Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “dispatch scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

222 records · Page 13

Profile of Resource Adequacy in the MISO Region

MISO is facing a number of generation resource challenges, ranging from large amounts of retirements, behind schedule retrofit projects, and internal resources committed to exporting power to PJM's capacity market. This report identifies potential issues with generator retirements and retrofits, as well as potential transmission issues, including the impact of imports and exports in a short-term outlook for resource adequacy in the MISO region, including specific concerns with the generation capacity expected to be available in the MISO North and Central regions from 2014 to 2016, as well as additional risks from proposed environmental regulations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Decentralized wind uncertainty management: Alternating direction method of multipliers based distributionally-robust chance constrained optimal power flow

How to manage wind power uncertainty in system operation is an urgent and important issue, especially under substantially increasing penetration levels of wind generation in electric power systems. With increasing numbers of wind power plants (WPPs) integrated into power systems, their variability and uncertain power outputs become a challenge to maintaining system reliability. Traditional stochastic optimization-based models face the curse of dimensionality when the number of WPPs increases. This paper proposes a novel decentralized wind power uncertainty management model. In this model, conventional generators optimize their power capacity output and their participation to mitigate wind power uncertainty locally with only limited information exchange with the system operators. First, a distributionally-robust chance-constrained optimal power flow (DRCC-OPF) model is deployed to schedule the generation and reserve considering the wind power forecast uncertainty. Then, the alternating direction method of multipliers (ADMM) is used to reformulate the DRCC-OPF model into the distributed optimization model for each conventional generator and WPP. The tests on a small PJM 5-bus system and the IEEE 118-bus system demonstrate that the proposed decentralized model can increase the operation reliability without sacrificing system operating cost, especially when the wind power penetration levels are high. Using the proposed model, the optimal solutions can be obtained within one minute, for all studied cases, which verifies the computation efficiency of the proposed decentralized model. Furthermore, considering a large number of WPPs integrated into the system, the proposed decentralized method obtains a lower operating cost within one minute which demonstrates its efficiency to deal with high dimension of uncertainties.

17 WIND ENERGY↗

Dispatch analysis of flexible power operation with multi-unit small modular reactors

The relevance of nuclear power plant flexible power operation (FPO) is rising due to increased penetration of variable renewables. Small Modular Reactors (SMRs) such as NuScale are envisaged to have multiple units on one site. This provides opportunities for coordinating FPO between units, but also introduces challenges as common services (e.g., refueling equipment) must be shared between units and fuel loadings may be standardized. It is therefore important to quantify whether FPO with SMRs is economically beneficial. Here, this paper quantifies the economics of FPO on different timescales to analyze refueling outages of such multi-unit SMRs. A 24-h price-taker profit maximization of SMR operation is first solved considering revenues from wholesale power and ancillary service (AS) markets. The results are then used to find the most profitable operation strategy over several years for multiple units at the site accounting for the physics and materials limits on NPP operation, including refueling outages. Results show a small but appreciable participation of nuclear into AS, contributing 4% of revenues. Due to the longer fuel cycle, over a decade of operation the units’ refueling outages drifted by 3 months, ultimately leading to refueling during summer.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Spinning Reserve From Hotel Load Response: Initial Progress

