Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk Informed Decision Making”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Hierarchical Estimation For Planetary Protection

The software uses Bayes' theorem to describe the probability of an event based on prior knowledge of conditions that might be related to the event. The purpose of Bayesian analysis is to determine posterior probabilities based on prior probabilities where new information can be used in the decision-making process as additional data is gathered. The software will be used in Probabilistic Risk Assessments (PRAs) related to the Europa Clipper mission, which is one of NASA’s top priorities. Ultimately, the mission entails sending the Europa Clipper spacecraft to Jupiter’s Europa moon to orbit the planet and collect data for research and development. Europa is the smallest of the four Galilean moons orbiting Jupiter and is believed by researchers to be the most promising place to look for present-day environments suitable for life. Europa is thought to have an iron core, a rocky mantle, and a salt-water ocean covered by an ice-layered surface.

Gribok, Andrei [Idaho National Laboratory (INL), I↗

A Multi-Stage Stochastic Risk Assessment With Markovian Representation of Renewable Power

Probabilistic forecasts provide a distribution of possible outputs and so can capture the uncertainty and variability of Variable Renewable Energy (VRE). However, taking advantage of uncertainty information has practical challenges that make it difficult to integrate probabilistic forecasting into control room decision-making. This paper proposes a novel use-case for probabilistic forecasts by incorporating them into the hour-ahead operations for situational awareness via a risk-averse multi-stage stochastic program. We employ a Markovian representation of the probabilistic forecasts that enables the formulation of the multi-stage problem and avoids a scenario generation phase. We test the model on a realistically sized system to assess risk and showcase the capability of using probabilistic renewable forecast as input to produce probabilistic output forecasts of future system states. The results show that the model can capture time consistency in the reserves and Area Control Error (ACE) forecast. The solution times are adequate for risk profiling in hour-ahead timescales.

forecasting↗

A quantitative risk model for early lifecycle decision making

Decisions made in the earliest phases of system development have the most leverage to influence the success of the entire development effort, and yet must be made when information is incomplete and uncertain. We have developed a scalable cost-benefit model to support this critical phase of early-lifecycle decision-making.

requirements optimization summarization tradeoffs↗

Training for Aviation Decision Making: The Naturalistic Decision Making Perspective

This paper describes the implications of a naturalistic decision making (NDM) perspective for training air crews to make flight-related decisions. The implications are based on two types of analyses: (a) identification of distinctive features that serve as a basis for classifying a diverse set of decision events actually encountered by flight crews, and (b) performance strategies that distinguished more from less effective crews flying full-mission simulators, as well as performance analyses from NTSB accident investigations. Six training recommendations are offered: (1) Because of the diversity of decision situations, crews need to be aware that different strategies may be appropriate for different problems; (2) Given that situation assessment is essential to making a good decision, it is important to train specific content knowledge needed to recognize critical conditions, to assess risks and available time, and to develop strategies to verify or diagnose the problem; (3) Tendencies to oversimplify problems may be overcome by training to evaluate options in terms of goals, constraints, consequences, and prevailing conditions; (4) In order to provide the time to gather information and consider options, it is essential to manage the situation, which includes managing crew workload, prioritizing tasks, contingency planning, buying time (e.g., requesting holding or vectors), and using low workload periods to prepare for high workload; (5) Evaluating resource requirements ("What do I need?") and capabilities ("'What do I have?" ) are essential to making good decisions. Using resources to meet requirements may involve the cabin crew, ATC, dispatchers, and maintenance personnel; (6) Given that decisions must often be made under high risk, time pressure, and workload, train under realistic flight conditions to promote the development of robust decision skills.

