Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “START Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Astrometric Telescope Facility - Status report

The advent of the Space Station Program has provided an unexpected opportunity for the Astrometric Telescope Facility (ATF) study program by providing a potential long-duration on-orbit serviceable platform. It required a concept change for ATF from a free-flyer observatory to a Space-Station-based Observatory. The program was sent in this new direction at the start of fiscal year 1985, and program plans including study schedules and science and technical requirements are being revised and defined. The facility is designed to be versatile and capable of fulfilling the primary goal of planet detection, and to be highly useful for other astrophysics observations. Basically the ATF observing program is a long-duration plan requiring repetitive observations of single stars over a one to two decade period. These repetitive observations are needed to provide data necessary to conclusively determine the existence (or nonexistence) of planets of the Uranus and Neptune class in extrasolar planetary systems.

Nishioka, K.↗

NASA Educational Product Development and Post-Secondary Program Assessment Planning

Producing "value-added students" involves proactively addressing how successfully students develop their skills, knowledge, and personal, social, and ethical growth due to their association with a program. NASA programs for higher education can certainly be responsive in aiding the academic community strive for quality in terms of "valueadded" students. By identifying essential characteristics of exemplary assessment practices, the standards developed by accrediting agencies serve as guides for developing quality practices and policies. Such a process is an effective tool for communicating the expectations of the educational components of a program to all concerned with the program and its expected results. When standards are connected to student performance, they provide a very compelling argument for refocusing the definition of quality in higher education. By linking standards and performance, student learning and development becomes the starting point for examining program quality. If the multiple stakeholders - faculty, peers, the professional community, addressed assessment issues, then accreditation can be a link among various constituencies, the parties can better understand the needs of each other and develop the necessary trust needed for understanding and support.

Salmons, Phyllis A.↗

Sample Return Propulsion Technology Development Under NASA's ISPT Project

Abstract In 2009, the In-Space Propulsion Technology (ISPT) program was tasked to start development of propulsion technologies that would enable future sample return missions. Sample return missions can be quite varied, from collecting and bringing back samples of comets or asteroids, to soil, rocks, or atmosphere from planets or moons. As a result, ISPT s propulsion technology development needs are also broad, and include: 1) Sample Return Propulsion (SRP), 2) Planetary Ascent Vehicles (PAV), 3) Multi-mission technologies for Earth Entry Vehicles (MMEEV), and 4) Systems/mission analysis and tools that focuses on sample return propulsion. The SRP area includes electric propulsion for sample return and low cost Discovery-class missions, and propulsion systems for Earth Return Vehicles (ERV) including transfer stages to the destination. Initially the SRP effort will transition ongoing work on a High-Voltage Hall Accelerator (HIVHAC) thruster into developing a full HIVHAC system. SRP will also leverage recent lightweight propellant-tanks advancements and develop flight-qualified propellant tanks with direct applicability to the Mars Sample Return (MSR) mission and with general applicability to all future planetary spacecraft. ISPT s previous aerocapture efforts will merge with earlier Earth Entry Vehicles developments to form the starting point for the MMEEV effort. The first task under the Planetary Ascent Vehicles (PAV) effort is the development of a Mars Ascent Vehicle (MAV). The new MAV effort will leverage past MAV analysis and technology developments from the Mars Technology Program (MTP) and previous MSR studies. This paper will describe the state of ISPT project s propulsion technology development for future sample return missions.12

Anderson, David J.↗

Software for Start-Ups: Introducing the NASA in Silicon Valley

Ames is in the unique position to cater to tech companies and start-ups in California's Silicon Valley. The majority of Ames' technology transfer is software, which is very attractive to newly developing companies in the Valley as they create their business plans and develop their technology portfolio structures. Ames is collaborating with several "accelerators", "incubators" and academic technology transfer programs to connect start-ups with the space agency's technologies and software. The ultimate goal is to enable successful businesses by harnessing the unique resources of the Silicon Valley entrepreneurial ecosystem, AND beyond! Note: All info is in the public domain.

Williams, Kimberly↗

Development of the XV-15 tiltrotor research aircraft - Lessons learned

The initial ground rules that guided the decision process during the initial stages of the XV-15 tiltrotor aircraft development are reviewed and reevaluated. A full flight-envelope nonlinear simulation mathematical model is outlined, along with the advantages of a multiaircraft program. Direct involvement of government engineers in all aspects of the program is considered to be beneficial, while the ejection-seat test requirement is not. Utilization of existing components - a rotor, transmissions, and engines - is analyzed, and emphasis is placed on integrated system test plans responsible for producing two reliable aircraft through a complete checkout of the aircraft subsystems before the start of the fligth program. Wind-tunnel and fatigue test requirements are presented, and the decision to go with an all mechanical control system design is addressed.

