Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “WELLS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Installing Deep Groundwater Monitoring Wells in a Volcanic Dominated Rift Basin: Los Alamos National Laboratory, New Mexico - 17594

Los Alamos National Laboratory (LANL, or the Laboratory) is located in northern New Mexico near the west margin of the Espanola Basin. LANL is underlain by a complex basin-fill sequence of alluvial fan deposits, volcanic tuff, basaltic and dacitic lavas, and riverine deposits. On-going environmental remediation and characterization activities have evolved to improve the performance of groundwater monitoring wells, ensuring they yield representative groundwater and core samples. Groundwater occurs as canyon-fill alluvial water, perched intermediate-depth water associated with the basalts and other local-scale perching horizons, and as a regional-scale aquifer that is the main water supply for the area. Anthropogenic contaminants are found in all three groundwater zones. The regional aquifer below LANL is nominally 1000-1400 feet below ground surface (bgs). Monitoring wells at the Laboratory, are therefore, among the deepest routinely installed in the US. Logistical challenges at LANL include steep terrain, widespread cultural sites, and threatened and endangered species habitat restrictions. Additionally, the cost of installing monitoring wells is high because of groundwater depths and the variable drilling techniques that are required to characterize and install wells in a complex geologic environment. A major challenge to the characterization approach at LANL has been to meet sample quality requirements while minimizing drilling costs. In the late 1990's threaded drill-casing was advanced by rotary drilling methods using compressed air as the only circulation fluid. This resulted in relatively low impacts to the geochemical integrity of rock and groundwater samples, but led to frequent episodes of stuck casing. Additional fluids were introduced to the air-rotary program, improving penetration rates, but also resulting in non-representative groundwater samples due to long-term impacts to the aquifer in the vicinity of the well screen. Mud-rotary drilling was incorporated into the program, but it also had significant long-term impacts on groundwater quality, and often inhibited identification of perched groundwater zones and accurate identification of the water table in the regional aquifer. Current drilling practice makes limited use of fluid additives (e.g. foam) to supplement air circulation methods in order to advance drill casing through the vadose zone. Starting about 100 feet above the water table, drill casing is advanced to the target horizon in the regional aquifer using only air and municipal water (when needed) for circulation. Additionally, the threaded drill casing couplings have been replaced with welded connections, significantly reducing the occurrence of stuck casing. Careful observations of water production and water levels during drilling, coupled with the ability to retract casing for video and geophysical logs, now allows for robust characterization of perched groundwater systems and accurate definition of the top of regional saturation. Recent advances in the drilling program include combined dual-rotary/sonic drilling to depths up to 1150 feet and dual-rotary casing advance at angles up to 25 deg. from vertical. The former allows for core collection with minimal fluid addition, thereby preserving pore water chemistry. The latter method allows for well installation into portions of the aquifer otherwise inaccessible due to constraints at the surface (e.g., cultural sites or topography). Similar to the development of drilling techniques, both well design and groundwater sampling system design have evolved throughout the program. Current well design emphasizes a minimal annulus of filter pack, maximum screen slot size based on formation sieve analyses, and thorough well development to mitigate formation damage due to drilling. To sample groundwater at multiple levels in the same well, earlier sampling systems included Westbay{sup R} multi-zone systems and dual-screen single-pump and dual-screen dual-pump systems designed in collaboration with Baski, Inc. These multi-zone sampling systems proved difficult to develop and maintain given the depth to groundwater, and most current well installations are configured with a single screen and a submersible pump. The ability to purge from a well-developed single-screen well has substantially improved the collection of representative groundwater samples. A carefully crafted groundwater characterization program in target aquifers at depths ranging from 1,000 to 1,400 feet bgs within a complex geologic setting, while also retaining the ability to collect representative core and groundwater samples, may have application at a number of sites throughout the environmental industry. Optimizing each well to meet program objectives while reducing total project costs benefits all environmental investigations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Efforts to Improve Efficiency of Extraction Well Operation at the Fernald Preserve, Harrison, Ohio - 16177

