Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “active insulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Advanced High-Temperature Flexible TPS for Inflatable Aerodynamic Decelerators

Typical entry vehicle aeroshells are limited in size by the launch vehicle shroud. Inflatable aerodynamic decelerators allow larger aeroshell diameters for entry vehicles because they are not constrained to the launch vehicle shroud diameter. During launch, the hypersonic inflatable aerodynamic decelerator (HIAD) is packed in a stowed configuration. Prior to atmospheric entry, the HIAD is deployed to produce a drag device many times larger than the launch shroud diameter. The large surface area of the inflatable aeroshell provides deceleration of high-mass entry vehicles at relatively low ballistic coefficients. Even for these low ballistic coefficients there is still appreciable heating, requiring the HIAD to employ a thermal protection system (TPS). This TPS must be capable of surviving the heat pulse, and the rigors of fabrication handling, high density packing, deployment, and aerodynamic loading. This paper provides a comprehensive overview of flexible TPS tests and results, conducted over the last three years. This paper also includes an overview of each test facility, the general approach for testing flexible TPS, the thermal analysis methodology and results, and a comparison with 8-foot High Temperature Tunnel, Laser-Hardened Materials Evaluation Laboratory, and Panel Test Facility test data. Results are presented for a baseline TPS layup that can withstand a 20 W/cm2 heat flux, silicon carbide (SiC) based TPS layup, and polyimide insulator TPS layup. Recent work has focused on developing material layups expected to survive heat flux loads up to 50 W/cm2 (which is adequate for many potential applications), future work will consider concepts capable of withstanding more than 100 W/cm2 incident radiant heat flux. This paper provides an overview of the experimental setup, material layup configurations, facility conditions, and planned future flexible TPS activities.

DelCorso, Joseph A.↗

Advanced Turbine Technology Applications Project (ATTAP)

The Advanced Turbine Technologies Application Project (ATTAP) is in the fifth year of a multiyear development program to bring the automotive gas turbine engine to a state at which industry can make commercialization decisions. Activities during the past year included reference powertrain design updates, test-bed engine design and development, ceramic component design, materials and component characterization, ceramic component process development and fabrication, ceramic component rig testing, and test-bed engine fabrication and testing. Engine design and development included mechanical design, combustion system development, alternate aerodynamic flow testing, and controls development. Design activities included development of the ceramic gasifier turbine static structure, the ceramic gasifier rotor, and the ceramic power turbine rotor. Material characterization efforts included the testing and evaluation of five candidate high temperature ceramic materials. Ceramic component process development and fabrication, with the objective of approaching automotive volumes and costs, continued for the gasifier turbine rotor, gasifier turbine scroll, extruded regenerator disks, and thermal insulation. Engine and rig fabrication, testing, and development supported improvements in ceramic component technology. Total test time in 1992 amounted to 599 hours, of which 147 hours were engine testing and 452 were hot rig testing.

Source record↗

NASA Tech Briefs, September 2003

Topics include: Oxygen-Partial-Pressure Sensor for Aircraft Oxygen Mask; Three-Dimensional Venturi Sensor for Measuring Extreme Winds; Swarms of Micron-Sized Sensors; Monitoring Volcanoes by Use of Air-Dropped Sensor Packages; Capacitive Sensors for Measuring Masses of Cryogenic Fluids; UHF Microstrip Antenna Array for Synthetic- Aperture Radar; Multimode Broad-Band Patch Antennas; 164-GHz MMIC HEMT Frequency Doubler; GPS Position and Heading Circuitry for Ships; Software for Managing Parametric Studies; Software Aids Visualization of Computed Unsteady Flow; Software for Testing Electroactive Structural Components; Advanced Software for Analysis of High-Speed Rolling-Element Bearings; Web Program for Development of GUIs for Cluster Computers; XML-Based Generator of C++ Code for Integration With GUIs; Oxide Protective Coats for Ir/Re Rocket Combustion Chambers; Simplified Waterproofing of Aerogels; Improved Thermal-Insulation Systems for Low Temperatures; Device for Automated Cutting and Transfer of Plant Shoots; Extension of Liouville Formalism to Postinstability Dynamics; Advances in Thrust-Based Emergency Control of an Airplane; Ultrasonic/Sonic Mechanisms for Drilling and Coring; Exercise Device Would Exert Selectable Constant Resistance; Improved Apparatus for Measuring Distance Between Axles; Six Classes of Diffraction-Based Optoelectronic Instruments; Modernizing Fortran 77 Legacy Codes; Active State Model for Autonomous Systems; Shields for Enhanced Protection Against High-Speed Debris; Scaling of Two-Phase Flows to Partial-Earth Gravity; Neutral-Axis Springs for Thin-Wall Integral Boom Hinges.

