Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STARTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Coupling with concentric contact around motor shaft for line start synchronous motor

A method comprises providing a line-start synchronous motor. The motor has a stator, a rotor core disposed within the stator, and a motor shaft. In accordance with a step of the method, a coupling for coupling a load to the motor is provided. The coupling has a motor shaft attachment portion configured to provide substantially concentric contact around the shaft at the end of the motor shaft. The coupling has a load attachment portion configured to operatively connect to a load. In accordance with a step of the method, a load is coupled to the motor with the coupling, and driven from start to at least near synchronous speed during steady state operation of the motor with a load coupled thereto. The motor shaft attachment portion may comprise a bushing assembly with matching and opposed tapered surfaces that cooperate to secure the motor shaft attachment portion around the motor shaft.

42 ENGINEERING↗

Crack Initiation Behavior of Cold-Worked Alloy 690 in Simulated PWR Primary Water - Role of Starting Microstructure, Applied Stress and Cold Work on Precursor Damage Evolution

Long-term stress corrosion crack (SCC) initiation behavior in Alloy 690 is being evaluated by constant load tensile testing in simulated pressurized water reactor primary water. Seven commercial Alloy 690 heats with different starting microstructures and cold-work levels are being tested at either 90% or 100% of the material yield stress. Previous studies have revealed grain boundary (GB) cavity formation after 7,110 to 9,220 hours of exposure in certain thermally treated (TT) Alloy 690 heats in highly cold-worked (CW) conditions, serving as precursors to intergranular cracks. This paper summarizes the new characterization results for the evolution of GB cavities in four Alloy 690TT heats in 21% and 31%CW conditions loaded at yield stress after 18,400 hours of exposure. Link-up of GB cavities has led to formation of long internal creep cracks, resulting in crack initiation detected by direct current potential drop in a highly CW Alloy 690TT heat with uniform, semi-continuous distribution of small GB carbides. In comparison, highly CW materials featuring larger and more widely spaced GB carbides did not show a significant increase in GB cavity density or size. Quantitative assessments were performed on GB cavity evolution in highly CW specimens for two Alloy 690TT heats demonstrating the strong dependence of GB cavity evolution on applied stress and starting GB microstructure.

Zhai, Ziqing↗

CREATING TOOLPATHS WITHOUT STARTS AND STOPS FOR EXTRUSION-BASED SYSTEMS

Toolpath generation for extrusion-based additive manufacturing systems, called slicing, involves operations on polygonal contours that are derived from an STL file. Slicing generates multiple paths per layer (both closed-loop and open-loop) that are designed to optimally fill the space outlined by the polygon(s). In the course of printing a layer, the extruder must start and stop, the tip must be wiped, and the extruder must travel between paths without printing. Any amount of time the printer spends moving without printing is considered wasted time because the part isn’t being constructed. In addition, the start/stop point, known as the seam, is often a blemish on the surface of the part that contributes to weaker material properties. Therefore, a single path for creating multi-bead walled structures is desirable because it would save machine time and create parts with better surface finish. This paper will cover one method of modifying the CAD file and slicing engine to allow for parts to be printed without starting and stopping the extruder.

Roschli, Alex↗

Development and Application of the Stakeholder Tool for Assessing Radioactive Transportation (START) - 16516

The U.S. Department of Energy, Office of Nuclear Energy is laying the groundwork for implementing interim storage of spent nuclear fuel (SNF) pursuant to the Administration's Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste. This effort includes planning to address technical and logistical aspects of transporting SNF to an interim storage facility. A key project component is the development and utilization of a decision-support tool to evaluate transportation routing options and emergency preparedness. START (Stakeholder Tool for Assessing Radioactive Transportation) is a web-based application that utilizes geographic information systems (GIS) technology to represent transportation network operations as well as proximate features, such as tribal lands, emergency response capability, schools and environmentally-sensitive areas. Modes and routes between shipment origins and destinations designated by the user can be evaluated according to multiple routing criteria, and users can impose constraints that require the route to pass through or avoid specified locations. Considerable information is produced describing route efficiency, safety, security and environmental exposure that enable stakeholders to understand the implications of alternative route options. This paper describes START's capabilities and illustrates its use. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Start-up of Silo 130 Waste Retrieval at La Hague: first Step Towards Reducing Legacy Inventory - 20020

