Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “authorization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Jicarilla Apache Utility Authority Renewable Energy and Energy Efficiency Strategic Planning

The purpose of this Strategic Plan Report is to provide an introduction and in-depth analysis of the issues and opportunities, resources, and technologies of energy efficiency and renewable energy that have potential beneficial application for the people of the Jicarilla Apache Nation and surrounding communities. The Report seeks to draw on the best available information that existed at the time of writing, and where necessary, draws on new research to assess this potential. This study provides a strategic assessment of opportunities for maximizing the potential for electrical energy efficiency and renewable energy development by the Jicarilla Apache Nation. The report analyzes electricity use on the Jicarilla Apache Reservation in buildings. The report also assesses particular resources and technologies in detail, including energy efficiency, solar, wind, geothermal, biomass, and small hydropower. The closing sections set out the elements of a multi-year, multi-phase strategy for development of resources to the maximum benefit of the Nation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Dissolver Off-gas Hot Operations Authorization (AFCI CETE Milestone Report)

The head-end processing of the Coupled-End-to-End (CETE) Demonstration includes fuel receipt, fuel disassembly, exposure of fuel (e.g., by segmenting the fuel pins), voloxidation of the fuel to separate tritium, and fuel dissolution. All of these processing steps with the exception of the dissolution step will be accomplished in the Irradiated Fuels Examination Laboratory (IFEL) (Building 3525). The final headend step will be performed in the Radiochemical Engineering Development Center (Building 7920). The primary purpose of the fuel dissolution step is to prepare the solid fuel for subsequent liquid separations steps. This is accomplished by dissolving the fuel solids using nitric acid. During the dissolution process gases are evolved. Oxides of nitrogen are the primary off-gas components generated by the reactions of nitric acid and the fuel oxides however, during the dissolution and sparging of the resulting solution, iodine, C-14 as carbon dioxide, xenon, and krypton gasses are also released to the off-gas stream. The Dissolver Off-gas treatment rack provides a means of trapping these volatile fission products and other gases via various trapping media. Specifically the rack will recover iodine on a solid sorbent bed, scrub NOx in a water/acid column, scrub CO{sub 2} in a caustic scrubber column, remove moisture with solid sorbent drier beds and recover Xe and Kr using solid absorbent beds. The primary purpose of this experimental rack and the off-gas rack associated with the voloxidation equipment located at IFEL is to close the material balances around the volatile gases and to provide an understanding of the impacts of specific processing conditions on the fractions of the volatile components released from the various head-end processing steps.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Raleigh Housing Authority Duct Sealing Evaluation

In multifamily and attached buildings, manual duct sealing methods are often impractical or very costly and disruptive because of the difficulty in accessing leakage sites. In this project, two retrofit duct sealing techniques manually applied sealants and injecting a spray sealant (Aeroseal) in combination with some manual sealing were implemented in several low-rise multi-unit buildings in North Carolina. An analysis of the cost and performance of the two methods is presented. Each method was used in 20 housing units: approximately half of each group of units are single story and the remainder are two story. Results show that duct leakage to the outside was reduced by an average of 59% through the use of manual methods, and by 90% in the units where a combination of injected spray sealant and manual sealing was used. Some of this difference is likely due to the fact that injected spray sealing reached portions of the duct system that were inaccessible to manual methods. It was found that 73% of the leakage reduction in homes that were treated with injected spray sealant was attributable to the manual sealing done at boots, returns, and the air handler. The cost of manually applying sealant ranged from $275 to $511 per unit and for the Aeroseal treated ducts the cost was $700 per unit. Utility bills were collected and compared for 1 year before and after the retrofits for each unit. Energy savings based on utility bills were within 25%-50% of those predicted by the models for most unit types. Utility bill analysis shows 14% and 16% energy savings using the Aeroseal and hand sealing procedures, respectively, in heating season whereas in cooling season, energy savings using Aeroseal and hand sealing were both 16%. Average simple payback based on utility bills was 2.2 years for manual units and 4.7 years for the Aeroseal units. Only 18 of 40 units had usable utility bills. Berkshire Village Court - House Count - 4: Single Story, Hand sealed ducts; Single Story, Aeroseal Ducting; 2-Story, Hand Sealed ducts; 2-Story, Aeroseal ducts Terrace Park Court - House Count - 2: Single Story, Hand sealed ducts; Double Story, Hand sealed ducting Winter Park Court - House Count - 2: Single Story, Hand sealed ducts, Aeroseal sealed ducting; Double Story, Aeroseal ducting

