Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost model”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Methodology for evaluating modular assembly of large space platforms

This paper presents a methodology for analytically comparing approaches to modular assembly of large space platforms. the methodology combines a physical model of the modules, a life-cycle cost model, and a risk model to capture influential trade-offs.

in-space construction↗

ASCoT 3: Nonlinear Principal Components Analysis and Uncertainty Quantification in Early Concept Spacecraft Flight Software Cost Estimation

For mission planners and evaluators alike, value in cost models comes from a mean or median prediction, an understanding of the uncertainty on that prediction, and an understanding of model performance. Here we apply advanced statistical and machine learning methods to spacecraft flight software cost, effort, and SLOC estimation, and present the results in the latest version of the Analogy Software Cost Tool (ASCoT). We present in- and out-of-sample performance metrics for our models, each of which incorporate some amount of epistemic uncertainty. ASCoT, hosted on the One NASA Cost Engineering (ONCE) database via the Online NASA Space Estimation Tool (ONSET), was first showcased in 2016 as a number of analogy-based models and methods (kNN and Clustering) to support early project formulation. This ASCoT update improves upon the previous analogic methods by incorporating uncertainty in the data transformations. In particular, we use a Nonlinear Principal Components Analysis (NLPCA) to deal with ordinal data.

Robotic Spacecraft↗

Review of a Draft - Avoiding the Impossible: Re-focusing a Non-Feasible Mission 2-Hrs into a 3-Day Engineering Session

Concurrent engineering offers a great many benefits to engineers and mission designers throughout the world of aerospace. The only downside of concurrent engineering, and this is somewhat unavoidable, is that you don’t know the results of a design session until the end when it is completed. Usually, this is not a problem – you wouldn’t start building a spacecraft before the design is finished. However, within mass and cost constrained systems, you may end up with a final design that although technically sound – is not feasible due to mass or cost limits. Employing in-session mass and cost models with flexible inputs that refine their estimates and variance as more detailed information comes in throughout a design session allows major design changes to be made when the probability of breaching a mass or cost cap exceeds a threshold level. This enables mission designers to re-focus the study, and avoid spending 3-days with 15 engineers designing a non-feasible mission. By understanding key correlations and nested relationships within mass or cost, and specifically mass or cost allocations per mission element by mission type, it’s possible to get flexible-input, statistically based mass and cost estimates very early in the design process. Baseline models are seeded using mission characteristics and general parameters (outer planetary orbiter-probe mission, $500M cost cap for example) to provide a rough estimate of the expected mass or cost. As information gets solidified during the session, it gets added to the model and the estimates are updated. Continuing the orbiter-probe mission example, modeling probe heat shield cost as a percent of total probe cost, and probe cost as a percent of total flight system cost, and total flight system cost as a percent of total mission cost allows a design team to roll-up solidified information to estimate the probability of fitting within a mass or cost constraint early in a concurrent design session. When only the heat shield cost is known, the variance of the final estimate is higher, whereas when the full probe gets defined, naturally, the variance of the estimate decreases. A methodology, model, verification and demo implementation for cost limit breach are presented.

Hihn, Jairus M.↗

The critical satellite technical issues of future pervasive broadband low-cost communication networks

The critical technical issues of signal waveform design, projected spacecraft technology, satellite launch options, and satellite cost are discussed for future pervasive broadband communication networks. With DPCM video signal encoding, 32 Mb/s user-to-user data rate per channel, 10% overhead, two orthogonal polarizations, and crosstalk loss limited to 1 dB, TFM permits about 75 channels/GHz of frequency allocation. The BOM (beginning of mission) weight and power of a baseline 400-channel multibeam satellite is about 1800 kg and 5000 W. Each 35 Mb/s channel can support 1 to 10 video channels. The weight and power estimates assume hardened digital logic, composite materials for a multibeam antenna structure, high-efficiency solar cells, batteries, and amplifiers. Based on a cost model for large communication satellites, the total space segment cost of two active satellites and one spare would be about $485 M.

Harvey, R. L.↗

Forecast of long term coal supply and mining conditions: Model documentation and results

A coal industry model was developed to support the Jet Propulsion Laboratory in its investigation of advanced underground coal extraction systems. The model documentation includes the programming for the coal mining cost models and an accompanying users' manual, and a guide to reading model output. The methodology used in assembling the transportation, demand, and coal reserve components of the model are also described. Results presented for 1986 and 2000, include projections of coal production patterns and marginal prices, differentiated by coal sulfur content.

