Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “checklists”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Enhancing Cloud Cybersecurity: Prescriptive Controls for Operational Technology

This whitepaper provides strategic insights and recommendations into security cloud-based solutions for electric utilities, encompassing operational technology (OT), virtual power plants (VPP), distributed energy resources (DERs), applications, networks, and data storage as they transition to and leverage cloud infrastructure through managed service providers (MSPs) and cloud service providers (CSPs). Principles derived from established frameworks serve as a foundation for best practices across cybersecurity projects and remove the constraints of settling on a single framework. For organizations that prefer not to integrate a specific framework altogether, elements of the proposed approach could be adopted or tailored to best fit defined requirements and expected functionalities. The Cirrus assessment, a utility cloud feasibility tool, and the roadmap it provides serve as a precursor to this paper, which seeks to be a valuable resource for defining next steps following cloud technology integration feasibility appraisal. With its comprehensive approach to adoption, the Cirrus framework offers strategic guidance on responsibly preparing for or deploying a utility cloud solution. The previously published whitepaper, “Use Case-Informed Framework for Utility Cloud Migration,” details the guiding strategy, research, and deployment of cloud solutions within electric and interconnected grid systems. Before implementing the controls suggested in this document, it is recommended that stakeholders complete Cirrus's cloud integration assessment and pair the results with their unique cybersecurity controls to form a comprehensive cloud-based utility cybersecurity plan. The Cirrus outcome will consider a series of future architectures for the grid before and after the energy transition and evaluate the arguments for and against cloud applications for each electric and interconnected grid layer. This document is a companion to the original whitepaper, "Use Case-Informed Framework for Utility Cloud Migration" to further identify and recommend security controls based on Cirrus’s cloud integration assessment output. The following whitepaper outlines the cybersecurity controls that secure cloud-service models pertinent to the electric sector using the predefined categories identify, protect, detect, and respond and recover. The objective is to outline prescriptive security controls based on the type of architecture and data stored in the cloud. The focus includes dissecting the shared responsibility model and elucidating what on-premises Infrastructure as a Service (IaaS), Platform as a Service (PaaS), and Software as a Service (SaaS) entail. A pivotal consideration in this context is allocating responsibility for foundational cybersecurity aspects—having used Cirrus for the cloud integration assessment. The ensuing controls detailed herein also represent a checklist of controls necessary for a secure cloud transition, equipping utilities with the knowledge to navigate this digital transformation with confidence and strategic foresight in a safe and responsible manner.

42 ENGINEERING↗

Economic Evaluation of Modernization Expenditures for Electric Utility Distribution Systems: A Guide for Utility Regulators

Cost-effectiveness evaluation of potential grid modernization solutions is integral to integrated distribution system planning (IDSP). This report synthesizes and updates prior cost-effectiveness approaches identified by the U.S. Department of Energy for grid modernization investments, incorporating multi-objective decision-making. The structure of the report follows the IDSP process, from identifying objectives and priorities to prioritizing grid solutions. The report details two methods for conducting initial cost-effectiveness screening of individual and interdependent grid components: (1) Lowest Reasonable Cost and (2) Benefit-Cost Analysis. Drawing on solutions that passed the initial cost-effectiveness screen, the utility prioritizes grid solutions based on policy objectives and priorities, regulatory compliance, operational efficiencies, and other factors to develop a portfolio of distribution solutions. The utility uses multi-objective decision-making to assess each proposed expenditure against each objective and respective metric. The utility applies a weighting factor, reflecting the priority ranking of the objective, to the total numerical “score” based on the contribution of the proposed solution to addressing each objective. Ultimately, the utility ranks each expenditure from highest to lowest priority using the final score for each solution as well as its cost. The report includes examples of emerging best practices for states and utilities and a cost-effectiveness process checklist.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY↗

Connectivity Troubleshooting Guide for Advanced Electricity Meters

This guide is designed to walk users through a troubleshooting process for disconnected advanced electricity meters. The guide centers on two connectivity troubleshooting decision trees related to power issues and network connectivity issues, respectively. Additionally, it contains additional background information such as definitions, diagrams, and checklists that can help a user prepare to troubleshoot meter connectivity issues.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SolarAPP+ Performance Review (2024 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2024, 799 AHJs had expressed interest in the platform, with 264 fully adopting (215) or piloting (49) the platform. In 2024, 861 installers submitted 37,393 permits through the SolarAPP+ platform, including 27,375 permits for PV+storage systems. SolarAPP+ permits accounted for around 43% of all permits issued in all participating AHJs, and more than 60% of all permits in several participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 12 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 18,400 hours of AHJ staff time in 2024. Finally, we estimate that SolarAPP+ eliminated over 100,000 business days in permitting-related delays in 2024.

