Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “coordinated operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Coordination and control – limits in standard representations of multi-reservoir operations in hydrological modeling

Abstract. Major multi-reservoir cascades represent a primary mechanism for dealing with hydrologic variability and extremes within institutionally complex river basins worldwide. These coordinated management processes fundamentally reshape water balance dynamics. Yet, multi-reservoir coordination processes have been largely ignored in the increasingly sophisticated representations of reservoir operations within large-scale hydrological models. The aim of this paper is twofold, namely (i) to provide evidence that the common modeling practice of parameterizing each reservoir in a cascade independently from the others is a significant approximation and (ii) to demonstrate potential unintended consequences of this independence approximation when simulating the dynamics of hydrological extremes in complex reservoir cascades. We explore these questions using the Water Balance Model, which features detailed representations of the human infrastructure coupled to the natural processes that shape water balance dynamics. It is applied to the Upper Snake River basin in the western US and its heavily regulated multi-reservoir cascade. We employ a time-varying sensitivity analysis that utilizes the method of Morris factor screening to explicitly track how the dominant release rule parameters evolve both along the cascade and in time according to seasonal high- and low-flow events. This enables us to address aim (i) by demonstrating how the progressive and cumulative dominance of upstream releases significantly dampens the ability of downstream reservoir rules' parameters to influence flow conditions. We address aim (ii) by comparing simulation results with observed reservoir operations during critical low-flow and high-flow events in the basin. Our time-varying parameter sensitivity analysis with the method of Morris clarifies how independent single-reservoir parameterizations and their tacit assumption of independence leads to reservoir release behaviors that generate artificial water shortages and flooding, whereas the observed coordinated cascade operations avoided these outcomes for the same events. To further explore the role of (non-)coordination in the large deviations from the observed operations, we use an offline multi-reservoir water balance model in which adding basic coordination mechanisms drawn from the observed emergency operations is sufficient to correct the deficiencies of the independently parameterized reservoir rules from the hydrological model. These results demonstrate the importance of understanding the state–space context in which reservoir releases occur and where operational coordination plays a crucial role in avoiding or mitigating water-related extremes. Understanding how major infrastructure is coordinated and controlled in major river basins is essential for properly assessing future flood and drought hazards in a changing world.

54 ENVIRONMENTAL SCIENCES↗

Coordinated crew performance in commercial aircraft operations

A specific methodology is proposed for an improved system of coding and analyzing crew member interaction. The complexity and lack of precision of many crew and task variables suggest the usefulness of fuzzy linguistic techniques for modeling and computer simulation of the crew performance process. Other research methodologies and concepts that have promise for increasing the effectiveness of research on crew performance are identified.

Murphy, M. R.↗

Power Quality and Stability in a Cluster of Microgrids with Coordinated Power and Energy Management

Distributed Energy Resources (DER) such as photovoltaic (PV) systems and battery energy storage systems (BESS) can be operated collectively as microgrids. Microgrids can be effective in meeting local load requirements as well as in improving the power quality and stability in a modern power distribution system. Multiple microgrids can also be operated in a coordinated manner as a cluster, to improve the resiliency of the power distribution system. In the event of an outage caused by a transmission system failure, the microgrids in a cluster can use their distributed generation capacity and energy storage resources to recover and extend power availability to the critical loads in the system. In this paper, an illustrative cluster of two microgrids based on the IEEE 13-bus model with DERs has been used, to demonstrate the operation of the concept using real-time simulations. Using real-time simulations, capabilities such as switching reconfiguration following faults, identification of optimal DER placement for effective power quality management, and power electronic controller validation have been demonstrated. For the two-microgrid cluster, this paper also presents improvements in load voltage quality and

Chowdhury, Prithwiraj Roy↗

Atmospheric Radiation Measurements Aerosol Intensive Operating Period: Comparison of Aerosol Scattering during Coordinated Flights