Source record↗

Secondary electric power generation with minimum engine bleed

Secondary electric power generation with minimum engine bleed is discussed. Present and future jet engine systems are compared. The role of auxiliary power units is evaluated. Details of secondary electric power generation systems with and without auxiliary power units are given. Advanced bleed systems are compared with minimum bleed systems. A cost model of ownership is given. The difference in the cost of ownership between a minimum bleed system and an advanced bleed system is given.

Tagge, G. E.↗

Space Station needs, attributes and architectural options, volume 2, book 3: Cost and programmatics

The cost and programmatic considerations which integrate mission requirements and architectural options into a cohesive system for exploitation of space opportunities within affordable limits are discussed. The mission requirements, baseline architecture, a top level baseline schedule, and acquisition costs are summarized. The work breakdown structure (WBS) used to structure the program, and the WBS dictionary are included. The costing approach used, including the operation of the primary costing tool, the SPACE cost model are described. The rationale for the choice of cost estimating relationships is given and costs at the module level are shown. Detailed costs at the subsystem level are shown. The baseline schedule and annual funding profiles are provided. Alternate schedules are developed to provide different funding profiles. Alternate funding sources are discussed and foreign and contractor participation is outlined. The results of the benefit analysis are given and the accrued benefits deriving from an implemented space station program are outlined.

Source record↗

Advanced Launch System propulsion focused technology liquid methane turbopump technical implementation plan

This program will focus on the integration of all functional disciplines of the design, manufacturing, materials, fabrication and producibility to define and demonstrate a highly reliable, easily maintained, low cost liquid methane turbopump as a component for the STBE (Space Transportation Booster Engine) using the STME (main engine) oxygen turbopump. A cost model is to be developed to predict the recurring cost of production hardware and operations. A prime objective of the program is to design the liquid methane turbopump to be used in common with a LH2 turbopump optimized for the STME. Time phasing of the effort is presented and interrelationship of the tasks is defined. Major subcontractors are identified and their roles in the program are described.

Csomor, A.↗

The structure of the software cost function

It is the purpose of this paper to analyze the structure of the cost estimating relationships that commercial cost models use and to test whether they are viable cost functions.

cost function cost estimating relationship wage ra↗

Thermoelectric System Economics - The Apex: New Paradigms in Manufacturing and Interface Performance Relationships Driving System Cost Optimizations

Thermoelectric energy recovery systems require cost-optimized designs with high thermal and thermoelectric (TE) performance to surmount common commercialization barriers controlling the acceptance of thermoelectric generator (TEG) systems. Recent work has addressed this requirement with new analytic tools and paradigms that allow integrated TEG cost-performance analysis and optimization. New work herein has identified the existence of optimized TE element design (i.e., TE element length) for minimizing TEG cost and provides design guidelines associated with critical thermal and electrical contact resistance effects and TE manufacturing sensitivities. Once optimum hot-side heat flux criteria are satisfied, this work highlights the tradeoffs between interface resistance effects and manufacturing cost effects in determining optimum-cost TE element lengths, and then quantifies the increase in optimum-cost TE lengths as manufacturing costs become more sensitive to TE element lengths. Optimized TE element design criteria and key non-dimensional design parameters (i.e., [𝐶′′′LTE/𝐶′′], [TE/con], [con/(TE,aveLTE)]) driving the design are presented and explained showing the interdependencies between manufacturing cost parameters and thermal and electrical interface impacts on integrated TE cost-performance analysis and design. Comprehensive TEG system cost-performance relationships clearly demonstrate the two parameters that most greatly impact the TEG system cost are heat exchanger costs ($/(W/K)) and TE hot side heat flux. Reducing heat exhanger cost from $1/(W/K) to $0.5/(W/K) can decrease TEG system cost by $2/W to $4/W depending on TE hot side heat fluxes from 4-10 W/cm2. The impact of TE hot side heat flux on TEG system cost is larger; reducing TE system cost by factors of 2-4 as TE hot side heat flux increases from 4 W/cm2 to high levels around 18 W/cm2. The levels of thermal contact resistance and electrical contact resistance required to even approach the critical TEG system cost level of $1/W are characterized by con = 1.0 x 10-10 -m2 and r = 0.1, respectively. This not only lowers TEG costs, but it also makes the TEG system costs less sensitive to TE manufacturing dependences on TE element length. New design paradigms and relationships create holistic, integrated TE performance-cost models that enhance understanding of crucial interrelationships between component costs, TE design parameters and material properties, heat exchanger design parameters, interfacial heat flux, and now thermal and electrical interface effects in minimizing TEG system costs.

