Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Steam generator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Synchronous Machine Governor Upgrade

Conventional generation sources play a critical role in the stability and reliability of the electrical grid, particularly as we transition towards more renewable energy sources. To understand and accurately emulate their behavior for optimizing grid operations and ensuring seamless integration with renewable technologies, it is essential to better emulate the grid- and plant-level impacts of conventional generation sources, such as natural gas (NG) driven heat recovery steam generators (HRSGs) and combustion turbines (CTs). Therefore, a governor model is developed in a programmable logic controller (PLC) to investigate the performance of the conventional generator under various dynamic operating conditions and to identify the impact on grid stability in a controlled environment. The governor model aims to enable the hardware-in-the-loop (HIL) based emulation of these conventional generation sources using the existing 2 MVA synchronous machine/generator that is driven by a flexible 2.5 MW variable speed drive. This setup will allow us to replicate the dynamic characteristics and response behaviors of NG-driven HRSGs and CTs. The controls for the emulated conventional plants follow the industry standard and are adjustable, ensuring they accurately reflect the operational capabilities and limitations of real-world systems. These controls include load-following capabilities, ramp rates, startup and shutdown sequences, and emissions characteristics. By incorporating these adjustable controls, we aim to capture the nuanced impacts of conventional generation, such as their ability to provide ancillary services like frequency regulation, voltage support, and spinning reserve. In this report, we simulate two types of dynamic operations: grid-connected and islanding. For each dynamic operation, representative starting sequences are tested, including turbine purge, ignition, speed ramping up, generator excitation and synchronizing, and breaker close. The HIL based tests provides insights for field deployment, specifically the high-fidelity governor model provides results to predict the potential stability and reliability risk and suggest possible integration measures (e.g., generation and load balancing, tuning of governor control parameters). Ultimately, this enhanced emulation capability will be integrated into our Advanced Research on Integrated Energy Systems (ARIES), enabling us to conduct comprehensive studies on the interactions between conventional and renewable energy sources. By better understanding these interactions, we can develop strategies to optimize the overall performance and reliability of the grid. This will support the deployment of advanced grid management techniques, such as demand response, grid-forming inverters, and energy storage systems. The main contributions are summarized as follows: (1) This report introduces a PLC-based governor model for gas turbines. This model accurately simulates the dynamic behavior of conventional generation sources under various operational scenarios; (2) The model is integrated with an HIL testbed that includes a 2.5 MW variable speed drive and a 2 MVA synchronous machine. This setup enables realistic, real-time emulation of conventional power plants, particularly NG driven HRSGs and CTs; (3) The developed model is adaptable to various gas turbine configurations and allows for precise control over parameters such as MW ramp rates. This flexibility makes it a valuable tool for future research and industry collaboration; and (4) By incorporating the model into the National Renewable Energy Laboratory's Advanced Research on Integrated Energy Systems, the report lays the groundwork for future studies on interactions between conventional and renewable energy sources, enhancing the ability to develop advanced grid management strategies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced virtual energy simulation training and research: IGCC with CO2 capture power plant