14 SOLAR ENERGY↗

The effects of exercise training interventions on depression in hemodialysis patients

Purpose Depression considerably influences the clinical outcomes, treatment compliance, quality of life, and mortality of hemodialysis patients. Exercise plays a beneficial role in depressive patients, but its quantitative effects remain elusive. This study aimed to summarize the effects of exercise training on depression in patients with end-stage renal disease undergoing hemodialysis. Methods The PUBMED, EMBASE, and Cochrane Library databases were systematically searched from inception to April 2023 to identify published articles reporting the effect of exercise training on the depression level of patients with End-Stage Renal Disease undergoing hemodialysis. Data were extracted from the included studies using predefined data fields by two independent researchers. The Cochrane Handbook for Systematic Reviews of Interventions and Joanna Briggs Institute Critical Appraisal Checklist for Quasi-Experimental Studies were employed for quality evaluation. Results A total of 22 studies enrolling 1,059 patients who participated in exercise interventions were included. Hemodialysis patients exhibited superior outcomes with intradialytic exercise (SMD = −0.80, 95% CI: −1.10 to −0.49) and lower levels of depression following aerobic exercise (SMD = −0.93, 95%CI: −1.32 to −0.55) compared to combined exercise (c − 0.85, 95% CI: −1.29 to −0.41) and resistance exercise (SMD = −0.40, 95%CI: −0.96 to 0.17). Regarding exercise duration, patients manifested lower depression levels when engaging in exercise activities for a duration exceeding 6 months (SMD = −0.92, 95% CI: −1.67 to −0.17). Concerning the duration of a single exercise session, the most significant improvement was noted when the exercise duration exceeded 60 min (SMD = −1.47, 95% CI: −1.87 to −1.06). Conclusion Our study determined that exercise can alleviate depression symptoms in hemodialysis patients. This study established the varying impacts of different exercise parameters on the reduction of depression levels in hemodialysis patients and is anticipated to lay a theoretical reference for clinicians and nurses to devise tailored exercise strategies for interventions in patients with depression. Systematic review registration https://www.crd.york.ac.uk/prospero/ , This study was registered in the International Prospective Register of Systematic Reviews (PROSPERO) database, with registration number CRD42023434181.

Yu, Huihui↗

Gas Separation Membrane Module Modeling: A Comprehensive Review

Membrane gas separation processes have been developed for diverse gas separation applications that include nitrogen production from air and CO2 capture from point sources. Membrane process design requires the development of stable and robust mathematical models that can accurately quantify the performance of the membrane modules used in the process. The literature related to modeling membrane gas separation modules and model use in membrane gas separation process simulators is reviewed in this paper. A membrane-module-modeling checklist is proposed to guide modeling efforts for the research and development of new gas separation membranes.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Cyber-Informed Engineering: Standards Development Organization Quick Start Guide

Cyber-Informed Engineering (CIE) is an emerging methodology focused on identifying and reducing high-consequence events that may affect physical critical infrastructure systems as a result of their dependence on digital technology. CIE, developed by National Laboratories and promoted by the Department of Energy (DOE), incorporates consequence-focused planning into the design and engineering process from the earliest stages of a project. This guide provides a concise overview of CIE and offers practical insight into how Standards Development Organizations (SDOs) can interpret CIE principles and apply those concepts in updates to various standards. It is important to remember that CIE extends beyond a compliance checklist, emphasizing a broader, interpretive approach. Instead, it encourages an interpretive mindset - a "turning of 'what if' to 'even if'" approach that anticipates and engineers out high-consequence events. The authors encourage SDOs to establish and promote CIE principles as enhancements for more resilient-by-design outcomes across critical infrastructure energy sectors. The 12 core principles of CIE outline specific behaviors and actions that SDOs and engineers may adopt to enhance system resilience. This guide applies these principles in a manner intended to be relevant across various technologies and threat landscapes. We welcome institutions and vendors to identify new or different framework alignments and mappings as we collectively work towards a safer and more reliable digital landscape.

97 MATHEMATICS AND COMPUTING↗

Inflight crew activities.

