Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “demand uncertainty”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

More Data Needed for Failure Rate Estimation, Validation, and Uncertainty Reduction

The currently planned schedule for advanced Environmental Control and Life Support System (ECLSS) development and test activities to support human exploration missions is unlikely to generate sufficient data to enable statistically-supportable, precise Orbital Replacement Unit (ORU) failure rate estimates to meet existing crew safety expectations. Accurate and precise failure rate estimates are critical for missions beyond Low Earth Orbit (LEO) because current risk mitigation approaches –namely regular resupply and rapid abort capabilities –will not be available. Safe operations will depend on mission planners’ ability to accurately forecast spares demand and efficiently provide the necessary resources. However, even after more than a decade of International Space Station (ISS) ECLSS operations, a significant amount of uncertainty remains in failure rate estimates. Uncertain or inaccurate failure rates result in increased risk and spares mass. A Bayesian estimation approach, such as the one currently implemented by the ISS Program, can reduce uncertainty by incorporating engineering judgement into failure rate estimates. However, experience on the ISS and with other complex systems shows that these prior failure rate estimates are often inaccurate. In addition, prior estimates are typically point values; some level of uncertainty must be added to convert these into probability distributions for Bayesian updating, and there are several potential methods for doing so. Due to the low rate of data collection, any inaccuracy in theseprior estimates currently hasa strong influence on the end result. This paper examines the challenges associated with failure rate estimation, validation, and uncertainty reduction in the context of ECLSS development for beyond-LEO missions. A variety of techniques for generating and updating Bayesian priors are discussed and evaluated using both real-world and simulated data. Potential solutions for improving failure rate estimation, including testing additional units, are analyzed and discussed, and a set of recommendations are provided for next-generation system development activities.

Reliability↗

More Data Needed for Failure Rate Estimation, Validation, and Uncertainty Reduction

The currently planned schedule for advanced Environmental Control and Life Support System (ECLSS) development and test activities to support human exploration missions is unlikely to generate sufficient data to enable statistically-supportable, precise Orbital Replacement Unit (ORU) failure rate estimates to meet existing crew safety expectations. Accurate and precise failure rate estimates are critical for missions beyond Low Earth Orbit (LEO) because current risk mitigation approaches –namely regular resupply and rapid abort capabilities –will not be available. Safe operations will depend on mission planners’ ability to accurately forecast spares demand and efficiently provide the necessary resources. However, even after more than a decade of International Space Station (ISS) ECLSS operations, a significant amount of uncertainty remains in failure rate estimates. Uncertain or inaccurate failure rates result in increased risk and spares mass. A Bayesian estimation approach, such as the one currently implemented by the ISS Program, can reduce uncertainty by incorporating engineering judgement into failure rate estimates. However, experience on the ISS and with other complex systems shows that these prior failure rate estimates are often inaccurate. In addition, prior estimates are typically point values; some level of uncertainty must be added to convert these into probability distributions for Bayesian updating, and there are several potential methods for doing so. Due to the low rate of data collection, any inaccuracy in theseprior estimates currently hasa strong influence on the end result. This paper examines the challenges associated with failure rate estimation, validation, and uncertainty reduction in the context of ECLSS development for beyond-LEO missions. A variety of techniques for generating and updating Bayesian priors are discussed and evaluated using both real-world and simulated data. Potential solutions for improving failure rate estimation, including testing additional units, are analyzed and discussed, and a set of recommendations are provided for next-generation system development activities.