Source record↗

Solar Power System Evaluated for the Human Exploration of Mars

The electric power system is a crucial element of any mission for the human exploration of the Martian surface. The bulk of the power generated will be delivered to crew life support systems, extravehicular activity suits, robotic vehicles, and predeployed in situ resource utilization (ISRU) equipment. In one mission scenario, before the crew departs for Mars, the ISRU plant operates for 435 days producing liquefied methane and oxygen for ascent-stage propellants and water for crew life support. About 200 days after ISRU production is completed, the crew arrives for a 500-day surface stay. In this scenario, the power system must operate for a total of 1130 days (equivalent to 1100 Martian "sols"), providing 400 MW-hr of energy to the ISRU plant and up to 18 kW of daytime user power. A photovoltaic power-generation system with regenerative fuel cell (RFC) energy storage has been under study at the NASA Glenn Research Center at Lewis Field. The conceptual power system is dominated by the 4000- m2 class photovoltaic array that is deployed orthogonally as four tent structures, each approximately 5 m on a side and 100-m long. The structures are composed of composite members deployed by an articulating mast, an inflatable boom, or rover vehicles, and are subsequently anchored to the ground. Array panels consist of thin polymer membranes with thin-film solar cells. The array is divided into eight independent electrical sections with solar cell strings operating at 600 V. Energy storage is provided by regenerative fuel cells based on hydrogen-oxygen proton exchange membrane technology. Hydrogen and oxygen reactants are stored in gaseous form at 3000 psi, and the water produced is stored at 14.7 psi. The fuel cell operating temperature is maintained by a 40-m2 deployable pumped-fluid loop radiator that uses water as the working fluid. The power management and distribution (PMAD) architecture features eight independent, regulated 600-Vdc channels. Power management and distribution power cables use various gauges of copper conductors with ethylene tetrafluoroethylene insulation. To assess power system design options and sizing, we developed a dedicated Fortran code to predict detailed power system performance and estimate system mass. This code also modeled the requisite Mars surface environments: solar insolation, Sun angles, dust storms, dust deposition, and thermal and ultraviolet radiation. Using this code, trade studies were performed to assess performance and mass sensitivities to power system design parameters (photovoltaic array geometry and orientation) and mission parameters (landing date and landing site latitude, terrain slope, and dust storm activity). Mission analysis cases were also run. Power results are shown in this graph for an analysis case with a September 1, 2012, landing date; 18.95 North latitude landing site; two seasonal dusts storms; and tent arrays. To meet user load requirements and the ISRU energy requirement, an 8-metric ton (MT) power system and 4000-m2 photovoltaic array area were required for the assumed advanced CuInS2 thin-film solar cell technology. In this figure, the top curve is the average daytime photovoltaic array power, the middle curve is average daytime user load power, and the bottom curve is nighttime power. At mission day 1, daytime user power exceeds 120 kW before falling off to 80 kW at the end of the mission. Throughout the mission, nighttime user power is set to the nighttime power requirement. In this analysis, "nighttime" is defined as the 13- to 15-hr period when array power output is below the daytime power requirement. During dust storms, power system capability falls off dramatically so that by mission day 900, a daily energy balance cannot be maintained. Under these conditions, the ISRU plant is placed in standby mode, and the regenerative fuel cell energy storage is gradually discharged to meet user loads.