The Fernald Preserve, a former uranium processing facility that produced high-purity uranium metal products during the Cold War, is located in southwest Ohio. The facility became a US Department of Energy Office of Legacy Management (LM) site in November 2006, following completion of the Comprehensive Environmental Response, Compensation, and Liability Act environmental remediation and site restoration (with the exception of groundwater). When the site was turned over to LM, approximately 76.5 ha of the Great Miami Aquifer remained contaminated with uranium above the final remediation level of 30 μg/L. Here, uranium contamination is being removed from groundwater in the Great Miami Aquifer through a pump-and-treat operation, which is predicted to continue until 2033. Twenty extraction wells pump about 30 million liters per day. Operation of the system is impacted by iron in the groundwater that promotes iron fouling of the well pumps, motors, and screens. The design of the well field evolved over 21 years and reflected a conservative system that could respond to a wide range of pumping conditions. For instance, some of the extraction wells were sized with pumps and motors that would allow the well to pump up to 1890 L/min (500 gpm) if warranted. The added flexibility, though, came at the cost of operational efficiency. We describe the efforts that have been taken by LM since the Fernald site was transferred to LM to mitigate the operational impacts from the iron fouling aquifer conditions and improve the efficiency of the well-field operation. Variable-frequency drives were installed at six wells to replace flow control valves. Several wells with oversized pumps and motors were changed from 24-hour per day operation to 8-hour per day operation to allow the pumps to operate closer to their design flow rates. Pumps and motors were 'right-sized' at many wells to improve pumping efficiency. The process used to rehabilitate (or clean) well screens was improved, and a process was developed to clean pumps without having to pull them from the well. To reduce pressure drops, improvements were also made to the configuration of the discharge piping. A new control system was installed for each well to allow local control and local tracking of energy used. The amount of energy used daily compared to number of gallons pumped provides a method to assess pump performance and determine when action is necessary to restore well pump efficiency. Additionally, the metrics being employed to help quantify well-field efficiency improvements are described, and the benefits achieved by proactively managing the pump-and-treat operation are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rehabilitation of Westbay{sup R} Wells with PCE-Contaminated Tubing Fluid - 19250

In November 2015, tetrachloroethylene, also known as PCE, was discovered in groundwater samples collected from a Westbay{sup R} multi-level groundwater monitoring well at the Idaho National Laboratory (INL).a The result was unexpected due to the remote location of the well. Subsequent investigation determined that PCE was not present in the groundwater. The detected PCE was due to inadvertent contamination of the tubing fluid in the Westbay well-monitoring system. Further investigation showed that three of the 11 Westbay wells at the INL contained PCE-contaminated tubing fluid at concentrations above the U.S. Environmental Protection Agency maximum contamination level (5 μg/L); the three wells were identified for rehabilitation as part of the INL well maintenance program. Well rehabilitation would either remove and replace the PCE-contaminated tubing fluid or remove the PCE from the tubing fluid. The interior of the Westbay well casing is isolated from the surrounding groundwater and filled with tubing fluid (either distilled or potable water). Groundwater samples are collected by opening sealed ports using a specialized sampling device. The unique construction prevents the direct interaction of the groundwater and tubing fluid. The tubing fluid also supports the structural integrity of the Westbay wells. The unique construction of the Westbay wells-i.e., the small diameter (5.08 cm [2 in.]) and the depths of the tubing fluid ranging from 144.8 to 419 m (475 to 1,376 ft) below ground surface-posed unique challenges to the rehabilitation. Because the tubing fluid provides structural integrity to the Westbay well, the fluid cannot be removed and then replaced without damaging the integrity of the Westbay well. Additionally, the small diameter of the systems and the associated depths limit the availability of equipment that can be used for the rehabilitation. After an evaluation of potential methods, it was determined that the use of an in-well, granular-activated-carbon filtration swab deployed via a wire line would provide the safest and most cost-effective method for rehabilitation. Rehabilitation commenced during the summer of 2018 and is ongoing with measurable success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sedimentary Geothermal Feasibility in Eastern Nevada and Millard County, Utah Well Databases

In order to gather data to assess sedimentary geothermal feasibility in Nevada and Utah, state oil and gas and geothermal databases were serached for well files and well logs. Well data from the Nevada Bureau of Mines and Geology oil and gas and geothermal databases was mined for the following areas in Nevada: Blackburn oil field, Marys River, North Willow Creek, Tomera Ranch, and Diamond Valley, all in the Elko Basin; Bacon Flat in Railroad Valley; and Steptoe Basin. For Pavant Butte in Utah, the State of Utah Division of Oil and Gas Well File and Well Log Searches were mined for well records in Millard County. Only wells close to Pavant Butte were mined for detailed information, but all Millard County wells are included in the database. Well files were searched for temperature, permeability, pressure information, and formation depth and thickness. Temperature values are uncorrected. Locations for some wells were converted from township and range locations to approximate latitude and longitude using Google Earth and Earth Point grids to locate well pads. If no well pad could be located for a well, the center of the smallest section available (usually partsect) was used as the approximate location.