Reliability↗

More Data Needed for Failure Rate Estimation, Validation, and Uncertainty Reduction

Current Environmental Control and Life Support System (ECLSS) development and test activities are not generating data fast enough to provide statistically-supportable precise Orbital Replacement Unit (ORU) failure rate estimates for future missions. Accurate and precise failure rate estimates are critical for missions beyond Low Earth Orbit (LEO) because current risk mitigation approaches – namely regular resupply and rapid abort capabilities – will not be available. Safe operations will depend on mission planners’ ability to accurately forecast spares demand and efficiently provide the necessary resources. However, even after more than a decade of operations on board the International Space Station (ISS), a significant amount of uncertainty remains in failure rate estimates. Uncertain or inaccurate failure rates result in increased risk and spares mass for future missions. A Bayesian failure rate estimation approach, such as the one currently implemented by the ISS Program, can help reduce uncertainty by incorporating engineering judgement into failure rate estimates. However, experience on the ISS and with other complex systems shows that these prior failure rate estimates are often inaccurate. In addition, prior failure rate estimates are typically point values; some level of uncertainty must be added to convert these into probability distributions for Bayesian updating, and there are several potential methods for doing so. Due to the low rate of data collection, these subjective (and often inaccurate) prior estimates currently have a strong influence on the end result. This paper examines the challenges associated with failure rate estimation, validation, and uncertainty reduction in the context of ECLSS development for beyond-LEO missions. A variety of techniques for generating and updating Bayesian priors are discussed and evaluated using both real-world and simulated data. Potential solutions for improving failure rate estimation, including testing additional units, are analyzed and discussed, and a set of recommendations are provided for next-generation system development activities.

Supportability↗

Managing Uncertainty and Flexibility in Day-Ahead Electricity Markets

Net load imbalances from day ahead forecasts can lead to significant grid operations costs and are expected to increase as variable renewable energy adoption grows. We propose a new wholesale market product to manage the risk of net load imbalances called Flexibility Options. This product relies on probabilistic forecasts to estimate flexibility demand and would be co-optimized in the day-ahead market. We also propose stochastic methods that enable DER and flexible load aggregators to participate in flexibility markets while considering the uncertainty in weather and occupant behavior.

day-ahead market↗

Application of a recursive distortion estimator to the geodetic correction of thematic mapper imagery

It is pointed out that the higher resolution provided by the Thematic Mapper increases the demands on the accuracy needed by the ground processing in correcting for geodetic errors deriving from internal misalignments and uncertainties in the knowledge of spacecraft ephemeris and attitude. In addition, the Thematic Mapper will also process longer imagery intervals than previous missions. The recursive distortion estimator to be used is a Kalman filter. Here, a minimum variance spacecraft state error vector is estimated for known initial covariance of the elements of that vector and known image noise. Tests of the recursive distortion estimator with various spacecraft models carried out using a simulation of real world state vector dynamics are described. A determination is made of the density of control points needed to meet specified geometric correction requirements; it is expressed as a function of imagery interval length and control point measurement error.

Arnold, P.↗

Using probabilistic solar power forecasts to inform flexible ramp product procurement for the California ISO

How can independent system operators (ISOs) take advantage of probabilistic solar forecasts to lower generation costs and improve reliability of power systems? We discuss one three-step approach for doing so, focusing on how such forecasts might help the California Independent System Operator (CAISO) prepare unexpected net load ramps, where net load equals gross demand minus wind and solar production. First, we enhance an existing solar forecasting system to provide well-calibrated hours-ahead probabilistic forecasts. We then relate the degree of uncertainty reflected in the forecasted prediction intervals (independent variables) to error distributions for net load ramp forecasts for the CAISO real-time market (dependent variable) using machine learning and quantile regression. Projected ramp forecast errors conditioned on solar uncertainty are translated into flexible ramp requirements that therefore reflect real-time meteorological and solar conditions, improving on typical ISO procedures. Detailed descriptions are provided on the quantile regression and kth-nearest neighbor categorization methods for accomplishing that translation. Finally, a multiple time-scale look-ahead market simulation model is applied to a 118-bus IEEE Reliability Test System, modified to represent the CAISO generation mix and demand distributions. The model runs quantify how solar-conditioned ramp requirements can, first, decrease operating costs by reducing requirements compared to often conservative unconditional methods and, second, decrease generation scarcity events and consequently improve reliability by increasing flexibility requirements at times when unconditional forecast-based requirements understate actual ramp uncertainty. Solar-conditioned ramp requirements are found to reduce generation operating costs by about 2% for the test system (which would be equivalent to over $\$100$ million per year for a CAISO-size system).

