Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “development timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

X-Ray Calibration Facility/Advanced Video Guidance Sensor Test

The advanced video guidance sensor was tested in the X-Ray Calibration facility at Marshall Space Flight Center to establish performance during vacuum. Two sensors were tested and a timeline for each are presented. The sensor and test facility are discussed briefly. A new test stand was also developed. A table establishing sensor bias and spot size growth for several ranges is detailed along with testing anomalies.

Johnston, N. A. S.↗

X-Ray Calibration Facility/Advanced Video Guidance Sensor Test

The advanced video guidance sensor was tested in the X-Ray Calibration facility at Marshall Space Flight Center to establish performance during vacuum. Two sensors were tested and a timeline for each are presented. The sensor and test facility are discussed briefly. A new test stand was also developed. A table establishing sensor bias and spot size growth for several ranges is detailed along with testing anomalies.

Johnston, N. A. S.↗

Mid-Course Correction Contingency Analysis for the James Webb Space Telescope

This investigation details two analyses performed as part of an early orbit contingency operations study related to the James Webb Space Telescope’s limited ability to maneuver in a sunward direction. First, contingency planning developed by the Flight Dynamics Team and shared with the Science and Operations Center to quickly assess the available timeline in the event of a delayed mid-course correction maneuver is presented. Second, the methods for recovering from a maneuver over-burn using observatory geometry to exploit the solar radiation pressure perturbation contributions from the large sunshield as well as adjusting the maneuver campaign to recover the observatory are examined.

JWST↗

Liquid Oxygen (LO2) propellant conditioning concept testing

Marshall Space Flight Center (MSFC) and industry contractors have undertaken activities to develop a simplified liquid oxygen (LO2) propellant conditioning concept for future expendable launch vehicles. The objective of these activities is to reduce operations costs and timelines and to improve safety of these vehicles. The approach followed has been to identify novel concepts through system level studies and demonstrate the feasibility of these concepts through small-scale and full-scale testing. Testing will also provide data for design guidelines and validation of analytical models. Four different concepts are being investigated: no-bleed, low-bleed, use of a recirculation line, and helium (He) bubbling. This investigation is being done under a Joint Institutional Research and Development (JIRAD) program currently in effect between MSFC and General Dynamics Space Systems (GDSS). A full-scale test article, which is a facsimile of a propellant feed duct with an attached section to simulate heat input from a LO2 turbopump, will be tested at the Cold Flow Facility at MSFC's West Test Area. Liquid nitrogen (LN2), which has similar properties to LO2, will be used in place of LO2 for safety and budget reasons. Work to date includes design and fabrication of the test article, design of the test facility and initial fabrication, development of a test matrix and test procedures, initial predictions of test output, and heat leak calibration and heat exchanger tests on the test article. The tests for all propellant conditioning concepts will be conducted in the summer of 1993, with the final report completed by October, 1993.

Perry, Gretchen L. E.↗

AMO EXPRESS: A Command and Control Experiment for Crew Autonomy Onboard the International Space Station