15 GEOTHERMAL ENERGY↗

A Simple Data-Centric Methodology for Producible Geothermal Well Determinations: Preprint

The Bureau of Land Management (BLM) has traditionally lacked a standardized methodology for determining if a newly drilled geothermal well is "producible," a designation essential for deciding whether a lease should be "held by production." This is a straightforward problem to solve in oil and gas: Demonstrate that a well is economically viable, meaning it produces sufficient oil or gas to exceed direct operating costs and lease-related expenses, such as rentals or minimum royalties. In geothermal, the problem is more complex: Geothermal wells are tightly coupled with the downstream infrastructure - specifically, the power plant, which is often not designed until well after a lease is deemed as "held by production." Although this designation is critical for advancing geothermal power plant development on BLM-managed lands, current geothermal well assessments often rely on ad hoc approaches that can be complex, operator-biased, and heavy in assumptions related to economic viability. To address this, we have developed two complementary methodologies: a minimum power requirement-based approach and a productivity index (PI)-based approach. These methods leverage key flow test data - pressure, temperature, flow rate, and specific enthalpy - to provide reliable and standardized producible well determinations. The minimum power requirement-based approach evaluates wells against specific power output thresholds informed by reservoir experts and the associated temperature requirements. The PI-based approach assesses well productivity using widely accepted reservoir engineering metrics, proposing a threshold of 2.5 kg/s/bar. Both methods are data-driven and grounded in empirical production data from operational geothermal wells, avoiding uncertain economic assumptions while maintaining decision-making accuracy. Wells falling below key performance thresholds (i.e., PI, specific power) are deemed non-producible. These methodologies aim to streamline BLM's decision-making process, reduce nontechnical barriers to geothermal energy adoption, and enable regulatory expansion into states lacking geothermal expertise. Preliminary results indicate clear trends and thresholds in production data that provide actionable insights for evaluating well producibility. Validation using well completion report (WCR) data is ongoing, with promising results demonstrating the potential for these standardized methodologies to impact geothermal development significantly.

15 GEOTHERMAL ENERGY↗

Completion Report for Model Evaluation Well ER-5-5: Corrective Action Unit 98: Frenchman Flat

Model Evaluation Well ER-5-5 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of Nevada Environmental Management Operations at the Nevada National Security Site (formerly known as the Nevada Test Site). The well was drilled in July and August 2012 as part of a model evaluation well program in the Frenchman Flat area of Nye County, Nevada. The primary purpose of the well was to provide detailed geologic, hydrogeologic, chemical, and radiological data that can be used to test and build confidence in the applicability of the Frenchman Flat Corrective Action Unit flow and transport models for their intended purpose. In particular, this well was designed to obtain data to evaluate the uncertainty in model forecasts of contaminant migration from the upgradient underground nuclear test MILK SHAKE, conducted in Emplacement Hole U-5k in 1968, which were considered to be uncertain due to the unknown extent of a basalt lava-flow aquifer present in this area. Well ER-5-5 is expected to provide information to refine the Phase II Frenchman Flat hydrostratigraphic framework model, if necessary, as well as to support future groundwater flow and transport modeling. The 31.1-centimeter (cm) diameter hole was drilled to a total depth of 331.3 meters (m). The completion string, set at the depth of 317.2 m, consists of 16.8-cm stainless-steel casing hanging from 19.4-cm carbon-steel casing. The 16.8-cm stainless-steel casing has one slotted interval open to the basalt lava-flow aquifer and limited intervals of the overlying and underlying alluvial aquifer. A piezometer string was also installed in the annulus between the completion string and the borehole wall. The piezometer is composed of 7.3-cm stainless-steel tubing suspended from 6.0-cm carbon-steel tubing. The piezometer string was landed at 319.2 m, to monitor the basalt lava-flow aquifer. Data collected during and shortly after hole construction include composite drill cuttings samples collected every 3.0 m, various geophysical logs, preliminary water quality measurements, and water-level measurements. The well penetrated 331.3 m of Quaternary–Tertiary alluvium, including an intercalated layer of saturated basalt lava rubble. No well development or hydrologic testing was conducted in this well immediately after completion; however, a preliminary water level was measured in the piezometer string at the depth of 283.4 m on September 25, 2012. No tritium above the minimum detection limit of the field instruments was detected in this hole. Future well development, sampling, and hydrologic testing planned for this well will provide more accurate hydrologic information for this site. The stratigraphy, general lithology, and water level were as expected, though the expected basalt lava-flow aquifer is basalt rubble and not the dense, fractured lava as modeled. The lack of tritium transport is likely due to the difference in hydraulic properties of the basalt lava-flow rubble encountered in the well, compared to those of the fractured aquifer used in the flow and transport models.