Kerslake, Thomas W.↗

Arc Jet Test and Analysis of Asbestos Free Solid Rocket Motor Nozzle Dome Ablative Materials

Asbestos free solid motor internal insulation samples were recently tested at the MSFC Hyperthermal Arc Jet Facility. Objectives of the test were to gather data for solid rocket motor analog characterization of ablative and in-depth thermal performance of rubber materials subject to high enthalpy/pressure flow conditions. Tests were conducted over a range of convective heat fluxes for both inert and chemically reactive sub-sonic free stream gas flow. Active instrumentation included use of total calorimeters, in-depth thermocouples, and a surface pyrometer for in-situ surface temperature measurement. Post-test sample forensics involved determination of eroded depth, charred depth, total sample weight loss, and documentation of the general condition of the eroded profile. A complete Charring Material Ablator (CMA) style aero thermal analysis was conducted for the test matrix and results compared to the measured data. In general, comparisons were possible for a number of the cases and the results show a limited predictive ability to model accurately both the ablative response and the in-depth temperature profiles. Lessons learned and modeling recommendations are made regarding future testing and modeling improvements that will increase understanding of the basic chemistry/physics associated with the complicated material ablation process of rubber materials.

Clayton, J. Louie↗

Thermal Switch for Satellite Temperature Control

An active radiator tile (ART) thermal valve has been fabricated using silicon micromachining. Intended for orbital satellite heat control applications, the operational principal of the ART is to control heat flow between two thermally isolated surfaces by bring the surfaces into intimate mechanical contact using electrostatic actuation. Prototype devices have been tested in a vacuum and demonstrate thermal actuation voltages as low as 40 volts, very good thermal insulation in the OFF state, and a large increase in radiative heat flow in the ON state. Thin, anodized aluminum was developed as a coating for high infrared emissivity and high solar reflectance.

Ziad, H.↗

Long term orbital storage of cryogenic propellants for advanced space transportation missions

A comprehensive study has developed the major features of a large capacity orbital propellant depot for the space-based, cryogenic OTV. The study has treated both the Dual-Keel Space Station and co-orbiting platforms as the accommodations base for the propellant storage facilities, and trades have examined both tethered and hard-docked options. Five tank set concepts were developed for storing the propellants, and along with layout options for the station and platform, were evaluated from the standpoints of servicing, propellant delivery, boiloff, micrometeoroid/debris shielding, development requirements, and cost. These trades led to the recommendation that an all-passive storage concept be considered for the platform and an actively refrigerated concept providing for reliquefaction of all boiloff be considered for the Space Station. The tank sets are modular, each storing up to 45,400 kg of LO2/LH2, and employ many advanced features to provide for microgravity fluid management and to limit boiloff. The features include such technologies as zero-gravity mass gauging, total communication capillary liquid acquisition devices, autogenous pressurization, thermodynamic vent systems, thick multilayer insulation, vapor-cooled shields, solar-selective coatings, advanced micrometeoroid/debris protection systems, and long-lived cryogenic refrigeration systems.

Schuster, John R.↗

Electrical behavior of a Shuttle Electrodynamic Tether System /SETS/

Many novel electrodynamic and space plasma physics experiments can be done from the space shuttle using a gravity gradient stabilized subsatellite tethered 10-30 km above the Orbiter via a long, conducting wire which is insulated from the ionospheric plasma. This system, called the Shuttle Electrodynamic Tether System (SETS), is described in the present paper with emphasis upon the various electrical processes which determine its coupling to the ambient plasma. The three most important physical effects include sheath formation and electron collection by the subsatellite, the generation of a large emf through the orbital motion of the tether across geomagnetic field lines, and the active ejection of electrons from the Orbiter into the surrounding ionosphere. An electrical circuit analogy is presented for SETS together with a brief outline of possible areas related to the artificial generation of magnetohydrodynamic waves.

Banks, P. M.↗

Triton: A hot potato

The effect of sunlight on the surface of Triton was studied. Widely disparate models of the active geysers observed during Voyager 2 flyby were proposed, with a solar energy source almost their only feature. Yet Triton derives more of its heat from internal sources (energy released by the radioactive decay) than any other icy satellite. The effect of this relatively large internal heat on the observable behavior of volatiles on Triton's surface is investigated. The following subject areas are covered: the Global Energy Budget; insulation polar caps; effect on frost stability; mantle convection; and cryovolcanism.

