Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Technical Basis for Design Life Extension of the SAVY-4000 Series Nuclear Material Packaging System from Five Years to Fifteen Years

The DOE Manual, M441.1-1, Nuclear Material Packaging, approved March 7, 2008, provides detailed packaging requirements for protecting workers from exposure to nuclear materials stored outside of an approved engineered contamination barrier. The SAVY-4000 Series nuclear material packaging system is a DOE Manual 441.1-1 compliant storage system used at Los Alamos National Laboratory. The purpose of this report is to document the technical basis and DOE approval for the initial 5-year design life of the SAVY-4000 Series and to summarize, with supporting detailed technical reports as references, the technical basis for extending the design life from 5 years to 15 years.

61 RADIATION PROTECTION AND DOSIMETRY↗

Technical & Programmatic Solutions for DPC Direct Disposal: Engineering Cost Analysis Support - Scoping

This memo describes the engineering technical and costing analysis support needed for identifying and evaluating technical and programmatic solutions for spent nuclear fuel (SNF) in dual-purpose canisters (DPCs), and the resources planned to provide that support. The Technical and Programmatic Solutions (T&PS) work scope is intended to identify and evaluate the range of feasible options available for DPC direct disposal, considering the range of DPC designs in the existing fleet and a range of generic geologic disposal concepts. It will also identify changes to the way DPCs are loaded, and/or additional hardware that could be installed in DPCs as they are loaded, to improve disposability (chiefly, post closure criticality control). These two thrusts are the focus of engineering support to the work package.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

System Studies for Global Nuclear Assurance & Security: 3S Risk Analysis for Small Modular Reactors (Volume I)—Technical Evaluation of Safety Safeguards & Security

Coupling interests in small modular reactors (SMR) as efficient and effective method to meet increasing energy demands with a growing aversion to cost and schedule overruns traditionally associated with the current fleet of commercial nuclear power plants (NPP), SMRs are attractive because they offer a significant relative cost reduction to current-generation nuclear reactors—increasing their appeal around the globe. Sandia's Global Nuclear Assurance and Security (GNAS) research perspective reframes the discussion around the "complex risk" of SMRs to address interdependencies between safety, safeguards, and security. This systems study provides technically rigorous analysis of the safety, safeguards, and security risks of SMR technologies. The aim of this research is three-fold. The first aim is to provide analytical evidence to support safety, safeguards, and security claims related to SMRs (Study Report Volume I). Second, this study aims to introduce a systems-theoretic approach for exploring interdependencies between the technical evaluations (Study Report Volume II). The third aim is to demonstrate Sandia's capability for timely, rigorous, and technical analysis to support emerging complex GNAS mission objectives.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Summary of Investigations on Technical Feasibility of Direct Disposal of Dual-Purpose Canisters

This study has evaluated the technical feasibility of direct disposal in a geologic repository, of commercial spent nuclear fuel (SNF) in dual-purpose canisters (DPCs) of existing designs. The authors, representing several national laboratories, considered waste isolation safety, engineering feasibility, thermal management, and postclosure criticality control. The 3-year study concludes that direct disposal is technically feasible for most DPCs, depending on the repository host geology. Postclosure criticality control, and thermal management strategies that allow permanent disposal within 150 years, are two of the most challenging aspects. This document summarizes technical results from a series of previous reports, and describes additional studies that can be done especially if site-specific information becomes available from one or more prospective repository sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Building Tune-Up Accelerator Program (Final Technical Report)

In 2016, the City of Seattle passed a mandatory Building Tune-Up requirement for all commercial buildings 50,000 square feet (SF) and larger as part of its Climate Action strategy. The requirement is phased in by size with large buildings (greater than 200,000 SF) required first. This allowed Seattle’s Office of Sustainability & Environment (OSE) to offer the Building Tune-Up Accelerator (TUA) Program to the “mid-size” building market (less than 100,000 SF) to meet the requirements early. With funding from the US DOE, a package of technical and financial support was developed for building owners and energy service providers to encourage this hard-to-reach market to participate in the tune-up—and even go beyond requirements for greater energy savings. Seattle City Light, the municipal electric utility, offered participants a simple per square foot financial incentive. Partners at the University of Washington Integrated Design Lab, Smart Buildings Center and Pacific Northwest National Lab (PNNL) offered service provider trainings, analytical tools and technical support. This final technical report summarizes the program, projected energy and emissions savings and lessons learned from program development to implementation to final evaluation for the 102 buildings that participated.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Technical Cooperation on Verification and its role in Trust Building [Slides]