58 GEOSCIENCES↗

Completion Report for Model Evaluation Well ER-11-2: Corrective Action Unit 98: Frenchman Flat

Model Evaluation Well ER-11-2 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of Nevada Environmental Management Operations at the Nevada National Security Site (formerly known as the Nevada Test Site). The well was drilled in August 2012 as part of a model evaluation program in the Frenchman Flat area of Nye County, Nevada. The primary purpose of the well was to provide detailed geologic, hydrogeologic, chemical, and radionuclide data that can be used to test and build confidence in the applicability of the Frenchman Flat Corrective Action Unit flow and transport models for their intended purpose. In particular, this well was designed to provide data to evaluate the uncertainty in model forecasts of contaminant migration from the upgradient underground nuclear test PIN STRIPE, conducted in borehole U-11b in 1966. Well ER-11-2 will provide information that can be used to refine the Phase II Frenchman Flat hydrostratigraphic framework model if necessary, as well as to support future groundwater flow and transport modeling. The main 31.1-centimeter (cm) hole was drilled to a total depth of 399.6 meters (m). A completion casing string was not set in Well ER-11-2. However, a piezometer string was installed in the 31.1-cm open hole. The piezometer is composed of 7.3-cm stainless-steel tubing hung on 6.0-cm carbon-steel tubing via a crossover sub. The piezometer string was landed at 394.5 m, for monitoring the lower tuff confining unit. Data collected during and shortly after hole construction include composite drill cuttings samples collected every 3.0 m, various geophysical logs, water quality (including tritium and other test-related radionuclides) measurements, and water level measurements. The well penetrated 42.7 m of Quaternary and Tertiary alluvium and 356.9 m of Tertiary volcanic rock. The water-level measured in the piezometer string on September 25, 2012, was 353.8 m below ground surface. No tritium above levels detectable by field methods were encountered in this hole. No well development or hydrologic testing was conducted in this well immediately after completion, and future well development, sampling, and hydrologic testing planned for this well will be limited due to the diameter of the piezometer string. The stratigraphy, general lithology, and the water level are as expected, but the section of geology encountered is higher than expected due to faulting. No tritium above the minimum detection limit of the field equipment was detected because the target aquifer (the Topopah Spring aquifer) at Well ER-11-2 is structurally higher than expected and thus unsaturated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Handbook: Collecting Groundwater Samples from Monitoring Wells in Frenchman Flat, CAU 98

Frenchman Flat basin on the Nevada National Security Site (NNSS) contains Corrective Action Unit (CAU) 98, which is comprised of ten underground nuclear test locations. Environmental management of these test locations is part of the Underground Test Area (UGTA) Activity conducted by the U.S. Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended) with the U.S. Department of Defense (DOD) and the State of Nevada. A Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) has been approved for CAU 98 (DOE, 2011). The CADD/CAP reports on the Corrective Action Investigation that was conducted for the CAU, which included characterization and modeling. It also presents the recommended corrective actions to address the objective of protecting human health and the environment. The recommended corrective action alternative is “Closure in Place with Modeling, Monitoring, and Institutional Controls.” The role of monitoring is to verify that Contaminants of Concern (COCs) have not exceeded the Safe Drinking Water Act (SDWA) limits (Code of Federal Regulations, 2014) at the regulatory boundary, to ensure that institutional controls are adequate, and to monitor for changed conditions that could affect the closure conditions. The long-term closure monitoring program will be planned and implemented as part of the Closure Report stage after activities specified in the CADD/CAP are complete. Groundwater at the NNSS has been monitored for decades through a variety of programs. Current activities were recently consolidated in an NNSS Integrated Sampling Plan (DOE, 2014). Although monitoring directed by the plan is not intended to meet the FFACO long-term monitoring requirements for a CAU (which will be defined in the Closure Report), the objective to ensure public health protection is similar. It is expected that data collected in accordance with the plan will support the transition to long-term monitoring at each CAU. The sampling plan is designed to ensure that monitoring activities occur in compliance with the UGTA Quality Assurance Plan (DOE, 2012). The sampling plan should be referenced for Quality Assurance (QA) elements and procedures governing sampling activities. The NNSS Integrated Sampling Plan specifies the groundwater monitoring that will occur in CAU 98 until the long-term monitoring program is approved in the Closure Report. The plan specifies the wells that must be monitored and categorizes them by their sampling objective with the associated analytical requirements and frequency. Possible sample collection methods and required standard operating procedures are also presented. The intent of this handbook is to augment the NNSS Integrated Sampling Plan by providing well-specific details for the sampling professional implementing the Sampling Plan in CAU 98, Frenchman Flat. This handbook includes each CAU 98 well designated for sampling in the NNSS Integrated Sampling Plan. The following information is provided in the individual well sections: 1. The purpose of sampling. 2. A physical description of the well. 3. The chemical characteristics of the formation water. 4. Recommended protocols for purging and sampling. The well-specific information has been gathered from numerous historical and current sources cited in each section, but two particularly valuable resources merit special mention. These are the USGS NNSS website (http://nevada.usgs.gov/doe_nv/ntsarea5.cfm) and the UGTA Field Operations website (https://ugta.nv.doe.gov/sites/Field%20Operations/default.aspx). 2 Land surface elevation and measuring point for water level measurements in Frenchman Flat were a focus during CAU investigations (see Appendix B, Attachment 1 in Navarro-Intera, 2014). Both websites listed above provide information on the accepted datum for each well. A summary is found on the home page for the well on the USGS website. Additional information is available through a link in the “Available Data” section to an “MP diagram” with a photo annotated with the datum information. On the UGTA Field Operations well page, the same information is in the “Wellhead Diagram” link. Well RNM-2s does not have an annotated photo at this time. All of the CAU 98 monitoring wells are located within Area 5 of Frenchman Flat, with the exception of ER-11-2 in Area 11 (Figure 1). The wells are clustered in two areas: the northern area (Figure 2) and the central area (Figure 3). Each well is discussed below in geographic order from north to south as follows: ER-11-2, ER-5-3 shallow piezometer, ER-5-3-2, ER-5-5, RNM-1, RNM-2s, and UE-5n.

