Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TERMINAL FACILITIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Clean-out and Reuse of GCEP Facilities at Portsmouth

PORTS began operations in 1956 to enrich uranium for both civilian and military use. It operated under Goodyear Atomic Corporation and Lockheed-Martin as a government-owned contractor-operated facility until the formation of the United States Enrichment Corporation (USEC) as a government corporation in 1993. In 1998, USEC was privatized as a publicly traded corporation. USEC leases the Portsmouth and Paducah GDPs from the U.S. Department of Energy (DOE). Enrichment operations were terminated at Portsmouth in 2001, although USEC continues to lease and maintain the Portsmouth GDP in Cold Shutdown and conduct some DOE projects there. LPP found that removal of old equipment to allow reuse of a facility can present unexpected challenges. Classified components create significant logistics issues. In this case, teamwork and attention to detail by USEC, LATA/Parallax, and DOE resulted in solutions and success. Lessons learnt: - Transportation logistics are particularly important when shipping waste streams with special requirements. - Investment in extra equipment yields tangible benefits where other resources (cleared drivers) are scarce. - An early start to providing specially qualified drivers, in this case providing security clearances, is essential. Availability is limited, and the time required to qualify new drivers may be lengthy. - A dedicated communications station, rather than reliance on existing resources (shift superintendent), is invaluable.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

On the drag of model dendrite fragments at low Reynolds number

An experimental study of low Reynolds number drag on laboratory models of dendrite fragments has been conducted. The terminal velocities of the dendrites undergoing free fall along their axis of symmetry were measured in a large Stokes flow facility. Corrections for wall interference give nearly linear drag vs Reynolds number curves. Corrections for both wall interference and inertia effects show that the dendrite Stokes settling velocities are always less than that of a sphere of equal mass and volume. In the Stokes limit, the settling speed ratio is found to correlate well with the primary dendrite arm aspect ratio and a second dimensionless shape parameter which serves as a measure of the fractal-like nature of the dendrite models. These results can be used to estimate equiaxed grain velocities and distance of travel in metal castings. The drag measurements may be used in numerical codes to calculate the movement of grains in a convecting melt in an effort to determine macrosegregation patterns caused by the sink/float mechanism.

Zakhem, R.↗

On the drag of model dendrite fragments at low Reynolds number

An experimental study of low Reynolds number drag on laboratory models of dendrite fragments has been conducted. The terminal velocities of the dendrites undergoing free fall along their axis of symmetry were measured in a large Stokes flow facility. Corrections for wall interference give nearly linear drag vs Reynolds number curves. Corrections for both wall interference and inertia effects show that the dendrite Stokes settling velocities are always less than that of a sphere of equal mass and volume. In the Stokes limit, the settling speed ratio is found to correlate well with primary dendrite arm aspect ratio and a second dimensionless shape paremeter which serves as a measure of the fractal-like nature of the dendrite models. These results can be used to estimate equiaxed grain velocities and distance of travel in metal castings. The drag measurements may be used in numerical codes to calculate the movement of grains in a convecting melt in an effort to determine macrosegregation patterns caused by the sink/float mechanism.

Zakhem, R.↗

STS-49 Endeavour/Compiled Video for Editors

Compiled footage includes shots taken of the rollout of Endeavour at Palmdale, CA, the departure and arrival of Endeavour for Kennedy Space Center (KSC), main engine three installation, solid rocket booster (SRB) segment lift and stack at the Vehicle Assembly Building (VAB), external tank mate to SRB, Intelsat rotation at the Vertical Processing Facility (VPF), Endeavour rollover from the Orbiter Processing Facility (OPF) to VAB, rollout to Pad B, and the flight readiness firing (FRF). The crew is seen during the Terminal Countdown and Demonstration Test (TCDT) training activities, at breakfast, suiting up, and exiting the Operations and Checkout (O&C) Building.