NASA is investigating a range of future human spaceflight missions, including both Mars-distance and Near Earth Object (NEO) targets. Of significant importance for these missions is the balance between crew autonomy and vehicle automation. As distance from Earth results in increasing communication delays, future crews need both the capability and authority to independently make decisions. However, small crews cannot take on all functions performed by ground today, and so vehicles must be more automated to reduce the crew workload for such missions. NASA's Advanced Exploration Systems Program funded Autonomous Mission Operations (AMO) project conducted an autonomous command and control experiment on-board the International Space Station that demonstrated single action intelligent procedures for crew command and control. The target problem was to enable crew initialization of a facility class rack with power and thermal interfaces, and involving core and payload command and telemetry processing, without support from ground controllers. This autonomous operations capability is enabling in scenarios such as initialization of a medical facility to respond to a crew medical emergency, and representative of other spacecraft autonomy challenges. The experiment was conducted using the Expedite the Processing of Experiments for Space Station (EXPRESS) rack 7, which was located in the Port 2 location within the U.S Laboratory onboard the International Space Station (ISS). Activation and deactivation of this facility is time consuming and operationally intensive, requiring coordination of three flight control positions, 47 nominal steps, 57 commands, 276 telemetry checks, and coordination of multiple ISS systems (both core and payload). Utilization of Draper Laboratory's Timeliner software, deployed on-board the ISS within the Command and Control (C&C) computers and the Payload computers, allowed development of the automated procedures specific to ISS without having to certify and employ novel software for procedure development and execution. The procedures contained the ground procedure logic and actions as possible to include fault detection and recovery capabilities. The autonomous operations concept includes a reduction of the amount of data a crew operator is required to verify during activation or de-activation, as well as integration of procedure execution status and relevant data in a single integrated display. During execution, the auto-procedures (via Timerliner) provide a step-by-step messaging paradigm and a high-level status upon termination. This messaging and high-level status is the only data generated for operator display. To enhance situational awareness of the operator, the Web-based Procedure Display (WebPD) provides a novel approach to the issues of procedure display and execution tracking. WebPD is a web based application that serves as the user interface for electronic procedure execution. It incorporates several aspects of the HTML5 standard. Procedures are written in a dialect of XML called Procedure Representation Language (PRL). WebPD tracks execution status in the procedure or procedures being displayed. WebPD aggregates and simplifies the auto-sequence execution status information, and formatted to be easily followed and understood by an operator who is not dedicated to actively monitoring the task. WebPD also provides an integrated data and control interface to pause or halt the execution in order to provide a check point of operation and to examine progress before starting the next sequence of activities. For this demonstration, the procedure was initiated and monitored from the ground. As the Timeliner sequences executed, their high-level execution status was written to PLMDM memory. This memory is read and downlinked via Ku-Band at a 1 Hz rate. The data containing the high-level execution status is de-commutated on the ground, and rebroadcast for WebPD consumption. A future demonstration will be performed onboard, with ISS astronauts initiating the operations instead of ground controllers. The AMO EXPRESS experiment demonstrated activation and de-activation of EXPRESS rack 7, providing the capability of future single button activations and deactivations of facility class racks. The experiment achieved numerous technical and operations 'firsts' for the ISS

Stetson, Howard K.↗

Integrating Mission Timelines and Procedures to Enhance Situational Awareness in Human Spaceflight Operations

Future human spaceflight missions to the Moon, Mars, and beyond will have significant transmission delays and reduced communications bandwidth compared to operations in Low Earth Orbit, requiring increased crew autonomy due to the limited availability of real-time support from Mission Control Center (MCC). In this paper, we argue for the development of technology to enhance situational awareness (SA) for a remote MCC and astronauts onboard the vehicle, describe a usability study conducted towards this aim, and identify key usability features for the design of future integrated timeline tools. By tightly integrating timelines and procedures, future crew systems can predict future constraint violations, suggest resolutions to these violations, and ultimately support more successful missions.

User experience↗

Integrating Mission Timelines and Procedures to Enhance Situational Awareness in Human Spaceflight Operations

Future human spaceflight missions to the Moon, Mars, and beyond will have significant transmission delays and reduced communications bandwidth compared to operations in Low Earth Orbit, requiring increased crew autonomy due to the limited availability of real-time support from Mission Control Center (MCC). In this paper, we argue for the development of technology to enhance situational awareness (SA) for a remote MCC and astronauts onboard the vehicle, describe a usability study conducted towards this aim, and identify key usability features for the design of future integrated timeline tools. By tightly integrating timelines and procedures, future crew systems can predict future constraint violations, suggest resolutions to these violations, and ultimately support more successful missions.