In this presentation, we highlight the deployment of a real-time dynamic simulator of an integrated gasification combined cycle (IGCC) power plant with CO{sub 2} capture at the Department of Energy's (DOE) National Energy Technology Laboratory's (NETL) Advanced Virtual Energy Simulation Training and Research (AVESTARTM) Center. The Center was established as part of the DOE's accelerating initiative to advance new clean coal technology for power generation. IGCC systems are an attractive technology option, generating low-cost electricity by converting coal and/or other fuels into a clean synthesis gas mixture in a process that is efficient and environmentally superior to conventional power plants. The IGCC dynamic simulator builds on, and reaches beyond, conventional power plant simulators to merge, for the first time, a 'gasification with CO{sub 2} capture' process simulator with a 'combined-cycle' power simulator. Fueled with coal, petroleum coke, and/or biomass, the gasification island of the simulated IGCC plant consists of two oxygen-blown, downward-fired, entrained-flow, slagging gasifiers with radiant syngas coolers and two-stage sour shift reactors, followed by a dual-stage acid gas removal process for CO{sub 2} capture. The combined cycle island consists of two F-class gas turbines, steam turbine, and a heat recovery steam generator with three-pressure levels. The dynamic simulator can be used for normal base-load operation, as well as plant start-up and shut down. The real-time dynamic simulator also responds satisfactorily to process disturbances, feedstock blending and switchovers, fluctuations in ambient conditions, and power demand load shedding. In addition, the full-scope simulator handles a wide range of abnormal situations, including equipment malfunctions and failures, together with changes initiated through actions from plant field operators. By providing a comprehensive IGCC operator training system, the AVESTAR Center is poised to develop a workforce well-prepared to operate and control commercial-scale gasification-based power plants capable of 90% pre-combustion CO{sub 2} capture and compression, as well as low sulfur, mercury, and NOx emissions. With additional support from the NETL-Regional University Alliance (NETL-RUA), the Center will educate and train engineering students and researchers by providing hands-on 'learning by operating' experience The AVESTAR Center also offers unique collaborative R&D opportunities in high-fidelity dynamic modeling, advanced process control, real-time optimization, and virtual plant simulation. Objectives and goals are aimed at safe and effective management of power generation systems for optimal efficiency, while protecting the environment. To add another dimension of realism to the AVESTAR experience, NETL will introduce an immersive training system with innovative three-dimensional virtual reality technology. Wearing a stereoscopic headset or eyewear, trainees will enter an interactive virtual environment that will allow them to move freely throughout the simulated 3-D facility to study and learn various aspects of IGCC plant operation, control, and safety. Such combined operator and immersive training systems go beyond traditional simulation and include more realistic scenarios, improved communication, and collaboration among co-workers.

01 COAL, LIGNITE, AND PEAT↗

Assessment of NGNP Moisture Ingress Events

An assessment of modular HTGR moisture ingress events, making use of a phenomena identification and ranking process, was conducted by a panel of experts in the related areas for the U.S. next generation nuclear plant (NGNP) design. Consideration was given mainly to the prismatic core gas-cooled reactor configurations incorporating a steam generator within the primary circuit.

42 ENGINEERING↗

Methods of Heat-Exchange Intensification in NPP Equipment

The aims and problems of research on the means for intensifying heat exchange in the equipment of nuclear power plants are examined: nuclear reactors, steam generators, turbine condensers, heat-exchangers of dry water cooling towers, intermediate separators-steam superheaters of turbines, heat-exchange apparatus of safety systems, turbo-electro-generators, oil coolers, feed-water heaters. Methods of identifying heat-exchange are analyzed: different types of finning, turbulence generators and swirlers of one- and two-phase flows, coating on heating surfaces, systems with mixed flow. Computational recommendations are made for determining the intensity of heat emission from promising types of heat-exchange surfaces: bundles of lowfinned tubes and spiral coils.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Competitiveness Assessment of Decarbonizing Electricity and Process Heat Supply to a Campus with a Small Nuclear Reactor

This paper analyzes the competitiveness of siting a small nuclear reactor to support decarbonization of sites requiring tens of MW of electricity and/or process heat to support centralized heating and cooling system. This paper focuses on campuses as representative of sites with collections of buildings and research facilities with decarbonization needs represented by buildings heating, and electricity consumption by electrical loads which may include cooling via chilled water (e.g., for air conditioning and to cool down computer clusters). A nuclear reactor can be considered to decarbonize a site’s high-temperature steam generation used mostly for building heating needs, climate control, and hot water, by supplying process heat capabilities, while electricity decarbonization would be achieved mostly by the grid. However, a secondary application can be considered to maximize reactor utilization and avoid ramping down the reactor if the steam demand varies significantly throughout the year. Chilled water generation through steam-driven systems was identified as an attractive secondary option for the site analyzed, due to potential for plant design simplification, while electricity generation could be considered as well to reduce electricity purchases for a wider range of site applications. For a campus with peak 60MW thermal power demand, a small nuclear reactor with similar thermal power rating would almost eliminate CO2 emissions from steam generation and reduce electricity imports for chilled water production. A preliminary techno-economic feasibility study shows that a small nuclear reactor design that is optimized to support process heat can represent an economically feasible option when compared with other decarbonization alternatives.

