Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Availability and cost estimate of a high naphthene, modified aviation turbine fuel

Information from an Air Force study was used to determine the potential availability and cost of a modified conventional fuel with a naphthene content which could have a thermal stability near that of JP-7 for high-speed civil transports. Results showed sufficient capacity for a fuel made of a blend of 50 percent naphthenic straight run kerosene and 50 percent hydrocracked product, assuming a near-term requirement of 210,000 BBL per day. Fuel cost would be as low as 62.5 to 64.5 cents per gallon, assuming 20 dollars per barrel for crude.

Prok, George M.↗

Hydrogen from coal cost estimation guidebook

In an effort to establish baseline information whereby specific projects can be evaluated, a current set of parameters which are typical of coal gasification applications was developed. Using these parameters a computer model allows researchers to interrelate cost components in a sensitivity analysis. The results make possible an approximate estimation of hydrogen energy economics from coal, under a variety of circumstances.

Billings, R. E.↗

Fuel Economy and Cost Estimates for Medium and Heavy Duty Trucks

The U.S. Department of Energy’s (DOE’s) Vehicle Technologies Office (VTO) and Hydrogen and Fuel Cell Technologies Office (HFTO) aim to develop sustainable, affordable and efficient technologies for transportation of goods and people. These offices seek to advance DOE investments in advanced transportation component technologies and powertrains that translate to the estimated potential vehicle-level fuel savings contained herein. As part of quantifying these benefits, we have been asked to take a three-decades-long view of the fuel-saving vehicle technologies that will likely be implemented in medium- and heavy-duty trucks. In this work, we focus on technologies funded by VTO and HFTO that we expect to see during this time frame. Simulation was carried out for more than 20 types of trucks, ranging from Class 2 (the smallest medium-duty trucks, which span from Class 2b–6) to Class 8 (the largest heavy-duty trucks, which span Classes 7 and 8). The output of this study provides the fuel consumption and estimated purchase prices for trucks that employ advanced technologies, where both types of output offer a vehicle-level perspective and estimated projections about the future of advanced-technology medium- and heavy-duty trucks, as well as cost and performance data pairs that can inform other advanced transportation studies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Quality Guidelines for Energy Systems Studies: Cost Estimation Methodology for NETL Assessments of Power Plant Performance

This paper summarizes the methodology employed by the National Energy Technology Laboratory (NETL) in calculating power plant costs in its techno-economic studies, such as the Cost and Performance Baseline for Fossil Energy Systems series of reports. It also outlines the approach used to calculate the cost of electricity by which NETL evaluates electric power plants. These metrics and a clear understanding of the methodology used are essential in allowing different power plant technologies to be compared on a similar basis. These guidelines are tailored for power producing plants, although they can be applied to a variety of different revenue generating plants (e.g., coal to liquids, syngas generation, hydrogen).

20 FOSSIL-FUELED POWER PLANTS↗

Topical Report: Reference Plant Cost Estimates for TRIG™ Systems

Southern Company Services, Inc. has conducted a Reference Plant conceptual design for the Transport Integrated Gasification (TRIG™) IGCC technology. While the technical knowledge and cost data gathered from the Kemper County IGCC project provide a basis for this effort, this conceptual design incorporates cost improvements and commercially available technology advancements that are representative of a mature “nth” TRIG™ IGCC project. The design is based on an abundant, sub-bituminous coal feedstock, and includes two options for CO 2 capture. The resulting Reference Plant provides a basis for comparison with other technologies as a first step for evaluating the TRIG™ IGCC technology.

01 COAL, LIGNITE, AND PEAT↗

Space Transportation Booster Engine Configuration Study. Volume 3: Program Cost estimates and work breakdown structure and WBS dictionary

The objective of the Space Transportation Booster Engine Configuration Study is to contribute to the ALS development effort by providing highly reliable, low cost booster engine concepts for both expendable and reusable rocket engines. The objectives of the Space Transportation Booster Engine (STBE) Configuration Study were: (1) to identify engine development configurations which enhance vehicle performance and provide operational flexibility at low cost; and (2) to explore innovative approaches to the follow-on Full-Scale Development (FSD) phase for the STBE.