Hendricks, Terry J.↗

Outer planet probe cost estimates: First impressions

An examination was made of early estimates of outer planetary atmospheric probe cost by comparing the estimates with past planetary projects. Of particular interest is identification of project elements which are likely cost drivers for future probe missions. Data are divided into two parts: first, the description of a cost model developed by SAI for the Planetary Programs Office of NASA, and second, use of this model and its data base to evaluate estimates of probe costs. Several observations are offered in conclusion regarding the credibility of current estimates and specific areas of the outer planet probe concept most vulnerable to cost escalation.

Niehoff, J.↗

Local design optimization for composite transport fuselage crown panels

Composite transport fuselage crown panel design and manufacturing plans were optimized to have projected cost and weight savings of 18 percent and 45 percent, respectively. These savings are close to those quoted as overall NASA ACT program goals. Three local optimization tasks were found to influence the cost and weight of fuselage crown panels. This paper summarizes the effect of each task and describes in detail the task associated with a design cost model. Studies were performed to evaluate the relationship between manufacturing cost and design details. A design tool was developed to aid in these investigations. The development of the design tool included combining cost and performance constraints with a random search optimization algorithm. The resulting software was used in a series of optimization studies that evaluated the sensitivity of design variables, guidelines, criteria, and material selection on cost. The effect of blending adjacent design points in a full scale panel subjected to changing load distributions and local variations was shown to be important. Technical issues and directions for future work were identified.

Swanson, G. D.↗

CERESMIP: A Climate Modeling Protocol to Investigate Recent Trends in the Earth's Energy Imbalance

The Clouds and the Earth's Radiant Energy System (CERES) project has now produced over two decades of observed data on the Earth's Energy Imbalance (EEI) and has revealed substantive trends in both the reflected shortwave and outgoing longwave top-of-atmosphere radiation components. Available climate model simulations suggest that these trends are incompatible with purely internal variability, but that the full magnitude and breakdown of the trends are outside of the model ranges. Unfortunately, the Coupled Model Intercomparison Project (Phase 6) (CMIP6) protocol only uses observed forcings to 2014 (and Shared Socioeconomic Pathways (SSP) projections thereafter), and furthermore, many of the ‘observed' drivers have been updated substantially since the CMIP6 inputs were defined. Most notably, the sea surface temperature (SST) estimates have been revised and now show up to 50% greater trends since 1979, particularly in the southern hemisphere. Additionally, estimates of short-lived aerosol and gas-phase emissions have been substantially updated. These revisions will likely have material impacts on the model-simulated EEI. We therefore propose a new, relatively low-cost, model intercomparison, CERESMIP, that would target the CERES period (2000-present), with updated forcings to at least the end of 2021. The focus will be on atmosphere-only simulations, using updated SST, forcings and emissions from 1990 to 2021. The key metrics of interest will be the EEI and atmospheric feedbacks, and so the analysis will benefit from output from satellite cloud observation simulators. The Tier 1 request would consist only of an ensemble of AMIP-style simulations, while the Tier 2 request would encompass uncertainties in the applied forcing, atmospheric composition, single and all-but-one forcing responses. We present some preliminary results and invite participation from a wide group of models.

CMIP6↗

Software cost/resource modeling

The Putnam method for planning the time/work effort component of software development is evaluated. This software costing model, based on Norden-Rayleigh product life cycle concepts, was applied to four development projects. The time/effort tradeoff leading to savings attainable when development time on a project is extended by a few months is demonstrated. The software equation which relates the principal parameters of development time, total effort, system size, and the development environment is presented.

