Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “coordinated operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Discretization formulas for unstructured grids

The Galerkin weighted residual technique using linear triangular weight functions is employed to develop finite difference formula in cartesian coordinates for the Laplacian operator, first derivative operators and the function for unstructured triangular grids. The weighted residual coefficients associated with the weak formulation of the Laplacian operator are shown to agree with the Taylor series approach on a global average. In addition, a simple algorithm is presented to determine the Voronoi (finite difference) area of an unstructured grid.

Baumeister, Kenneth J.↗

Space astrophysics - Science operations

Science Operations in the Astrophysics Division of NASA Headquarters are the responsibility of the Science Operations Branch. The goals of Science Operations are to encourage multimission, panchromatic research in astrophysics and to foster coordination and cooperation among all mission operations and data analysis efforts. To meet these goals, the Branch is structured into four areas of responsibility. The paper describes these responsibilities.

Kutter, G. S.↗

Communication variations and aircrew performance

The relationship between communication variations and aircrew performance (high-error vs low-error performances) was investigated by analyzing the coded verbal transcripts derived from the videotape records of 18 two-person air transport crews who participated in a high-fidelity, full-mission flight simulation. The flight scenario included a task which involved abnormal operations and required the coordinated efforts of all crew members. It was found that the best-performing crews were characterized by nearly identical patterns of communication, whereas the midrange and poorer performing crews showed a great deal of heterogeneity in their speech patterns. Although some specific speech sequences can be interpreted as being more or less facilitative to the crew-coordination process, predictability appears to be the key ingredient for enhancing crew performance. Crews communicating in highly standard (hence predictable) ways were better able to coordinate their task, whereas crews characterized by multiple, nonstandard communication profiles were less effective in their performance.

Kanki, Barbara G.↗

Science Community Interface

The interface is described between NASA HQ, NASA Goddard, and the rocket Principal Investigators. The proposal selection process is described along with the cycle time to flight, constraints imposed by science objectives on operations, campaign modes, and coordination with ground based facilities. There were questions about the success rate of proposals and the primary sources of funding for the payloads program from the branches of the science divisions in OSSA, especially space physics, astrophysics, Earth sciences, and solar system exploration. The presentation is given in the form of viewgraphs.

Neupert, Werner M.↗

SUMER: Temperatures, densities, and velocities in the outer solar atmosphere

The SUMER (Solar Ultraviolet Measurement of Emitted Radiation) instrumentation that will be mounted on the SOHO (Solar and Heliospheric Observatory) spacecraft is in development. It has some capability of improving the solar angular resolution and the spectral resolution already obtained in the far UV to the extreme UV, corresponding to the temperature range between 10,000 and a few 1,000,000 K. Some insights into the SUMER spectrometer, developed to study the dynamics and to infer temperatures and densities of the low corona and the chromosphere-corona transition zone in using the 50 to 160 nm wavelength range, are given. The SUMER scientific goals and the techniques used are outlined. The instrumentation and the expected performances are described. The way the observations can be conducted is emphasized and the operation of SUMER in coordination with other SOHO instrumentations and in cooperation with ground based observations is explained.

Lemaire, Philippe↗

The solar optical telescope

Objectives of the Solar Optical Telescope are to study the physics of the Sun on the scale at which many of the important physical processes occur and to attain a resolution of 73km on the Sun or 0.1 arc seconds of angular resolution. Topics discussed in this overview of the Solar Optical Telescope include: why is the Solar Optical Telescope needed; current picture of the Sun's atmosphere and convection zone; scientific problems for the Solar Optical Telescope; a description of the telescope; the facility - science management, contamination control, and accessibility to the instruments; the scientific instruments - a coordinated instrument package for unlocking the Sun's secrets; parameters of the coordinated instrument package; science operations from the Space Shuttle; and the dynamic solar atmosphere.

Source record↗

Crew decision making under stress

Flight crews must make decisions and take action when systems fail or emergencies arise during flight. These situations may involve high stress. Full-missiion flight simulation studies have shown that crews differ in how effectively they cope in these circumstances, judged by operational errors and crew coordination. The present study analyzed the problem solving and decision making strategies used by crews led by captains fitting three different personality profiles. Our goal was to identify more and less effective strategies that could serve as the basis for crew selection or training. Methods: Twelve 3-member B-727 crews flew a 5-leg mission simulated flight over 1 1/2 days. Two legs included 4 abnormal events that required decisions during high workload periods. Transcripts of videotapes were analyzed to describe decision making strategies. Crew performance (errors and coordination) was judged on-line and from videotapes by check airmen. Results: Based on a median split of crew performance errors, analyses to date indicate a difference in general strategy between crews who make more or less errors. Higher performance crews showed greater situational awareness - they responded quickly to cues and interpreted them appropriately. They requested more decision relevant information and took into account more constraints. Lower performing crews showed poorer situational awareness, planning, constraint sensitivity, and coordination. The major difference between higher and lower performing crews was that poorer crews made quick decisions and then collected information to confirm their decision. Conclusion: Differences in overall crew performance were associated with differences in situational awareness, information management, and decision strategy. Captain personality profiles were associated with these differences, a finding with implications for crew selection and training.