Aeroseal↗

Understanding the Environmental Study Life Cycle in the United States Hydropower Licensing and Federal Authorization Process

We analyzed United States Federal Energy Regulatory Commission (FERC) documents prepared for 29 recently licensed hydropower projects and created two novel datasets to improve understanding of the environmental study life cycle, defined here as the process that begins with an environmental study being requested by a hydropower stakeholder or regulator, and ends with the study either being rejected or approved/conducted. Our two datasets consisted of summaries of information taken from (1), study determination letters prepared by FERC for 23 projects that were using the integrated licensing process, and (2), environmental study submittals and issuances tracked and attributed to seven projects using the FERC record. Our objective was to use the two resulting environmental life cycle datasets to understand which types of environmental studies are approved, rejected, and implemented during FERC licensing, and how consistently those types of studies are required across multiple hydropower projects. We matched the requested studies to a set of 61 river function indicators in eight categories and found that studies related to the category of biota and biodiversity were requested most often across all 29 projects. Within that category, studies related to river function indicators of presence, absence, detection of species and habitat/critical habitat were the most important to stakeholders, based on the relative number of studies requested. The study approval, rejection, and request rates were similar within each dataset, although the 23 projects with study determination letters had many rejected studies, whereas the dataset created from the seven projects had very few rejected studies.

13 HYDRO ENERGY↗

Fluorescent sensors reporting the activity of ammonium transceptors in live cells

Ammonium serves as key nitrogen source and metabolic intermediate, yet excess causes toxicity. Ammonium uptake is mediated by ammonium transporters, whose regulation is poorly understood. While transport can easily be characterized in heterologous systems, measuring transporter activity in vivo remains challenging. Here we developed a simple assay for monitoring activity in vivo by inserting circularly-permutated GFP into conformation-sensitive positions of two plant and one yeast ammonium transceptors (‘AmTrac’ and ‘MepTrac’). Addition of ammonium to yeast cells expressing the sensors triggered concentration-dependent fluorescence intensity (FI) changes that strictly correlated with the activity of the transporter. Fluorescence-based activity sensors present a novel technology for monitoring the interaction of the transporters with their substrates, the activity of transporters and their regulation in vivo, which is particularly valuable in the context of analytes for which no radiotracers exist, as well as for cell-specific and subcellular transport processes that are otherwise difficult to track.

De Michele, Roberto↗

Justification for an Increase in Authorized Operating Power at HFIR

1)Using verified and validated reactor physics methods coupled to a currently accepted thermal hydraulic analysis methodology, onset of incipient boiling power agrees well with the currently-accepted safety basis value. The MCNP-based methodology is acceptable for scoping studies of LEU fuel conversion. 2)A balance-of-plant assessment would have to be conducted to determine if the power up-rate to 100 MW could be supported for LEU fuel. 3)While analyses performed 45 years ago have been shown to be in agreement with today s methods, there is an advantage to the current methodology in that people working at HFIR today can explain/justify/defend the safety analyses rather than relying solely on documentation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

PRECEDENTS FOR AUTHORIZATION OF CONTENTS USING DOSE RATE MEASUREMENTS

For the transportation of Radioactive Material (RAM) packages, the requirements for the maximum allowed dose rate at the package surface and in its vicinity are given in Title 10 of the Code of Federal Regulations, Section 71.47. The regulations are based on the acceptable dose rates to which the public, workers, and the environment may be exposed. As such, the regulations specify dose rates, rather than quantity of radioactive isotopes and require monitoring to confirm the requirements are met. 10CFR71.47 requires that each package of radioactive materials offered for transportation must be designed and prepared for shipment so that under conditions normally incident to transportation the radiation level does not exceed 2 mSv/h (200 mrem/h) at any point on the external Surface of the package, and the transport index does not exceed 10. Before shipment, the dose rate of the package is determined by measurement, ensuring that it conforms to the regulatory limits, regardless of any analyses. This is the requirement for all certified packagings. This paper discusses the requirements for establishing the dose rates when shipping RAM packages and the precedents for meeting these requirements by measurement.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