types - prosumers, flexible loads, critical/noncritical customers, and distributed generators - as active participants in the restoration process. Unlike many existing transactive approaches, the proposed model is developed for service restoration and accounts for various customer types and their autonomy and privacy through an iterative approach to determine the optimal market price, while maintaining systemlevel power flow and voltage constraints. The advantages of the proposed approach are numerically validated on a modified IEEE 123-bus test system.

distributed energy resources↗

A Transactive Approach for Service Restoration Utilizing Customer Load Flexibility and Grid-Edge Resources

This paper develops a transactive energy system model to restore electricity to customers in an isolated distribution system after an outage. The model engages a variety of customer types -- prosumers, flexible loads, critical/noncritical customers, and distributed generators -- as active participants in the restoration process. Unlike many existing transactive approaches, the proposed model is developed for service restoration and accounts for various customer types and their autonomy and privacy through an iterative approach to determine the optimal market price, while maintaining system-level power flow and voltage constraints. The advantages of the proposed approach are numerically validated on a modified IEEE 123-bus test system.

distributed energy resources↗

A Transactive Approach for Service Restoration Utilizing Customer Load Flexibility and Grid-Edge Resources: Preprint

This paper develops a transactive energy system model to restore electricity to customers in an isolated distribution system after an outage. The model engages a variety of customer types -- prosumers, flexible loads, critical/noncritical customers, and distributed generators -- as active participants in the restoration process. Unlike many existing transactive approaches, the proposed model is developed for service restoration and accounts for various customer types and their \textit{autonomy} and \textit{privacy} through an iterative approach to determine the optimal market price, while maintaining system-level power flow and voltage constraints. The advantages of the proposed approach are numerically validated on a modified IEEE 123-bus test system.

distributed energy resources↗

Microgrid Assisted Design for Remote Areas

In this work, we present a three-stage multiobjective mixed-integer linear programming (MILP) for the optimal expansion planning and operation of isolated multienergy microgrids in remote areas. By selecting the optimal distributed generators (DGs) and energy storage systems (ESSs) mix selection, siting, sizing, and scheduling in the remote microgrid, the proposed model is targeted to minimize the annualized total cost of microgrids while enhancing the performance of the system, i.e., minimizing the voltage deviations and line power loss. To represent the electricity and heat flow between generation resources and various electrical, heating, and cooling loads in the isolated microgrid, linearized power flow, and heat flow constraints are employed in the proposed optimization model. The available capacity of DGs and ESSs are modeled as discrete constants instead of continuous variables for practical purpose. Numerical simulation results on a remote microgrid consisting of DGs, ESSs, and various loads validate the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design of Controller Hardware-In-the-Loop Model of Microgrid with Modular Building Blocks and Automated Design Script

The scalability of controller hardware-in-the-loop (CHIL) simulation is critical for validating control coordination and energy management in microgrids with distributed energy resources, especially as these modern systems become more complex and decentralized. This paper presents a CHIL modeling methodology that combines modular building blocks with an automated design script to streamline the development of high-fidelity microgrid models. Standardized subsystem templates for resources, converters, and buses are integrated with a Python-based script that compiles structured JSON configuration files into simulation-ready initialization code. The proposed approach reduces development time, improves model consistency, and enhances simulation fidelity. The methodology is validated on a Typhoon HIL604 platform and is broadly applicable to real-time simulation of complex, networked microgrid systems. This framework establishes a foundation for automated, scalable CHIL validation and accelerates the design of next-generation distributed energy systems.

Kim, Namwon [ORNL] (ORCID:0000000200438489)↗

Integrating Electric Vehicle Charging Infrastructure into Commercial Buildings and Mixed-Use Communities: Design, Modeling, and Control Optimization Opportunities: Preprint

This paper discusses modeling and field studies of controlled EV charging that have been performed with the goal of minimizing requirements for infrastructure upgrades, minimizing building peak demand charges, and maximizing the use of on-site generation. We present a large-scale workplace charging pilot of a demand-controlled scheduled EV charging system with over 250 active daily commuters, successfully demonstrating management of aggregate charging power to avoid new infrastructure investments, mitigate peak demand charges, and provide cost-effective workplace charging to users. In addition to understanding opportunities for demand management, integrating these controllable loads into the energy modeling process for new buildings will also be necessary. This paper then presents an example energy modeling process that evaluates the potential effects of EV charging on building load profiles and infrastructure requirements for a mixed-use community. Finally, we discuss an illustration of how EV charging can be controlled to be synergistic with other building loads and distributed generation.

buildings↗

Final Scientific Technical Report for "Microgrid RD&D and Testing of PIDC and PWD Systems"