Technical cooperation is a low-cost way to initiate movement in the arms control sphere and offers an operational path forward for the reestablishment of working relationships built on trust not freely given, but gained through experience, and a shared vision of the future; Political will alone, though necessary for cooperation to take place, is insufficient in the face of structural obstacles. For effective cooperation to have a future, countries must have both political will and complementary and conducive institutional structures; Cooperation at the intergovernmental level seems unlikely at this time. However, if relationships with international partners continue to be strained as development of new offensive technologies continues, it is very possible that future movement in technical arms control cooperation could again be initiated in the nongovernmental sphere; As the stewards of the majority of the world’s nuclear stockpile, the United States and the Russian Federation have a unique role to play in shaping global norms on arms control verification and cooperation; it is in their mutual interest now to begin to find technical solutions to the question of verification as other countries ramp up production.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Puget Sound Energy Glacier Energy Storage System: An Assessment of Battery Technical Performance

This report investigates the technical performance of the Glacier BESS facility, consisting of one 2 MW, 4 MWh BESS, based on a number of baseline and use case tests. Baseline tests were intended to assess the general technical capability of the BESS (e.g., stored energy capacity, ramp rate performance, ability to track varying charge/discharge commands, direct current (DC) battery internal resistance). Use case tests were used to examine the performance of the BESS while engaged in specific economic services (e.g., arbitrage, power factor correction). The project measured and/or calculated parameters that are important for understanding BESS performance when subjected to actual field operation for achieving economic benefits, e.g., round trip efficiency (RTE) with and without rest, with and without auxiliary loads, auxiliary power consumption, signal command tracking performance, temperature variations, parasitic power loss during power electronics switching during rest, and state of charge (SOC) excursions. These baseline and use case parameters were analyzed using recorded test results. In addition, the results and lessons presented herein are also beneficial for any task or effort that needs technical assessment on similar and different types of BESS based on field deployment results, since the assessment methodology remains the same.

25 ENERGY STORAGE↗

Technical & Programmatic Solutions for Direct Disposal of DPCs: Draft Outline and Staffing Plan

This is a work planning document that describes technical and programmatic goals for disposition of spent nuclear fuel (SNF) that is currently in dry storage in dual-purpose canisters (DPCs), or will be in the foreseeable future. It then describes how those goals can be promoted by a research and development (R&D) program. The needed R&D is compared to the ongoing work supported by the U.S. Department of Energy in FY18, and planned for FY19 and beyond. Some additional R&D activities are recommended, and plans are presented for technical integration activities that address the efficacy of the Direct Disposal of DPCs program (WBS 1.08.01.03.05), and integration with the overall Disposal Research program (WBS 1.08.01.03). The planned deliverable for this work package in FY19 (M2SF-1951\1010305051-Analysis of Solutions for DPC Disposal; 6/19/19) will be the product of this workplan. The deliverable will evaluate technical options for DPC direct disposal, taking into account the range ofpast and current DPC designs in the existing fleet. It will describe a set of goals for successful disposition of spent fuel in DPCs. It will analyze the scope and timing of needed R&D activities (R&D Plan), and discuss the uses of generic and site-specific analyses. Where appropriate, it will use alternative management cases to represent how DPC direct disposal could be incorporated in the overall geologic disposal program, given uncertainties in program direction and funding.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Workshop on Using a Git-based Repository for ASTM Committee Technical Knowledge Capture [Slides]