user experience↗

Space Transformation -- Localizing the Remote and Connecting the Isolated

In motivating the Space Transformation theme for this year’s 4S symposium, the organizers provided the following context, “Transformation of economies are driven by a change in values and accelerated by new technologies.” These words rang particularly true when I read them at the beginning of the holiday season. Like so many others, I was in the early phases of my Christmas shopping procrastination campaign, and I’d just been reflecting on how Amazon Prime was the transformational tool I’d been waiting for. Basic limiting principles of time and space, supply and demand, were all but erased by the Amazon Prime phenomenon. Coupled with emerging 3D printing and other adaptive manufacturing technologies, a transformation from deliberate planning to “think it … have it” had occurred, empowering me to procrastinate longer than I’d ever dreamed possible. The organizers went on to ponder, “Will space transformation also affect society?”, just as our team at the Air Force Research Lab’s (AFRL) Center for Rapid Innovation (CRI) were working alongside partners within our larger Integrated Capabilities Directorate, NASA’s Flight Opportunities and Small Spacecraft Technology programs, and DARPA’s Luna-10 program to develop technologies and execute demonstration missions that leverage the space domain to genuinely connect even the most remote and austere domains on the timeline of need. Picking apart the miracle that is Amazon prime, where does the model fail, and why? More relevantly to the theme of this year’s symposium, how can the space domain be used to overcome its limitations and minimize its weaknesses? Perhaps it is best assessed in the context of Use Cases. What are the Amazon delivery cost, schedule, and cargo limiters to the Amundsen-Scott South Pole Research Station, or the Lunar South Pole Research Station? This paper will explore enabling infrastructure that allows Amazon prime to thrive and assess the transformational enabling technologies that would be necessary to extend that miracle to the truly remote or the truly austere. Localizing the Remote • First, it will evaluate the ability of the on-going AFRL Rocket Cargo and Space Initiatives Ringside Seats systems, coupled with Astrobotic’s Xodiak and Xogdor capabilities, developed to support the NASA Flight Opportunities Program (FOP), to supply orbital/suborbital delivery to both improved and austere sites on the Earth and Moon. • Then, it will add the surface terminal distribution leg, with an examination of Lunar Outpost’s Mobile Autonomous Prospecting Platform (MAPP), equipped with Mobile Autonomous Robotic Swarm (MARS) software, and Intuitive Machine’s Hopper, developed with support of AFRL and NASA’s Commercial Lunar Payload Services (CLPS) program. Connecting the Isolated From there, it will focus on the destination, asking what implied destination services are required to support highly assured autonomous delivery. • Specifically, it will highlight Astrobotic’s Skymage mesh-networked publish and subscribe communication and navigation service, as well as AFRL’s on-going developments of radioisotope and reactor nuclear-sourced thermoelectric power generation and distribution systems under development under the Joint Emergent Technology Supplying On-orbit Nuclear Power (JETSON) program by Lockheed Martin, Westinghouse, Intuitive Machines, and Zeno Power, to provide the power service to locations well off the grid. • Finally, the paper will connect to the “human machine”. What connects the remote or in-situ human consumer to the remote domain? What connects the diverse international government and commercial services to each other? The former will focus on AFRL’s OraCloud feeding their Space Defense Control and Characterization System (SDCCS) and Lunar Station’s MoonHacker systems, while the latter will focus on the BlueHalo/Tensor LunX Technology Platform for the Cislunar Commodity Marketplace. In 1984, Krafft Ehricke famously remarked that, “If God wanted man to become a spacefaring species, He would have given man a Moon.” This paper is not about the Moon, but is about humans as a spacefaring species, shedding the pesky land/air limitations of the Amazon Prime model … so that we can all live a procrastinator’s “think it … have it” existence.

Charles Finley↗

Time management displays for shuttle countdown

The Intelligent Launch Decision Support System project is developing a Time Management System (TMS) for the NASA Test Director (NTD) to use for time management during Shuttle terminal countdown. TMS is being developed in three phases: an information phase; a tool phase; and an advisor phase. The information phase is an integrated display (TMID) of firing room clocks, of graphic timelines with Ground Launch Sequencer events, and of constraints. The tool phase is a what-if spreadsheet (TMWI) for devising plans for resuming from unplanned hold situations. It is tied to information in TMID, propagates constraints forward and backward to complete unspecified values, and checks the plan against constraints. The advisor phase is a situation advisor (TMSA), which proactively suggests tactics. A concept prototype for TMSA is under development. The TMID is currently undergoing field testing. Displays for TMID and TMWI are described. Descriptions include organization, rationale for organization, implementation choices and constraints, and use by NTD.