(1996↗

Managing Subsurface Pressure Buildup and Interference in Commercial-Scale CO 2 Storage Project with Proximal Injection Wells

Large-scale decarbonization using carbon capture and storage (CCS) is likely to involve many commercial-scale CO 2 storage projects located in close proximity to each other. This close proximity raises concerns over pressure interference among the storage projects. Pressure interference between injection and storage efforts can reduce the practicable CO 2 storage resource and force wells to inject CO 2 at a lower rate to avoid the fracture pressure thresholds per United States Environmental Protection Agency (EPA) Class VI well regulations to preserve injection and confining zone integrity and potentially mitigate against inducing seismic activity. These analyses employ numerical full-physics reservoir modeling to evaluate how pressure buildup fronts and CO 2 plumes evolve under commercial-scale injection volumes of CO 2 in which multiple storage sites located in close proximity occur in tandem. The simulation models mimic injection at pseudo basin-scale and assume homogeneous saline formation(s) as storage targets with a pair of upper and lower homogeneous seal layer/s. These analyses specifically investigate the efficacy of two basin-wide reservoir pressure management strategies in addressing the technical challenges associated with pressure buildup and CO 2 plume commingling. The strategies explored include: 1) enlarging the area of injection well spacing (WS) and 2) storing CO 2 in a stacked sequence (SSS) of saline formations compared to a single formation. The storage and confining zones properties assumed were held common across the scenarios, unless specified otherwise. Analyses results show that after injecting 4 million tons per year for 30 years using 4 separate wells (each injecting 1 million metric tons per year), the radius of CO 2 plume extends to a mere 3 km or less from injection wells. Meanwhile, the radius of pressure buildup ranges on the order of tens to a few hundreds of kilometers, depending on the magnitude of pressure buildup threshold that one would use to define the front. CO 2 plume commingling from different injection wells appears to occur 50 years post-injection, especially under scenarios with narrowly spaced (i.e., < 5 km apart) injection well locations. Findings from sensitivity cases on the well spacing suggest that storage formations modeled would require different well spacing to avoid fracture pressure thresholds. For instance, modeled storage formations with high fracture gradients (i.e., 0.8 psi/ft) would need less than 5–km well spacing, whereas those with lower fracture gradients (i.e., 0.7 psi/ft) would need approximately 20–km well spacing, based on assumed modeling parameters. Under stacked injection, the pressure challenges (described above) still exist but are more alleviated due to distributing the same injection volume across more available reservoir volume. These analyses demonstrate that stacked-sequence storage can effectively address the challenges, while still providing the same target CO 2 storage volumes and allowing a large number of storage projects to be deployed in the same basin by better utilizing the available storage resource across different reservoir depths. Among cases modeled, the resulting pressure buildup front is most suppressed when each storage project distributes injection volumes over several wells, each of which injects a portion of the total CO 2 across the stacked sequence. This strategy results in the smallest CO 2 aerial footprint amongst scenarios evaluated but also shows the largest reduction in the pressure buildup at the top of perforation at the injection wells (upwards of approximately 42 percent compared to the commercial-scale single-formation storage), the result of which is crucial to maintain caprock integrity. The findings presented by this research draw attention to the importance of greater coordination among storage operators and regulatory stakeholders to foster the upscaling and deployment of CCS. These analyses provide insights into required decision-making when considering multi-project deployment in a shared basin. Because these analyses evaluate a very specific geologic situation, they bear further investigations across other geologic situations.