Schroers, Laurel G.↗

A targeted opsonization platform for programming innate immunity against rapidly evolving novel viruses.

Recent work has shown that artificial opsonins stimulate the targeted destruction of bacteria by phagocyte immune cells. Artificial opsonization has the potential to direct the innate immune system to target novel antigens, potentially even viral pathogens. Furthermore, the engagement of innate immunity presents a potential solution for the spread of pandemics in a scenario when a vaccine is unavailable or ineffective. Funded by the LDRD late start bioscience pandemic response program, we tested whether artificial opsonins can be developed to target viral pathogens using phage MS2 and a SARS-CoV-2 surrogate. To direct opsonization against these viruses we purified antibody derived viral targeting motifs and attempted the same chemical conjugation strategies that produced bacterial targeting artificial opsonins. However, the viral targeting motifs proved challenging to conjugate using these methods, frequently resulting in precipitation and loss of product. Future studies may be successful with this approach if a smaller and more soluble viral-targeting peptide could be used.

60 APPLIED LIFE SCIENCES↗

Operational Issues in the Development of a Cost-Effective Reusable LOX/LH2 Engine

The NASA Space Launch Initiative (SLI) was initiated in early 2001 to conduct technology development and to reduce the business and technical risk associated with developing the next-generation reusable launch system. In the field of main propulsion, two LOXLH2 rocket engine systems, the Pratt & Whitney / Aerojet Joint Venture (JV) COBRA and the Rocketdyne RS-83, were funded to develop a safe, economical, and reusable propulsion system. Given that a large-thrust reusable rocket engine program had not been started in the U.S. since 1971, with the Space Shuttle Main Engine (SSME), this provided an opportunity to build on the experience developed on the SSME system, while exploiting advances in technology that had occurred in the intervening 30 years. One facet of engine development that was identified as being especially vital in order to produce an optimal system was in the areas of operability and maintainability. In order to achieve the high levels of performance required by the Space Shuttle, the SSME system is highly complex with very tight tolerances and detailed requirements. Over the lifetime of the SSME program, the engine has required a high level of manpower to support the performance of inspections, maintenance (scheduled and unscheduled) and operations (prelaunch and post-flight). As a consequence, the labor- intensive needs of the SSME provide a significant impact to the overall cost efficiency of the Space Transportation System (STS). One of the strategic goals of the SLI is to reduce cost by requiring the engine(s) to be easier (Le. less expensive) to operate and maintain. The most effective means of accomplishing this goal is to infuse the operability and maintainability features into the engine design from the start. This paper discusses some of the operational issues relevant to a reusable LOx/LH2 main engine, and the means by which their impact is mitigated in the design phase.

Ballard, Richard O.↗

The NASA CSTI high capacity power project

The SP-100 Space Nuclear Power Program was established in 1983 by DOD, DOE, and NASA as a joint program to develop technology for military and civil applications. Starting in 1986, NASA has funded a technology program to maintain the momentum of promising aerospace technology advancement started during Phase 1 of SP-100 and to strengthen, in key areas, the chances for successful development and growth capability of space nuclear reactor power systems for a wide range of future space applications. The elements of the Civilian Space Technology Initiative (CSTI) High Capacity Power Project include Systems Analysis, Stirling Power Conversion, Thermoelectric Power Conversion, Thermal Management, Power Management, Systems Diagnostics, Environmental Interactions, and Material/Structural Development. Technology advancement in all elements is required to provide the growth capability, high reliability and 7 to 10 year lifetime demanded for future space nuclear power systems. The overall project will develop and demonstrate the technology base required to provide a wide range of modular power systems compatible with the SP-100 reactor which facilitates operation during lunar and planetary day/night cycles as well as allowing spacecraft operation at any attitude or distance from the sun. Significant accomplishments in all of the project elements will be presented, along with revised goals and project timelines recently developed.