Golden, J. R.↗

Commonality analysis for the NASA Space Station Common Module

The concept of commonality to enhance cost savings, as applied to NASA's Space Station Common Module (CM), is explored. The equipment to be included in the CM is organized by subsystems of structure, power, thermal, command and data handling, environmental control and life support, and crew station. The weight, volume, and quantity of each instrument item will be subsequently added to support a cost model. The CM concept, its reference configuration, power distribution and management, and cost sensitivity options are discussed in detail. Some computer programs are outlined, stressing the importance of the existing capabilities of the STS and the optimum commonality case.

Powell, L. E.↗

Local design optimization for composite transport fuselage crown panels

Composite transport fuselage crown panel design and manufacturing plans were optimized to have projected cost and weight savings of 18 and 45 percent, respectively. These savings are close to those quoted as overall NASA Advanced Composite Technology (ACT) program goals. Three local optimization tasks were found to influence the cost and weight of fuselage crown panels. The effects are summarized of each task and the task associated with a design cost model is described in detail. Studies were performed to evaluate the relationship between manufacturing cost and design details. A design tool was developed to aid in these studies. The development of the design tool included combining cost and performance constraints with a random search optimization algorithm. The resulting software was used in a series of optimization studies that evaluated the sensitivity of design variables, guidelines, criteria, and material selection on cost. The effect of blending adjacent design points in a full scale panel subjected to changing load distributions and local variations was shown to be important. Technical issues and directions for future work were identified.

Swanson, G. D.↗

Assurance Equations: A Cost and Criticality Model for Optimizing Quality Assurance Surveillance

The cost of quality vs cost of failure correction has been a long-running topic of discussion within the Aerospace community. It leads directly to concepts of “risk tolerance”, and risk-based decision-making. It would be valuable if there was a way to compute the optimal investment in customer-executed quality assurance activities using defect significance with respect to performance objectives, the activities’ defect detection effectiveness, and the cost-penalty for late discovery of impactful defects. This optimization is particularly of interest to projects whose budget constraints significantly limit their risk management options.The cost to fix defects (i.e., failure correction) escalates as the project matures. There have been studies attempting to determine the relative cost of fixing defects discovered during various phases of a project life cycle with important implications, all of which suggest growth factors are large. The commonly referred to 1:10:100 rule represents a cost multiplier for repair/rework across the Design to Fab to Test hardware development phases. Cost premiums for QA activities also accumulate when they are treated as mandatory (due to schedule drag) or are performed later than their assigned phase.This paper describes the modeling of development phase -dependencies in the conduct of typical customer-executed quality assurance activities. Our initial modeling encompasses:• Distinct phases of the production lifecycle• Multiple kinds of Defects, each with some a-priori likelihood of being present• Each defect’s impact on performance Objectives for a type of hardware• The cost and efficacy of assurance techniques at detecting such Defects• The costs of fixing those Defects detected in a given phase of the production lifecycleThe model captures assurance activities’ abilities to Detect defects. Upon detection it is assumed that the Defect is immediately fixed. Defects that “escape” detection by some activity may thereafter be detected by a later activity, but by then the cost of fixing the Defect may have escalated. Defects are related to the performance Objectives they would detract from, were those Defects to remain present in the operating system.We have constructed and are exploring, a model that relates the importance of hardware system elements to mission objectives, the impact of types of Defects on those hardware types, the cost of customer-executed assurance activities (i.e., supplier controls) and their effectiveness towards reducing an impactful quality escape, and the cost of Defect correction across production phase. We describe the approach taken to select the key model aspects, why they are relevant to our NASA mission, and our efforts to populate it with relevant and contemporary data. We use a notional example to illustrate model design and function.

Plante, Jeannette↗

Fast Conceptual Cost Estimating of Aerospace Projects Using Historical Information

Accurate estimates can be created in less than a minute by applying powerful techniques and algorithms to create an Excel-based parametric cost model. In five easy steps you will learn how to normalize your company 's historical cost data to the new project parameters. This paper provides a complete, easy-to-understand, step by step how-to guide. Such a guide does not seem to currently exist. Over 2,000 hours of research, data collection, and trial and error, and thousands of lines of Excel Visual Basic Application (VBA) code were invested in developing these methods. While VBA is not required to use this information, it increases the power and aesthetics of the model. Implementing all of the steps described, while not required, will increase the accuracy of the results.

Butts, Glenn↗