42 ENGINEERING↗

Strategic Qualitative Risk Assessment of Thousands of Legacy Wells within the Area of Review (AoR) of a Potential CO2 Storage Site

The subsurface confinement of anthropogenic carbon dioxide (CO2) demands robust risk assessment methodologies to identify potential leakage pathways. Legacy wells within the Area of Review (AoR) represent one potential leakage pathway. Robust methodologies require enormous amounts of data, which are not available for many old legacy wells. This study strategically categorizes 4386 legacy wells within the AoR of a potential CO2 storage site in the Illinois basin and identifies the high-risk wells by leveraging publicly available data—reports and well logs submitted to state regulatory agencies. Wells were categorized based on their proximity to the injection well location, depth, the mechanical integrity of well barriers, and the accessibility to these wells throughout the project lifecycle. Wells posing immediate risks were identified, guiding prioritized corrective actions and monitoring plans. Out of 4386 wells, 54 have high priority for corrective action, 10 have medium priority, and the remainder are of low priority. Case study results from the Illinois basin demonstrate the effectiveness and applicability of this approach, to assess the risk associated with legacy wells within the AoR of potential CO2 storage site, strategically categorizing over 4000 such wells despite data limitations.

Arbad, Nachiket (ORCID:0000000215353656)↗

Characteristic Performance Evaluation of a new SAGe Well Detector for Small and Large Sample Geometries

Environmental scientific research requires a detector that has sensitivity low enough to reveal the presence of any contaminant in the sample at a reasonable counting time. Canberra developed the germanium detector geometry called Small Anode Germanium (SAGe) Well detector, which is now available commercially. The SAGe Well detector is a new type of low capacitance germanium well detector manufactured using small anode technology capable of advancing many environmental scientific research applications. The performance of this detector has been evaluated for a range of sample sizes and geometries counted inside the well, and on the end cap of the detector. The detector has energy resolution performance similar to semi-planar detectors, and offers significant improvement over the existing coaxial and Well detectors. Energy resolution performance of 750 eV Full Width at Half Maximum (FWHM) at 122 keV γ-ray energy and resolution of 2.0 - 2.3 keV FWHM at 1332 keV γ-ray energy are guaranteed for detector volumes up to 425 cm{sup 3}. The SAGe Well detector offers an optional 28 mm well diameter with the same energy resolution as the standard 16 mm well. Such outstanding resolution performance will benefit environmental applications in revealing the detailed radionuclide content of samples, particularly at low energy, and will enhance the detection sensitivity resulting in reduced counting time. The detector is compatible with electric coolers without any sacrifice in performance and supports the Canberra Mathematical efficiency calibration method (In situ Object Calibration Software or ISOCS, and Laboratory Source-less Calibration Software or LABSOCS). In addition, the SAGe Well detector supports true coincidence summing available in the ISOCS/LABSOCS framework. The improved resolution performance greatly enhances detection sensitivity of this new detector for a range of sample sizes and geometries counted inside the well. This results in lower minimum detectable concentrations compared to Traditional Well detectors. The SAGe Well detectors are compatible with Marinelli beakers and compete very well with semi-planar and coaxial detectors for large samples in many applications. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Evaluating offshore legacy wells for geologic carbon storage: A case study from the Galveston and Brazos areas in the Gulf of Mexico

In this article, federal offshore waters in the Gulf of Mexico are of interest for large-scale geologic carbon storage (GCS). However, more than 80,000 offshore oil and gas wells exist in the region, which could impact the integrity of sealing intervals. In this study, we propose a screening methodology for ranking offshore legacy wells based on the challenge they may present to GCS. The methodology relies on the review of well regulatory records to 1) identify leakage pathways and assess the potential hazards that wells pose to planned GCS operations, 2) evaluate well features that impact the accessibility of wells to determine the feasibility of potential corrective actions, and 3) rank wells based on the overall challenge they may pose for GCS. We demonstrate our framework by evaluating the construction and abandonment of 156 wells across eight areas of interest (AOIs) in shallow federal waters along the Texas Gulf Coast. The majority (99.3 %) of wells considered were constructed and plugged in a manner that did not isolate prospective GCS targets in the Upper and Lower Miocene formations and may potentially require a challenging or uncertain corrective action prior to GCS. Dataset trends suggest that the observed well construction and plugging designs may be common in shallow offshore federal waters along the Texas Gulf Coast. Consequently, operators pursuing offshore GCS projects in the region may consider selecting areas that avoid challenging wells or performing robust evaluations of legacy well leakage risks to plan corrective action prior to CO 2 injection.