Source record↗

Space-to-Ground Optical Interface Verification for the Orion Artemis II Optical (O2O) Communications Demonstration

The Orion Artemis II Optical Communications (O2O) system will demonstrate the operational utility of laser communications for the first crewed Artemis mission scheduled to launch next year. O2O will provide an optical link with data rates up to 260 Mbps return from the moon and up to 20 Mbps forward to the moon. The optical link employs a Serially Concatenated Pulse Position Modulation (SCPPM) communications signal, compliant with the Consultative Committee for Space Data Systems (CCSDS) standard, and a modulated uplink beacon for acquisition and collaborative tracking. O2O employs optical ground stations located at the White Sands Complex (WSC) and Table Mountain Facility (TMF) to support the Earth end of the link. We describe interface testing performed between the space and ground terminals to verify the physical layer communication and beacon signals.

optical↗

Aviation meteorology research and development: A status report

The dynamic and rapid growth of technology in the area of aviation meteorology research and development are described with emphasis on the measurement of hazardous weather phenomena. Aspects of both onboard instrumentation and ground based facilities are evaluated in terms of their effectiveness of in avoiding hazards due to atmospheric electricity and lightning. Methods of alleviating terminal are hazards such as fog, low visibility and ceilings are also described.

Enders, J.↗

Goldstone solar system radar

Planning, direction, experimental design, and coordination of data-acquisition and engineering activities in support of all Goldstone planetary radar astronomy were performed. This work demands familiarity with the various components of a planetary radar telescope (transmitter, receiver, antenna, computer hardware and software) as well as knowledge of how the entire system must function as a cohesive unit to meet the particular scientific objectives at hand in a given observation. Support radar data-processing facilities, currently being used for virtually all Goldstone data reduction includes: a VAX 11/780 computer system, an FPS 5210 array processor, terminals, tape drives, and image-display devices, as well as a large body of data-reduction software to accommodate the variety of data-acquisition formats and strategems. Successful 113-cm radar observation of Callisto and the near-Earth asteroid 1981 Midas and Goldstone/VLA radar observations of Saturn's rings were obtained. Quick-look verification programs from data taken with phase-coded cw (i.e., ranging) waveforms, applicable to Venus, the Moon, and small bodies were completed. Definition of scientific and engineering requirements on instrument performance, radar system configuration, and personnel, for all 1988 Goldstone radar investigations was accomplished.

Jurgens, Raymond F.↗

EDOS Data Capture for ALOS

In 2008, NASA's Earth Sciences Missions Operations (ESMO) at Goddard Space Flight Center (GSFC) directed the Earth Observing System Data Operations System (EDOS) project to provide a prototype system to assess the feasibility of high rate data capture for the Japan Aerospace Exploration Agency's (JAXA) Advanced Land Observing Satellite (ALOS) spacecraft via NASA's Tracking and Data Relay Satellite System (TDRSS). The key objective of this collaborative effort between NASA and JAXA was to share science data collected over North and South America previously unavailable due to limitations in ALOS downlink capacity. EDOS provided a single system proof-of-concept in 4 months at White Sands TDRS Ground Terminal The system captured 6 ALOS events error-free at 277 Mbps and delivered the data to the Alaska Satellite Facility (ASF) within 3 hours (May/June '08). This paper describes the successful rapid prototyping approach which led to a successful demonstration and agreement between NASA and JAXA for operational support. The design of the operational system will be discussed with emphasis on concurrent high-rate data capture, Level-O processing, real-time display and high-rate delivery with stringent latency requirements. A similar solution was successfully deployed at Svalbard, Norway to support the Suomi NPP launch (October 2011) and capture all X-band data and provide a 30-day backup archive.