On June 25, 2019, the first grapple of waste and debris was lifted from Silo 130, one of the most challenging legacy waste storage silos at La Hague. This was the achievement of more than ten years of studies and efforts focused on solving some very unique technical and safety challenges, and on designing an innovative, efficient solution. The waste is from de-cladding materials from past Gas-Cooled Reactor fuel reprocessing operations. It is an unsorted mixture of magnesium cladding pieces, graphite debris, and various other metallic waste types. These materials can be chemically reactive and therefore need specific dispositions for handling and storing. The building is more than 40 years old and does not meet modern standards. French safety authorities have required the silo to be emptied. After about three years of operation, the bulk of this waste will be removed and placed in safe storage, pending the selection of a final conditioning solution. Removal of bottom debris will then be possible. When finished, this operation will bring a conclusion to a significant legacy-related hazard on the site. The silo will then be available for final cleaning and de-activation. This paper will describe the technical, safety, and economical challenges, and the various decisions and optimizations that led to the definition of the process and technology to be implemented. Several innovative features were developed and implemented, in all sections of the project: project organization, progressive approach for the waste disposition strategy, light building design, customized and robust retrieval technology, processing technologies involving the most modern robotic and sorting techniques, storage method... Several of these first-of-a-kind innovative features have been developed and qualified specifically for this application, using the detailed qualification procedure specified for all La Hague projects. The facility was built in less than five years, overcoming various difficulties along the line. Commissioning is now finished with the combined efforts of the project, engineering, start-up, and operating teams assisted by dedicated suppliers. The facility is now ramping-up. The paper will also report on the commissioning and start-up of the facility and describe the first operational results. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cold-Starting All-Solid-State Batteries from Room Temperature by Thermally Modulated Current Collector in Sub-Minute

All-solid-state batteries (ASSBs) show great potential as high-energy and high-power energy storage devices but their attainable energy/power density at room temperature is severely reduced because of the sluggish kinetics of lithium-ion transport. Here we first reported a thermally modulated current collector (TMCC), which can rapidly cold-start ASSBs from room temperature to operating temperatures (70–90 °C) in less than one minute, and simultaneously enhance the transient peak power density by 15-fold compared to one without heating. This TMCC is prepared by integrating a uniform, ultrathin (~200 nm) nickel layer as a thermal modulator within an ultralight polymer-based current collector. By isolating the thermal modulator from the ion/electron pathway of ASSBs, it can provide fast, stable heat control yet does not interfere with regular battery operation. Moreover, this ultrathin (13.2 μm) TMCC effectively shortens the heat transfer pathway, minimizes heat losses, and mitigates the formation of local hot spots. The simulated heating energy consumption can be as low as ~3.94% of total battery energy. This TMCC design with good tunability opens new frontiers towards smart energy storage devices in the future from the current collector perspective.

25 ENERGY STORAGE↗

Production of High Energy Tail Electrons by Electron Bernstein Waves during the Current Start-up Discharges in the LATE Device

Toroidal plasma current is started and ramped up by injecting microwave power in the electron cyclotron range of frequency without induction in the LATE device. Radial scanning with hard X-ray pulse height analysis reveals the production of high energy electrons with average energy {approx}100 keV in the radial region from R = 28 cm to 40.5 cm, which are heated by electron Bernstein wave. The radial profile of photon counts in the energy range from 25 to 200 keV is very similar to that of perpendicular pressure obtained by magnetic measurement and equilibrium analysis, suggesting that a significant portion of trapped electrons exists outside the last closed flux surface. The plasma current inside the LCFS is carried mainly by passing electrons, while some portion of the outside current may be generated as a result of the toroidal precession of trapped electrons.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Non-inductive current start-up assisted by energetic electrons in Q-shu University experiment with steady-state spherical tokamak

After intensive discharge cleaning of the chamber wall, non-inductive current start-up experiments have been successfully performed in QUEST in moderate vertical fields of about 1.0-1.5 mT with positive n-index. Simultaneously, with increasing plasma current, an asymmetric toroidal flow of energetic electrons was observed and direct measurements of current driven by this asymmetric flow were taken with a newly developed Langmuir probe technique. A numerical study of the energetic electron orbits indicates that the total current is enough to play a dominant role in the formation of a closed flux surface in QUEST.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Finding diverse ways to improve algebraic connectivity through multi-start optimization