Orasanu, J.↗

Application of MCM image construction to IRAS comet observations

There is a wealth of IRAS comet data, obtained in both the survey and pointed observations modes. However, these measurements have remained largely untouched due to difficulties in removing instrumental effects from the data. We have developed a version of the Maximum Correlation Method for Image Construction algorithm (MCM) which operates in the moving coordinate system of the comet and properly treats both real cometary motion and apparent motion due to spacecraft parallax. This algorithm has been implemented on a 486/33 PC in FORTRAN and IDL codes. Preprocessing of the IRAS CRDD includes baseline removal, deglitching, and removal of long tails due to dielectric time constants of the detectors. The resulting images are virtually free from instrumental effects and have the highest possible spatial resolution consistent with the data sampling. We present examples of high resolution IRAS images constructed from survey observations of Comets P/Tempel 1 and P/Tempel 2, and pointed observations of IRAS-Araki-Alcock.

Schlapfer, Martin F.↗

Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.

Jacobs, Derya, A.↗

Tiltrotor Acoustic Flight Test: Terminal Area Operations

This paper provides a comprehensive description of an acoustic flight test of the XV- 15 Tiltrotor Aircraft with Advanced Technology Blades (ATB) conducted in August and September 1991 at Crows Landing, California. The purpose of this cooperative research effort of the NASA Langley and Ames Research Centers was to obtain a preliminary, high quality database of far-field acoustics for terminal area operations of the XV-15 at a takeoff gross weight of approximately 14,000 lbs for various glide slopes, airspeeds, rotor tip speeds, and nacelle tilt angles. The test also was used to assess the suitability of the Crows Landing complex for full scale far-field acoustic testing. This was the first acoustic flight test of the XV-15 aircraft equipped with ATB involving approach and level flyover operations. The test involved coordination of numerous personnel, facilities and equipment. Considerable effort was made to minimize potential extraneous noise sources unique to the region during the test. Acoustic data from the level flyovers were analyzed, then compared with data from a previous test of the XV-15 equipped with Standard Metal Blades

SantaMaria, O. L.↗

The Water Vapor Variability - Satellite/Sondes (WAVES) Field Campaigns

Three NASA-funded field campaigns have been hosted at the Howard University Research Campus in Beltsville, MD. In each of the years 2006, 2007 and 2008, WAVES field campaigns have coordinated ozonesonde launches, lidar operations and other measurements with A-train satellite overpasses for the purposes of satellite validation. The unique mix of measurement systems, physical location and the interagency, international group of researchers and students has permitted other objectives, such as mesoscale meteorological studies, to be addressed as well. We review the goals and accomplishments of the three WAVES missions with the emphasis on the nonsatellite validation component of WAVES, as the satellite validation activities have been reported elsewhere.

Whiteman, D. N.↗

Human-system Interaction Issues and Proposed Solutions To Promote Successful Maturation of the UTM System

Over five years, NASA, together with partnering organizations, has been developing and successfully demonstrating the maturing capabilities of the Unmanned Aircraft Systems (UAS) Traffic Management (UTM) system and its ability to support communication and coordination among small UAS operations through a series of flight tests. During these flight tests, human-system interaction (HSI) elements were also explored in order to identify the barriers to implementation as human operators transitionally fulfill roles that will be ultimately tasked to future automation. Throughout the tests, similar issues were regularly documented and are expected to persist if not formally addressed by consistent procedures or regulation. Documented here, along with suggested mitigations, are the most frequently noted HSI items, which include operator training, data standardization, and information quantity.

UTM↗

Human-system interaction issues and proposed solutions to promote successful maturation of the UTM system

Over five years, NASA, together with partnering organizations, has been developing and successfully demonstrating the maturing capabilities of the Unmanned Aircraft Systems (UAS) Traffic Management (UTM) system and its ability to support communication and coordination among small UAS operations through a series of flight tests. During these flight tests, human-system interaction (HSI) elements were also explored in order to identify the barriers to implementation as human operators transitionally fulfill roles that will be ultimately tasked to future automation. Throughout the tests, similar issues were regularly documented and are expected to persist if not formally addressed by consistent procedures or regulation. Documented here, along with suggested mitigations, are the most frequently noted HSI items, which include operator training, data standardization, and information quantity.

UTM↗

Studying Human-System Interaction within the UTM System

Over five years, NASA, together with partnering organizations, has been developing and successfully demonstrating the maturing capabilities of the Unmanned Aircraft Systems (UAS) Traffic Management (UTM) system and its ability to support communication and coordination among small UAS operations through a series of flight tests. During these flight tests, human-system interaction (HSI) elements were also explored in order to identify the barriers to implementation as human operators transitionally fulfill roles that will be ultimately tasked to future automation. Throughout the tests, similar issues were regularly documented and are expected to persist if not formally addressed by consistent procedures or regulation. Documented here, along with suggested mitigations, are the most frequently noted HSI items, which include operator training, data standardization, and information quantity. .