Alstom Grid Inc’s (ALSTOM Grid) Research Design and Development (RD&D) project, “Microgrid RD&D and Testing for PIDC and PWD” was conducted in partnership with Philadelphia Industrial Development Corporation (PIDC) in its role as owner’s representative and manager of a vibrant commercial and industrial community, involving critical loads in one of the nation’s largest unregulated, non-military electric distribution systems. PIDC needed to develop solutions to address the planned considerable growth in Distributed Energy Resources (DER) Combined Heat Plan (CHP), Renewables, Distributed Generation (DG), Demand Response (DR) and Storage. In supporting the corporate objective, PIDC needed a new class of control systems for achieving enhanced energy resilience of their critical infrastructure operation during adverse conditions together with carbon emission reduction and optimization of the overall system operation economics through system energy efficiency during normal and emergency operating conditions. Additionally, PIDC anticipated the need to support a new class of commercial agreements with tenants, such as those for Urban Outfitters, for guaranteed one hundred percent (100%) grid resilience and electric power supply in case of utility outage conditions. The project was designed to address the challenges for the commercial & industrial (C&I) communities. But more importantly, the project included development of scalable and replicable solutions intended to target a multitude of the nation’s electric distribution communities. The project researched and developed a fully comprehensive prototype consisting of microgrid operation and control functions including islanding, synchronization and reconnection, protection, voltage, frequency, and power quality management, dispatch, and system resiliency. The project provided the foundation required to significantly enhance the overall national objectives set by the DOE for energy resilience, emission reduction and system energy efficiency improvement, including protection of critical infrastructure and public resources.

14 SOLAR ENERGY↗

Roadmap for Advancement of Low-Voltage Secondary Distribution Network Protection

Downtown low-voltage (LV) distribution networks are generally protected with network protectors that detect faults by restricting reverse power flow out of the network. This creates protection challenges for protecting the system as new smart grid technologies and distributed generation are installed. This report summarizes well-established methods for the control and protection of LV secondary network systems and spot networks, including operating features of network relays. Some current challenges and findings are presented from interviews with three utilities, PHI PEPCO, Oncor Energy Delivery, and Consolidated Edison Company of New York. Opportunities for technical exploration are presented with an assessment of the importance or value and the difficulty or cost. Finally, this leads to some recommendations for research to improve protection in secondary networks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

MPC-based double-layer real-time conditional cSelf-restoration for interconnected microgrids

In this report, we propose a novel model predictive control(MPC)-based real-time conditional self-restoration energy management system (CSR-EMS) for interconnected microgrids (IMGs) integrated with renewable energy sources (RESs) and energy storage systems (ESSs). Superior to the existing IMG self-restoration methods, the “conditionality” of the proposed CSR-EMS can economically realize self-restoration and grid-assisted restoration during energy deficiency or faults, in both islanded and grid-connected modes. Cost minimization is implemented as the objective function to judge in real-time which restoration mode is economically preferred. The proposed CSR-EMS comprises two layers–the lower layer operates locally to eliminate electricity fluctuations created by RESs and ensure economic effectiveness within an MG, whereas the upper layer oversees the real-time operational status of the IMG system and determines power exchange among microgrids (MGs) during abnormalities. In detail, when a microgrid inside the IMG system experiences an energy deficiency, the CSR-EMS, on an MPC basis, intelligently optimizes power production from each dispatchable distributed generator (DG), ESS, power imported from the main grid, and power exchange among the IMGs to maintain the demand–supply balance, while considering system recovery cost, state of charge (SoC) of ESSs and operation modes of the IMGs (i.e., grid-connected or islanded mode). Simulation results and comparisons with existing IMG self-healing EMSs demonstrate the economic efficacy of the proposed CSR-EMS strategy during normal and abnormal operations, which can be used as an energy control framework for modern power systems with multiple interconnected microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Guide to Updating Interconnection Rules and Incorporating IEEE Standard 1547

The intent of this paper is to support local authorities in adopting the most current technical requirements for interconnecting distributed energy resources (DERs) to the electric distribution system as specified in the Institute of Electrical and Electronics Engineers Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018). To create interconnection rules that successfully address policy goals, market trends, and technical requirements, state regulators need to be well informed of DER integration considerations. Interconnection processes and technical issues often overlap; the two are not easily segregated, and they are often considered and evaluated concurrently within the context of interconnection rulemaking. Accordingly, this paper addresses both the technical issues and related process considerations. A lack of uniform and transparent procedures for addressing interconnection rule changes can result in implementation issues or inefficiencies, such as unclear, lengthy, and complicated interconnection rules that can increase distributed generation "soft costs" (i.e., non-hardware costs). This can further delay the deployment of DERs and jeopardize time-constrained national and state policy goals, such as renewable energy targets, or limit participation in emerging techno-economic trends. Additionally, misconstructed interconnection rules are at risk of becoming mired in stakeholder conflicts. This guide addresses the concerns of electric service regulators from both the process and technical standpoints by presenting a structured, step-by-step approach to developing and updating existing interconnection rules. In this document, the process of developing and updating interconnection rules is subdivided into three steps: (1) determining the context (stakeholders and major drivers); (2) developing the rule, including updating technical requirements; and (3) maintaining and revising the rule over time.