McLemore, Bruce↗

The Architecture of the Laser Communications Relay Demonstration Ground Stations: An Overview

NASA's Laser Communication Relay Demonstration (LCRD) will be NASA's first long-duration demonstration of laser communications (lasercom) in space, providing geosynchronous-satellite-hosted bidirectional relay services between two Earth ground stations. LCRD will leverage and enhance existing ground stations. Ground Station 1 (GS-1) will leverage the Optical Communications Telescope Laboratory (OCTL) built by JPL, while Ground Station 2 (GS-2) will leverage the Lunar Laser Communications Demonstration (LLCD) Ground Terminal (LLGT) built by MIT Lincoln Laboratory. While each ground system has unique telescopes and integrated optics, many of the backend subsystems (e.g., communications, environmental monitoring, control, user simulators) will be common to both terminals. Here we provide an overview of the architecture of the LCRD ground stations, and the planned enhancements to the existing facilities.

deformable mirror↗

Structural basis of HIV inhibition by translocation-defective RT inhibitor 4'-ethynyl-2-fluoro-2'-deoxyadenosine (EFdA)

4'-Ethynyl-2-fluoro-2'-deoxyadenosine (EFdA) is the most potent nucleoside analog inhibitor of HIV reverse transcriptase (RT). It retains a 3'-OH yet acts as a chain-terminating agent by diminishing translocation from the pretranslocation nucleotide-binding site (N site) to the posttranslocation primer-binding site (P site). Also, facile misincorporation of EFdA-monophosphate (MP) results in difficult-to-extend mismatched primers. To understand the high potency and unusual inhibition mechanism of EFdA, we solved RT crystal structures (resolutions from 2.4 to 2.9 Å) that include inhibition intermediates ( i ) before inhibitor incorporation (catalytic complex, RT/DNA/EFdA-triphosphate), ( ii ) after incorporation of EFdA-MP followed by dT-MP (RT/DNA EFdA-MP P • dT-MP N ), or ( iii ) after incorporation of two EFdA-MPs (RT/DNA EFdA-MP P • EFdA-MP N ); ( iv ) the latter was also solved with EFdA-MP mismatched at the N site (RT/DNA EFdA-MP P • EFdA-MP *N ). We report that the inhibition mechanism and potency of EFdA stem from interactions of its 4'-ethynyl at a previously unexploited conserved hydrophobic pocket in the polymerase active site. Furthermore, the high resolution of the catalytic complex structure revealed a network of ordered water molecules at the polymerase active site that stabilize enzyme interactions with nucleotide and DNA substrates. Finally, decreased translocation results from favorable interactions of primer-terminating EFdA-MP at the pretranslocation site and unfavorable posttranslocation interactions that lead to observed localized primer distortions.

59 BASIC BIOLOGICAL SCIENCES↗

PROGRESS IN REDUCING THE NUCLEAR THREAT: UNITED STATES PLUTONIUM CONSOLIDATION AND DISPOSITION

Following the end of the Cold War, the United States identified 61.5 metric tons (MT) of plutonium and larger quantities of enriched uranium that are permanently excess to use in nuclear weapons programs. The Department of Energy (DOE) also began shutting down, stabilizing, and removing inventories from production facilities that were no longer needed to support weapons programs and non-weapons activities. The storage of 'Category I' nuclear materials at Rocky Flats, Sandia National Laboratories, and several smaller sites has been terminated to reduce costs and safeguards risks. De-inventory continues at the Hanford site and the Lawrence Livermore National Laboratory. Consolidation of inventories works in concert with the permanent disposition of excess inventories, including several tonnes of plutonium that have already been disposed to waste repositories and the preparation for transfers to the planned Mixed Oxide (MOX) Fuel Fabrication Facility (for the bulk of the excess plutonium) and alternative disposition methods for material that cannot be used readily in the MOX fuel cycle. This report describes status of plutonium consolidation and disposition activities and their impacts on continuing operations, particularly at the Savannah River Site.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of real-time ATC simulation facility