Kirk, R. L.↗

Thermal modeling of comet Kopff: Implications for the CRAF mission

A thermal model of periodic comet Kopff was developed to aid in planning for the Comet Rendezvous Asteroid Flyby mission. The model is based on the comet nucleus model, which estimates the surface temperature distribution and sublimation rates on a rotating icy sphere in heliocentric orbit. The model results are compared with the observed gas production rates from Kopff in 1983. It is found that approximately 15 percent of the sunlit nucleus surface is active, a relatively high fraction for a typical short-period comet. This suggests that the actual nucleus radius may be larger than the model value. The slope of the observed gas production curve with heliocentric distance is steeper than that predicted by the thermal model. This may indicate the existence of a more complex process than direct sublimation of surface ices, such as gas diffusion through a nonvolatile insulating crust.

Weissman, Paul↗

Update: HFC 245fa Blown Foam Development with External Tank Spray Foams

The Marshall Space Flight Center (MSFC) Thermal Protection Systems (TPS) Materials Research Laboratory is currently investigating environmentally friendly blowing agents for use in the insulations of the Space Shuttle's External Tank. The original TPS foam materials of the External Tank were blown with chlorofluorocarbon 11, which is now regulated because of its high Ozone Depletion Potential (ODP). Hydrochlorofluorocarbons (HCFCs), with an ODP that is one tenth that of CFCs, have been widely adopted as an interim blowing agent in urethane insulations. In FY96, Lockheed Martin completed the production qualification and validation of HCFC 141b blown insulations. Because of the expected limited commercial lifetime of HCFC 141b, research efforts are underway to identify and develop alternatives with zero ODP. HFC245fa (1,1,1,3,3-pentaflouropropane) has been chosen by the manufacturer as a third-generation blowing agent to be marketed commercially. Preliminary work evaluating this third-generation candidate has demonstrated promising material mechanical property data. Favorable results from small-scale spray activities have justified evaluations using production foam processing spray parameters. With the scale-up of the spray equipment, however, additional processing issues have been identified. This paper will present data collected to date regarding the use of this blowing agent in External Tank spray foams.

Davis, S.↗

Return to Service of a Liquid Hydrogen Storage Sphere

One, of two, 850,000 gallon liquid hydrogen storage spheres, at NASA's Kennedy Space Center, was decommissioned in 2010. This tank had an abnormally high heat leak that was investigated and determined to be the result of a large void in the perlite insulation. The insulation void was subsequently filled, and the tank was refurbished for its planned use in the Space Launch Systems (SLS) program. Return to service of this tank began in December of 2017 with a partial liquid hydrogen fill. Since that time, routine measurement of the liquid level have been recorded in order to establish a new boiloff rate and associated heat leak. This data shows the perlite top off activities have resulted in a much reduced, and within design specification, heat leak.

air leak↗

Return to Service of a Liquid Hydrogen Storage Sphere

One, of two, 850,000 gallon liquid hydrogen storage spheres, at NASA's Kennedy Space Center, was decommissioned in 2010. This tank had an abnormally high heat leak that was investigated and determined to be the result of a large void in the perlite insulation. The insulation void was subsequently filled, and the tank was refurbished for its planned use in the Space Launch Systems (SLS) program. Return to service of this tank began in December of 2017 with a partial liquid hydrogen fill. Since that time, routine measurement of the liquid level have been recorded in order to establish a new boiloff rate and associated heat leak. This data shows the perlite top off activities have resulted in a much reduced, and within design specification, heat leak.