Source record↗

Fast Conceptual Cost Estimating of Aerospace Projects Using Historical Information

Accurate estimates can be created in less than a minute by applying powerful techniques and algorithms to create an Excel-based parametric cost model. In five easy steps you will learn how to normalize your company 's historical cost data to the new project parameters. This paper provides a complete, easy-to-understand, step by step how-to guide. Such a guide does not seem to currently exist. Over 2,000 hours of research, data collection, and trial and error, and thousands of lines of Excel Visual Basic Application (VBA) code were invested in developing these methods. While VBA is not required to use this information, it increases the power and aesthetics of the model. Implementing all of the steps described, while not required, will increase the accuracy of the results.

Butts, Glenn↗

The use of activity-based cost estimation as a management tool for cultural change

It will be shown that the greatest barrier to American exploration of the planet Mars is not the development of the technology needed to deliver humans and return them safely to earth. Neither is it the cost of such an undertaking, as has been previously suggested, although certainly, such a venture may not be inexpensive by some measures. The predicted costs of exploration have discouraged serious political dialog on the subject. And, in fact, even optimistic projections of the NASA budget do not contain the resources required, under the existing development and management paradigm, for human space exploration programs. It will be demonstrated that the perception of the costs of such a venture, and the cultural responses to the perceptions are factors inhibiting American exploration of the moon and the planet Mars. Cost models employed in the aerospace industry today correctly mirror the history of past space programs, and as such, are representative of the existing management and development paradigms. However, if, under this current paradigm no major exploration programs are feasible, then cost analysis methods based in the past may not have great utility in exploring the needed cultural changes. This paper explores the use of a new type of model, the activity based cost model, which will treat management style as an input variable, in a sense providing a tool whereby a complete, affordable program might be designed, including both the technological and management aspects.

Mandell, Humboldt↗

A Decision Tool that Combines Discrete Event Software Process Models with System Dynamics Pieces for Software Development Cost Estimation and Analysis

The development process for a large software development project is very complex and dependent on many variables that are dynamic and interrelated. Factors such as size, productivity and defect injection rates will have substantial impact on the project in terms of cost and schedule. These factors can be affected by the intricacies of the process itself as well as human behavior because the process is very labor intensive. The complex nature of the development process can be investigated with software development process models that utilize discrete event simulation to analyze the effects of process changes. The organizational environment and its effects on the workforce can be analyzed with system dynamics that utilizes continuous simulation. Each has unique strengths and the benefits of both types can be exploited by combining a system dynamics model and a discrete event process model. This paper will demonstrate how the two types of models can be combined to investigate the impacts of human resource interactions on productivity and ultimately on cost and schedule.

Mizell, Carolyn Barrett↗

Nuclear Energy Cost Estimates for Net Zero World Initiative – 2024 Update

This report provides recommended parameters for incorporating nuclear energy systems into decarbonization modeling scenarios. The values are primarily intended for the Net Zero World (NZW) Initiative but are expected to prove useful to other related efforts. Both costs and operational metrics are provided in the study for large reactors and small modular reactors (SMR).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Site Selection and Cost Estimation of Pilot-Scale CO2 Saline Storage Study in the Gulf of Mexico

Presentation at NETL Carbon Management Project Review Meeting held in Pittsburgh, Pennsylvania, August 15–19, 2022. The presentation provides a high-level overview of initial conceptual analysis evaluating site selection, geologic assessment, infrastructure, and project cost considerations associated with the development of pilot-scale CO2 storage projects in the offshore Gulf of Mexico.