In May 2003, a Twin Otter airplane, equipped with instruments for making in situ measurements of aerosol optical properties, was deployed during the Atmospheric Radiation Measurements (ARM) Program s Aerosol Intensive Operational Period in Oklahoma. Several of the Twin Otter flights were flown in formation with an instrumented light aircraft (Cessna 172XP) that makes routine in situ aerosol profile flights over the site. This paper presents comparisons of measured scattering coefficients at 467 nm, 530 nm, and 675 nm between identical commercial nephelometers aboard each aircraft. Overall, the agreement between the two nephelometers decreases with longer wavelength. During the majority of the flights, the Twin Otter flew with a diffuser inlet while the Cessna had a 1 mm impactor, allowing for an estimation of the fine mode fraction aloft. The fine mode fraction aloft was then compared to the results of a ground-based nephelometer. Comparisons are also provided in which both nephelometers operated with identical 1 mm impactors. These scattering coefficient comparisons are favorable at the longer wavelengths (i.e., 530 nm and 675 nm), yet differed by approximately 30% at 467 nm. Mie scattering calculations were performed using size distribution measurements, made during the level flight legs. Results are also presented from Cadenza, a new continuous wave cavity ring-down (CW-CRD) instrument, which compared favorably (i.e., agreed within 2%) with data from other instruments aboard the Twin Otter. With this paper, we highlight the significant implications of coarse mode (larger than 1 mm) aerosol aloft with respect to aerosol optical properties.

Hallar, A. G.↗

UAS Service Supplier Network Performance

This report summarizes the performance of Unmanned Aircraft System (UAS) Service Suppliers (USS) in the Technical Capability Level 4 (TCL4) flight test performed by NASA and its partners in support of the UAS Traffic Management (UTM) concept. TCL4 is the final in a series of TCL demonstrations of a traffic management system for small UAS (sUAS). All demonstrations have been executed in collaboration with industry partners. The [FAA 2018] UTM Concept of Operations document describes UTM as:...the manner in which the FAA will support operations for predominantly sUAS operating in low altitude airspace. UTM utilizes industry’s ability to supply services under FAA’s regulatory authority where these services do not currently exist. It is a community-based traffic management system, where the Operators are responsible for the coordination, execution, and management of operations, with rules of the road established by FAA. UTM is designed to support the demand and expectations for a broad spectrum of operations with ever-increasing complexity and risk. UTM should be considered a collection of services rather than a monolithic application. The following section describes the architecture at a high level. For further insight, the FAA’s concept document [FAA 2018] or NASA’s earlier concept publication [NASA 2016] should be consulted.

Rios, Joseph L.↗

Distribution System Congestion Management - A Survey of Reliable Integration for Aggregated Resources and Microgrids

Rising penetration of consumer-owned Distribution Grid Resources (DGRs), increasingly managed by third party aggregators and enrolled in grid services and wholesale market programs, can create localized congestion in distribution networks. Managing these constraints is challenging due to a persistent coordination and information gap: utilities are accountable for reliability and have network topology and state visibility, while aggregators control the DGR capability needed to relieve congestion. This survey synthesizes congestion management solutions for distribution systems with high DGR penetration, covering both market-based mechanisms (distribution level markets, locational pricing, flexibility auctions) and non-market-based solutions (network reconfiguration, direct DGR control, demand response, curtailment, etc.). The literature is organized across three decision horizons: long term planning, operational planning, and real-time operation. Special attention is devoted to emerging distribution system operator architectures and coordination frameworks spanning transmission system operators, aggregators, and microgrids. Drawing on recent case studies and implementations, we distill best practices, identify key technical and economic barriers, and outline research directions. The evidence points to a shift toward integrated congestion management that combines market signals with technical controls, enabled by improved monitoring, forecasting, and closed loop control capabilities.