The Flight Transportation Laboratory has developed a real time interactive Air Traffic Control simulation facility designed to provide a versatile and easy to use tool for research and experimentation involving air traffic control. The facility uses a VAX-11/750 as the central computer. The SANDERS GRAPHICS-7 display system is used to simulate air traffic control displays. Pseudo-pilot displays are provided on Texas Instruments TI940 video terminals. Finally, a custom designed audio system driven by a Z-80 and interfaced with the VAX provides voice communication between the air traffic controllers and the pseudo-pilots. The audio system provides computer controlled voice disguising and thus allows each aircraft to have its own audio characteristics and provides an added realism to the experiment. The facility can accommodate multiple controller stations and pseudo-pilot stations. Each station is manned by a single operator who has a large repertoire of commands with which to control his/her display and the simulated aircraft under his/her jurisdiction. An additional console and a distinct set of commands allow full controllability of the simulation environment by the experimenter in real time.

Pararas, J.↗

Narrowing transient testing pulse widths to enhance LWR RIA experiment design in the TREAT facility

The Transient Reactor Test (TREAT) Facility provided thousands of transient irradiations and plays a crucial role in nuclear-heated safety research. The facility’s flexible design and multi-mission nature saw historic experiments for numerous reactor fuels and transient types but was never specifically adapted to address very-brief pulse transients akin to postulated Light Water Reactor (LWR) Reactivity Initiated Accidents (RIA). Since the behaviors of fuel under these conditions depends strongly on energy input duration and resulting cladding time/temperature response under pellet cladding mechanical interactions, this three-year project was conceived to investigate new pulse-narrowing capabilities. Kinetic models showed incremental improvements for minor facility enhancements including increased reactivity step insertions (to initiate the power pulse) and slightly-increased transient rod drive speed for pulse termination (“clipping”). Replacing peak fuel assemblies, repositioning non-transient control rods to hold down the “hot side” of the core, and balancing against required excess reactivity needs, the limiting fuel assembly power can be reduced by ~20 %. Furthermore, this is a remarkable discovery of latent capability in TREAT, not only in enabling the subject capabilities for reduced pulse widths, but also significantly “uprating” the core’s transient energy capacity. Incremental improvements can likely enhance TREAT’s capability into BWR-relevant missions; briefer PWR pulse shapes can only be achieved with an advanced clipping system. Helium-3 ( 3 He) was found to offer the greatest benefits for clipping design and overall performance. A unique concept showed great promise for enabling a 3 He-based system with a reasonable cost; this design concept will likely become the focal point of future work.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Mechanism and kinetics of light alkane dehydrogenation and cracking over isolated Ga species in Ga/H-MFI

The objective of this study is to examine the mechanisms and kinetics of C2H6 dehydrogenation and n-C4H10 dehydrogenation and cracking over isolated Ga species in Ga/HMFI and to compare these results to those reported previously for C3H8 dehydrogenation and cracking. C2H6 dehydrogenation is found to be catalyzed by both [GaH]2+ and [GaH2]+ cations at similar turnover frequencies. Rate measurements over Ga/H-MFI containing predominantly [GaH2]+ cations reveal that C2H6 dehydrogenation rates exhibit a Langmuir.Hinshelwood dependence on C2H6 partial pressure at elevated temperatures (>730 K), consistent with the involvement of chemisorbed [C2H5.GaH]+ species. The reaction kinetics suggest that C2H6 dehydrogenation proceeds via heterolytic C-H cleavage of adsorbed C2H6 by [GaH2]+ cations to form H2 and [C2H5-GaH]+ species, which further decompose via β-hydride elimination to form C2H4. By contrast, C4H10 dehydrogenation and both terminal and central cracking are catalyzed exclusively by [GaH]2+ cations. All three reactions exhibit a Langmuir-Hinshelwood dependence on C4H10 partial pressure and are inhibited by H2. Ratios of dehydrogenation to cracking (total) and terminal to central cracking are approximately independent of C4H10 partial pressure consistent with the involvement of a common C4H10-derived surface intermediate. The observed reaction kinetics are consistent with an alkyl-mediated mechanism occurring over [GaH]2+, analogous to that reported previously for C3H8 dehydrogenation/cracking over Ga/H-MFI (Phadke, N. M.; et al. J. Am. Chem. Soc. 2019, 141, 1614-1627). The mechanism proceeds via facile, heterolytic dissociation of adsorbed C4H10 to form [C4H9-GaH]+-H+ cation pairs via methyl C-H-activated pathways. Dehydrogenation then proceeds via β-hydride elimination, respectively, forming butene, while terminal and central cracking proceed via C-H-activated H+ attack. Methylene activation was also considered but found to occur at a significantly lower rate. Theoretical analysis of the proposed reaction pathways leads to apparent activation enthalpies in good agreement with values extracted from the measured kinetics, thereby supporting the proposed pathways and the roles of [GaH]2+ and [GaH2]+ cations in the dehydrogenation and cracking of light alkanes on Ga/H-MFI.