Orasanu, Judith↗

Carolina Coastal Plain Ecological Forecasting: Utilizing NASA Earth Observations to Map Suitable Venus Flytrap Habitat in an Effort to Inform Conservation, Seed Banking, and Reintroduction in the Carolina Coastal Plain and Sandhills Regions

Although the carnivorous plant Venus flytrap (Dionaea muscipula) is recognized globally, its native range is restricted to a small portion of the North and South Carolina Coastal Plain and Sandhills. Within this limited range, Venus flytrap populations are threatened by habitat loss, fire suppression, and poaching. NASA DEVELOP partnered with the North Carolina Botanical Garden (NCBG), the University of North Carolina Herbarium (NCU), and the North Carolina Natural Heritage Program (NCNHP) to support Venus flytrap conservation. The team developed models based on species presence data and environmental variables using the Software for Assisted Habitat Modeling (SAHM) to create a 2021 habitat suitability map for Venus flytrap. These models incorporated Earth observations collected by Landsat 8 Thermal Infrared Sensor (TIRS), Terra Moderate Resolution Imaging Spectroradiometer (MODIS), Advanced Land Observation Satellite (ALOS) Phased Array type L-band Synthetic Aperture Radar (PALSAR), and Sentinel-2 Multispectral Instrument (MSI). To predict areas at high risk of development, the team produced a 2050 land-use change map using TerrSet Land Change Modeler. The team found potential areas of conflict between predicted habitat and forecasted future development. Many areas of suitable habitat were concentrated along the coast where development was likely to occur, placing populations there at risk of extirpation. Overlaying suitable habitat with forecasted land change also identified suitable habitats with minimal risk of development, which may serve as lasting Venus flytrap habitat. These results can inform the NCBG and NCNHP’s conservation decision-making, including targeted seed banking, reintroduction, and prioritization of enduring habitats for protection and management.

Monika Rock↗

Carolina Coastal Plain​ Ecological Forecasting

Although the carnivorous plant Venus flytrap (Dionaea muscipula) is recognized globally, its native range is restricted to a small portion of the North and South Carolina Coastal Plain and Sandhills. Within this limited range, Venus flytrap populations are threatened by habitat loss, fire suppression, and poaching. NASA DEVELOP partnered with the North Carolina Botanical Garden (NCBG), the University of North Carolina Herbarium (NCU), and the North Carolina Natural Heritage Program (NCNHP) to support Venus flytrap conservation. The team developed models based on species presence data and environmental variables using the Software for Assisted Habitat Modeling (SAHM) to create a 2021 habitat suitability map for Venus flytrap. These models incorporated Earth observations collected by Landsat 8 Thermal Infrared Sensor (TIRS), Terra Moderate Resolution Imaging Spectroradiometer (MODIS), Advanced Land Observation Satellite (ALOS) Phased Array type L-band Synthetic Aperture Radar (PALSAR), and Sentinel-2 Multispectral Instrument (MSI). To predict areas at high risk of development, the team produced a 2050 land-use change map using TerrSet Land Change Modeler. The team found potential areas of conflict between predicted habitat and forecasted future development. Many areas of suitable habitat were concentrated along the coast where development was likely to occur, placing populations there at risk of extirpation. Overlaying suitable habitat with forecasted land change also identified suitable habitats with minimal risk of development, which may serve as lasting Venus flytrap habitat. These results can inform the NCBG and NCNHP’s conservation decision-making, including targeted seed banking, reintroduction, and prioritization of enduring habitats for protection and management.