Winter, J.↗

Research on Haystack radiometer, 20-24 GHz maser, and radio astronomy programs

During the first half of 1973, the Haystack antenna was utilized 76% of the time. Of this useful time, 72% was devoted to radio astronomy observing, 5% was spent on radar-related research and 23% went into maintenance and system improvements. Twenty-eight new radio astronomy programs were accepted, eight of which were completed during the period. One new radar program, topographic observations of Mars, was started in June and will be completed early in 1974. Fourteen programs continued from the previous period were also defined as complete. As of 1 July, 28 ratio observing programs were in a continuing status on the Haystack books. Four radar projects were also continuing. The 20-24 GHz maser development described in the preceding report progressed very well during an on-antenna test phase which began early in the year, but which terminated unfortunately in June with the complete loss of gain in the maser. Investigation of this problem is in progress. During this on-antenna test phase, the most sensitive water vapor observing capability which has yet become available was demonstrated.

Source record↗

The scientific potential and technological challenges of the High-Luminosity Large Hadron Collider program

Here, we present an overview of the High-Luminosity (HL-LHC) program at the Large Hadron Collider (LHC), its scientific potential and technological challenges for both the accelerator and detectors. The HL-LHC program is expected to start circa 2027 and aims to increase the integrated luminosity delivered by the LHC by an order of magnitude at the collision energy of 14 TeV. This requires upgrades to the injector system, accelerator complex and luminosity levelling. The two experiments, ATLAS and CMS, require substantial upgrades to most of their systems in order to cope with the increased interaction rate, and much higher radiation levels than at the current LHC. We present selected examples based on novel ideas and technologies for applications at a hadron collider. Both experiments will replace their tracking systems. We describe the ATLAS pixel detector upgrade featuring novel tilted modules, and the CMS Outer Tracker upgrade with a new module design enabling use of tracks in the level-1 trigger system. CMS will also install state-of-the-art highly segmented calorimeter endcaps. Finally, we describe new picosecond precision timing detectors of both experiments. In addition, we discuss how the upgrades will enhance the physics performance of the experiments, and solve the computing challenges posed by the expected large data sets. The physics program of the HL-LHC is focused on precision measurements probing the limits of the Standard Model (SM) of particle physics and discovering new physics. We present a selection of studies that have been carried out to motivate the HL-LHC program. A central topic of exploration will be the characterization of the Higgs boson. The large HL-LHC data samples will extend the sensitivity of searches for new particles or new interactions whose existence has been hypothesized in order to explain shortcomings of the SM. Finally, we comment on the nature of large scientific collaborations.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Atlas V Launch Incorporated NASA Glenn Thermal Barrier

In the Spring of 2002, Aerojet experienced a major failure during a qualification test of the solid rocket motor that they were developing for the Atlas V Enhanced Expendable Launch Vehicle. In that test, hot combustion gas reached the O-rings in the nozzle-to-case joint and caused a structural failure that resulted in loss of the nozzle and aft dome sections of the motor. To improve the design of this joint, Aerojet decided to incorporate three braided carbon-fiber thermal barriers developed at the NASA Glenn Research Center. The thermal barriers were used to block the searing-hot 5500 F pressurized gases from reaching the temperature-sensitive O-rings that seal the joint. Glenn originally developed the thermal barriers for the nozzle joints of the space shuttle solid rocket motors, and Aerojet decided to use them on the basis of the results of several successful ground tests of the thermal barriers in the shuttle rockets. Aerojet undertook an aggressive schedule to redesign the rocket nozzle-to-case joint with the thermal barriers and to qualify it in time for a launch planned for the middle of 2003. They performed two successful qualification tests (Oct. and Dec. 2002) in which the Glenn thermal barriers effectively protected the O-rings. These qualification tests saved hundreds of thousands of dollars in development costs and put the Lockheed-Martin/Aerojet team back on schedule. On July 17, 2003, the first flight of an Atlas V boosted with solid rocket motors successfully launched a commercial satellite into orbit from Cape Canaveral Air Force Station. Aero-jet's two 67-ft solid rocket boosters performed flawlessly, with each providing thrust in excess of 250,000 lbf. Both motors incorporated three Glenn-developed thermal barriers in their nozzle-to-case joints. The Cablevision satellite launched on this mission will be used to provide direct-to-home satellite television programming for the U.S. market starting in late 2003. The Atlas V is a product of the military's Enhanced Expendable Launch Vehicle program designed to provide assured military access to space. It can lift payloads up to 19,100 lb to geosynchronous transfer orbit and was designed to meet Department of Defense, commercial, and NASA needs. The Atlas V and Delta IV are two launch systems being considered by NASA to launch the Orbital Space Plane/Crew Exploration Vehicle. The launch and rocket costs of this mission are valued at $250 million. Successful application of the Glenn thermal barrier to the Atlas V program was an enormous breakthrough for the program's technical and schedule success.