14 SOLAR ENERGY↗

Development of Multiresolution Capabilities for the Holistic Energy Resource Optimization Network (HERON) tool A progress update

INL researchers work on technoeconomic analyses for integrated energy systems (IES) using the Framework for Optimization of ResourCes and Economics (FORCE). Within FORCE, researchers use the Holistic Energy Resource Optimization Network (HERON) tool to conduct optimization of grid portfolios under uncertain market conditions. These optimizations determine optimal capacities for all IES components and strategies for resource dispatch which maximize some economic metric (e.g., net present value). Resource dispatch occurs on finer timescales (typically hours) and thus are asked to respond to a given time series (e.g. hourly load demand profiles for a grid, or pre-determined electricity prices). Volatile and complex bidding dynamics as well as poorly forecasted weather events within deregulated markets add uncertainty to the time series; FORCE can address this uncertainty by training a reduced order model on historical time series and generate unique synthetic time series which represent individual scenarios or realizations of the market. The IES configuration can be simulated under these different sampled realizations and a stochastic optimization is conducted which optimizes the expected value of the desired economic metric. The training of a synthetic time series generator is limited by the chosen time resolution; dynamics can occur on different time scales. Seasonal demand trends can dominate faster dynamical events (such as power outages from certain sectors or severe weather events) which might not get captured correctly by the trained model. In this report, we investigate different ways of addressing the training and generation of time series on multiple time scales using three main algorithms: wavelet decomposition, dynamic mode decomposition, and generative adversarial networks for time series. We demonstrate a time series analysis that yields information on not just the frequency space but also temporal space: where a fast Fourier transform can provide what frequencies dominate, the new algorithms can provide when the frequencies dominate as well. These analyses can help improve IES optimization by allowing researchers to couple simulations at different timescales when it is most needed - seasonal, day-ahead, and real time optimization - with greater computational efficiency. Future work will include implementation of a subset of the proposed algorithms into the FORCE toolset and application of these analyses into multiple timescale optimization.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Simulation-based inference for parameter estimation of complex watershed simulators

High-resolution, spatially distributed process-based (PB) simulators are widely employed in the study of complex catchment processes and their responses to a changing climate. However, calibrating these PB simulators using observed data remains a significant challenge due to several persistent issues, including the following: (1) intractability stemming from the computational demands and complex responses of simulators, which renders infeasible calculation of the conditional probability of parameters and data, and (2) uncertainty stemming from the choice of simplified representations of complex natural hydrologic processes. Here, we demonstrate how simulation-based inference (SBI) can help address both of these challenges with respect to parameter estimation. SBI uses a learned mapping between the parameter space and observed data to estimate parameters for the generation of calibrated simulations. To demonstrate the potential of SBI in hydrologic modeling, we conduct a set of synthetic experiments to infer two common physical parameters – Manning's coefficient and hydraulic conductivity – using a representation of a snowmelt-dominated catchment in Colorado, USA. We introduce novel deep-learning (DL) components to the SBI approach, including an “emulator” as a surrogate for the PB simulator to rapidly explore parameter responses. We also employ a density-based neural network to represent the joint probability of parameters and data without strong assumptions about its functional form. While addressing intractability, we also show that, if the simulator does not represent the system under study well enough, SBI can yield unreliable parameter estimates. Approaches to adopting the SBI framework for cases in which multiple simulator(s) may be adequate are introduced using a performance-weighting approach. The synthetic experiments presented here test the performance of SBI, using the relationship between the surrogate and PB simulators as a proxy for the real case.