Stauff, Nicolas E.↗

The hydrogen behavior analysis in the water-ingress accident of the 250 MW pebble-bed modular high temperature gas-cooled reactor - 18639

The demonstration power plant of Chinese 250 MW high temperature gas-cooled reactor pebbled-bed module (HTR-PM) which is being under construction in the Shidao Bay of Shandong province has made breakthrough in all of the critical technologies, and is willing to operate in 2017. HTR-PM does not have the risk of large amount of hydrogen generation resulted from the zirconium water reaction due to its special design of graphite core structure and helium coolant of the primary circuit, however, considering that the HTR-PM has a small containment and does not design the deliberate ignitions which is the main hydrogen management measure in light water reactors, it is still necessary to study the hydrogen behavior in the water-ingress accident in which hydrogen will probably be generated. In this paper, the hydrogen generation amount and its distribution in the HTR-PM containment are analyzed with the TINTE code and GASFLOW code respectively in the water ingress accident caused by the steam generator heating tubes rupture. The calculation results indicate that there are total about 16.6 kg and 21 kg hydrogen produced due to graphite corrosion in the typical design basis water ingress accident and beyond design basis accident. The containment sub-pressure ventilation system makes sure the hydrogen concentration in the containment is less than 0.2% during the accident. There is no hydrogen explosion risk in the HTR-PM. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Planning for Plume Diagnostics for Ground Testing of J-2X Engines at the SSC

John C. Stennis Space Center (SSC) is the premier test facility for liquid rocket engine development and certification for the National Aeronautics and Space Administration (NASA). Therefore, it is no surprise that the SSC will play the most prominent role in the engine development testing and certification for the J-2X engine. The Pratt & Whitney Rocketdyne J-2X engine has been selected by the Constellation Program to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage in NASA s strategy of risk mitigation for hardware development by building on the Apollo program and other lessons learned to deliver a human-rated engine that is on an aggressive development schedule, with first demonstration flight in 2010 and human test flights in 2012. Accordingly, J-2X engine design, development, test, and evaluation is to build upon heritage hardware and apply valuable experience gained from past development and testing efforts. In order to leverage SSC s successful and innovative expertise in the plume diagnostics for the space shuttle main engine (SSME) health monitoring,1-10 this paper will present a blueprint for plume diagnostics for various proposed ground testing activities for J-2X at SSC. Complete description of the SSC s test facilities, supporting infrastructure, and test facilities is available in Ref. 11. The A-1 Test Stand is currently being prepared for testing the J-2X engine at sea level conditions. The A-2 Test Stand is currently being used for testing the SSME and may also be used for testing the J-2X engine at sea level conditions in the future. Very recently, ground-breaking ceremony for the new A-3 rocket engine test stand took place at SSC on August 23, 2007. A-3 is the first large - scale test stand to be built at the SSC since the A and B stands were constructed in the 1960s. The A-3 Test Stand will be used for testing J-2X engines under vacuum conditions simulating high altitude operation at approximately 30,480 m (100,000 ft). To achieve the simulated altitude environment, chemical steam generators using isopropyl alcohol, LOX, and RELEASED - Printed documents may be obsolete; validate prior to use. water would run for the duration of the test and would generate approximately 2096 Kg/s of steam to reduce pressure in the test cell and downstream of the engine. The testing at the A-3 Test Stand is projected to begin in late 2010, meanwhile the J-2X component testing on A-1 is scheduled to begin later this year.