Beller, Arthur E.↗

Life Support for Deep Space and Mars

How should life support for deep space be developed? The International Space Station (ISS) life support system is the operational result of many decades of research and development. Long duration deep space missions such as Mars have been expected to use matured and upgraded versions of ISS life support. Deep space life support must use the knowledge base incorporated in ISS but it must also meet much more difficult requirements. The primary new requirement is that life support in deep space must be considerably more reliable than on ISS or anywhere in the Earth-Moon system, where emergency resupply and a quick return are possible. Due to the great distance from Earth and the long duration of deep space missions, if life support systems fail, the traditional approaches for emergency supply of oxygen and water, emergency supply of parts, and crew return to Earth or escape to a safe haven are likely infeasible. The Orbital Replacement Unit (ORU) maintenance approach used by ISS is unsuitable for deep space with ORU's as large and complex as those originally provided in ISS designs because it minimizes opportunities for commonality of spares, requires replacement of many functional parts with each failure, and results in substantial launch mass and volume penalties. It has become impractical even for ISS after the shuttle era, resulting in the need for ad hoc repair activity at lower assembly levels with consequent crew time penalties and extended repair timelines. Less complex, more robust technical approaches may be needed to meet the difficult deep space requirements for reliability, maintainability, and reparability. Developing an entirely new life support system would neglect what has been achieved. The suggested approach is use the ISS life support technologies as a platform to build on and to continue to improve ISS subsystems while also developing new subsystems where needed to meet deep space requirements.

life support↗

Evolving from Planning and Scheduling to Real-Time Operations Support: Design Challenges

Versions of Scheduling and Planning Interface for Exploration (SPIFe) have supported a variety of mission operations across NASA. This software tool has evolved and matured over several years, assisting planners who develop intricate schedules. While initially conceived for surface Mars missions, SPIFe has been deployed in other domains, where people rather than robotic explorers, execute plans. As a result, a diverse set of end-users has compelled growth in a new direction: supporting real-time operations. This paper describes the new needs and challenges that accompany this development. Among the key features that have been built for SPIFe are current time indicators integrated into the interface and timeline, as well as other plan attributes that enable execution of scheduled activities. Field tests include mission support for the Lunar CRater Observation and Sensing Satellite (LCROSS), NASA Extreme Environment Mission Operations (NEEMO) and Desert Research and Technology Studies (DRATS) campaigns.

Marquez, Jessica J.↗

Designing Mission Operations for the Gravity Recovery and Interior Laboratory Mission

NASA's Gravity Recovery and Interior Laboratory (GRAIL) mission, to understand the internal structure and thermal evolution of the Moon, offered unique challenges to mission operations. From launch through end of mission, the twin GRAIL orbiters had to be operated in parallel. The journey to the Moon and into the low science orbit involved numerous maneuvers, planned on tight timelines, to ultimately place the orbiters into the required formation-flying configuration necessary. The baseline GRAIL mission is short, only 9 months in duration, but progressed quickly through seven very unique mission phases. Compressed into this short mission timeline, operations activities and maneuvers for both orbiters had to be planned and coordinated carefully. To prepare for these challenges, development of the GRAIL Mission Operations System began in 2008. Based on high heritage multi-mission operations developed by NASA's Jet Propulsion Laboratory and Lockheed Martin, the GRAIL mission operations system was adapted to meet the unique challenges posed by the GRAIL mission design. This paper describes GRAIL's system engineering development process for defining GRAIL's operations scenarios and generating requirements, tracing the evolution from operations concept through final design, implementation, and validation.