Active Distribution Networks (ADN)↗

The SILEX experiment system operations

The European Space Agency is going to conduct an inter orbit link experiment which will connect a low Earth orbiting satellite and a Geostationary satellite via optical terminals. This experiment has been called SILEX (Semiconductor Inter satellite Link EXperiment). Two payloads will be built. One called PASTEL (PASsager de TELecommunication) will be embarked on the French Earth observation satellite SPOT4. The future European experimental data relay satellite ARTEMIS (Advanced Relay and TEchnology MISsion) will carry the OPALE terminal (Optical PAyload Experiment). The principal characteristic of the mission is a 50 Megabits flow of data transmitted via the optical satellite link. The relay satellite will route the data via its feeder link thus permitting a real time reception in the European region of images taken by the observation satellite. The PASTEL terminal has been designed to cover up to 9 communication sessions per day with an average of 5. The number of daily contact opportunities with the low earth orbiting satellite will be increased and the duration will be much longer than the traditional passes over a ground station. The terminals have an autonomy of 24 hours with respect to ground control. Each terminal will contain its own orbit model and that of its counter terminal for orbit prediction and for precise computation of pointing direction. Due to the very narrow field of view of the communication laser beam, the orbit propagation calculation needs to be done with a very high accuracy. The European Space Agency is responsible for the operation of both terminals. A PASTEL Mission Control System (PMCS) is being developed to control the PASTEL terminal on board SPOT4. The PMCS will interface with the SPOT4 Control Centre for the execution of the PASTEL operations. The PMCS will also interface with the ARTEMIS Mission Control System for the planning and the coordination of the operation. It is the first time that laser technology will be used to support inter-satellite links in Europe. Due to the complexity and experimental character of this new optical technology, the SILEX experiment control facilities will be designed to allow as much operational flexibility as possible.

Demelenne, B.↗

Transactive Energy Communications Interface Standards Landscape

Transactive energy represents distributed, optimal-seeking coordination approaches for managing the operation of large numbers of energy-related devices and systems. The concept assumes intelligent agents interact with other agents on behalf of their owners to balance the supply and demand of energy and coordinate other operation services in an electric system. They do this by exchanging value signals for services in near-term and forward time periods using market mechanisms. The technique is particularly applied to coordination of flexibility in operating distributed energy resources. The integration of large numbers of devices requires that they be able to connect and interoperate easily and reliably. Given the many technologies and solution providers integrating products, communications interfaces based on clear, unambiguous specifications with supporting tests require standardization and adoption by the community of system integrators. This report reviews the state of communications interface standards that show promise for transactive energy approaches to the coordination of distributed energy resources. It reviews promising standards to highlight challenges and gaps. It offers structured comparisons between standards and the features offered by their ecosystems of participants.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NAIRAS Ionizing Radiation Model: Extension from Atmosphere to Space

The Nowcast of Aerospace Ionizing RAdiation System (NAIRAS) model is a real-time, global, physics-based model originally developed to predict exposure from cosmic radiation to air travelers from both galactic and solar sources. A prototype operational NAIRAS model has provided tabular and graphical data products via its public web site for about ten years. A new version of the NAIRAS model has been developed that incorporates an extension of the model domain from the atmospheric ionizing radiation environment to the space radiation environment, with the addition of the trapped inner belt proton source and altitude-dependent and rigidity-dependent geomagnetic shielding of the galactic cosmic rays (GCR) and solar energetic particle (SEP) protons. New output products of differential and integral particle flux have been developed for the characterization of single-event effects (SEE), expanding the application of NAIRAS from human radiation exposure assessment to allowing end-users to quantify radiation environment risks to aviation and spacecraft microelectronic systems. The NAIRAS model has transitioned to prototype operations at the Community Coordinated Modeling Center (CCMC) where the model now operates in two modes: (1) real-time global predictions of the atmospheric radiation environment and (2) a run-on-request (RoR) service allowing the user to select a specific time period for the global dosimetric calculations, or to upload an aircraft, balloon, or spaceflight trajectory file to provide predictions of the dosimetric and particle flux quantities along the flight path. The new features of NAIRAS version 3.0 are described in this paper and example results of the new output products for low-Earth orbit (LEO), medium-Earth orbit (MEO), and free-space radiation environments are presented