SaintCyr, William W.↗

Altitude Testing of Large Liquid Propellant Engines

The National Aeronautics and Space Administration entered a new age on January 14, 2004 with President Bush s announcement of the creation the Vision for Space Exploration that will take mankind back to the Moon and on beyond to Mars. In January, 2006, after two years of hard, dedicated labor, engineers within NASA and its contractor workforce decided that the J2X rocket, based on the heritage of the Apollo J2 engine, would be the new engine for the NASA Constellation Ares upper stage vehicle. This engine and vehicle combination would provide assured access to the International Space Station to replace that role played by the Space Shuttle and additionally, would serve as the Earth Departure Stage, to push the Crew Excursion Vehicle out of Earth Orbit and head it on a path for rendezvous with the Moon. Test as you fly, fly as you test was chosen to be the guiding philosophy and a pre-requisite for the engine design, development, test and evaluation program. An exhaustive survey of national test facility assets proved the required capability to test the J2X engine at high altitude for long durations did not exist so therefore, a high altitude/near space environment testing capability would have to be developed. After several agency concepts the A3 High Altitude Testing Facility proposal was selected by the J2X engine program on March 2, 2007 and later confirmed by a broad panel of NASA senior leadership in May 2007. This facility is to be built at NASA s John C. Stennis Space Center located near Gulfport, Mississippi. 30 plus years of Space Shuttle Main Engine development and flight certification testing makes Stennis uniquely suited to support the Vision For Space Exploration Return to the Moon. Propellant handling infrastructure, engine assembly facilities, a trained and dedicated workforce and a broad and varied technical support base will all ensure that the A3 facility will be built on time to support the schedule needs of the J2X engine and the ultimate flight of the first Ares I vehicle. The A3 facility will be able to simulate pre-ignition altitude from sea-level to 100,000 feet and maintain it up to 650 seconds. Additionally the facility will be able to accommodate initial ignition, shutdown and then restart test profiles. A3 will produce up to 5000 lbm/sec of superheated steam utilizing a Chemical Steam generation system. Two separate inline steam ejectors will be used to produce a test cell vacuum to simulate the 100,000 ft required altitude. Operational capability will ensure that the facility can start up and shutdown without producing adverse pressure gradients across the J2X nozzle. The facility will have a modern thrust measurement system for accurate determination of engine performance. The latest advances in data acquisition and control will be incorporated to measure performance parameters during hotfire testing. Provisions are being made in the initial design of the new altitude facility to allow for testing of other, larger engines and potential upper stage launch vehicles that might require vacuum start testing of the engines. The new facility at Stennis Space Center will be complete and ready for hotfire operations in late 2010.

Maynard, Bryon T.↗

High temperature ultrasonic transducers for the generation of guided waves for non-destructive evaluation of pipes

Applications for non-destructive evaluation and structural health monitoring of steam generators require ultrasonic transducers capable of withstanding the high temperatures of the pipes and heat exchangers. These applications require a strong coupling of the transducer to the heat exchanger’s complex geometry at the elevated temperatures. Our objective is to use spray-on piezo-electrics for depositing comb transducers onto the curved surfaces. This paper shows results for composite transducers such as lead zirconate titanate/ bismuth titanate and bismuth titanate/ lithium niobate. The comb transducers were prepared by precision laser ablation. The feasibility of producing second harmonic waves in rods with these spay-on comb transducers was demonstrated and paves the way toward measuring material degradation early-on before crack initiation occurs.

42 ENGINEERING↗

Creation of Multiple Effect Evaporator and Combined Cycle Modelica Modules, and Optimization of Potable Water Generation from Saltwater Sources (Final Technical Report)

Modelica models for a Heat Recovery Steam Generator (HRSG) and Multiple Effect Evaporator have been developed. These models have been validated against results from literature and from an actual cogeneration system on the campus of NC State University. The models are capable of connecting to other components to create multi-input, multi-output energy systems with storage, also known as integrated energy systems. An existing 35 MW gas turbine model is connected to the HRSG model created for this project to produce 9 bar steam. The high pressure steam feeds a backpressure steam turbine from the library to generate additional electric power. 2 bar steam leaves the turbine to supply an 8 effect MEE to generate water for a community. As part of the effort, three research papers were submitted (two published in ANS Proceedings and one submitted to Applied Energy).