14 SOLAR ENERGY↗

TRANSENSOR: Transformer Real-time Assessment INtelligent System with Embedded Network of Sensors and Optical Readout. Final Report

Utilities across the world are wrestling with evolving market dynamics, population growth and climate change. Distributed Energy Resources (DERs) such as solar photovoltaics, distributed generators and energy storage systems are becoming important parts of the U.S. energy mix. These factors are driving an increasing need for low-cost grid asset monitoring. Aside from being costly, traditional utility monitoring systems are not sufficiently robust and do not provide real-time visibility into the condition of grid assets such as transformers. Lack of accurate real-time measurements on performance has resulted in the use of lagging indicators, such as oil sample analysis. To address this need, an innovative embedded optical sensing technology, Transformer Real-time Assessment Intelligent System (TRANSENSOR) was developed, validated and demonstrated in this project. To date, TRANSENSOR has focused on transformers but is extendable to other grid assets. In addition to the technology being embedded into new transformers during manufacturing, a retrofit configuration that can be installed on existing transformers in the field was also developed. It is anticipated that the ability to retrofit existing transformers will help accelerate adoption of the underlying TRANSENSOR technology. Phase 1 of the project focused on laboratory development and qualification of the technology. Following iterations and exploration of relevant optical sensing modalities and multiplexed configurations of interest for the transformer environment, an effective candidate configuration was agreed upon, down-selected and custom-designed for embedding into General Electric (GE) network transformers. Two new GE 500 kilovolt ampere (kVA), 27 kilovolt (kV) distribution network transformers were built with embedded fiber-optic (FO) sensors and successfully qualified per industry standards at GE’s Shreveport, Louisiana facility during Phase 1 of the project. Following the successful completion of Phase 1, the team proceeded to Phase 2, which focused on a field demonstration of the technology. Over Phase 2, the first new GE transformer built with embedded fiber-optic sensors was installed in an above-ground cage and connected to the grid at Con Edison’s Astoria facility. A second transformer equipped with TRANSENSOR was installed in an underground vault. Additionally, an older (1982 year model) GE transformer in an above-ground cage was retrofitted with fiber- optic sensors and reconnected to the grid at ConEd’s facility. Analysis of data acquired from the sensors showed interesting correlations with transformer loading. Additionally, key events such as transformer low-voltage network connection, primary-side energizing, and a pressure loss event from an oil sampling were detected by the TRANSENSOR system. Online data processing/feature extraction algorithms for the second transformer in the underground vault detected key features and event alerts that were transmitted through a wireless 4G connection. The remote deployment concept showed promising results with data collection running for a total of 8 months across the three (3) GE transformers instrumented for the Phase 2 field demonstration. This sets the stage well for further development and commercialization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Measuring labor productivity dynamics in U.S. industrial and electric power sectors: a case study (2014–2023)

This study proposes a subsystem methodology for measuring labor productivity in the U.S. industrial and electric power sectors by leveraging public data available between 2014 and 2023. Building on Pasinetti’s framework and subsequent developments, the approach employs Vertically Integrated Sectors (VIS) to account for both direct and indirect productivity effects. The novelty of this work is twofold. First, it enables the estimation of productivity trends over time, providing a robust foundation for empirical analysis. Second, it applies the methodology to a case study of the electric generation sector, highlighting its practical relevance. Using data from the Bureau of Economic Analysis, the Bureau of Labor Statistics, and the Impact Analysis for Planning (IMPLAN) tool, the study reveals significant discrepancies between conventional productivity measures and those derived from the VIS approach. Furthermore, the proposed method aligns with the principles of Integrated Energy Systems by capturing the interrelations among generation, distribution, storage, and consumption. This alignment underscores its utility and applications for energy-related policy and planning. Overall, the findings contribute to more precise labor productivity assessments, supporting informed decision-making and future research. Additionally, the method highlights the importance of considering the whole supply chain, providing interrelated metrics for labor productivity which includes both, direct and indirect effects on the final labor productivity metric. By incorporating intersectoral dependencies, this method offers a more comprehensive and accurate measure of labor productivity compared to traditional metrics.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