Monika Rock↗

Risk Model for EM Decision Support Toolsets

The Government Office of Accountability (GAO) has published several reports identifying the need for the Department of Energy (DOE) Office of Environmental Management (EM) to address mounting costs for DoE's cleanup program. DOEEM could greatly benefit from independent decision tool-sets/models that would allow them to evaluate options and inform business decision at the enterprise level considering site-specific life cycle costs and system plans. Program goals: Develop a tool-set that enables EM to independently evaluate alternatives, assess outcomes from different contracting strategies, and inform critical decisions for the enterprise. Project goals: Adaption of a Risk Model for integration with complimentary tool-sets for project level decision making. Operational Events: Discrete event model that evaluates operational variables (e.g. capacity, throughput, maintenance constraints) and identify bottlenecks. Identifying and Bounding Project Risk: Identify risks that impact confidence in meeting goals (e.g. production). Life cycle Cost: Evaluate impacts of staffing levels, inventory, and capital investments on life cycle costs. Methods and approach: Monte Carlo Analysis is being executed to generate results: Input derives from Risk Register Data; Tied to Projected and Target Schedules; Incorporates float duration within the model. Assumes associated risk mitigation actions being completed within a timeline of five fiscal years. Metrics include: Confidence in Meeting Production Goal; Confidence in Safety Standards; Confidence in Continuous Operation; Other Metrics can be added as appropriate regarding specific site needs. The adapted risk model can be used as a stand alone decision tool or can be integrated complementary tool-sets (i.e. process and cost models) for project-specific decisions. These support tool-sets can then be integrated with others for site- and complex- level evaluations. Future work includes designing an adaptable and modular framework that would allow integration of multiple tool-sets for holistic and/or targeted evaluation of alternative strategies for decision making that could lead to risk and cost reduction across the enterprise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2024 OES-Environmental 2024 State of the Science Report, Chapter 8: Marine Renewable Energy Data and Information Systems

As the marine renewable energy (MRE) sector grows, large amounts of environmental and technical data and information are being collected. When these data and information are openly available, they can be used to guide research and development, inform responsible siting and consenting of projects, and increase stakeholder understanding through transparency. For example, quality environmental data collected during the siting, consenting, construction, operation, and decommissioning of MRE projects can all play key roles in better characterizing baseline conditions, developing effective monitoring and mitigation strategies, and retiring environmental risks through data transferability (see Chapter 6). Ensuring that these data and information are easily discoverable and accessible will help the MRE sector make informed decisions and coexist in an increasingly busy ocean environment.

16 TIDAL AND WAVE POWER↗

New York City Panel on Climate Change 2019 Report Chapter 8: Indicators and Monitoring

The Indicators and Monitoring chapter of the first New York City Panel on Climate Change Report began with the paradigm: What cannot be measured cannot be managed (Rosenzweig et al., 2010). This statement is as valid today as it was then.The NPCC1 (2010) Indicators and Monitoring chapter addressed the need for assembling a suite of indicators to monitor climate change and adaptation in order to inform climate change decision making. It outlined criteria for selection of indicators (policy relevance, analytic soundness, measurability), defined categories of indicators (physical climate change; risk exposure, vulnerability, and impacts; adaptation; new research), and provided examples of specific indicators. Table 8.1 is a summary table of indicator development contribution from the NPCC1 I&M chapter (Jacob et al., 2011). The chapter explored the institutional requirements for indicator data availability, continuity, archiving, and public accessibility.