20 FOSSIL-FUELED POWER PLANTS↗

Analyzing the Impact of Solar Power on Multi-Hourly Thermal Generator Ramping

Solar power generation, unlike conventional forms of electricity generation, has higher variability and uncertainty in its output because solar plant output is strongly impacted by weather. As the penetration rate of solar capacity increases, grid operators are increasingly concerned about accommodating the increased variability and uncertainty that solar power provides. This paper illustrates the impacts of increasing solar power penetration on the ramping of conventional electricity generators by simulating the operation of the Independent System Operator -- New England power system. A production cost model was used to simulate the power system under five different scenarios, one without solar power and four with increasing solar power penetrations up to 18%, in terms of annual energy. The impact of solar power is analyzed on six different temporal intervals, including hourly and multi-hourly (2- to 6-hour) ramping. The results show how the integration of solar power increases the 1- to 6-hour ramping events of the net load (electric load minus solar power). The study also analyzes the impact of solar power on the distribution of multi-hourly ramping events of fossil-fueled generators and shows increasing 1- to 6-hour ramping events for all different generators. Generators with higher ramp rates such as gas and oil turbine and internal combustion engine generators increased their ramping events by 200% to 280%. For other generator types--including gas combined-cycle generators, coal steam turbine generators, and gas and oil steam turbine generators--more and higher ramping events occurred as well for higher solar power penetration levels.

14 SOLAR ENERGY↗

Partial Oxidation Gas Turbine for Power and Hydrogen Co-Production from Coal-Derived Fuel in Industrial Applications

The report presents a feasibility study of a new type of gas turbine. A partial oxidation gas turbine (POGT) shows potential for really high efficiency power generation and ultra low emissions. There are two main features that distinguish a POGT from a conventional gas turbine. These are associated with the design arrangement and the thermodynamic processes used in operation. A primary design difference of the POGT is utilization of a non?catalytic partial oxidation reactor (POR) in place of a conventional combustor. Another important distinction is that a much smaller compressor is required, one that typically supplies less than half of the air flow required in a conventional gas turbine. From an operational and thermodynamic point of view a key distinguishing feature is that the working fluid, fuel gas provided by the OR, has a much higher specific heat than lean combustion products and more energy per unit mass of fluid can be extracted by the POGT expander than in the conventional systems. The POGT exhaust stream contains unreacted fuel that can be combusted in different bottoming ycle or used as syngas for hydrogen or other chemicals production. POGT studies include feasibility design for conversion a conventional turbine to POGT duty, and system analyses of POGT based units for production of power solely, and combined production of power and yngas/hydrogen for different applications. Retrofit design study was completed for three engines, SGT 800, SGT 400, and SGT 100, and includes: replacing the combustor with the POR, compressor downsizing for about 50% design flow rate, generator replacement with 60 90% ower output increase, and overall unit integration, and extensive testing. POGT performances for four turbines with power output up to 350 MW in POGT mode were calculated. With a POGT as the topping cycle for power generation systems, the power output from the POGT ould be increased up to 90% compared to conventional engine keeping hot section temperatures, pressures, and volumetric flows practically identical. In POGT mode, the turbine specific power (turbine net power per lb mass flow from expander exhaust) is twice the value of the onventional turbine. POGT based IGCC plant conceptual design was developed and major components have been identified. Fuel flexible fluid bed gasifier, and novel POGT unit are the key components of the 100 MW IGCC plant for co producing electricity, hydrogen and/or yngas. Plant performances were calculated for bituminous coal and oxygen blown versions. Various POGT based, natural gas fueled systems for production of electricity only, coproduction of electricity and hydrogen, and co production of electricity and syngas for gas to liquid and hemical processes were developed and evaluated. Performance calculations for several versions of these systems were conducted. 64.6 % LHV efficiency for fuel to electricity in combined cycle was achieved. Such a high efficiency arise from using of syngas from POGT exhaust s a fuel that can provide required temperature level for superheated steam generation in HRSG, as well as combustion air preheating. Studies of POGT materials and combustion instabilities in POR were conducted and results reported. Preliminary market assessment was performed, and recommendations for POGT systems applications in oil industry were defined. POGT technology is ready to proceed to the engineering prototype stage, which is recommended.