Dunlap, Patrick H., Jr.↗

Automated shaker placement and regularized input estimation for MIMO testing.

Multi-input, multi-output (MIMO) testing is used in component qualification to reproduce operational responses in the laboratory. It is often preferred to single-input and base-shake testing because of the potential for equivalent or better tests using smaller actuators and shorter test suites. Given a target response, two key steps in MIMO test design are selecting actuator locations and solving for input loads. Actuator locations are often manually selected using expert judgment. If an automatic method is used, locations are usually determined by simulating the vibration control problem and minimizing a combination of the input energy and control residuals. To select a configuration, the relative importance of input energy and residuals must be specified. Specifying relative weights is, in general, a manual and subjective process. This paper develops an objective function that compares actuator configurations based on control accuracy and required input energy without any manual parameter tuning. The objective function uses an optimally selected tradeoff parameter for each candidate configuration. To choose actuator locations using the new objective function, a pivoting algorithm for integer programming problems is developed. Starting with an initial configuration (such as the one generated by a greedy algorithm), the pivoting algorithm guarantees an objective function decrease in each iteration until convergence is reached. In a simulation featuring a structure excited by a diffuse acoustic field, electrodynamic shaker locations and regularized inputs are solved for without any analyst-specified parameters. Simulations are performed in MIMO configurations where the number of target responses is less than, equal to, and greater than the number of actuators.

Multi-input multi-output↗

Comparison of Approach-to-Critical Results in Current and Pulse Mode for Systems with High Starter Neutron Rates

Reactors and critical assemblies use a variety of detection systems to monitor the neutron population. The count rate is proportional to the neutron flux present at the location of the detector. When such systems are placed external to an assembly, it is often assumed that the relative leakage multiplication will be proportional to the detector count rate (assuming that the source term, system geometry, and detector placement have not changed). Such systems are often used in an approach-to-critical during reactor startup to ensure that the critical configuration is well predicted. Various types of detectors have been used during an approach-to-critical. These include 3 He, BF 3 , ion chambers, fission chambers, and fission foils. Any of these types of systems (or others) should work well when adequate counting statistics are available. These detector systems can be operated in either pulse or current mode. The National Criticality Experiments Research Center (NCERC) has two detection systems that are commonly used in critical assembly operations. The start-up (referred to as "SU" in this work) system is made up of 3 He proportional counters in pulse mode and the linear counter system (referred to as "LC" in this work) consists of compensated ion-chambers in current mode. Typically the SU system is used for approach-to-critical operations and the LC system is only used at/above delayed critical ( k eff = 1). This work investigates the use of the LC system for an approach-to-critical. It has been long hypothesized that such an approach would be feasible for systems with high starter neutron rates.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The Chemistry Graduate Student Experience: Findings from an ACS Survey

Graduate training is a key element in producing a scientific workforce that reflects the nation’s diversity. This paper examines data from a 2013 American Chemical Society (ACS) survey of 2,544 chemistry masters and doctoral students and reveals barriers to reaching this goal. Multivariate statistical analyses indicate that women reported significantly less supportive relationships with advisors. Women were less likely to plan to finish their degrees, and for PhD students, the discrepancy was larger for students at the start of their graduate program. Women were also less likely to pursue the next level of training, and the gender difference related to postdoctoral plans was greater for those who identified with a racial-ethnic group traditionally underrepresented in chemistry (underrepresented minority, URM). URM students who were beyond the first year of their graduate program reported significantly less supportive relationships with peers. They were also less likely to have funding sufficient to meet their needs and more often used personal resources including loans. Despite these difficulties, URM students were more likely to definitely plan to finish their degrees, and men who identified as URM were more likely to plan to pursue postdoctoral work. Independent of gender and identification as URMs, students in more highly ranked schools reported less advisor support. Extensive open-ended comments indicated that large proportions of the students desired more attention and meaningful feedback from advisors and changes within their programs to promote support for students and advisor accountability. Suggestions for future research are given, and a companion commentary discusses needed directions for change.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

MPACT Programmer's Manual (V.4.3)

Figure 1 shows a high-level call chart for MPACT. The call chart uses the actual procedure names, starting with the main program name, MPACT. The only exception is the italicized names where the upstream procedure contains a number of subroutines calls. These calls are logically separated into blocks, such as setup basic info/inputs. Brief descriptions of what the procedure accomplishes are provided where needed. More detailed procedure information, including procedure arguments and definitions, can be found directly in the procedure header in the MPACT source code or Doxygen documentation (http://www.doxygen.nl/).