This project was motivated by the fundamental match between hotel space conditioning load response capability and power system contingency response needs. As power system costs rise and capacity is strained demand response can provide a significant system reliability benefit at a potentially attractive cost. At ORNL s suggestion, Digital Solutions Inc. adapted its hotel air conditioning control technology to supply power system spinning reserve. This energy saving technology is primarily designed to provide the hotel operator with the ability to control individual room temperature set-points based upon occupancy (25% to 50% energy savings based on an earlier study [Kirby and Ally, 2002]). DSI added instantaneous local load shedding capability in response to power system frequency and centrally dispatched load shedding capability in response to power system operator command. The 162 room Music Road Hotel in Pigeon Forge Tennessee agreed to host the spinning reserve test. The Tennessee Valley Authority supplied real-time metering equipment in the form of an internet connected Dranetz-BMI power quality meter and monitoring expertise to record total hotel load during both normal operations and test results. The Sevier County Electric System installed the metering. Preliminary testing showed that hotel load can be curtailed by 22% to 37% depending on the outdoor temperature and the time of day. These results are prior to implementing control over the common area air conditioning loads. Testing was also not at times of highest system or hotel loading. Full response occurred in 12 to 60 seconds from when the system operator s command to shed load was issued. The load drop was very rapid, essentially as fast as the 2 second metering could detect, with all units responding essentially simultaneously. Load restoration was ramped back in over several minutes. The restoration ramp can be adjusted to the power system needs. Frequency response testing was not completed. Initial testing showed that the units respond very quickly. Problems with local power quality generated false low frequency signals which required testing to be stopped. This should not be a problem in actual operation since the frequency trip points will be staggered to generate a droop curve which mimics generator governor response. The actual trip frequencies will also be low enough to avoid power quality problems. The actual trip frequencies are too low to generate test events with sufficient regularity to complete testing in a reasonable amount of time. Frequency response testing will resume once the local power quality problem is fully understood and reasonable test frequency settings can be determined. Overall the preliminary testing was extremely successful. The hotel response capability matches the power system reliability need, being faster than generation response and inherently available when the power system is under the most stress (times of high system and hotel load). Periodic testing is scheduled throughout the winter and spring to characterize hotel response capability under a full range of conditions. More extensive testing will resume when summer outdoor temperatures are again high enough to fully test hotel response.

24 POWER TRANSMISSION AND DISTRIBUTION↗

matsim-agents v1.0

matsim-agents is a multi-agent AI framework for atomistic materials simulation and discovery. It orchestrates large language models (LLMs), machine-learned interatomic potentials (MLIPs), and DFT codes into a single agentic loop running on laptops and DOE leadership-class supercomputers. MULTI-AGENT ORCHESTRATION A LangGraph state machine with three nodes: a Planner that converts a natural-language research objective into structured tasks; an Executor that dispatches atomistic tools and loops until the queue is empty; and an Analyst that summarizes results into a human-readable report. State is checkpointed after every step and human-in-the-loop gates can be inserted at any edge. HYPOTHESIS-DRIVEN DISCOVERY CHAT An interactive REPL (matsim-agents chat) that couples LLM dialogue with atomistic simulation. Chemical formulas are automatically detected in conversation turns and trigger a full crystal-phase exploration: structure generation → relaxation → stability scoring → result injection back into the conversation, creating a closed hypothesis-refinement loop. CRYSTAL PHASE ENUMERATION Given a composition, the phase explorer enumerates prototypes by stoichiometry: elemental (fcc/bcc/hcp/sc/diamond), binary 1:1 (rocksalt/CsCl/zincblende/ wurtzite/fluorite/rutile), ternary 1:1:3 (cubic perovskite), ternary 1:2:4 (perovskite + spinel), quaternary 1:1:2:6 (Fm-3m double perovskite). 2-D prototypes (graphene, h-BN, MoS2 2H/1T) and multilayer stacking are also supported via --include-2d and --num-layers. SUPERCELL GENERATION AND SITE DECORATION Auto-tiling to a minimum atom count (--min-atoms), explicit NxNxN tiling (--supercell), symmetry-distinct site decorations (--n-orderings), and isotropic lattice-scale sweeps (--lattice-scales) for volume bracketing. MLFF RELAXATION AND STABILITY SCORING HydraGNN (multi-headed GNN) drives structure relaxation via ASE with FIRE, BFGS, or BFGSLineSearch. Stability output: delta-E/atom ranking across phases and a max-residual-force dynamical-stability proxy. Other MLIPs (MACE, NequIP, Orb) can be plugged in through the same interface. DFT BACKENDS Quantum ESPRESSO pw.x and VASP 6.6 are first-class labellers. Both have validated GPU builds and SLURM/PBS launchers for three DOE platforms: Frontier (AMD MI250X, ROCm), Aurora (Intel PVC, oneAPI), Perlmutter (NVIDIA A100, CUDA). QE produces ~100 binaries (pw.x, ph.x, epw.x, ...). VASP supports scf, relax, vc-relax, and vc-relax-shape run types. ACTIVE-LEARNING LOOP matsim-agents al run CONFIG.yaml drives an iterative HydraGNN-DFT loop: MD generates candidates → ensemble/MC-dropout uncertainty selects the most informative → DFT labels them in parallel inside one allocation → dataset grows → HydraGNN retrains → repeat. DFT backend is a single YAML toggle (dft.backend: vasp | qe). LLM-generated seed structures are supported (no curated POSCAR library needed). Config uses ${VAR}, ${VAR:-default}, ${VAR:?msg} shell-style substitution for cross-user/cross-site portability. LLM BACKENDS Ollama (local, default), vLLM (HPC multi-GPU serving), OpenAI, Anthropic, HuggingFace Transformers+Accelerate. Selected at runtime via flag or env var with no code changes. HPC PORTABILITY Same Python entry points run on Frontier (ROCm 7.2), Aurora (oneAPI), and Perlmutter (CUDA 12). DFT and ML stacks are never co-loaded in the same shell; they couple through the scheduler and filesystem. Advanced multi-node launchers (serve, discovery-chat, single-relaxation, active-learning, QE warm-start) are provided for all three platforms. CODABENCH COMPETITION BUNDLE A self-contained benchmark: 159 atomistic test structures across 11 material classes, 5 tasks (formation energy, forces, ML relaxation, AI-DFT relaxation, phase stability ranking), public/private leaderboard split (30/70), and four ready-to-run baselines: MACE-MP-0, HydraGNN, UMA, AllScAIP.