01 COAL, LIGNITE, AND PEAT↗

Experimental validation on the operational and cooling performance of the passive safety system with Atlas

After the Fukushima accident, passive safety systems are considered as the most promising alternatives to reinforce the safety and reliability of an ultimate heat removal system without any operator actions. In Korea, a passive auxiliary feedwater system (PAFS) was developed and adopted to a GEN-III+ nuclear power plant, APR+ to completely replace the conventional auxiliary feedwater system. The integral effect tests were performed to validate the cooling and operational performance of PAFS, coupled with the reactor coolant systems using the ATLAS facility. The representative design basis accidents (DBAs) such as a feedwater line break, a steam line break, and a steam generator tube rupture transients were experimentally simulated in this study. In addition, an integral effect test was performed for simulating a station blackout transient as a limiting beyond DBA. From the integral effect test results, it could be concluded that the APR+ has the capability of coping with the hypothetical DBA and bDBA by adopting PAFS and proper set-points of its operation. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Experimental study on the operational and the cooling performance of the APR+ passive auxiliary feedwater system

The passive auxiliary feedwater system (PAFS) is one of the advanced safety features adopted in the APR+ which is intended to completely replace the conventional active auxiliary feedwater system. The PAFS cools down the steam generator secondary side and eventually removes the decay heat from the reactor core by introducing a natural driving force mechanism; i.e., condensing steam in nearly-horizontal U-tubes submerged inside the passive condensation cooling tank (PCCT). With an aim of validating the cooling and operational performance of the PAFS, the separate effect test, PASCAL (PAFS Condensing Heat Removal Assessment Loop), is being performed to experimentally investigate the condensation heat transfer and natural convection phenomena in the PAFS. A single nearly-horizontal U-tube whose dimension is same as the prototypic U-tube of the APR+ PAFS is simulated in the PASCAL test. By performing the PASCAL test, the major thermal-hydraulic parameters such as local/overall heat transfer coefficients, fluid temperature inside the tube, wall temperature of the tube, and pool temperature distribution in the PCCT were produced not only to evaluate the current condensation heat transfer model but also to present database for the safety analysis related with the PAFS. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Modeling and optimization of a modified claus process as part of an integrted gasification combined cycle (IGCC) power plant with CO2 capture