54 ENVIRONMENTAL SCIENCES↗

Learning and discovering multiple solutions using physics-informed neural networks with random initialization and deep ensemble

In this work we explore the capability of physics-informed neural networks (PINNs) to discover multiple solutions. Many real-world phenomena governed by nonlinear differential equations (DEs), such as fluid flow, exhibit multiple solutions under the same conditions, yet capturing this solution multiplicity remains a significant challenge. A key difficulty lies in providing appropriate initial conditions or guesses, as widely used time-marching schemes and Newton’s method are highly sensitive to these choices when solving complex computational problems. While machine learning models, particularly PINNs, have shown promise in solving DEs, their ability to capture multiple solutions remains underexplored. In this work, we propose a simple and practical approach using PINNs to learn and discover multiple solutions. We first demonstrate that PINNs, when combined with random initialization and deep ensemble method—originally developed for uncertainty quantification—can effectively uncover multiple solutions to nonlinear ordinary and partial DEs. Although training large ensembles of PINNs may appear computationally demanding, this can be done efficiently using vectorization techniques supported by modern deep learning frameworks, allowing many networks to be trained simultaneously. Our approach highlights the critical role of initialization in shaping solution diversity, addressing an often-overlooked aspect of machine learning for scientific computing. Furthermore, we propose utilizing PINN-generated solutions as initial conditions or initial guesses for conventional numerical solvers to enhance accuracy and efficiency in capturing multiple solutions. Extensive numerical experiments, including the Allen–Cahn equation and cavity flow, where our approach successfully identifies both stable and unstable solutions, validate the effectiveness of our method. These findings establish a general and efficient framework for addressing solution multiplicity in nonlinear DEs.

97 MATHEMATICS AND COMPUTING↗

Factors Influencing Building Demand Flexibility

The U.S. Department of Energy’s National Roadmap for Grid-interactive Efficient Buildings (GEB) acknowledged that building demand flexibility (DF) is both an important strategy to decarbonizing the buildings sector and an important resource for meeting the changing needs of the electrical grid such as improving grid reliability. However, understanding the complexity and uncertainties in real building field performance of DF strategies is a large gap hindering stakeholders on both grid and buildings side to make investments on deploying such strategies. The research work in this report intended to advance understanding of the variability and influential factors in building demand flexibility. Adding such knowledge based on lab testing results and measured performance data from real buildings is an important contribution. The report uses standardized metrics and methods to quantify DF performance from field-measured DF datasets of two significant building groups of big-box retail and medium office buildings to present the challenge of building DF variability in multiple dimensions. The report presents findings related to how several key factors influence building demand flexibility from implementing a common, cost-effective DF control strategy (i.e., adjusting zone temperatures). The findings are supported by full-scale lab testing, field data analysis and simulation research. The authors also provided application-oriented recommendations to stakeholders such as building aggregators, utility program design professionals, sophisticated building portfolio owners, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Using Global Market Demand Analysis to Guide Conceptual Design of Low-Boom Supersonic Transports

This paper uses a mathematical framework to identify the interdependencies of key variables in supersonic transportation demand analysis. The existing quantitative models for supersonic transportation demand analysis are compared for consistency in modeling the interdependencies. Unlike other quantitative models, the Low-Boom Systems Analysis Model (LBSAM2) can propagate important design characteristics of a supersonic transport aircraft concept to the level of economic metrics (such as the number of future supersonic passengers), with a consistent coupling of the market demand analysis, detailed mission analysis, and low-boom constraint. This allows the use of the detailed demand analysis results from LBSAM2 to maximize the economic viability of a supersonic transport aircraft by finding favorable system-level trades between weight, range, fuel burn, and assumed sonic boom ground noise limit for supersonic overland flight. In this paper, LBSAM2 is integrated with conceptual low-boom design to improve the economic viability of low-boom supersonic transport aircraft. A brief discussion of uncertainties in the LBSAM2 analysis is also included, focusing on their impacts on the relative economic advantages between low-boom concepts.