Phadke, NM↗

BioSiting Tool (BioSiting) v2

The BioSiting Tool provides a geospatial interface for analyzing bioeconomy resources and infrastructure across the continental U.S. The tool integrates empirical and modeled data from a broad range of sources. Bioeconomy resources mapped in the tool include agricultural residues, forest residues, municipal solid waste streams, food waste, manure, fats, oils and greases and potential yields of energy crops. Infrastructure mapped in the tool includes biorefineries, material recovery facilities, anaerobic digesters, wastewater treatment plants, combustion plants, district energy systems, crude oil pipelines, petroleum pipelines, natural gas pipelines, railways and freight terminals. Additional data layers include environmental justice indicators at the census tract level and carbon dioxide geologic storage potential. Users can select a location on the map, define a buffer radius in kilometers and generate an inventory of all bioecomony resources within the buffer zone. Data from the tool can be downloaded from individual buffer zones, or at the state or national level.

Huntington, Tyler↗

Design and implementation of a telecommunication interface for the TAATM/TCV real-time experiment

The traffic situation display experiment of the terminal configured vehicle (TCV) research program requires a bidirectional data communications tie line between an computer complex. The tie line is used in a real time environment on the CYBER 175 computer by the terminal area air traffic model (TAATM) simulation program. Aircraft position data are processed by TAATM with the resultant output sent to the facility for the generation of air traffic situation displays which are transmitted to a research aircraft.

Nolan, J. D.↗

Flight test evaluation of the Stanford University/United Airlines differential GPS Category 3 automatic landing system

Test flights were conducted to evaluate the capability of Differential Global Positioning System (DGPS) to provide the accuracy and integrity required for International Civil Aviation Organization (ICAO) Category (CAT) 3 precision approach and landings. These test flights were part of a Federal Aviation Administration (FAA) program to evaluate the technical feasibility of using DGPS based technology for CAT 3 precision approach and landing applications. A United Airlines Boeing 737-300 (N304UA) was equipped with DGPS receiving equipment and additional computing capability provided by Stanford University. The test flights were conducted at NASA Ames Research Center's Crows Landing Flight Facility, Crows Landing, California. The flight test evaluation was based on completing 100 approaches and autolandings; 90 touch and go, and 10 terminating with a full stop. Two types of accuracy requirements were evaluated: 1) Total system error, based on the Required Navigation Performance (RNP), and 2) Navigation sensor error, based on ICAO requirements for the Microwave Landing System (MLS). All of the approaches and autolandings were evaluated against ground truth reference data provided by a laser tracker. Analysis of these approaches and autolandings shows that the Stanford University/United Airlines system met the requirements for a successful approach and autolanding 98 out of 100 approaches and autolandings, based on the total system error requirements as specified in the FAA CAT 3 Level 2 Flight Test Plan.

Kaufmann, David N.↗