The modified Claus process is one of the most common technologies for sulfur recovery from acid gas streams. Important design criteria for the Claus unit, when part of an Integrated Gasification Combined Cycle (IGCC) power plant, are the ability to destroy ammonia completely and recover sulfur thoroughly from a relatively low purity acid gas stream without sacrificing flame stability. Due to these criteria, modifications are often required to the conventional process, resulting in a modified Claus process. For the studies discussed here, these modifications include the use of a 95% pure oxygen stream as the oxidant, a split flow configuration, and the preheating of the feeds with the intermediate pressure steam generated in the waste heat boiler (WHB). In the future, for IGCC plants with CO2 capture, the Claus unit must satisfy emission standards without sacrificing the plant efficiency in the face of typical disturbances of an IGCC plant such as rapid change in the feed flowrates due to load-following and wide changes in the feed composition because of changes in the coal feed to the gasifier. The Claus unit should be adequately designed and efficiently operated to satisfy these objectives. Even though the Claus process has been commercialized for decades, most papers concerned with the modeling of the Claus process treat the key reactions as equilibrium reactions. Such models are validated by manipulating the temperature approach to equilibrium for a set of steady-state operating data, but are of limited use for dynamic studies. One of the objectives of this study is to develop a model that can be used for dynamic studies. In a Claus process, especially in the furnace and the WHB, many reactions may take place. In this work, a set of linearly independent reactions has been identified and kinetic models of the furnace flame and anoxic zones, WHB, and catalytic reactors have been developed. To facilitate the modeling of the Claus furnace, a four-stage method was devised so as to determine which set of linearly independent reactions would best describe the product distributions from available plant data. Various approaches are taken to derive the kinetic rate expressions which are either missing in the open literature or found to be inconsistent. A set of plant data is used for optimal estimation of the kinetic parameters. The final model agrees well with the published plant data. Using the developed kinetics models of the Claus reaction furnace, WHB, and catalytic stages, two optimization studies are carried out. The first study shows that there exists an optimal steam pressure generated in the WHB that balances hydrogen yield, oxygen demand, and power generation. In the second study, it is shown that an optimal H2S/SO2 ratio exists that balances single-pass conversion, hydrogen yield, oxygen demand, and power generation. In addition, an operability study has been carried out to examine the operating envelope in which both H2S/SO2 ratio and adiabatic flame temperature can be controlled in the face of disturbances typical for the operation of an IGCC power plant with CO2 capture. Impact of CO2 capture on the Claus process has also been discussed.

08 HYDROGEN↗

Waste heat utilization in industrial processes

A survey is given of new developments in heat exchangers and heat pumps. With respect to practical applications, internal criteria for plant operation are discussed. Possibilities of government support are pointed out. Waste heat steam generators and waste heat aggregates for hot water generation or in some cases for steam superheating are used. The possibilities of utilization can be classified according to the economic improvements and according to their process applications, for example, gascooling. Examples are presented for a large variety of applications.

Weichsel, M.↗

OSU High Temperature Test Facility Design Technical Report, Revision 2

The HTTF is an integral test facility, which has been designed to model the behavior of interest for a MHTGR during the Depressurized Conduction Cooldown (DCC) event. It also has the potential to conduct limited explorations into the progression of the Pressurized Conduction Cooldown (PCC) event and phenomena during normal operations. The facility is scaled 1:4 by height and 1:64 by volume. A scaling report has been developed and provides further detail into the scaling analysis for the HTTF. The maximum core power for the facility is approximately 2.2MW. The core region will be of a modular design to allow for both the prismatic block core and the pebble bed core designs to be tested. However, only the prismatic block design is discussed in this report. The HTTF consists of the following systems: A primary system consisting of the reactor pressure vessel (RPV), the circulator, cross over ducts and primary piping. The core internals sit inside the RPV and provide support for the core and core heaters. The purpose of the primary system is to maintain the pressure boundary, remove heat from the core through convection, conduction and radiation, and provide heat to the core through a series of electrical heaters. A secondary system consisting of a steam generator, feed water system and main steam system. The purpose of the secondary system is to remove heat from the primary system during heat up, cool down and normal operations. A reactor cavity simulation system consisting of a cavity tank, gas conditioning system and a series of break valves. Note that the prototypical MHTGR sits inside of a cavity. In the event of a break the helium will blowdown into this cavity. At the HTTF, the cavity is modeled as a separate tank, the reactor cavity simulation tank (RCST) and is connected to the RPV through break valves—hot-leg, cold-leg, upper break, and lower break. A reactor cavity cooling system (RCCS) consisting of a series of water cooled panels and the water supply system for these panels. The HTTF RCCS is not a scaled prototypical RCCS system for the MHTGR. It is provided in the HTTF in order to set the boundary condition for radiation heat transfer from the RPV. Various auxiliary systems including the city water supply system, the electrical power supply and distribution system, the chilled water system and the instrument air system.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