Equilibrium state of supersonic market↗

A Unified Scaling Framework for Comparative Analysis of Major Electrical Machine Topologies

This paper presents a unified framework for comparing major electrical machine topologies under identical output and thermal constraints, with emphasis on supply-chain-aware selection among rare-earth-intensive, reduced-rare-earth, and rare-earth-free solutions. Using power factor and air-gap flux density as the principal descriptors, the framework links topology choice to relative size, copper demand, magnet dependence, cost sensitivity, and inertia. To support robust early-stage screening, the deterministic scaling model is combined with uncertainty representation, Monte Carlo scenario propagation, and hesitationaware ranking. The results show that rare-earth-rich machines remain compact and dense, whereas reduced-rare-earth and rare-earth-free alternatives become more attractive under specific material-risk and cost scenarios.

Kumar, Praveen [ORNL] (ORCID:0000000291877857)↗

Observed changes in hydroclimate attributed to human forcing

Observational and modeling studies indicate significant changes in the global hydroclimate in the twentieth and early twenty-first centuries due to anthropogenic climate change. In this review, we analyze the recent literature on the observed changes in hydroclimate attributable to anthropogenic forcing, the physical and biological mechanisms underlying those changes, and the advantages and limitations of current detection and attribution methods. Changes in the magnitude and spatial patterns of precipitation minus evaporation (P–E) are consistent with increased water vapor content driven by higher temperatures. While thermodynamics explains most of the observed changes, the contribution of dynamics is not yet well constrained, especially at regional and local scales, due to limitations in observations and climate models. Anthropogenic climate change has also increased the severity and likelihood of contemporaneous droughts in southwestern North America, southwestern South America, the Mediterranean, and the Caribbean. An increased frequency of extreme precipitation events and shifts in phenology has also been attributed to anthropogenic climate change. While considerable uncertainties persist on the role of plant physiology in modulating hydroclimate and vice versa, emerging evidence indicates that increased canopy water demand and longer growing seasons negate the water-saving effects from increased water-use efficiency.

54 ENVIRONMENTAL SCIENCES↗

Synthesis of observed and simulated rain microphysics to inform a new Bayesian statistical framework for microphysical parameterization in climate models (Final Scientific Report)

This project aimed to investigate a new approach to bulk microphysics schemes. We identified the need to move beyond the fixed structural assumptions and approximation of existing schemes. For example, most schemes assume some functional form for the rain drop size distribution (e.g. a gamma or exponential distribution). Most schemes then evolve some number of statistical moments of that distribution via various processes, such as evaporation, sedimentation, collision-coalescence, and collisional breakup. These microphysical processes, in turn, are typically some fixed functional form derived from either some other (more detailed) model, or using some single-particle rates that are then integrated over the size distribution. While these process rate functions may have some free parameters to adjust, in other cases doing so is impossible (e.g. when the process rates are analytical or piecewise solutions to some target function). Our goal was to build and test a scheme that assumed no size distribution form, and used a series of power laws as the basis for the process rates. Moments of the size distribution would be predicted, but no underlying size distribution would be specified. Any number or choice of size distribution moments could be used, and any number of power laws could be employed to model the process rates. Thus, our approach is flexible, and can seamlessly scale across levels of complexity, as demanded by the data. Bayesian inference then would provide the formalism to estimate the model parameters and structure, allowing for robust uncertainty quantification. We proposed testing this framework in idealized simulations using bin microphysical schemes as a data source. We also proposed using real data to inform our microphysics scheme, and also that we would integrate our scheme into WRF.

58 GEOSCIENCES↗

Observed Changes in Hydroclimate Attributed to Human Forcing

Observational and modeling studies indicate significant changes in the global hydroclimate in the twentieth and early twenty-first centuries due to anthropogenic climate change. In this review, we analyze the recent literature on the observed changes in hydroclimate attributable to anthropogenic forcing, the physical and biological mechanisms underlying those changes, and the advantages and limitations of current detection and attribution methods. Changes in the magnitude and spatial patterns of precipitation minus evaporation ( P–E ) are consistent with increased water vapor content driven by higher temperatures. While thermodynamics explains most of the observed changes, the contribution of dynamics is not yet well constrained, especially at regional and local scales, due to limitations in observations and climate models. Anthropogenic climate change has also increased the severity and likelihood of contemporaneous droughts in southwestern North America, southwestern South America, the Mediterranean, and the Caribbean. An increased frequency of extreme precipitation events and shifts in phenology has also been attributed to anthropogenic climate change. While considerable uncertainties persist on the role of plant physiology in modulating hydroclimate and vice versa, emerging evidence indicates that increased canopy water demand and longer growing seasons negate the water-saving effects from increased water-use efficiency.