MOS↗

Automating Surface Attitude Positioning and Pointing Operations for Mars 2020

The Surface Attitude Positioning and Pointing (SAPP) subsystem of the Mars Perseverance rover keeps track of the rover’s position and attitude on the surface of Mars. The SAPP Downlink Engineering Operations team members receive data from the rover on a daily basis. They must interpret the data to make sure the rover is staying safe and to support uplink planning. The SAPP team keeps track of the error growth in the rover’s attitude estimate due to noise in the Rover Inertial Measurement Unit’s (RIMU) gyroscopes used to propagate that attitude estimate whenever the rover is moving. Whenever this error grows to a particular threshold, SAPP is responsible for updating the onboard attitude knowledge using the RIMU’s accelerometers to estimate rover roll and pitch and sun imaging to estimate rover yaw, thereby reducing this attitude estimation error. Accurate attitude estimation is required so that the rover can successfully point its High Gain Antenna (HGA) to receive information from Earth and as a backup to the Mars orbiters used for sending data from the rover to Earth, point instruments on its Remote Sensing Mast (RSM), and support safe movement and placement of instruments by the rover’s ARM relative to the Martian surface. The Mars 2020 Engineering Operations team has been working to increase the operational efficiency of the mission and eventually move to a five-hour timeline for daily operations. In pursuit of this goal, the SAPP Engineering Operations team has automated their downlink process by developing a centralized Jupyter notebook to analyze the data received daily from the rover. The SAPP downlink Jupyter notebook automatically collects the data relevant to the SAPP subsystem and visualizes this information in plots and tables that can be easily read by downlink operators to aid them in assessing the status of the subsystem. Various Application Programming Interfaces (APIs) have been incorporated into the downlink daily notebook to automate the collection and posting of data, such as gathering and posting data products to the cloud. The SAPP team has also developed a SAPP downlink software library that includes functions to aid the notebook in processing data. In addition to assessing the SAPP subsystem on a daily basis, operators need to assess the long-term trending behavior of the subsystem over time. An automated trending process has been developed to collect information from the daily notebooks in order to plot and analyze that data in a centralized place. These daily and trending processes have expedited the SAPP downlink assessment and laid the groundwork to completely automate the SAPP downlink process so that SAPP operators are unnecessary unless something unexpected occurs. This paper will provide an overview of the functions that the SAPP subsystem carries out on a daily basis, and will then dive into the automations that have been developed for daily and trending downlink assessment. An assessment of the downlink efficiency will be provided, along with a summary of lessons learned and work to go. Finally, the authors will discuss how these types of automated spacecraft health assessments could be more broadly used within mission operations.

Zarifian, Anais↗

Capability Gaps Assessment and Identification of Critical Technology Elements for Mars Transit Habitat

The Habitation Systems Development Office (HP40) at NASA Marshall Space Flight Center supports systems engineering, integration, and project management for next generation space habitats. For in space operations and eventual transport of humans to Mars, NASA will rely on a Mars Transit Habitat (TH). The TH will be designed for an up to 1,200-day Mars mission and will carry all food and supplies needed to support four crew for this duration. In the current concept of operations, Mars TH transfers to near rectilinear halo orbit (NRHO) following launch and docks at Gateway as a visiting vehicle. While there, the TH will complete system shakedown testing and a series of analog missions which will grow from 3 to 6+ months in duration TH also augments Gateway’s habitation capabilities beyond 60-days. Proposed Gateway-TH missions will far exceed the longest duration cislunar human missions to date. These shakedown missions will also be the first operational readiness tests of Mars TH’s long-duration deep space systems, and of the split crew (two crew on the surface, two crew in space) operations that are vital to the approach for the first human Mars mission. Once shakedown missions are complete, Mars TH departs Gateway to aggregate with the Mars propulsion system in NRHO before onboarding the crew and final supplies in Earth orbit via a co-manifested Orion-logistics module. Orion and the LM return to Earth prior to the now aggregated Deep Space Transport vehicle’s journey to Mars. Development of the Mars TH requires significant technology development and maturation. Each year the agency performs a capability gaps assessment, where gaps developed by subject matter experts (SMEs) in various engineering/science disciplines are linked to architectural elements in formulation and prioritized. A gap captures the difference between the current state-of-the-art and the maturity of the capability that is needed to enable or enhance a mission as it is currently envisioned in the government reference architecture. HP40 conducted a gap analysis for Mars TH which will be summarized in this poster. Gaps classified as enabling (which means the mission cannot achieve success without gap closure) were subsequently used to identify critical technology elements (CTEs) for Mars TH. This identification of CTEs was also informed by an examination of the product breakdown structure for Mars TH and focused conversations with SMEs in specific technology areas. CTEs identified for Mars TH to date include the following (note this is not a comprehensive list – CTEs listed represent those in MSFC’s capability areas): inflatable softgoods for habitation; enhanced CO2 recovery; life support systems with greater levels of reliability and maintainability; autonomous guidance, navigation, command and control; and radiators for the Mars TH application. The habitation systems development team is currently delving deeper into each CTE to assess technology approaches being pursued, their maturity, and the degree of difficulty in maturation to meet projected Mars TH timelines. This poster will summarize work to date on the identification of enabling capability gaps linked to Mars TH and provide insight into the associated CTEs and technology maturation efforts.

technology development↗

[Evaluation of super dwarf wheat growth and development in greenhouse "Svet" during cultivation in inhabited pressurized chamber]