58 GEOSCIENCES↗

A Method to Represent a Well in a Three‐Dimensional Discrete Fracture Network Model

Abstract In discrete fracture network (DFN) modeling, fractures are randomly generated and placed in the model domain. The rock matrix is considered impermeable. Small fractures and isolated fractures are often ignored to reduce computational expense. As a result, the rock matrix between fractures could be large and intersections may not be found between a well introduced in the model and the hydraulically connected fracture networks (fracture backbones). To overcome this issue, this study developed a method to conceptualize a well in a three‐dimensional (3D) DFN using two orthogonal rectangular fractures oriented along the well's axis. Six parameters were introduced to parameterize the well screen and skin zone, and to control the connectivity between the well and the fracture backbones. The two orthogonal fractures were discretized using a high‐resolution mesh to improve the quality of flow and transport simulations around and along the well. The method was successfully implemented within dfnWorks 2.0 (Hyman et al. 2015) to incorporate a well in a 3D DFN and to track particles leaving an injection well and migrating to a pumping well. Verification of the method against MODFLOW/MODPATH found a perfect match in simulated hydraulic head and particle tracking. Using three examples, the study showed that the method ensured the connectivity between wells and fracture backbones, and honored the physical processes of flow and transport along and around wells in DFNs. Recommendations are given for estimating the values of the six introduced well parameters in a real‐world case study.

Pham, Hai (ORCID:0000000310164394)↗

Locating Undocumented Wells Using Historical Oil and Gas Exploration Maps: A Case Study in Osage County, Oklahoma

Undocumented oil and gas wells lack reliable information about their locations and characteristics, making them difficult to identify. These wells can result in unanticipated delays and costs in the development of nearby surface and subsurface resources, and, if improperly plugged, can cause contamination. This study leverages historical petroleum exploration maps to locate such wells, focusing on Osage County, Oklahoma. Two sets of early 20th century oil and gas exploration maps by the United States Geological Survey were georeferenced and analyzed using a computer vision model to detect well symbols. The locations of detected wells were compared to the location of known wells in the database from the Bureau of Indian Affairs Osage Agency to identify potential undocumented wells. The analysis yielded over 500 potential undocumented wells, with dry holes constituting the largest fraction. Field verification confirmed the presence of some undocumented wells. Comparison with prior work revealed limited overlap, underscoring the complementary value of historical oil and gas maps for locating undocumented wells. This approach demonstrates the utility of integrating historical cartographic resources with modern geospatial and machine learning techniques to improve the identification and management of undocumented wells.

Energy - Petroleum↗

Interface effect in coupled quantum wells

This paper intends to theoretically investigate the effect of the interfaces on the Rashba spin splitting of two coupled quantum wells. The results show that the interface related Rashba spin splitting of the two coupled quantum wells is both smaller than that of a step quantum well which has the same structure with the step quantum well in the coupled quantum wells. And the influence of the cubic Dresselhaus spin-orbit interaction of the coupled quantum wells is larger than that of a step quantum well. It demonstrates that the spin relaxation time of the two coupled quantum wells will be shorter than that of a step quantum well. As for the application in the spintronic devices, a step quantum well may be better than the coupled quantum wells, which is mentioned in this paper.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Joint Optimization of Well Completions and Controls for CO 2 Enhanced Oil Recovery and Storage

CO 2 storage through CO 2 enhanced oil recovery (EOR) is considered as one of the technologies to help promote larger scale deployment of CO 2 storage because of associated economic benefits through oil recovery, 45Q tax credits and the utilization of existing infrastructure. The objective of this study is to demonstrate how optimal reservoir management and operation strategies (including well completions and controls) can be used to optimize both CO 2 storage and oil recovery. The optimization problem was focused on jointly estimating the well completions (i.e., fraction of injection/production well perforations in each reservoir layer) and CO 2 injection/oil production controls that maximize the net present value (NPV) in a CO 2 EOR and storage operation. We utilized the newly developed StoSAG algorithm, one of the most efficient optimization algorithms in the reservoir management community, to solve the optimization problem. The performance of joint optimization approach was compared with the performance of well control only optimization approach. In addition, the performance of co-optimization of CO 2 storage and oil recovery approach was compared with the performances of maximization of only CO 2 storage and maximization of only oil recovery approaches. The optimization results showed that a joint optimization of well completions and well controls can achieve an 8.84% higher final NPV than the one obtained from the optimization of only well controls. It was observed that the NPV incremental for joint optimization is mainly due to the fact that the optimal well completions and controls approach results in efficient CO 2 storage and oil production from different reservoir layers depending on the differences in individual layer properties. Comparison of co-optimization (i.e., maximization of NPV) and maximization of only CO 2 storage or only oil recovery showed that the co-optimization and maximization of only oil recovery result in significantly higher final NPV than that obtained through maximization of only CO 2 storage approach while maximization of only CO 2 storage can achieve significantly higher CO 2 storage in the reservoir compared to the other two scenarios. The similar results for co-optimization and maximization of oil production are obtained because of the difference in oil revenue compared to CO 2 storage tax credit. To the best of our knowledge, this is the first study in oil/gas industry and CO 2 storage community to perform joint optimization of well completions and well controls in the fields. We expect that the proposed optimization framework will be a useful and efficient tool for field engineers to optimally manage CO 2 EOR projects to maximize revenue through oil recovery as well as CO 2 storage by taking advantage of the new 45Q tax law.