Christopher J. Mertens↗

Implicitly Coordinated Detect and Avoid Capability for Safe Autonomous Operation of Small UAS

As the airspace becomes increasingly shared by autonomous small Unmanned Aerial Systems (UAS), there would be a pressing need for coordination strategies so that aircraft can safely and independently maneuver around obstacles, geofences, and traffic aircraft. Explicitly coordinating resolution strategies for small UAS would require additional components such as a reliable vehicle-to-vehicle communication infrastructure and standardized protocols for information exchange that could significantly increase the cost of deploying small UAS in a shared airspace. This paper explores a novel approach that enables multiple aircraft to implicitly coordinate their resolution maneuvers. By requiring all aircraft to execute the proposed approach deterministically, it is possible for all of them to implicitly agree on the region of airspace each will be occupying in a given time interval. The proposed approach lends itself to the construction of a suitable feedback mechanism that enables the real-time execution of an implicitly conflict-free path in a closed-loop manner dealing with uncertainties in aircraft speed. If a network infrastructure is available, the proposed approach can also exploit the benefits of explicit information.

Balachandran, Swee↗

Integrated Hydro-Terrestrial Modeling: Development of a National Capability

Water is one of our most important natural resources and is essential to our national economy and security. Multiple federal government agencies have mission elements that address national needs related to water. Each water-related agency champions a unique science and/or operational mission focused on advancing a portion of the nation’s ability to meet our water-related challenges. These diverse mission needs have engendered a rich and extensive base of water-related data and modeling capabilities. While useful for their intended purposes, these capabilities are not well integrated to address complex regional problems and overarching national problems. These major investments by a number of federal agencies, however, lay the foundation for an integrated hydro-terrestrial modeling and data infrastructure that will enhance knowledge, understanding, prediction, and management of the nation’s diverse water challenges. Creating a more seamless national hydro-terrestrial modeling and data capacity presents an enormous opportunity to advance operational as well as research capabilities leading to more effective water management. Advances are necessary not only in operational tools for forecasting but also in research to identify and resolve knowledge and data gaps that lead to unacceptable uncertainties in forecast outcomes. As such, close coordination across scientific, operational, and resource management communities is required. To this end, an interagency workshop on “Integrated Hydro-Terrestrial Modeling: Development of a National Capacity” was held at the National Science Foundation (NSF) headquarters in Alexandria, Virginia in September 2019, led jointly by the NSF, the U.S. Department of Energy (DOE) and the U.S. Geological Survey (USGS) and with broader interagency support provided through an interagency steering committee. This workshop provided a venue to bring together representatives of water-related agencies and their scientific partners (including university researchers) to initiate and refine a vision for a national Integrated Hydro-Terrestrial Modeling (IHTM) and data infrastructure and advance ideas towards its development. The workshop was designed to address three critical foci to advance the development of a national IHTM capacity: “Priority Water Challenges” around which to motivate and initiate development; Technical and methodological obstacles related to data and modeling; Organizational, structural, and cultural barriers that heretofore have impeded integration of capabilities across the federal and research landscapes. The following “Priority Water Challenge” domain areas represent targets for initiating development of the IHTM and were identified and selected in alignment with priorities of the administration’s Water Sub-Cabinet: (1) Nutrient loading, hypoxia, and harmful algal blooms; (2) Water availability in the western United States; and (3) Extreme weather-related water hazards. These water challenges span agency mission boundaries and encompass a broad range of geographies, complex system dynamics and feedbacks, and critical processes spanning hydrological, climatic, and biophysical systems as well as land-use/land-cover, agricultural, built infrastructure, societal, economic, and decisional environments. These three Priority Water Challenges cannot be fully addressed without leveraging complementary and synergistic capabilities across multiple agencies.