Goals of the 3-month experiment GREENHOUSE using the equipment of greenhouse SVET (ECO-PSY-95) were to feature growth and development of wheat through the entire cycle of ontogeny under the maximally mimicked MIR environment, and to try out the procedures and timeline of space experiment GREENHOUSE-2 as a part of the fundamental biology investigations within the MIR/NASA space science program. Irradiation intensity (PAR) was 65 W/m2 and 38 W/m2 in the experiment and laboratory control, respectively. Values of other environmental parameters were MIR average (18-25 degrees C, relative air humidity in the interval between 40% and 75%, total gas pressure of about 660 to 860 mm Hg, partial oxygen pressure within the range from 140 to 200 mm Hg, partial carbon dioxide pressure up to 7 mm Hg). Experimental results showed that wheat cultivation in inhabited chamber under a modified lighting unit providing greater irradiation of the crop area produced more plant mass although seed production dropped. Low grain content in ears could be the aftermath of the gaseous trace contaminants in the chamber atmosphere.

NASA Discipline Life Support Systems↗

GPM Timeline Inhibits For IT Processing

The Safety Inhibit Timeline Tool was created as one approach to capturing and understanding inhibits and controls from IT through launch. Global Precipitation Measurement (GPM) Mission, which launched from Japan in March 2014, was a joint mission under a partnership between the National Aeronautics and Space Administration (NASA) and the Japan Aerospace Exploration Agency (JAXA). GPM was one of the first NASA Goddard in-house programs that extensively used software controls. Using this tool during the GPM buildup allowed a thorough review of inhibit and safety critical software design for hazardous subsystems such as the high gain antenna boom, solar array, and instrument deployments, transmitter turn-on, propulsion system release, and instrument radar turn-on. The GPM safety team developed a methodology to document software safety as part of the standard hazard report. As a result of this process, a new tool safety inhibit timeline was created for management of inhibits and their controls during spacecraft buildup and testing during IT at GSFC and at the launch range in Japan. The Safety Inhibit Timeline Tool was a pathfinder approach for reviewing software that controls the electrical inhibits. The Safety Inhibit Timeline Tool strengthens the Safety Analysts understanding of the removal of inhibits during the IT process with safety critical software. With this tool, the Safety Analyst can confirm proper safe configuration of a spacecraft during each IT test, track inhibit and software configuration changes, and assess software criticality. In addition to understanding inhibits and controls during IT, the tool allows the Safety Analyst to better communicate to engineers and management the changes in inhibit states with each phase of hardware and software testing and the impact of safety risks. Lessons learned from participating in the GPM campaign at NASA and JAXA will be discussed during this session.

Inhibits↗

Satellite Power Systems (SPS) concept definition study (Exhibit D). Volume 4: Operations analyses

Using a coplanar, end-mounted antenna as a baseline, various configuration trades were performed to select a preferred solid state concept. The increase in efficiency that could be realized by use of multi bandgap solar cells, either with klystron or solid state antenna was evaluated. Satellite configurations were developed to exploit the sandwich antenna concept wherein solar cells are located on one side of the antenna panel and solid state dc/RF converters on the other side. These concepts entailed various primary and secondary reflector arrangements for directing solar energy to the solar cell side of the antenna with higher concentration ratios than used on the coplanar configurations. Operations analysis included development of a satellite construction scenario, a concept for the SCB, a top-level satellite construction operation, construction operation, construction timelines and crew sizes, mass flows to orbit, and a satellite maintenance scenario. The list of materials required for satellite construction was updated to identify significant differences relevant to the solid state satellite concept. Means of decommissioning satellites at the end of their design life were studied.

Hanley, G. M.↗

Creating a Scenario Suitable for Multiple Caregivers

The HPS can be utilized for the training of a wide variety of caregivers, ranging from physicians to laypeople. Methods: A single scenario was developed and adapted for a number of clinical scenarios and operational environments, ranging from in-flight to the immediate postflight timeline. In this way, different caregivers, from astronauts to search and rescue forces to specialty-boarded physicians, could make use of a single clinical situation. Five crew medical officer analogs and sixty anesthesia residents, serving as flight surgeon analogs, and, were briefed on space medicine and physiology, then were exposed to the scenario and asked to manage the patient as if they were part of the in-flight or recovery team. Results: Basic themes, such as crisis resource management, were standard across the student audiences. Discussion: A single clinical script can easily be adapted for multiple uses.

Doerr, Harold↗