Blake, Reginald↗

Predictive Modeling for Differential Diagnosis and Mortality Risk Assessment

The prevalence of electronic health record (EHR) systems has brought prodigious biomedical informatics opportunity. Automated machine learning methods can effectively utilize such data and have become common tools for healthcare predictive modeling. Researches in medical informatics have explored the potential of deep learning and classical models in emergent care scenarios. In particular, predicting differential diagnoses for admissions have proven useful in decreasing unnecessary lab tests and improving inpatient triage decision-making. Moreover, identification of high-risk patients for in-hospital mortality is vitally important to maximize allocation of medical resources.The Medical Information Mart for Intensive Care (MIMIC-III) database, containing de-identified critical care inpatient was used in our study. This data set captures hospital patient laboratory measurements, pharmacologic prescriptions, diagnostic data and procedure event recordings. When considering adult patients and discounting admissions with ICU length of stay less than 24 hours, there were 37,787 unique admissions and 30,414 total patients. We examined the top 25 most prevalent ICD-9 group-level disease specificities in MIMIC-III using a multi-label classification model. In-hospital mortality was modeled as binary classification with 4,155 (13%) adult patients that expired, of which 3,138 (75.5%) were in the ICU setting. The metrics AUC, F1 score, sensitivity and specificity values calculated for each disease label measured prediction performance.The usage of ICD-9 group codes reduced feature dimension from 14,567 to 942 and greatly improved distribution of patient diagnostic categories. Disease temporal patterns were captured by considering the most frequently sampled 6 vital signs and 13 laboratory values. Missing data were imputed at each time-stamp. Time-series raw hourly average values were converted into 5 summary features (mean, standard deviation, number of observations, min & max values). Patient demographic variables such as age, gender, marital status and ethnicity were also factored into the modeling. Choi et al showed that contextual embedding of medical data, diagnostic and procedural codes alone can predict future diagnoses with sensitivity as high as 0.79. We utilized an embedding technique called word2vec which allowed sparse representations of medical history to be transformed into dense word vectors. The mappings captured contextual information by treating each admission as a sentence and learning the most likely neighboring words in a sliding window fashion. Binary and multi-label classification was achieved via collapse models, which do not consider temporal information, as well as recurrent neural networks with regularization, Softmax output layer activation together with categorical cross-entropy as the loss function.

US Army collaboration↗

Comparison of Artemis 2 and Artemis 5 Model Outcomes Using the Impact Probabilistic Risk Assessment Tool

BACKGROUND The Artemis campaign is a Moon exploration program with a series of six planned missions, five of which will be crewed. These five crewed missions will contain a single mission segment (space flight), or multiple mission segments involving space flight (Orion), lunar landing (LTV) and/or space habitat (Gateway). Each crewed segment faces the risk of unique medical conditions, necessitating medical sets/kits tailored to those specificities. To support and enable a data-driven and evidence-based decision-making process through out a mission’s life cycle, a software tool called IMPACT was developed. Using probabilistic risk assessment (PRA) methodologies, IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a novel tool built for analyzing the possibility of encountering complex medical risks during space flight, and for identifying the medical resources and capabilities needed to treat those potential at-risk medical conditions. This presentation will seek to compare IMPACT’s computational results upon potential complex space medical conditions (e.g., sprain/strain back or sleep disturbance) using IMPACT’s risk metrics and the associated optimized medical sets/kits between two Artemis missions: single segment Artemis 2 and multi-segmented Artemis 5. OVERVIEW By identifying potential medical conditions in space using input criteria such as crew quantity and composition, certain crew physical characteristics, mission duration and mission activities, IMPACT can produce analyses on the type of medical resources and capabilities needed to produce an optimized medical set/kit to address those medical conditions. IMPACT achieves this by performing hundreds of thousands of Monte Carlo simulations of missions to build aggregate pictures of medical risk. IMPACT’s risk metrics include loss of crew life (LOCL) – a measure of crew mortality due to medical conditions in space, return to definitive care (RTDC) – the need to perform crew evacuation, and task time lost (TTL) – a measure of the inability to perform activities due to crew disability. These risk metrics are applied to every medical condition identified by IMPACT’s computation analyses for every segment of the mission. Medical sets/kits are optimized to address these medical conditions but must fit within the stated Artemis Design Reference Mission (DRM) request for mass and volume physical size constraints. ANTICIPATED ANALYSIS AND CONCLUSION Using two Artemis missions, Artemis 2 and Artemis 5, IMPACT will provide the analyses for comparison of medical set/kit contents based upon mass and/or volume requirements and identify the at-risk medical conditions within both missions. This paper serves as an initial exploration of probabilistic risk assessment (PRA) medical risk calculations between two crewed Artemis missions and is not intended to be deemed the official medical response for the Artemis campaign.

probabilistic risk assessment↗

In-Depth Modeling and Simulation Analysis of Artemis Missions Using the Impact Probabilistic Risk Assessment Tool