99 GENERAL AND MISCELLANEOUS↗

Opportunistic Hybrid Communications Systems for Distributed PV Coordination

A full-scale, operational implementation of the opportunistic hybrid communications systems for distributed photovoltaic (PV) coordination was successfully developed, simulated, and validated in this 3-year project. The system is considered hybrid because it uses different communications pathways from the scale of residential PV inverters to a transmission network; primary technologies harnessed include Low-Power Wireless Personal Area Network (LoWPAN), Power Line Communication (PLC), WiFi mesh, Worldwide Interoperability for Microwave Access (WiMAX), Ethernet cable, and Optical Ethernet systems. It is opportunistic in that it chooses to route messages through each of these systems based on recent data about latency and availability to ensure reliable message passing.

14 SOLAR ENERGY↗

NPP Simulators for Coupled Thermal and Electric Power Dispatch

The Light Water Reactor Sustainability (LWRS) program within the United States Department of Energy supports extending the operation of the U.S. commercial nuclear power plant (NPP) fleet. Within the LWRS program, the Flexible Plant Operation and Generation (FPOG) Pathway works to diversify the revenue streams of light water reactors (LWRs) by opening opportunities for the co-generation of non-electric products in addition to supplying electrical power to the grid. Recent events have added greater motivation to these efforts. For example, the recent Inflation Reduction Act (IRA) passed by the U.S. federal government offers substantial tax incentives for producing clean hydrogen, the technology readiness level of dispatchable and high-efficiency hydrogen production has dramatically increased in a short time, and societal response to world climate change is driving a transition away from fossil fuels. Producing hydrogen with maximum efficiency using nuclear power requires dispatching both electrical and thermal power from the nuclear plant to the hydrogen plant, so testing concepts of operations for combined electrical and thermal power dispatch (TPD) from an NNP to a hydrogen plant is of interest. This report documents achievement of the Light Water Reactor Sustainability (LWRS) program milestone “Install and demonstrate a vendor-developed simulator on the Human Systems Simulation Laboratory (HSS) for dispatch of LWR electrical power to a close-coupled electrolysis plant” with a due date of Dec. 22, 2022. Several factors provide motivation for this effort. Coupling the power generation deck of a nuclear power plant to a hydrogen production facility introduces new possibilities for operational transients that must be addressed. In particular, the performance of the integrated system during startup and shutdown of the hydrogen production facility, as well as offnormal conditions, need to be evaluated to ensure there are no adverse effects on the operation of the existing NPP. The concept of operations involving the NPP, the hydrogen plant, and the electric power grid must be tested using NPP simulators and operating procedures that have been modified for TPD operations. These tests must also include dynamic simulations of the coupled tertiary thermal and electric loads as well as coordinated activities with NPP operators, tertiary load operators and grid power coordinators. The report summarizes progress in developing and testing full-scope NPP simulators at the HSSL, including a generic BWR simulator from GSE Systems, Inc. and generic PWR simulator from Westinghouse. In the case of the TPD-GBWR Simulator from GSE Systems, Inc., a BWR is thermally coupled to a high temperature electrolysis (HTE) plant that produces hydrogen and oxygen from de-ionized water. The hydrogen plant is not explicitly simulated but only included as a transient heat sink. A thermal power dispatch (TPD) system transfers heat between the steam systems at the BWR and the hydrogen plant. Operational results from two versions of the modified simulator are presented. The first version uses synthetic oil as a heat transfer fluid in a closed delivery heat loop (DHL) that generates steam at the hydrogen plant. The second version uses steam as the heat transfer fluid in a delivery steam line (DSL) to provide steam to the hydrogen plant. For both versions, the estimated thermal power delivery distance is approximately one kilometer. The amount of thermal power dispatched in the simulators is 15% of the total reactor thermal power such that the simulators provide a tool to study the feasibility of coupling a BWR to industrial processes that benefit from a combination electrical and thermal power dispatch. Ongoing work within a CRADA is also developing a full-scope PWR simulator provided by Westinghouse for both thermal and electric power coupling. This simulator is based on a PWR plant with two three-loop Westinghouse reactors. Westinghouse PWRs are sufficiently similar that a simulator of a three-loop reactor is an appropriate representation for two-loop and four-loop PWR reactors. The three-loop simulator will initially be modified for close-coupling to a 100 MW HTE hydrogen production plant that will require approximately 25 MW of thermal power while operating at its maximum rated capacity. The simulator testing will include full coupling to dynamic simulations of a hydrogen production plant and a representative bulk electric grid. The simulator provided by Westinghouse is similar to the GPWR simulator that INL has already obtained from GSE Systems but has a few important added benefits. First, the Westinghouse simulator is based on digital controls and has additional screens that can be called up to show parameter trends to assist operators in decision-making. The Westinghouse simulator also has upgrades to the controls and hardware representations, such as valve actuators, that make it more realistic and flexible in terms of accurately sim