Consensus technical standards maintained by ASTM International rely on individual contributors to act as technical contacts, effectively stewards, for a particular standard. As a particular standard’s technical content evolves over time, the contact must update relevant tables, graphics, and supporting discussion. However, the details of the data sources and/or processes used to perform such updates may be separate enough from the standard such that expert knowledge is required to perform these updates. As a result of this need for expert knowledge, and the desire to capture that knowledge, subcommittee E10.05 (Nuclear Radiation Metrology) has experimented with using a git-based repository to capture data and processes to reproduce figures needed by E10.05 to maintain the ASTM standards under their jurisdiction. This workshop will provide an overview of the git-based repository site’s organization, operation, and outputs. It will then lead interested workshop participants through adding content, not yet already included in the repository to the site.

42 ENGINEERING↗

Bituminous Coal and Natural Gas to Electricity: >90% Capture Cases Technical Note

This technical note provides cost and performance estimates for post combustion carbon capture (PCCC) systems designed for greater than 90 percent capture on conventional PC- and NG-fueled power plants. The cost and performance estimates provided here were developed using the National Energy Technology Laboratory’s (NETL’s) well-documented methodology for conducting technoeconomic analysis of fossil energy conversion systems and leveraging published performance and cost projections for higher capture rate systems. Included in this technical note is a brief description of the method used to adjust select 90 percent capture cases from NETL’s Cost and Performance Baselines for Fossil Energy Systems Volume 1: Bituminous Coal and Natural Gas to Electricity, hereafter referred to as the Baseline Study. This technical note is intended to serve as an interim update to NETL’s Baseline Study cases by providing cost and performance estimates for high capture PCCC technology that can be deployed in the near-term at fossil-fueled electricity generating units.

20 FOSSIL-FUELED POWER PLANTS↗

PCOR Partnership Best Practices Manual for Subsurface Technical Risk Assessment of Geologic CO 2 Storage Projects

In 2003, the U.S. Department of Energy established the Regional Carbon Sequestration Partnerships (RCSP) Initiative to help develop technology, infrastructure, and regulations needed to facilitate large-scale carbon dioxide (CO 2 ) geologic storage (herein “storage”) and support deployment of commercial carbon capture and storage projects. The Plains CO 2 Reduction (PCOR) Partnership, led by the Energy & Environmental Research Center (EERC), is one of seven partnerships created by this program. The PCOR Partnership is publishing a series of best practices manuals for each of the four PCOR Partnership-defined primary technical elements of a storage site: site characterization; modeling and simulation; risk assessment; and monitoring, verification, and accounting. This document describes the risk assessment process for evaluating subsurface technical risks associated with a CO 2 storage project. This best practices manual identifies the key elements comprising a risk assessment for a CO 2 storage complex and defines important risk management terminology and technical factors that are unique to the geologic storage of CO 2 . It also provides best practices for implementing a risk assessment based on lessons learned from conducting risk assessments for storage complexes within the PCOR Partnership region. Case studies of these real-world examples, which highlight key aspects of applying the risk assessment process to storage projects, are provided to support the proposed best practices. The development of a best practice requires the execution of multiple projects where the knowledge gained and lessons learned are accumulated over time and integrated to yield a best practice. This development progression is an adaptive management process whereby best practices constantly evolve over time in response to knowledge gained and lessons learned. This document encompasses the current body-of-knowledge and best practices for applying a standardized risk assessment approach within risk management for storage projects. Application of these best practices will provide reliable and consistent standards for identifying project-related risks, analyzing the probabilities and potential impacts of these risks, evaluating which risks require treatment, and determining priority for treatment implementation. These best practices will continue to evolve and be refined over time as commercialization of the CO 2 storage industry proceeds.