BACKGROUND The Artemis campaign is a Moon exploration program with a series of six planned missions, five of which will be crewed. These five crewed missions will contain a single mission segment (space flight), or multiple mission segments involving space flight (Orion), lunar landing (LTV) and/or space habitat (Gateway). Each crewed segment faces the risk of unique medical conditions, necessitating medical sets/kits tailored to those specificities. To support and enable a data-driven and evidence-based decision-making process through out a mission’s life cycle, a software tool called IMPACT was developed. Using probabilistic risk assessment (PRA) methodologies, IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a novel tool built for analyzing the possibility of encountering complex medical risks during space flight, and for identifying the medical resources and capabilities needed to treat those potential at-risk medical conditions. IMPACT achieves this by performing hundreds of thousands of Monte Carlo simulations of missions to build aggregate pictures of medical risk. During an extended simulation modeling phase, IMPACT generated analytical results for medical risks, and the medical resources and capabilities to address those risks, for every segment of every crewed Artemis mission. This presentation will highlight the reliability, consistency and validity of IMPACT’s computational modeling techniques and will showcase the library of analytical outcomes generated for the Artemis missions. OVERVIEW During the early stages of IMPACT’s design, architecture and technical requirements collection, “scenarios” (use cases) - achievement goals required for acceptance testing, were identified by stakeholders. IMPACT successfully completed the scenario testing requirements and undertook an extensive operational run phase utilizing a wide range of input combinations with a goal of delivering a cohesive, trustworthy, reliable, vast, and diverse body of evidence. The intent of these modeling runs was to validate consistency in output, ensure solidity of executable operations and to streamline processes by identifying areas requiring efficiency improvements. Using the many missions of Artemis, IMPACT ran variations of operational runs to assess the output for acceptable, as well as unusual characteristics. This rigorous long-term “shakedown” analysis was implemented to help build a collective body of evidence to aid in securing a high level of confidence, reliability, and validity in the output, whether from the applicational components of IMPACT, or the entirety of the operational process. ANTICIPATED ANALYSIS AND CONCLUSION This presentation will discuss the various categories of input criteria; the comparisons in the application of these input criteria to various Artemis missions; the preparation and collection of the body of evidence, and reliability of the computational modeling techniques. This paper serves as an initial analytical overview of IMPACT’s probabilistic risk assessment (PRA) medical risk outputs covering Artemis missions and is not intended to be deemed the official medical response for the Artemis campaign.

Crew Composition↗

Stochastic Analysis for Long Term Capital Structures, Systems, and Components Refurbishment and Replacement

As commercial Nuclear Power Plants (NPPs) pursue extended plant operation in the form of Second License Renewal (SLR), opportunities exist for these plants to provide capital investments to ensure long-term safe and economic performance. At the current time, several utilities have announced an intention to pursue extended operation for one or more of their NPPs via SLR . The goal of this research is to develop a risk-informed approach to evaluate and prioritize plant capital investments made in preparation for, and during the period of, extended plant operations to support decisions for NPP operations. Since the capital investments are influenced by various factors, such as markets, safety and regulatory, the decision-making process of NPP operations should take into account relevant factors for balancing risks, costs and profits. The traditional method of capital budgeting is based on the priority list of candidate projects using economic measures such as benefit-investment ratio, net present value (NPV) and internal rate of return. In the literatures, the problem of capital budgeting or the variant can be represented by an appropriate knapsack problem. The knapsack approach to capital budgeting takes as input as investment, along with the cost and profit of each project. The objective of capital budgeting is to find the combination of the binary decisions for every investment such that the overall profit is as large as possible. The output is a collection of projects to be carried out, and we refer this selected collection of projects as a project portfolio. One limitation of traditional optimization models for capital budgeting is that they do not account for risk/uncertainty in profit and cost streams associated with individual projects, they do not account for risk in resource availability in future years [1,2,3]. Projects can incur cost over-runs, especially when projects are large, performed infrequently, and when there is risk regarding technical viability, external contractors, and/or suppliers of requisite parts and materials. Occasionally, projects are performed ahead of schedule and with cost savings. Planned budgets for capital improvements can be cut and key personnel may be lost. Or, there may be surprise windfalls in budgets for maintenance activities due to decreased costs for “unplanned” maintenance. In these cases, how should we resolve capital budgeting when we have risk forecasts for costs, profits and budgets? One approach we proposed in this summary is to re-solve the optimization models based on assumed statistical distributions of given parameters. If these distributions were not available, a two-stage stochastic optimization approach can be used to provide priority lists to decision-makers to support better risk-informed decisions [4, 5]. In this summary, we will only focus on the first approach.