Drought↗

A Hybrid Reinforcement Learning-MPC Approach for Distribution System Critical Load Restoration

This paper proposes a hybrid control approach for distribution system critical load restoration, combining deep reinforcement learning (RL) and model predictive control (MPC) aiming at maximizing total restored load following an extreme event. RL determines a policy for quantifying operating reserve requirements, thereby hedging against uncertainty, while MPC models grid operations incorporating RL policy actions (i.e., reserve requirements), renewable (wind and solar) power predictions, and load demand forecasts. We formulate the reserve requirement determination problem as a sequential decision-making problem based on the Markov Decision Process (MDP) and design an RL learning environment based on the OpenAI Gym framework and MPC simulation. The RL agent reward and MPC objective function aim to maximize and monotonically increase total restored load and minimize load shedding and renewable power curtailment. The RL algorithm is trained offline using a historical forecast of renewable generation and load demand. The method is tested using a modified IEEE 13-bus distribution test feeder containing wind turbine, photovoltaic, microturbine, and battery. Case studies demonstrated that the proposed method outperforms other policies with static operating reserves.

distribution system↗

Deploying Intra-hour Uncertainty Analysis Tools to ABB’s GridView - CRADA 445

The quickly-changing generation resource mix in the US grid, with large additions of variable resources, retirements of traditional thermal generation, distributed generation and demand response, are creating new challenges on the traditional operation of both the generation and transmission systems. The ability to perform intra-hour high fidelity production cost modeling (PCM) is needed to allow grid operators and grid planners to integrate high penetration (more than 50%) of variable energy resources, and to make prompt well informed decisions in market operations and planning. In the last decade, PNNL has developed several stand-alone tools to enable grid operators and planners to understand the impact of high variable generation on their systems. These tools have been used is studies such as: (1) Evaluation the benefits of WECC balancing authorities coordination under high variable generation penetration , (2) Benefits of Energy Imbalance Market in the North West Power Pool and (3) Duke Energy and NV Energy solar integration studies. ABB’s GridView is a widely used commercial PCM tool. It is the tool used by WECC and their stakeholders to develop the WECC PCM planning model on bi-annual basis. This proposal is focused on the integrating of PNNL intra-hour uncertainty analysis tools to GridView.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Uncertainty Budget for Detector-Based Absolute Radiometric Calibration With GLAMR

The accuracy of the absolute radiometric calibration (RadCal) for remote sensing instruments is essential to their wide range of applications. The uncertainty associated to the traditional source-based RadCal method is assessed at a 2% (k=1) or higher level for radiance measurement. To further improve the accuracy to meet the demands of climate studies, a detector-based approach using tunable lasers as a light source has been devised. The Goddard Laser for Absolute Measurement of Radiance, known as the GLAMR system, is a notable example of the incorporation of such technology. Using transfer radiometers calibrated at NIST as calibration standards, the absolute spectral response (ASR) function of a remote sensing instrument is measured with its uncertainty traceable to the International System of Units. This paper presents a comprehensive uncertainty analysis of the detector-based absolute RadCal using the GLAMR system. It identifies and examines uncertainty sources during the GLAMR RadCal test, including those from the GLAMR system, the testing configuration, and data processing methodologies. Analysis is carried out to quantify the contribution of each source and emphasize the most influential factors. It is shown that the calibration uncertainty of GLAMR RadCal can be better than 0.3% (k=1) in the wavelength range of 350-950 nm and 0.6% (k=1) between 950-2300 nm, with the exception of regions with strong water absorption. In addition, recommendations are made to refine the calibration process to further reduce the uncertainty.

Zhipeng Wang↗