Krenn, A. G.↗

Using Mylar-Insulated Cryopumping Panels to Improve Vacuum Level During Warm Temperature Testing at JSCs Large Thermal Vacuum Facilities

The Johnson Space Center’s Space Environment Simulation Lab (SESL) has both Chamber A, the world’s largest purpose-built thermal vacuum chamber capable of creating deep space conditions, and Chamber B, the largest human rated thermal vacuum chamber. A unique design feature of these chambers is the gaseous helium cryopumping panels within the liquid nitrogen shroud. This shroud is used to bring the chamber to cryogenic temperatures while the cryopumping panels trap gasses using their large surface area in order to create a high vacuum environment of 5*10^-6 Torr. In preparation for the James Webb Space Telescope (JWST) flight test, a series of functionals required the chamber to run at higher temperatures, and therefore did not need active cooling from the liquid nitrogen shroud. During testing, cryopumping panels were used to mitigate contamination during this main shroud warm-up. One of the cryopumping panels in Chamber A was covered with several layers of aluminized mylar in order to thermally protect the zone from the warmed shroud. This strategy was effective and became part of operations during JWST testing. Currently, Chamber B has requests for both commercial and NASA space suit tests at both high and low temperatures to accurately generate thermal models. High temperature tests would greatly benefit from simultaneous shroud warming and the high vacuum environment provided by the cryopumping panels. This paper will quantitatively define the thermal loads on the panels used in previous Chamber A warm up sequences. Additionally, this report will perform a thermal analysis to judge the feasibility of adding layers of aluminized mylar to the cryopumping panels of Chamber B.

Cryogenics↗

Using Mylar-Insulated Cryopumping Panels to Improve Vacuum Level During Warm Temperature Testing at JSC's Large Thermal Vacuum Facilities

The Johnson Space Center’s Space Environment Simulation Lab (SESL) has both Chamber A, the world’s largest purpose-built thermal vacuum chamber capable of creating deep space conditions, and Chamber B, the largest human rated thermal vacuum chamber. A unique design feature of these chambers is the gaseous helium cryopumping panels within the liquid nitrogen shroud. This shroud is used to bring the chamber to cryogenic temperatures while the cryopumping panels trap gasses using their large surface area in order to create a high vacuum environment of 5*10^-6 Torr. In preparation for the James Webb Space Telescope (JWST) flight test, a series of functionals required the chamber to run at higher temperatures, and therefore did not need active cooling from the liquid nitrogen shroud. During testing, cryopumping panels were used to mitigate contamination during this main shroud warm-up. One of the cryopumping panels in Chamber A was covered with several layers of aluminized mylar in order to thermally protect the zone from the warmed shroud. This strategy was effective and became part of operations during JWST testing. Currently, Chamber B has requests for both commercial and NASA space suit tests at both high and low temperatures to accurately generate thermal models. High temperature tests would greatly benefit from simultaneous shroud warming and the high vacuum environment provided by the cryopumping panels. This paper will quantitatively define the thermal loads on the panels used in previous Chamber A warm up sequences. Additionally, this report will perform a thermal analysis to judge the feasibility of adding layers of aluminized mylar to the cryopumping panels of Chamber B.

Cryogenics↗

Cluster Analysis of Thermal Icequakes Using the Seismometer to Investigate Ice and Ocean Structure (SIIOS): Implications for Ocean World Seismology

Ocean Worlds are of high interest to the planetary community due to the potential habitability of their subsurface oceans. Over the next few decades several missions will be sent to ocean worlds including the Europa Clipper, Dragonfly, and possibly a Europa lander. The Dragonfly and Europa lander missions will carry seismic payloads tasked with detecting and locating seismic sources. The Seismometer to Investigate Ice and Ocean Structure (SIIOS) is a NASA PSTAR funded project that investigates ocean world seismology using terrestrial analogs. The goals of the SIIOS experiment include quantitatively comparing flight-candidate seismometers to traditional instruments, comparing single-station approaches to a small-aperture array, and characterizing the local seismic environment of our field sites. Here we present an analysis of detected local events at our field sites at Gulkana Glacier in Alaska and in Northwest Greenland approximately 80 km North of Qaanaaq, Greenland. Both field sites passively recorded data for about two weeks. We deployed our experiment on Gulkana Glacier in September 2017 and in Greenland in June 2018. At Gulkana there was a nearby USGS weather station which recorded wind data. Temperature data was collected using the MERRA satellite. In Greenland we deployed our own weather station to collect temperature and wind data. Gulkana represents a noisier and more active environment. Temperatures fluctuated around 0°C, allowing for surface runoff to occur during the day. The glacier had several moulins, and during deployment we heard several rockfalls from nearby mountains. In addition to the local environment, Gulkana is located close to an active plate boundary (relative to Greenland). This meant that there were more regional events recorded over two weeks, than in Greenland. Greenland’s local environment was also quieter, and less active. Temperatures remained below freezing. The Greenland ice was much thicker than Gulkana (~850 m versus ~100 m) and our stations were above a subglacial lake. Both conditions can reduce event detections from basal motion. Lastly, we encased our Greenland array in an aluminum vault and buried it beneath the surface unlike our array in Gulkana where the instruments were at the surface and covered with plastic bins. The vault further insulated the array from thermal and atmospheric events.