Lupo Pasini, Massimiliano [Oak Ridge National Labo↗

Analysis of Benefits of an Energy Imbalance Market in the NWPP

The Northwest Power Pool (NWPP) Market Assessment Committee (MC) Initiative, which was officially launched on March 19, 2012, set out to explore a range of alternatives that could help the Balancing Authorities and scheduling utilities in the NWPP area address growing operational and commercial challenges affecting the regional power system. The MC formed an Analytical Team with technical representatives from each of the member Balancing Areas in the NWPP and with staff of Pacific Northwest National Laboratory (PNNL). This Analytical Team was instructed to conduct extensive studies of intra-hour operation of the NWPP system in the year 2020 and of the NWPP region with 14,671 MW of wind penetration. The effort utilized a sub-hourly production cost model (the PLEXOS® computer model) that inputs data from the Western Electricity Coordinating Council (WECC)-wide Production Cost Model (PCM) to evaluate potential production cost savings. The Analytical Team was given two general options to evaluate: •Energy Imbalance Market (EIM): establishment of an automated, organized NWPP area market for economically supplying energy imbalance within the hour. •Enhanced Market-Operational Tools (EMT) that might augment or replace an EIM. The Analytical The Analytical Team built on the WECC-wide PCM data from prior work done in the WECC and carried forward the evolution of the original WECC Transmission Expansion Planning Policy Committee (TEPPC) 2020 PC0 data base. A large number of modifications and improvements were made to this case and the data were subjected to extensive review by the team members to improve the model representation of the Northwest (NW). MC meetings that were open to the public were held for interested parties to review and provide input to the study. Results for the test, base, and sensitivity case studies performed by the MC Initiative Analytical Team indicate that there are a wide range of benefits that could be obtained from the operation of an EIM in the NWPP depending on what assumptions are made. The instructions from the MC were to determine a "minimum high confidence" range of potential benefits. The results for the Base Case indicate that the EIM benefits ranged from approximately $40 million to $70 million in annual savings from the operation of an EIM in the NWPP footprint. A number of additional relevant sensitivity cases were performed, including low and high water conditions, low and high natural gas prices, and various flex reserve requirements, resource operations, and amounts of resource capability held back during the preschedule period. Along with the results for the Base Case, the results for these studies yielded EIM benefits that clustered within the range of $70 to $80 million dollars per year with potential benefits ranging from approximately $125 million to as little as $17 million per year. Because the design and operation of an EIM could enable participating Balancing Authorities (BAs) to collectively lower the quantity of resources they must carry to meet within-hour balancing needs, a sensitivity case was also performed to analyze the impact that such reductions might have on the benefits from an EIM. The results for this sensitivity case indicate that such reductions could increase the benefits from the operation of an EIM in the NWPP into the range of approximately $130 million to $160 million per year. Also, a sensitivity case for a WECC-wide EIM was performed with the results indicating that the potential benefits to the NWPP could increase into the range of $197 million to $233 million per year. While there may be potential reliability benefits from the coordinated dispatch process underlying the operation of an EIM, reliability benefits from an EIM were out of the scope of this study. The EIM benefit analyses that were performed by the Analytical Team are provided in this report.

Power markets, NWPP, Energy Imbalance, EIM, Renewa↗