99 GENERAL AND MISCELLANEOUS↗

A Guide for Improved Resource Adequacy Assessments in Evolving Power Systems: Institutional and Technical Dimensions

This paper identifies and evaluates issues in traditional resource adequacy (RA) assessment practices, and how adjusting these practices may affect and depend on existing institutional arrangements for planning and procurement. The paper proposes a technical-institutional roadmap that would allow regulators in vertically-integrated jurisdictions and system planners and operators in restructured jurisdictions to revise RA practices across a range of components. First, we compile a critical review of current RA assessment practices based on (1) interviews with RA practitioners and (2) a review of recent technical literature. We find that (i) RA may need to expand beyond capacity adequacy to ensure energy adequacy – relevant for energy-limited resources such as storage – and potentially some form of ancillary service adequacy (e.g. enough ramping-up and ramping-down capability in the system); (ii) chronological hourly simulations for all hours in the year are the current best practice; (iii) metrics and models used do not reflect economic criteria in system operation and loss of load; and (iv) there is a need to improve representation of weather dependencies and weather data. Second, we review planning and RA reports for several private and public entities that plan generation and/or transmission infrastructure in the continental U.S. to look for existing practices involving resilience assessments. We find no systematic treatment of the costs of extreme weather and other hazards, the benefits of resilience, and resilience metrics in planning analyses and no systematic treatment of resilience metrics, methods, and outcomes for resource adequacy purposes. Third, we create a technical framework for probabilistic RA assessment and use it to study how key choices about how to model power system operations affect the values that are obtained for RA metrics. We find that (i) non-economic dispatch schemes that ignore economic objectives can lead to accurate RA assessments when coordinated with detailed operational strategies; (ii) multi-year data is critical to capture a wide variety of system conditions; (iii) not incorporating transmission limits into RA assessment could lead to substantial underestimation of traditional “expected value” RA metrics; and (iv) new RA metrics that capture event-specific shortfall characteristics should be used as supplements to traditional metrics. Finally, we examine RA assessments and use this information to propose a guide of evolving industry standards for resource adequacy assessments in resource planning and transmission planning. We report minimum, best, and frontier practices for temporal resolution of assessments, metrics and targets, weather data, load forecasting, characterization of variable renewable resources, characterization of transmission and market transactions, RA modeling and integration with planning processes, and capacity accreditation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NASA’s Simulation Activities for Evaluating UAM Concept of Operations

NASA’s vision for Advanced Air Mobility (AAM) is to help emerging aviation markets to safely develop an air transportation system that moves people and cargo between places previously not served or underserved by aviation using revolutionary new aircraft types. Urban Air Mobility (UAM), the concept of expanding transportation networks by serving short flights to transport people and goods around metropolitan areas, is part of a larger paradigm shift toward AAM, in which new technologies and business models are enabling transformational applications of aviation. In NASA’s Concept of Operations for UAM, Providers of Services for UAM (PSU) play a key role to enable safe and efficient UAM operations by sharing operational data among UAM operators. PSUs provide a pre-departure strategic conflict management service that establishes operational plans for new flights and coordinates them with all relevant operations in shared airspace. The strategic conflict management aims to minimize the need for tactical separation provision, while considering anticipated traffic demand, vertiport capacity and availability, forecasted weather, and airspace restrictions. NASA is currently preparing a new lab evaluation activity with aviation industry partners, called the X4 simulation, to demonstrate their airspace services and capabilities and test new information exchange requirements for UAM operations. This simulation activity will support NASA’s National Campaign (NC) flight tests which are planned over the next several years to guide the collective community and stakeholders through a series of scenario-based test activities that involve vehicles and airspace management services operating in a live test environment. This presentation will provide an overview of the X4 simulation, including objectives, scenarios, assumptions, system architecture, and test schedule. The X4 simulation will evaluate the interconnectivity and operational intent sharing between PSUs for multiple operators, as well as the performance of strategic conflict management.