54 ENVIRONMENTAL SCIENCES↗

Energy Northwest - Horn Rapids Solar and Storage: An Assessment of Battery Technical Performance

Chartered in 1957 as a joint action agency of the state, Energy Northwest (ENW) is a consortium of 27 public utility districts and municipalities across Washington state. ENW takes advantage of economies of scale and shared services to help utilities run their operations more efficiently and at lower cost, to the benefit of more than 1.5 million customers. ENW develops, owns, and operates a diverse mix of electricity generating resources, including hydro, solar, and wind projects – and the Northwest’s only active nuclear energy facility. These projects provide enough reliable, affordable, and environmentally responsible energy to power more than a million homes each year, and that carbon-free electricity is provided at the cost of generation. The agency continually explores new generation projects to meet its members’ needs. In 2017, as part of the second round of funding from the Washington state Clean Energy Fund, the Washington State Department of Commerce granted up to $3 million in matching funds to develop an estimated $6.5 million project that deployed a 4-MW, 20-acre solar generating array of photovoltaic (PV) panels coupled with a 1 MW/5.5 MWh lithium-iron-phosphate battery energy storage system (BESS) in Richland, Washington. The combination of PV and BESS will provide a predictable, renewable generating source and will also serve as a training ground for solar and battery technicians throughout the nation. The City of Richland will purchase the power from the project and utilize the benefits of the energy storage. The project provides Washington state with its first opportunity to integrate a large-scale solar and storage facility into its clean mix of hydro, nuclear, and wind resources. This first-of-its-kind facility combines solar generation with battery storage and technician training. In 2019, Pacific Northwest National Laboratory (PNNL) worked with ENW to assess the integrated PV and BESS in representative use cases that could benefit the City of Richland. Between March and May 2022, extensive testing was conducted, and the results were used to assess the technical performance of the BESS subjected to actual field operations. Both reference performance and use case tests were performed: (A) Reference performance tests assess the general technical capabilities of the BESS, such as energy capacity, round-trip efficiency (RTE), ramp rate, and signal tracking capability. These are the first tests performed (baseline), and they are repeated after use case tests (post cycle). A standardized U.S. Department of Energy (DOE) energy storage performance protocol was used to characterize the BESS, including representative duty cycle profiles, test procedure guidance, and calculation guidance for determining key characteristics. (B) Use case tests examine the performance of the BESS for specific use cases using duty cycles developed by PNNL in collaboration with ENW. Five use cases were selected for testing: 1) demand charge reduction, 2) load shaping, 3) transmission charge reduction, 4) Volt-VAR service, and 5) outage mitigation. The use case duty cycles were developed based on utility and site-specific characteristics in addition to the technical characteristics and physical capabilities of the BESS. Use case tests were performed between the baseline and post cycle tests. This report describes the BESS and its components, presents testing and performance analysis results, and shares key insights and lessons learned from this project. Outcomes of the tests and analyses will help ENW understand the performance of the Horn Rapids BESS in its current state and design appropriate operational strategies for this and other BESSs over the long term.

14 SOLAR ENERGY↗

Technical Basis for Advanced Artificial Intelligence and Machine Learning Adoption in Nuclear Power Plants

The research and development reported here is part of the Technology Enabled Risk-Informed Maintenance Strategy project sponsored by the U.S. Department of Energy’s Light Water Reactor Sustainability program. The primary objective of the research presented in this report is to produce a technical basis for developing explainable and trustable artificial intelligence (AI) and machine learning (ML) technologies. The technical basis will lay the foundation for addressing the technical and regulatory adoption challenges of AI/ML technologies across plant assets and the nuclear industry at scale and to achieve seamless cost-effective automation without compromising plant safety and reliability.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Technical Bases for Consequence Analyses Using MACCS (MELCOR Accident Consequence Code System)

The use of MELCOR Accident Consequence Code System (MACCS) in regulatory applications requires that input parameters used in MACCS models have a defensible and transparent technical basis. The existing technical basis for MACCS parameters was identified and updates were developed based on current data and information. The transparent way these updates are documented provides a technical basis for updating MACCS parameters with consistent application among the MACCS user community.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Workshop on Establishing and Operating a National Nuclear Security Support Centre Hypothetical Scenario: “Centralia Nuclear Security Support Centre Technical Support Plan”