97 MATHEMATICS AND COMPUTING↗

Containerization of Phase-2 Tracker Data Acquisition and Control Framework

The CMS Experiment has started an extensive upgrade program in the context of the High-Luminosity phase of the LHC (Phase-2). In order to cope with the highly demanding High-Luminosity conditions, CMS will need a completely new inner and outer tracking detectors. On top of R&D development, a Data AcQuisition (DAQ) software is being developed along with different applications to control, monitor and validate the newly produced modules of the future tracker. As more and more developers are getting involved to maintain all those codes, an environment where software and applications can work independently of the host machine operating system is crucial. The Phase-2 Tracker group decided to make use of Docker as containerization solution for its framework. This poster describes the containerization of DAQ software/applications utilized to test and validate the Tracker modules. This includes continuous integration and continuous deployment (so-called CI/CD) and running GUI applications inside containers.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Western States Building Energy & Controls Apprenticeship (BECA) Program

How does this project help to understand the challenges of workforce development in the commercial building energy management industry? The purpose of this project was to create a replicable, scalable, and portable apprenticeship program for building energy management and controls. This paper will demonstrate how local processes can be more adaptable and inclusive than federal processes in achieving workforce development goals. Our work provides insights into the technical effectiveness of the program, enabling others to achieve greater success in their workforce development initiatives. The project required more time and financial resources than initially anticipated and spent a year in a no-cost extension working to accomplish the Statement of Project Objectives. The original goal was to create an Industry Related Apprenticeship Program (IRAP). The development of this apprenticeship presented challenges due to the lack of existing programs for reference and the absence of relevant industry classification codes by the Department of Labor (DOL). Notably, the role of a commercial building energy analyst is not recognized by the DOL. The SIC (industry codes) do not have a good description of this job. There are many that may fall into related categories, but none are the actual duties of an energy analyst. Discussions with the DOL indicated that substantial groundwork was necessary before a national apprenticeship program could be implemented, causing delays in the program’s commencement. As a result, students experienced longer wait times before starting their apprenticeship component. The apprenticeship program officially launched on September 14, 2021. The success of the State of Oregon’s apprenticeship program, the first of its kind in the state, underscored the flexibility and effectiveness of local initiatives compared to federal efforts. The COVID-19 pandemic also significantly impacted the project’s success. Beginning in March 2020, the pandemic led to widespread closures of schools and colleges by fall 2020. By September 2021, when the apprenticeship option became available, enrollment in colleges and universities nationwide had decreased, affecting student participation in the program. Moreover, as employers transitioned their employees to remote work, there was limited interaction with external personnel, influencing the willingness of training agents (employers) to integrate additional workers into their teams. This paper addresses several challenges encountered during the project, with the hope that future workforce development efforts will benefit from these experiences. We Final Technical Report 4 | Page encourage others to engage with state and federal agencies to enhance and update pathways for workforce development and apprenticeship programs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Weapon Material Program: FY24 Annual Report

The Weapon Material Program (WMP) framework was started in July of Fiscal Year (FY) 2022, along with other Mission Support organizations. The first year was about building the organization with the right people, identifying needs, and developing a vision for expectations. It was also a year to move forward with new equipment and technology for weapon material processes. With numerous improvements, WMP is building world-class systems for production, warehousing, and analytical testing. FY 2023 was a year of development. The WMP was a new organization defining its identity, its focus, and its mission. At the end of FY 2023, WMP evaluated its current position and its immediate needs along with its future goals. The entire organization set out on this FY 2024 journey to success. The lack of funding, staffing, and visibility dramatically impacted weapon material operations, testing, and qualifications. This neglect required numerous areas to be addressed and improvement plans to be developed and implemented. WMP processes, procedures, and overall business operations were dramatically in need of updating, revision, and formal documentation. This included all areas: technology, equipment, facility modifications/upgrades, and testing improvements. To ensure organizational improvement and forward momentum in FY 2024, WMP executed a multi-faceted strategic vision. Action items included the following: • Filling open positions with capable personnel who would contribute to a more robust organization • Establishing more formal operations and problem-solving techniques • Improving departmental procedures to align with expanding scope • Improving training • Establishing collaboration meetings with other departments/organizations • Focusing on the importance of identifying and mitigating concerns with At-Risk Materials (@RM) • Leading modernization eff orts for Blending and Packaging (B&P) We are on the verge of a transformational improvement in all of our processes in support of the mission. The following area achievements outlined in this report reflect the hard work toward achieving the goal of “being the material Subject Matter Experts in the nuclear enterprise”.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