Urban Air Mobility, Simulation, Advanced Air Mobil↗

Integrated Science Investigation of the Sun (ISIS): Design of the Energetic Particle Investigation

The Integrated Science Investigation of the Sun (ISIS) is a complete science investigation on the Solar Probe Plus (SPP) mission, which flies to within nine solar radii of the Sun's surface. ISIS comprises a two-instrument suite to measure energetic particles over a very broad energy range, as well as coordinated management, science operations, data processing, and scientific analysis. Together, ISIS observations allow us to explore the mechanisms of energetic particles dynamics, including their: (1) Origins-defining the seed populations and physical conditions necessary for energetic particle acceleration; (2) Acceleration-determining the roles of shocks, reconnection, waves, and turbulence in accelerating energetic particles; and (3) Transport-revealing how energetic particles propagate from the corona out into the heliosphere. The two ISIS Energetic Particle Instruments measure lower (EPI-Lo) and higher (EPI-Hi) energy particles. EPI-Lo measures ions and ion composition from approx. 20 keV/nucleon-15 MeV total energy and electrons from approx.25-1000 keV. EPI-Hi measures ions from approx. 1-200 MeV/nucleon and electrons from approx. 0.5-6 MeV. EPI-Lo comprises 80 tiny apertures with fields-of-view (FOVs) that sample over nearly a complete hemisphere, while EPI-Hi combines three telescopes that together provide five large-FOV apertures. ISIS observes continuously inside of 0.25 AU with a high data collection rate and burst data (EPI-Lo) coordinated with the rest of the SPP payload; outside of 0.25 AU, ISIS runs in low-rate science mode whenever feasible to capture as complete a record as possible of the solar energetic particle environment and provide calibration and continuity for measurements closer in to the Sun. The ISIS Science Operations Center plans and executes commanding, receives and analyzes all ISIS data, and coordinates science observations and analyses with the rest of the SPP science investigations. Together, ISIS' unique observations on SPP will enable the discovery, untangling, and understanding of the important physical processes that govern energetic particles in the innermost regions of our heliosphere, for the first time. This paper summarizes the ISIS investigation at the time of the SPP mission Preliminary Design Review in January 2014.

Coronal Mass Ejections↗

Initial Development of an Upper Class E Traffic Management (ETM) System for Stratospheric Flight Operations

Advances in technologies across multiple areas have spurred the motivation and development of new entrants and use cases for the national airspace system to accommodate. The stratosphere, encompassing Upper Class E airspace, is of particular interest due to the types of aircraft that can operate there and the unique missions that can be carried out. The diversity of aircraft that plan to operate and the long durations envisioned presents a challenge for the management of that airspace in a manner that does not burden the current paradigm of air traffic service provision. Upper Class E Traffic Management (ETM) is an approach pioneered by NASA and FAA to enable the cooperative management of high-altitude airspace through operations in cooperative areas facilitated by information exchanges and coordination based on common operating practices. NASA has developed, implemented, and commenced initial tests of the underlying systems and architecture to enable ETM operations. The implementation is the first of its kind and meant to serve as a reference for broader adoption. This paper will present the architecture and details of the system components as well as how it has been implemented for the test. Summary results of initial connectivity tests are included to highlight the functionality of the ETM system, which provides the path forward for more complex operations and interactions at a greater scale.

Upper Class E Traffic Management↗