This plan outlines the systemic and coordinated management of the CNSSC technical support programme. In accordance with the CNSSC Strategy Implementation Plan and Memoranda of Understanding among stakeholders, Centralia Border Guards (CBG) and Centralia Nuclear Energy Agency (CNEA) will lead the effort to develop standardized approach to technical support and will provide technical support to the following CNSSC stakeholders: CBG, CNEA, Centralia National Police (CNP), Centralia Coast Guard (CCG), and CentrAtom/Centralia Nuclear Power Plant (CNPP).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

OPALCO - Decatur Island Solar and Energy Storage Project: An Assessment of Battery Technical Performance

Orcas Power & Light Cooperative (OPALCO) is a member-owned, nonprofit cooperative utility that provides energy services to approximately 11,200 customers across 20 islands in San Juan County, Washington. OPALCO’s mostly hydroelectric power is generated by Bonneville Power Administration and delivered to the islands by submarine cables. In 2016, as part of the second round of funding from the Washington state Clean Energy Fund, OPALCO received a $1 million matching grant to support a project that deployed a 504-kW LG community photovoltaic (PV) system in combination with a 1 MW/2 MWh lithium-iron-phosphate battery energy storage system (BESS) on Decatur Island, Washington. The Decatur Island Substation is essential to ensuring reliable energy for the residents of the San Juan Islands as it is the point of interconnection with the mainland transmission system. The BESS, in combination with the community solar array, will deliver an innovative method to both defer the costly upgrade of the transmission system and allow for other high-value applications intended to benefit the utility and its customers. In 2018, Pacific Northwest National Laboratory (PNNL) completed a preliminary economic assessment for several identified use cases in collaboration with OPALCO. Between August 2021 and May 2022, extensive testing was conducted, and the results were used to assess the technical performance of the BESS subjected to actual field operations. Both reference performance and use case tests were performed: (a) Reference performance tests assess the general technical capabilities of the BESS, such as energy capacity, round-trip efficiency (RTE), ramp rate, and signal tracking capability. These are the first tests performed (baseline) and are repeated after use case tests (post cycle). A standardized U.S. Department of Energy (DOE) energy storage performance protocol was used to characterize the BESS, including representative duty cycle profiles, test procedure guidance, and calculation guidance for determining key characteristics. (b) Use case tests examine the performance of the BESS for specific use cases using duty cycles developed by PNNL in collaboration with OPALCO. Four use cases were selected for testing: 1) demand charge reduction, 2) load shaping, 3) outage mitigation, and 4) transmission deferral. The use case duty cycles were developed based on utility and site-specific characteristics in addition to the technical characteristics and physical capabilities of the BESS. Use case tests were performed between the baseline and post cycle tests. This report describes the BESS and its components, presents testing and performance analysis results, and shares key insights and lessons learned from this project. Outcomes of the tests and analyses will help OPALCO understand the performance of the Decatur Island BESS in its current state and design appropriate operational strategies for this and other BESSs over the long term.

14 SOLAR ENERGY↗

A Guide for Improved Resource Adequacy Assessments in Evolving Power Systems: Institutional and Technical Dimensions