Artificial intelligence↗

Geothermally Coupled Well-Based Compressed Air Energy Storage

Previous work by McGrail et al. (2013, 2015) has evaluated the possibility of pairing compressed air energy storage with geothermal resources in lieu of a fossil-fired power generation component, and suggests that such applications may be cost competitive where geology is favorable to siting both the geothermal and CAES components of such a system. Those studies also note that the collocation of subsurface resources that meet both sets of requirements are difficult to find in areas that also offer infrastructure and near- to mid-term market demand for energy storage. This study examines a novel application for the compressed air storage portion of the project by evaluating the potential to store compressed air in disused wells by amending well casings to serve as subsurface pressure vessels. Because the wells themselves would function in lieu of a geologic storage reservoir for the CAES element of the project, siting could focus on locations with suitable geothermal resources, as long as there was also existing wellfield infrastructure that could be repurposed for air storage. Existing wellfields abound in the United States, and with current low energy prices, many recently productive fields are now shut in. Should energy prices remain stagnant, these idle fields will be prime candidates for decommissioning unless they can be transitioned to other uses, such as redevelopment for energy storage. In addition to the nation’s ubiquitous oil and gas fields, geothermal fields, because of their phased production lifetimes, also may offer many abandoned wellbores that could be used for other purposes, often near currently productive geothermal resources. These existing fields offer an opportunity to decrease exploration and development uncertainty by leveraging data developed during prior field characterization, drilling, and production. They may also offer lower-cost deployment options for hybrid geothermal systems via redevelopment of existing well-field infrastructure. This project assessed the technical and economic feasibility of implementing geothermally coupled well-based CAES for grid-scale energy storage. Based on an evaluation of design specifications for a range of casing grades common in U.S. oil and gas fields, a 5-MW CAES project could be supported by twenty to twenty-five 5,000-foot, 7-inch wells using lower-grade casing, and as few as eight such wells for higher-end casing grades. Using this information, along with data on geothermal resources, well density, and potential future markets for energy storage systems, The Geysers geothermal field was selected to parameterize a case study to evaluate the potential match between the proven geothermal resource present at The Geysers and the field’s existing well infrastructure. Based on calculated wellbore compressed air mass, the study shows that a single average geothermal production well could provide enough geothermal energy to support a 15.4-MW (gross) power generation facility using 34 to 35 geothermal wells repurposed for compressed air storage, resulting in a simplified levelized cost of electricity (sLCOE) estimated at 11.2 ¢/kWh (Table S.1). Accounting for the power loss to the geothermal power project associated with diverting geothermal resources for air heating results in a net 2-MW decrease in generation capacity, increasing the CAES project’s sLCOE by 1.8 ¢/kWh.

25 ENERGY STORAGE↗

Y-12 Groundwater Protection Program Monitoring Optimization Plan For Groundwater Monitoring Wells At The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee (Figure A.1). The plan describes the technical approach that will be implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well (Section 2.0). Under this approach, wells granted &#x27;active&#x27; status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling (Section 3.0), whereas wells granted &#x27;inactive&#x27; status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP (Section 3.0). Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans and procedures (Section 4.0). This plan applies to groundwater wells associated with Y-12 and related waste management areas and facilities located within three hydrogeologic regimes (Figure A.1): the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses a section of Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV and, for the purposes of this plan, includes a section of Union Valley east of the DOE Oak Ridge Reservation (ORR) boundary along Scarboro Road. The Chestnut Ridge Regime encompasses a section of Chestnut Ridge directly south of Y-12 that is bound on the west by a surface drainage feature (Dunaway Branch) and on the east by Scarboro Road. For this plan, the Chestnut Ridge Regime includes an area known as the South Campus Facility that is located west of Scarboro Road and south of Bethel Valley Road. The GWPP maintains an extensive database of construction details and related information for the monitoring wells in each hydrogeologic regime (including wells that have been destroyed or intentionally plugged and abandoned); the most recent hardcopy version of the database was issued in February 2003 (BWXT Y-12, L.L.C. [BWXT] 2003). As specified in the Y-12 GWPP Management Plan (Babcock & Wilcox Technical Services Y-12, LLC [B&W Y-12] 2009a), this plan will be reviewed and updated every three years.

54 ENVIRONMENTAL SCIENCES↗