The algebraic connectivity, also known as the Fiedler value, is a spectral measure of network connectivity that can be increased through edge addition. We present an algorithm for producing many diverse ways to add a fixed number of edges to a network to achieve a near optimal Fiedler value. Previous Fielder value optimization algorithms (i.e. the greedy algorithm) output only one solution. Obtaining a single solution is rarely good enough for real-world network redesign problems, as practical constraints (political, physical or financial) may prevent implementation. Our algorithm takes a multi-start optimization approach, adding a random initial edge and then applies a greedy heuristic to improve the Fiedler value. The random choice moves us to a new region of the search space, enabling discovery of diverse solutions. Additionally, we present a Determinantal Point Process framework for quantifying diversity. We then apply a Markov chain Monte Carlo technique to sift through the large number of output solutions and locate a smaller, more manageable collection of highly diverse solutions that can be presented to network redesign engineers. We demonstrate the effectiveness of our algorithm on real-world graphs with varied structures.

97 MATHEMATICS AND COMPUTING↗

A VSC-HVDC-Assisted Black-Start Strategy in Bulk Power Systems a Case Study in San Diego

With the worldwide growth in deploying high-voltage direct current (HVDC) transmission systems, their ability to facilitate black-start (BS) restoration has been a research topic of interest. In this context, voltage source converter (VSC)-HVDC is regarded as a BS resource, and this paper proposes a VSC-HVDC-assisted parallel BS restoration strategy in bulk power systems. The proposed strategy consists of two stages: 1) determination of the VSC and generator startup sequence and 2) load restoration simulation. In the first stage, the entire blackout system is sectionalized into multiple subsystems. Each subsystem includes a VSC-HVDC station or traditional BS unit, it independently determines its generator startup timeline and the energization timelines for buses and lines. The second stage involves load restoration, conceptualized as a modified unit commitment problem, with the timelines established in the first stage work as critical inputs. The proposed BS restoration strategy is tested on the San Diego power system to simulate the 2011 Southwest blackout. The simulation results validate the effectiveness of using VSC-HVDC links as a BS resource which not only speeds up the restoration process but also reduces both energy and economic losses.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Comparison between the measured and calculated reactivity in measuring the effectiveness of the emergency protection at the stage of physical start-up of unit no. 3 at the Kalinin nuclear power plant

This paper presents comparisons between the effectiveness of the emergency protection under both stationary and nonstationary formulations calculated with the use of the RADUGA-7.5 package and experimental data obtained in measuring the 'weight' of the emergency protection in the process of physical start-up of the VVER-1000 reactor of unit no. 3 of the Kalinin NPP. On the basis of the results obtained, recommendations are given on comparing the measured and calculated reactivity and parameters determined by using its value.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cold-Start Emissions Control in Hybrid Vehicles Equipped with a Passive Hydrocarbon and NOx Adsorber

We presents a study of the potential for using low-cost sorbent materials (i.e. Ag-Beta-zeolite and Fe-Mn-Zr transition metal oxides) to temporally trap hydrocarbons (HCs) and nitrogen oxides (NOx) emissions during cold-start periods in HEVs and PHEVs over transient driving cycles. The adsorption behavior of the candidate sorbent materials was characterized in our laboratory flow reactor experiments. The parameters were then used to develop a one-dimensional, transient device model which has been implemented in the Powertrain Systems Analysis Toolkit (PSAT) to simulate a passive HC and NOx absorber device. The results show that such an absorber can substantially reduce HC and NOx emissions by storing them when the 3-way catalyst is too cool to function and re-releasing them when the exhaust temperature rises. These improved emission controls do not involve any penalty in fuel consumption or require any change in engine operation. The cost of these sorbent materials is also much less than conventional 3-way catalysts.