This paper identifies and evaluates issues in traditional resource adequacy (RA) assessment practices, and how adjusting these practices may affect and depend on existing institutional arrangements for planning and procurement. The paper proposes a technical-institutional roadmap that would allow regulators in vertically-integrated jurisdictions and system planners and operators in restructured jurisdictions to revise RA practices across a range of components. First, we compile a critical review of current RA assessment practices based on (1) interviews with RA practitioners and (2) a review of recent technical literature. We find that (i) RA may need to expand beyond capacity adequacy to ensure energy adequacy – relevant for energy-limited resources such as storage – and potentially some form of ancillary service adequacy (e.g. enough ramping-up and ramping-down capability in the system); (ii) chronological hourly simulations for all hours in the year are the current best practice; (iii) metrics and models used do not reflect economic criteria in system operation and loss of load; and (iv) there is a need to improve representation of weather dependencies and weather data. Second, we review planning and RA reports for several private and public entities that plan generation and/or transmission infrastructure in the continental U.S. to look for existing practices involving resilience assessments. We find no systematic treatment of the costs of extreme weather and other hazards, the benefits of resilience, and resilience metrics in planning analyses and no systematic treatment of resilience metrics, methods, and outcomes for resource adequacy purposes. Third, we create a technical framework for probabilistic RA assessment and use it to study how key choices about how to model power system operations affect the values that are obtained for RA metrics. We find that (i) non-economic dispatch schemes that ignore economic objectives can lead to accurate RA assessments when coordinated with detailed operational strategies; (ii) multi-year data is critical to capture a wide variety of system conditions; (iii) not incorporating transmission limits into RA assessment could lead to substantial underestimation of traditional “expected value” RA metrics; and (iv) new RA metrics that capture event-specific shortfall characteristics should be used as supplements to traditional metrics. Finally, we examine RA assessments and use this information to propose a guide of evolving industry standards for resource adequacy assessments in resource planning and transmission planning. We report minimum, best, and frontier practices for temporal resolution of assessments, metrics and targets, weather data, load forecasting, characterization of variable renewable resources, characterization of transmission and market transactions, RA modeling and integration with planning processes, and capacity accreditation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development and Bench-Scale Testing of a Novel Biphasic Solvent-Enabled Absorption Process for Post-Combustion Carbon Capture (Final Technical Report)

A new class of biphasic solvents was developed, and the concept of the enabled carbon dioxide (CO 2 ) absorption process was tested for post-combustion carbon capture in our previous lab-scale research. The primary goals of this project were to advance the development of the novel biphasic CO 2 absorption process (BiCAP) and validate its technical advantages by testing the integrated technology at a 40 kWe bench-scale with actual coal-derived flue gas in a power plant environment. The project was led by the University of Illinois at Urban-Champaign (UIUC), and Trimeric Corporation served as a sub-awardee providing support in basic design and techno-economic studies. To achieve the project goals and objectives, solvent management studies, process modeling and optimization, bench-scale equipment design, construction and testing, and technical, economic and environmental assessments have been conducted. The two top-performing biphasic solvents developed in our previous research were used in this project. Biphasic solvent emissions and control were investigated in the laboratory. The emissions of the biphasic solvents from the absorber were comparable to or lower than the reference 30 wt% monoethanolamine (MEA) solution, while they could be more effectively removed in the water wash column. Lab-scale testing of solvent degradation reclamation has revealed that vacuum distillation was feasible for biphasic solvent reclamation. Aspen Plus models were used to optimize the BiCAP, and a CO 2 stripping configuration introducing a secondary cold solvent feed to the stripper was identified to be the most energy efficient. A 40 kWe bench-scale, integrated BiCAP system was successfully designed, fabricated, and installed at the UIUC’s Abbott Power Plant. Parametric testing with synthetic flue gas has demonstrated that the two biphasic solvents required a more than 40% lower heat duty for CO 2 desorption as compared to the reference MEA tested on the same bench-scale skid. Slipstream testing with actual coal flue gas for a total of 31 days in two test campaigns has further demonstrated stable operation of the bench-scale skid. During the first campaign targeting 90% CO 2 removal, the heat duty averaged at 2,183 MJ/tonne of CO 2 captured and during the second campaign targeting 95% removal, the heat duty averaged at 2,450 MJ/tonne of CO 2 captured. A techno-economic analysis has revealed that for integration of the BiCAP into a 650-MWe pulverized coal-fired power plant, the parasitic power loss was reduced by ~20%, and the cost of CO 2 capture was reduced by ~21% ($36.3/tonne on a December 2018 dollar basis) compared to the U.S. Department of Energy (DOE)’s baseline Case B12B. As progression from this bench-scale development effort, a new project “Engineering-Scale Testing of the Biphasic Solvent Based CO 2 Absorption Capture Technology at a Covanta Waste-to-Energy Facility” was awarded by the DOE, launched in February 2023, to allow the team to further test the technology and demonstrate its technical and economic advantages at a pilot scale.

20 FOSSIL-FUELED POWER PLANTS↗