Wijaya, Nur↗

Explainable AI for a No-Teardown Vehicle Component Cost Estimation: A Top-Down Approach

The broader ambition of this article is to popularize an approach for the fair distribution of the quantity of a system's output to its subsystems while allowing for underlying complex subsystem level interactions. Particularly, we present the use of this framework on a very specific (but generalizable) application, interesting for a more general AI audience. Here, we detail a data-driven approach to vehicle price modeling and its component price estimation by leveraging a combination of concepts from machine learning and game theory. We show an alternative to common teardown methodologies and surveying approaches for component and vehicle price estimation at the manufacturer's suggested retail price (MSRP) level that has the advantage of bypassing uncertainties involved in gathering teardown data, the need to perform expensive and biased surveying, and the need to perform retail price equivalent or indirect cost multiplier adjustments to mark up direct manufacturing costs to MSRP. This novel exercise not only provides accurate pricing of the technologies at the customer level, but also shows the, a priori known, large gaps in pricing strategies between manufacturers, vehicle classes, market segments, etc. There is also clear interaction between the price of technologies and other specifications present in vehicles. Those results are indication that old methods of manufacturer-level component costing, aggregation, and application of flat and rigid adjustment factors should be carefully examined. The findings are based on a database developed by Argonne, which includes over 64,000 vehicles covering MY1990 to MY2020 with hundreds of vehicle specs.

97 MATHEMATICS AND COMPUTING↗

Switchgrass nitrogen response and estimated production costs on diverse sites

Switchgrass ( Panicum virgatum L.) has been the principal perennial herbaceous crop investigated for bioenergy production in North America given its high production potential, relatively low input requirements, and potential suitability for use on marginal lands. Few large trials have determined switchgrass yields at field scale on marginal lands, including analysis of production costs. Thus, a field–scale study was conducted to develop realistic yield and cost estimates for diverse regions of the USA. Objectives included measuring switchgrass response to fertility treatments (0, 56, and 112 kg N ha –1 ) and generating corresponding estimates of production costs for sites with diverse soil and climatic conditions. Trials occurred in Iowa, New York, Oklahoma, South Dakota, and Virginia, USA. Cultivars and management practices were site specific, and field–scale equipment was used for all management practices. Input costs were estimated using final harvest–year (2015) prices, and equipment operation costs were estimated with the MachData model (2015). Switchgrass yields generally were below those reported elsewhere, averaging 6.3 Mg ha –1 across sites and treatments. Establishment stand percent ranged from 28% to 76% and was linked to initial year production. No response to N was observed at any site in the first production year. In subsequent seasons, N generally increased yields on well–drained soils; however, responses to N were nil or negative on less well–drained soils. Greatest percent increases in response to 112 kg N ha –1 were 57% and 76% on well–drained South Dakota and Virginia sites, where breakeven prices to justify N applications were over 70 and 63 Mg –1 , respectively. For some sites, typically promoted N application rates may be economically unjustified; it remains unknown whether a bioenergy industry can support the breakeven prices estimated for sites where N inputs had positive effects on switchgrass yield.

09 BIOMASS FUELS↗

Performance, size, mass, and cost estimates for projected 1kW EOL Si, InP, and GaAs arrays

One method of evaluating the potential of emerging solar cell and array technologies is to compare their projected capabilities in space flight applications to those of established Si solar cells and arrays. Such an application-oriented comparison provides an integrated view of the elemental comparisons of efficiency, radiation resistance, temperature sensitivity, size, mass, and cost in combination. In addition, the assumptions necessary to make the comparisons provide insights helpful toward determining necessary areas of development or evaluation. Finally, as developments and evaluations progress, the results can be used in more precisely defining the overall potential of the new technologies in comparison to existing technologies. The projected capabilities of Si, InP, and GaAs cells and arrays are compared.

Slifer, Luther W., Jr.↗

Cost estimates for removal of orbital debris

While there are currently no active measures for the removal of nonfunctional satellites or spent rocket stages from earth orbit, it has been deemed prudent to begin to identify and economically evaluate potential approaches for such orbital decluttering. The methods presently considered encompass retrieval with an OMV, forcible deorbiting via attached propulsive devices, and deorbiting via passive, drag-augmentation devices; the increases in payload-delivery costs they represent are respectively $15-20 million/object, $7.8 million/vehicle, and $5.5-15.5 million/unit. OMV removal appears the least economically feasible method.

Petro, Andrew↗