Marusiak, A. G.↗

Properties of insulator interfaces with p-HgCdTe

Heat treatment at 70 C of low carrier concentration p-type HgCdTe samples (p sub o = 8 x 10 exp 14/cm) generates an inverted surface layer. A two day anneal process below 95 C did not affect the Hall coefficient, whereas an almost complete recovery was obtained by annealing at 120 C. While bulk electron mobility, obtained from PEM data, remained high (about 9 x 10 exp 4 sq cm/V s at 77 K), surface mobility is lower by more than an order of magnitude. Surface recombination velocity indicates a continuous improvement with increased temperature, and the activation energy remains equal to the vacancies energy level. The proposed mechanism is that of positive changes in the sulfide migrating towards the interface and generating an image inversion layer.

Schacham, Samuel E.↗

Control-structure-thermal interactions in analysis of lunar telescopes

The lunar telescope project was an excellent model for the CSTI study because a telescope is a very sensitive instrument, and thermal expansion or mechanical vibration of the mirror assemblies will rapidly degrade the resolution of the device. Consequently, the interactions are strongly coupled. The lunar surface experiences very large temperature variations that range from approximately -180 C to over 100 C. Although the optical assemblies of the telescopes will be well insulated, the temperature of the mirrors will inevitably fluctuate in a similar cycle, but of much smaller magnitude. In order to obtain images of high quality and clarity, allowable thermal deformations of any point on a mirror must be less than 1 micron. Initial estimates indicate that this corresponds to a temperature variation of much less than 1 deg through the thickness of the mirror. Therefore, a lunar telescope design will most probably include active thermal control, a means of controlling the shape of the mirrors, or a combination of both systems. Historically, the design of a complex vehicle was primarily a sequential process in which the basic structure was defined without concurrent detailed analyses or other subsystems. The basic configuration was then passed to the different teams responsible for each subsystem, and their task was to produce a workable solution without requiring major alterations to any principal components or subsystems. Consequently, the final design of the vehicle was not always the most efficient, owing to the fact that each subsystem design was partially constrained by the previous work. This procedure was necessary at the time because the analysis process was extremely time-consuming and had to be started over with each significant alteration of the vehicle. With recent advances in the power and capacity of small computers, and the parallel development of powerful software in structural, thermal, and control system analysis, it is now possible to produce very detailed analyses of intermediate designs in a much shorter period of time. The subsystems can thus be designed concurrently, and alterations in the overall design can be quickly adopted into each analysis; the design becomes an iterative process in which it is much easier to experiment with new ideas, configurations, and components. Concurrent engineering has the potential to produce efficient, highly capable designs because the effect of one subystem on another can be assessed in much more detail at a very early point in the program. The research program consisted of several tasks: scale a prototype telescope assembly to a 1 m aperture, develop a model of the telescope assembly by using finite element (FEM) codes that are available on site, determine structural deflections of the mirror surfaces due to the temperature variations, develop a prototype control system to maintain the proper shape of the optical elements, and most important of all, demonstrate the concurrent engineering approach with this example. In addition, the software used for the finite element models and thermal analysis was relatively new within the Program Development Office and had yet to be applied to systems this large or complex; understanding the software and modifying it for use with this project was also required. The I-DEAS software by Structural Dynamics Research Corporation (SDRC) was used to build the finite element models, and TMG developed by Maya Heat Transfer Technologies, Ltd. (which runs as an I-DEAS module) was used for the thermal model calculations. All control system development was accomplished with MATRIX(sub X) by Integrated Systems, Inc.

Thompson, Roger C.↗