42 ENGINEERING↗

Enhancement of risk informed validation framework for external hazard scenario

In recent years, the U.S. Nuclear Regulatory Commission (USNRC) and the International Atomic Energy Agency (IAEA) have developed methodologies to assess the vulnerabilities of nuclear plants against site specific extreme hazards. In many cases, advanced simulation tools are being considered to simulate multi-physics, multi-scale phenomena and to evaluate vulnerability of nuclear facilities. The credibility of advanced simulation tools is assessed based on a formal verification, validation, and uncertainty quantification procedure. One of the key limitations in validation is the lack of relevant experimental data at system-level. This limitation leads to a decrease in the confidence of system-level risk predictions. Therefore, a robust validation framework is needed to formalize the confidence in predictive capability of advanced simulation results. Additionally, this study enhances the existing risk informed validation methodology, originally proposed by Kwag et al. [1] and Bodda et al. [2], by developing additional attributes and a new set of validation indicies for a complete and wider applicability of the framework. In this manuscript, the methodology to identify the critical path that leads to the system-level failure is illustrated. The overall validation is checked for completeness and consistency by comparing the critical path for both the system-level simulation and experimental models. The applicability of the code for an intended application is represented in terms of various maturity levels and helps in the process of decision making.

42 ENGINEERING↗

Benefits and Critical Knowledge Gaps in Determining the Role of Floating Photovoltaics in the Energy-Water-Food Nexus

Floating solar photovoltaic (FPV) systems have become an increasingly attractive application of photovoltaics (PV) because of land-use constraints, the cost of land and site preparation, and the perceived energy and environmental co-benefits. Despite the increasing interest in FPV systems, a robust validation of their suggested co-benefits and impacts on the nexus of energy, water, and food (EWF) systems is lacking. This information gap makes it challenging for decision makers to justify its adoption—potentially suppressing FPV deployment. To address this gap and to help de-risk this PV deployment opportunity, we (1) review the suggested co-benefits of FPV systems with a focus on the impacts that could alleviate pressures on EWF systems and (2) identify areas where further research is needed to reduce uncertainty around FPV system performance. Our review reveals that EWF nexus-relevant co-benefits, such as improved panel efficiency and reduced land usage, are corroborated in the literature, whereas others, such as water quality impacts, lack empirical evidence. Our findings indicate that further research is needed to quantify the water-related and broader economic, environmental, social, sustainability, justice, and resilience co-benefits and impacts of FPV systems.

14 SOLAR ENERGY↗

Shared Problem Models and Crew Decision Making

The importance of crew decision making to aviation safety has been well established through NTSB accident analyses: Crew judgment and decision making have been cited as causes or contributing factors in over half of all accidents in commercial air transport, general aviation, and military aviation. Yet the bulk of research on decision making has not proven helpful in improving the quality of decisions in the cockpit. One reason is that traditional analytic decision models are inappropriate to the dynamic complex nature of cockpit decision making and do not accurately describe what expert human decision makers do when they make decisions. A new model of dynamic naturalistic decision making is offered that may prove more useful for training or aiding cockpit decision making. Based on analyses of crew performance in full-mission simulation and National Transportation Safety Board accident reports, features that define effective decision strategies in abnormal or emergency situations have been identified. These include accurate situation assessment (including time and risk assessment), appreciation of the complexity of the problem, sensitivity to constraints on the decision, timeliness of the response, and use of adequate information. More effective crews also manage their workload to provide themselves with time and resources to make good decisions. In brief, good decisions are appropriate to the demands of the situation and reflect the crew's metacognitive skill. Effective crew decision making and overall performance are mediated by crew communication. Communication contributes to performance because it assures that all crew members have essential information, but it also regulates and coordinates crew actions and is the medium of collective thinking in response to a problem. This presentation will examine the relation between communication that serves to build performance. Implications of these findings for crew training will be discussed.