42 ENGINEERING↗

Evaluation of Neutron Radiography Reactor LEU-Core Start-Up Measurements

Benchmark models were developed to evaluate the cold-critical start-up measurements performed during the fresh core reload of the Neutron Radiography (NRAD) reactor with Low Enriched Uranium (LEU) fuel. Experiments include criticality, control-rod worth measurements, shutdown margin, and excess reactivity for four core loadings with 56, 60, 62, and 64 fuel elements. The worth of four graphite reflector block assemblies and an empty dry tube used for experiment irradiations were also measured and evaluated for the 60-fuel-element core configuration. Dominant uncertainties in the experimental k eff come from uncertainties in the manganese content and impurities in the stainless steel fuel cladding as well as the 236 U and erbium poison content in the fuel matrix. Calculations with MCNP5 and ENDF/B-VII.0 neutron nuclear data are approximately 1.4% (9σ) greater than the benchmark model eigenvalues, which is commonly seen in Monte Carlo simulations of other TRIGA reactors. Simulations of the worth measurements are within the 2σ uncertainty for most of the benchmark experiment worth values. The complete benchmark evaluation details are available in the 2014 edition of the International Handbook of Evaluated Reactor Physics Benchmark Experiments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Final Report Start-Up and Commissioning Tests on the DuraMelter 1200 HLW Pilot Melter System Using AZ-101 HLW Simulants

This document provides the final report on data and results obtained from commissioning tests performed on the one-third scale DuraMelter{trademark} 1200 (DM 1200) HLW Pilot Melter system that has been installed at VSL with an integrated prototypical off-gas treatment system. That system has replaced the DM1000 system that was used for HLW throughput testing during Part BI [1]. Both melters have similar melt surface areas (1.2 m{sup 2}) but the DM1200 is prototypical of the present RPP-WTP HLW melter design whereas the DM1000 was not. These tests were performed under a corresponding RPP-WTP Test Specification and associated Test Plan. This report is a followup to the previously issued Preliminary Data Summary Report. The DM1200 system will be used for testing and confirmation of basic design, operability, flow sheet, and process control assumptions as well as for support of waste form qualification and permitting. This will include data on processing rates, off-gas treatment system performance, recycle stream compositions, as well as process operability and reliability. Consequently, this system is a key component of the overall HLW vitrification development strategy. The results presented in this report are from the initial series of short-duration tests that were conducted to support the start-up and commissioning of this system prior to conducting the main body of development tests that have been planned for this system. These tests were directed primarily at system 'debugging,' operator training, and procedure refinement. The AZ-101 waste simulant and glass composition that was used for previous testing was selected for these tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Start-to-End Optics Validation of FFA-Based Energy Upgrade to CEBAF

This project will thoroughly validate the optics for a proof-of-principal, proposed FFA-based energy upgrade for CEBAF. This upgrade consists of CBETA-like FFA arcs in place of the highest-energy recirculating arcs in the machine, allowing for several more passes through the linacs. This should enable a highest beam energy of 20-24 GeV. This LDRD project will include Start-to-End (S2E) optics and beam dynamics simulations, beam loss and power deposition, and indicate requirements for updates to diagnostics.

43 PARTICLE ACCELERATORS↗

Black Start From DER

This presentation gives overview of black start related research at NREL.

black start↗

ABWR start-up test analysis using BWR core simulator with three-dimensional direct response matrix method

The ABWR start-up test analysis has been done with the BWR core simulator using the three--dimensional direct response matrix (3D-DRM) method. The Monte Carlo code VMONT made the sub-response matrices for the 3D-DRM method. Each boundary surface was subdivided by 4 x 4 for transverse segments, by 4 for angular segments and by 4 for axial zones in a node. For the calculation speedup, the 3D-DRM code used the divided sub-response matrices data set. The code used the MPI and OpenMP for the parallelized method. The median value is set as the average critical eigenvalues. The changes from the maximum value to the minimum value are 0.34 %{Delta}k with the spectral history method and 0.40 %{Delta}k without it, and the respective standard deviations were 0.12 % and 0.14 %. Using the spectral history method decreased the variation by 0.06 %{Delta}k. The root mean square differences of the axial power distribution were about 6 % between the analysis results and the plant data. Using the currents which converged in the previous exposure step reduced the number of iterations when the CR pattern changed only slightly. The averaged calculation time for each exposure step was about 5 hours on 12 PC Linux cluster servers with Core 2 Quad 3 GHz. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