UTM↗

Studying Human-System Interaction with the UTM System

Over five years, NASA, together with partnering organizations, has been developing and successfully demonstrating the maturing capabilities of the Unmanned Aircraft Systems (UAS) Traffic Management (UTM) system and its ability to support communication and coordination among small UAS operations through a series of flight tests. During these flight tests, human-system interaction (HSI) elements were also explored in order to identify the barriers to implementation as human operators transitionally fulfill roles that will be ultimately tasked to future automation. Throughout the tests, similar issues were regularly documented and are expected to persist if not formally addressed by consistent procedures or regulation. Documented here, along with suggested mitigations, are the most frequently noted HSI items, which include operator training, data standardization, and information quantity.

UTM↗

NAIRAS Model transition to the CCMC: real-time dosimetric output and low-Earth orbit applications

NASA’s Nowcast of Atmospheric Ionizing Radiation for Aviation Safety (NAIRAS) model is areal-time, global, physics-based model originally developed to predict exposure to cosmic radiation to air travelers from both galactic and solar sources. A prototype operational NAIRAS model has provided tabular and graphical data products via its public web site for a number of years. We present the advances in the transition of NAIRAS to operations at the Community Coordinated Modeling Center (CCMC), located at NASA Goddard Space Flight Center, where global NAIRAS products are available for a real-time space weather version of the model. In addition, a runs-on-request version provides model output along user selected flight trajectories. We show the global dosimetric output from the model that are available in real-time as well as the new products developed to support commercial spaceflight missions to low-Earth orbit(LEO) and the International Space Station (ISS).

Guillaume Gronof↗

Integrated Control Design for A Partially Turboelectric Aircraft Propulsion System

Electrified Aircraft Propulsion (EAP) holds great potential for reducing aviation emissions and fuel burn. A variety of EAP architectures have been proposed including partially-turboelectric configurations that combine turbofan engines with motor-driven propulsors. Such architectures exhibit coupling between subsystems and thus require an integrated control solution. To address this need, this paper presents an integrated control design strategy for a commercial single-aisle partially-turboelectric aircraft concept consisting of two wing-mounted turbofan engines and an electric motor driven tailfan propulsor. Within this architecture the turbofans serve the dual purpose of generating thrust and supplying mechanical offtake power used to generate electricity for the tailfan motor. The propulsion control system is tasked with coordinating turbofan and tailfan operation under both steady-state and transient scenarios. The paper introduces a linear state-space representation of the architecture reflecting the coupling between the turbofan and tailfan subsystems along with loop transfer functions reflecting open- and closed-loop system dynamics. Also discussed is an applied strategy for scheduling the tailfan setpoint command based on the average sensed fan speed of the two turbofans. This approach ensures synchronized operation of the turbofan and tailfan subsystems while also allowing the turbofan fuel control design to be simplified. Performance of the integrated control design is assessed through a real-time hardware-in-the-loop test conducted at the NASA Electric Aircraft Testbed. During this test a scaled version of the electrical system and turbomachinery shaft dynamics were implemented in electrical machine hardware and evaluated under closed-loop control. Results from this facility test are presented to illustrate the efficacy of the applied integrated control design approach under steady-state and transient scenarios including a full-flight mission profile.

Electrified Aircraft Propulsion↗

Integrated Control Design for A Partially Turboelectric Aircraft Propulsion System

Electrified Aircraft Propulsion (EAP) holds great potential for reducing aviation emissions and fuel burn. A variety of EAP architectures have been proposed including partially-turboelectric configurations that combine turbofan engines with motor-driven propulsors. Such architectures exhibit coupling between subsystems and thus require an integrated control solution. To address this need, this paper presents an integrated control design strategy for a commercial single-aisle partially-turboelectric aircraft concept consisting of two wing-mounted turbofan engines and an electric motor driven tailfan propulsor. Within this architecture the turbofans serve the dual purpose of generating thrust and supplying mechanical offtake power used to generate electricity for the tailfan motor. The propulsion control system is tasked with coordinating turbofan and tailfan operation under both steady-state and transient scenarios. The paper introduces a linear state-space representation of the architecture reflecting the coupling between the turbofan and tailfan subsystems along with loop transfer functions reflecting open- and closed-loop system dynamics. Also discussed is an applied strategy for scheduling the tailfan setpoint command based on the average sensed fan speed of the two turbofans. This approach ensures synchronized operation of the turbofan and tailfan subsystems while also allowing the turbofan fuel control design to be simplified. Performance of the integrated control design is assessed through a real-time hardware-in-the-loop test conducted at the NASA Electric Aircraft Testbed. During this test a scaled version of the electrical system and turbomachinery shaft dynamics were implemented in electrical machine hardware and evaluated under closed-loop control. Results from this facility test are presented to illustrate the efficacy of the applied integrated control design approach under steady-state and transient scenarios including a full-flight mission profile.

Electrified Aircraft Propulsion↗