Orasanu, Judith↗

Decision Making in Action: Applying Research to Practice

The importance of decision-making to safety in complex, dynamic environments like mission control centers, aviation, and offshore installations has been well established. NASA-ARC has a program of research dedicated to fostering safe and effective decision-making in the manned spaceflight environment: Because access to spaceflight is limited, environments with similar characteristics, including aviation and nuclear power plants, serve as analogs from which space-relevant data can be gathered and theories developed. Analyses of aviation accidents cite crew judgement and decision making as causes or contributing factors in over half of all accidents. Yet laboratory research on decision making has not proven especially helpful in improving the quality of decisions in these kinds of environments. One reason is that the traditional, analytic decision models are inappropriate to multi-dimensional, high-risk environments, and do not accurately describe what expert human decision makers do when they make decisions that have consequences. A new model of dynamic, naturalistic decision making is offered that may prove useful for improving decision making in complex, isolated, confined and high-risk environments. Based on analyses of crew performance in full-mission simulators and accident reports, features that define effective decision strategies in abnormal or emergency situations have been identified. These include accurate situation assessment (including time and risk assessment), appreciation of the complexity of the problem, sensitivity to constraints on the decision, timeliness of the response, and use of adequate information. More effective crews also manage their workload to provide themselves with time and resources to make good good decisions are appropriate to the demands of the situation. Effective crew decision making and overall performance are mediated by crew communication. Communication contributes to performance because it assures that all crew members have essential information, but it also regulates and coordinates crew actions and is the medium of collective thinking in response to a problem. This presentation will examine the relations between leadership, communication, decision making and overall crew performance. Implications of these findings for training will be discussed.

Orasanu, Judith↗

Decision Making in Action: Applying Research to Practice

The importance of decision-making to safety in complex, dynamic environments like mission control centers and offshore installations has been well established. NASA-ARC has a program of research dedicated to fostering safe and effective decision-making in the manned spaceflight environment. Because access to spaceflight is limited, environments with similar characteristics, including aviation and nuclear power plants, serve as analogs from which space-relevant data can be gathered and theories developed. Analyses of aviation accidents cite crew judgement and decision making as causes or contributing factors in over half of all accidents. A similar observation has been made in nuclear power plants. Yet laboratory research on decision making has not proven especially helpful in improving the quality of decisions in these kinds of environments. One reason is that the traditional, analytic decision models are inappropriate to multidimensional, high-risk environments, and do not accurately describe what expert human decision makers do when they make decisions that have consequences. A new model of dynamic, naturalistic decision making is offered that may prove useful for improving decision making in complex, isolated, confined and high-risk environments. Based on analyses of crew performance in full-mission simulators and accident reports, features that define effective decision strategies in abnormal or emergency situations have been identified. These include accurate situation assessment (including time and risk assessment), appreciation of the complexity of the problem, sensitivity to constraints on the decision, timeliness of the response, and use of adequate information. More effective crews also manage their workload to provide themselves with time and resources to make good decisions. In brief, good decisions are appropriate to the demands of the situation. Effective crew decision making and overall performance are mediated by crew communication. Communication contributes to performance because it assures that all crew members have essential information, but it also regulates and coordinates crew actions and is the medium of collective thinking in response to a problem. This presentation will examine the relations between leadership, communication, decision making and overall crew performance. Implications of these findings for spaceflight and training for offshore installations will be discussed.

Orasanu, Judith↗