In flight crew activities covering detailed flight plan, activities and procedures, checklists and summary

ASTRONAUT PERFORMANCE↗

In-space propellant systems safety. Volume 2: System safety guidelines and requirements

Detailed system safety guidelines/requirements were developed. Each one describes a safety measure which is suggested as a means of eliminating or reducing a particular hazard, or group of hazards, to an acceptable level, and which, if followed would tend to increase the level of safety in supplying propellants to a user in orbit. The first goal was to identify those actions that should be taken to make propellant logistics operations as safe as possible. The second was to serve as a checklist to verify that these actions had been taken in the design and operation of this and similar programs, or that they had been considered and rejected. The safety measures described in the GLR's are directed toward the prevention of hazards, the avoidance of undesired events, and the protection of the crew.

Source record↗

Formulation of an effective safety design review for the Skylab Program.

The Skylab Program is presenting a unique set of requirements by extending the capabilities of both men and equipment to withstand extended periods of time in space. The progression of space programs which preceded Skylab have provided a set of building blocks of knowledge and experience coupled with an extensive ground test program which makes it possible to plan its flight program without earlier, unmanned test flights. This approach, however, makes it mandatory that to the maximum extent possible, we factor into the design review process all the 'lessons learned' which are applicable. It is this conscious review of the Skylab design, based on checklists prepared from design criteria, gleaned from a variety of sources and experiences, which is the subject of this paper. A brief description of the Skylab Program, its objectives, and the missions planned for it are presented briefly to better understand the degree of extrapolation of hardware development from previous programs.

Cohen, H.↗

Phased Project Planning Guidelines

NHB 7121.2 is the initial publication of the guidelines for implementation of the Phased Project Planning (PPP) concept prescribed by NPD 7121,1A. These guidelines are applicable to the planning and approval activities which lead to the implementation of major new research and development projects as defined in NPD 7121.1A as well as to major modifications or extensions of approved projects. They should, therefore, be reflected in the Project Approval Documents which serve as the basic documentation for project definition, guidance and control throughout NASA. The purpose of PPP is to provide, through defined phases, an adequate basis for management decisions on the extent to which project activities can be properly undertaken and commitments made. However, these guidelines do not prescribe detailed format and content of plans and other documents and reports used to apply the PPP concept. Similarly, the work content of phases and the information requirements described herein are not checklists. They are included to assist in understanding the intent of the PPP concept and should not be viewed as rigid or inflexible. PPP, as a concept for orderly planning and definition of new major R&D undertakings, must be adapted to the peculiarities of each individual case. However, the flexibility permitted for adaptation should not be considered as a license for major variation which would compromise the objectives that underlie the concept. Cognizant NASA officials are expected to pursue their project planning and definition activities in reasonable conformance with these guidelines and to request only those exceptions or deviations which are clearly necessary and justified. These guidelines will be modified as determined necessary on the basis of experience. Comments or suggestions for changes should be directed to the Office of Organization and Management.

Source record↗

Degradation of learned skills. Effectiveness of practice methods on simulated space flight skill retention

Manual flight control and emergency procedure task skill degradation was evaluated after time intervals of from 1 to 6 months. The tasks were associated with a simulated launch through the orbit insertion flight phase of a space vehicle. The results showed that acceptable flight control performance was retained for 2 months, rapidly deteriorating thereafter by a factor of 1.7 to 3.1 depending on the performance measure used. Procedural task performance showed unacceptable degradation after only 1 month, and exceeded an order of magnitude after 4 months. The effectiveness of static rehearsal (checklists and briefings) and dynamic warmup (simulator practice) retraining methods were compared for the two tasks. Static rehearsal effectively countered procedural skill degradation, while some combination of dynamic warmup appeared necessary for flight control skill retention. It was apparent that these differences between methods were not solely a function of task type or retraining method, but were a function of the performance measures used for each task.

Sitterley, T. E.↗

Liquid rocket pressure regulators, relief valves, check valves, burst disks, and explosive valves

The development of and operational programs for effective use in design are presented for liquid rocket pressure regulators, relief valves, check valves, burst disks, and explosive valves. A review of the total design problem is presented, and design elements are identified which are involved in successful design. Current technology pertaining to these elements is also described. Design criteria are presented which state what rule or standard must be imposed on each essential design element to assure successful design. These criteria serve as a checklist of rules for a project manager to use in guiding a design or in assessing its adequacy. Recommended practices are included which state how to satisfy each of the criteria.

Source record↗

Recording and cataloging hazards information, revision A

A data collection process is described for the purpose of discerning causation factors of accidents, and the establishment of boundaries or controls aimed at mitigating and eliminating accidents. A procedure is proposed that suggests a discipline approach to hazard identification based on energy interrelationships together with an integrated control technique which takes the form of checklists.

Stein, R. J.↗